TTVARCHITECTS, INC.
United States District Courthouse
Repair & Alterations for the U.S. District Court
Northern District of Florida Pensacola, Florida
CMC Pre-Proposal Conference Presentation06 June 2017
Agenda
• INTRODUCTION
• SCOPE OF WORK
& EXISTING CONDITIONS
• EXTERIOR & LOBBY
• FORCE PROTECTION INTEGRATION
• BUILDING ENVELOPE INTEGRATION
• HVAC INTEGRATION
Introduction
Team Organization
TTVARCHITECTS, INC.
Structural/Envelope/ Blast
Civ i l/ Landscape
HVAC/Electr ical/Plumbing/ Fi re Protect ion
LEED/Light ing Cost Est imat ing
Environmental (Mold)
Pr ime Archi tect
Lead Designer
Scope of Work & Existing Conditions
• Prospectus Number PFL-2245-PE15, Project Summary:• "The General Services Administration (GSA) proposes a repair and alteration project to remediate mold, eliminate water infiltration, replace the building façade, and undertake system and site upgrades at the Pensacola District Courthouse located at 1 North Palafox Street in Pensacola, FL (the ‘District Courthouse’).”
• Scope items listed in the Prospectus:• Façade replacement• Meet Florida hurricane requirements• Meet current blast protection standards• New standing seam metal roof system• Abate the presence of mold • Repair or replace interior finishes damaged by water intrusion• Modernize fire protection systems• Modernize heating, ventilation, and air conditioning (HVAC) system to better control interior humidity• Improvements to public restrooms• Floor drains• Wall finishes• ABAAS accessibility compliance• Repair grounds and approaches• Repave parking area• Improve site drainage
Congressional Authorization
Existing Condition- view from Palafox Street
Existing Condition- view from corner of Garden & Palafox Street
Limestone Embedded Precast Exterior
Limestone Exterior- view from corner of Garden & Palafox Street
Limestone Exterior- view from Palafox Street
Expanded Lobby
Force Pro tection Integration
Typical Window Anchorage:
Window & Precast Panel Anchorage
Typical Precast Anchorage:
TYPICAL WINDOW ANCHORAGE
TYPICAL
PRECAST
PANEL
TYPICAL
PRECAST
PANEL
SUPPORTING
PUNCHED
WINDOW
TYPICAL PANEL ANCHORAGE
Lobby Blast Protection & Hurricane Mitigation
INTERIOR LOBBY HARDENING LOBBY BLAST & HURRICANE MITIGATION
EXISTING STEEL COLUMN TO BE
CONCRETE ENCASED, TYP.
HSS12x12x5/8 BEAM
15’-0” ABOVE LEVEL
1 SLAB, TYP.
HSS12x12x5/8 POST
FROM LEVEL 1 TO
LEVEL 3, TYP.
BLAST-RESISTANT
CURTAIN WALL, TYP.
HURRICANE-RESISTANT
CURTAIN WALL, TYP.
COLUMNS & BEAMS EMBEDDED
INTO CURTAINWALL, TYP.
Building Envelope Integration & Details
Stone Laminated Precast Panels with Internal Leaders - South Elevation
LOW SLOPE ROOF WITH PROPER DRAINAGE/ SLOPE
(JUDGE'S GARAGE)
REDUNDANT EMERCENCY
EMERCENCY OVERFLOW ROOF DRAINS WITH RIGHT
SIZED CAPACITY & DRAIN OUT OF BUILDING ABOVE
GRADE, TYP.
PRIMARY ROOF DRAINS
W/ RIGHT SIZED
CAPACITY,
TYP.
UPPER STANDING SEAM METAL
ROOF WITH RIGHT SIZED
CAPACITY PERIMETER GUTTER &
DOWNSPOUTS TO 4TH LEVEL
ROOFS & GRADE CONNECTIONS,
TYP.
NOTE: COMPLETELY REMOVE
& REPLACE EXISTING
STORMWATER DRAIN SYSTEM
FROM ROOF DRAIN TO
STREET, TYP.
PRD16
LOW SLOPE ROOF AT PORTICO WITH INTERNAL
RIGHT SIZEDDRAIN SYSTEM.
COMPLETE INTERNAL ROOF
DRAIN & PIPING ASSEMBLY
- RIGHT SIZED & QUANTITY OF
DRAINS, TYP.
UPPER GUTTER &
DOWNSPOUT, TYP.
OVERFLOW SCUPPERS (RIGHT SIZED) ALONG
PARAPET @ EACH
DRAIN, TYP.
REDUNDANT EMERCENCY OVERFLOW
SCUPPERS (RIGHT SIZED) ALONG PARAPET @
EACH
DRAIN, TYP.
