Increase GMP FBO.pdf
PDF 84 KB Posted
- Solicitation number
- GS-04P-09-EX-C-0078
About this file
Notice of Scope and GMP increase.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GSA Industry Day George C. Young.pdf | ||
| GSA Industry Day Announcement.doc | DOC document | |
| Project Team Interview Notice.doc | DOC document | |
| GS-04P-09-EX-C-0078 Amendment 7.doc | DOC document | |
| Preproposal Site Visit Attendee.pdf | ||
| GS-04P-09-EX-C-0078 Amendment 5.doc | DOC document | |
| GS-04P-09-EX-C-0078 Amendment 4.doc | DOC document | |
| GS-04P-09-EX-C-0078 Amendment 3.doc | DOC document | |
| GS-04P-09-EX-C-0078 Amendment 2.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY THEREFORE
FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO THE CONTRACTOR UNDER THE
CURRENT CONTRACT NUMBER GS-04P-09-EX-C-0078.
This modification is to increase ARRA funding on the firm, fixed-price Guaranteed Maximum Price (GMP) contract in the amount of $692,888.00. This Contract Award was posted to FBO on July 28, 2009. The
American Recovery and Reinvestment Act of 2009 was created to preserve and create jobs and promote economic recovery. The George C. Young Federal Building and Courthouse has been selected in support of this Recovery Plan.
The Modernization of the George C. Young Federal Building and Courthouse seeks to lower energy usage, improve environmental performance, increase on-site storm water management, improve indoor environmental quality, occupant health and productivity, maximize energy efficiency and cost savings while strengthening the local economy and keeping this building affordable in the long term.
In an effort to achieve these goals, the original GMP solicitation strived to anticipate and accommodate all aspects of the Modernization efforts. The award was designed to permit ongoing discussions and negotiations throughout the development of the design and specifications. Inherent in this type of contract are numerous uncertainties that do not permit costs to be estimated with sufficient accuracy.
At the time of solicitation and award, the design had not yet commenced. The award of a GMP contract, without a design in place, was anticipated to be adjusted to reflect conditions that may occur after refinement of the design. Such a living award document is necessary during the refinement of the scope of work.
It has now been determined that modifications of the existing berm will be added to the Statement of
Work. The scope is hereby increased to support the Modernization efforts and an increase in the GMP is a fundamental component of this undertaking. As such, the GMP is hereby modified in the amount of
$692,888.00.