Autec_Revovations_Supplemental_Bid_Sheet.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Interior and Exterior Alterations of the existing AUTEC Federal Building in West Palm Beach, Florida
Solicitation number
GS-04P-15-BV-C-0013
Issued by

About this file

Supplemental Bid Sheet

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT #1 SUPPLEMENTAL BID SHEET

GS-04P-15-BV-C-0013 Interior & Exterior Alterations of exisiting Autec Federal Building West Palm Beach, Florida

ItemQuanityUnitSubtotalsTotals
refer to scope of work for full work description
Division 01 - General Requirements
01 00 00 - General Requirements
01 50 00 - Temporary Facilities and Controls
01 70 00 - Execution and Closeout Requirements
Division 02 - Existing Conditions
02 40 00 - Demolition and Structure Moving
02 80 00 - Facility Remediation
Division 06 - Wood, Plastics, Composites
06 00 00 - Wood, Plastics, Composites
06 10 00 - Rough Carpentry
06 20 00 - Finish Carpentry
06 40 00 - Architectural Woodwork
Division 08 - Openings
08 10 00 - Doors and Frames
08 70 00 - Hardware
Division 09 - Finishes
09 00 00 - Finishes
09 50 00 - Ceilings
09 60 00 - Floorings
09 70 00 - Wall Finishes
09 90 00 - Painting and Coating
Division 12 - Furnishings
12 20 00 - Window Treatments
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC)
23 00 00 - Heating, Ventilating, and Air Conditioning (HVAC)
23 30 00 - HVAC Air Distribution
Division 26 - Electrical
26 00 00 - Electrical
26 50 00 - Lighting
Division 27 - Communications
27 00 00 - Communications
27 20 00 - Data Communications
27 30 00 - Voice Communications
Subtotal

Insurance ___%

Overhead ___%

Bonds ___%

Other

Total Offered Price:

Deductive Bid Options
Bid Option #1 Delete all decorative grills at new exterior curtain-wall openingsAmount:Revised Total Price___________________
Bid Option #2 Delete new acrylic resin panel assemblies and back lighting at catwalksAmount:Revised Total Price___________________
Bid Option #3 Restrooms 305 & 306, paint existing walls & non tiles surfaces, patch/repair existing surfaces & repair Existing Plumbing fixtures, in lieu of complete renovationAmount:Revised Total Price___________________
Bid Option #4 Delete pedestrian Crosswalk assembly crossing Banyon BoulevardAmount:Revised Total Price___________________

* Revised total price of Options 2,3,&4, should include deduction of the preceeding options as well*

&10Supplemental Price Schedule

Sheet2

Sheet3

File details come from the government source that posted it. Updated .