EMERCENCY OVERFLOW ROOF DRAINS
WITH OVERSIZED CAPACITY & DRAIN OUT
OF BUILDING ABOVE GRADE, TYP.
PRD11 PRD10
PRD9
PRD8
PRD1 PRD2 PRD3 PRD4 PRD5
PRD6 PRD7
PRD15 PRD14
PRD17
Roof Plan- Internal Roof Drains w/Concealed Gutter & Down leaders at 5th Level Roof
5TH FLOOR
PRECAST CORNICE ELEMENT
WITH CONCEALED GUTTER
SYSTEM
GUTTER DETAIL WITH CONCEALED DOWN LEADERINTERNAL LEADERS WALL SECTION
Window Head Detail Window Jamb Detail
5th Floor Window Sill and Roof Drain Detail 5th Floor Roof Assembly Detail
- MOCK-UP,WATER & AIR LEAKAGE TEST
Building Envelope System QA/QC Mock-Up& Water Testing Requirements
SS METAL ROOFING ASSEMBLY:
- WATER & AIR INFILTRATION TEST
GUTTER, DOWNSPOUT,& ROOF INTERFACE ASSEMBLY:
- MOCK-UP TO REVIEW/APPROVE
- AESTHETIC QUALITY
- TECHNICAL VERIFICATION OF WATERPROOFING COMPONENTS
- ESTABLISH QUALITY CONTROL BENCHMARK
- WATER TESTING PRIOR TO IMPLEMENTATION
- WATER TEST & FLOOD TEST AFTER INSTALLATION FOR WATERTIGHTNESS
PUNCHED WINDOW & FLASHING ASSEMBLY:
- MOCK-UP,WATER & AIR INFILTRATION TEST
PARAPET & EMERGENCY
OVERFLOW ASSEMBLY:
- MOCK-UP & WATER TEST
CURTAINWALL WINDOW & FLASHING ASSEMBLY:
-MOCK-UP,WATER & AIR INFILTRATION TEST
ALL STORMWATER PIPING/LEADERS
WATER TEST
CONTINUOUS AIR/MOISTURE BARRIER
ASSEMBLY:
ALL HORIZONTAL WATERPROOFING,
ROOF & DRAIN ASSEMBLIES:
-FLOOD TEST
Protection of Building Interior during Construction
• Exterior brick and interior wall finishes will be removed, but CMU back up wall will remain throughout construction
• Window replacement will likely be staged to occur one at a time or in small groups, so that no windows are left uncovered at the end of each work day
• Roof replacement work will be staged so that roof demolition areas are re-covered at the end of each work day
• Building HVAC systems will remain operational throughout construction, and interior humidity will be monitored
• CMc will be expected to develop a risk management plan outlining specific means and methods of protecting interior finishes from physical damage and moisture/humidity damage
• Hurricanes and pop-up thunderstorms are known risks that the CMc will be expected to manage
Mold Remediation
General Remediation Scope
• Remove and replace all finishes on interior faces of exterior walls and chases
• Remove and replace the first two feet of finishes (one side only, full height) at the intersection of interior walls that connect to an exterior wall
• If additional contamination is discovered after exploratory demolition begins, demolition will be extended to address all contaminated materials
• Remove and replace all carpet
• Remove and replace all acoustic ceilings
• Specific areas of known contamination will be addressed
• E.g., USMS locker rooms
• Millwork/casework will generally be cleaned and retained
• All HVAC distribution components will be sanitized
Site & Landscape
Site Improvements
HVAC Integration
• New single, chilled water Dedicated 100% Outside Air Unit (DOAHU) located outside the building.
• Nominal cooling capacity o f 165 tons, staged electric heating capacity o f 400 KW, and air flow delivery of 21,000 cfm.
• Ducted (internally) to existing main fresh air intake located on the 5th floor.
• Airflow measuring devices and modulating dampers placed in existing ductwork to ensure constant flow of conditioned outside air to each air handler.
• The existing chilled water air handlers will be cleaned in accordance with the NADCA St andards and reused.
HVAC (Heating, Ventilation, & Air Conditioning)
• The condensate drain pan inside theexisting air handlers will be cleaned andrust proofed t o prevent deterioration o f thedrain pan.• The existing ductwork will be fit t ed withinsulated access panels, 50 feet apart, t oallow cleaning of the interior of theductwork. The interior of all existingductwork will be cleaned.• All existing building HVAC system controllerswill be upgraded (hardware and software)• The entire building HVAC system (both airand water side) will be t ested, adjusted,balanced, and commissioned.
HVAC (Continued)
File details come from the government source that posted it. Updated .