From: <Saved by Windows Internet Explorer 8> Subject:

Date: Thu, 2 Jun 2011 12:16:34 -0400 MIME-Version: 1.0 Content-Type: text/html;

charset="Windows-1252" Content-Transfer-Encoding: 7bit Content-Location: http://www.wdol.gov/wdol/scafiles/davisbacon/PA23.dvb X-MimeOLE: Produced By Microsoft MimeOLE V6.00.2900.6090

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">

<HTML><HEAD>

<META content="text/html; charset=windows-1252" http-equiv=Content-Type> <META name=GENERATOR content="MSHTML 8.00.6001.19046"></HEAD> <BODY><PRE>General Decision Number: PA100023 05/13/2011 PA23

Superseded General Decision Number: PA20080023

State: Pennsylvania

Construction Type: Building

Counties: Columbia and Luzerne Counties in Pennsylvania.

BUILDING CONSTRUCTION PROJECTS, (does not include residential, construction consisting of single family homes and apartments up to and including 4 stories) EXCLUDING SEWAGE AND WATER

TREATMENT PLANT PROJECTS

Modification Number Publication Date 0 03/12/2010 1 04/16/2010 2 05/07/2010 3 06/04/2010 4 06/25/2010 5 07/02/2010 6 07/09/2010 7 07/16/2010 8 08/13/2010 9 09/10/2010 10 11/05/2010 11 12/03/2010 12 02/18/2011 13 04/08/2011 14 05/13/2011

ASBE0038-001 07/01/2010

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems) Carbon, Columbia, Lackawanna, Luzerne, Montour, Pike, and Wyoming Counties....................$ 32.28 15.32 Clinton, Lycoming, and Union.......................$ 34.28 15.32

BOIL0013-001 01/01/2011

Rates Fringes

BOILERMAKER......................$ 37.35 30.01

BRPA0005-031 05/01/2010

LUZERNE COUNTY

Rates Fringes

Bricklayer, Stonemason...........$ 30.91 13.56

BRPA0005-043 05/01/2010

COLUMBIA COUNTY

Rates Fringes

Bricklayer, Stonemason...........$ 29.65 13.17

BRPA0005-061 05/01/2010

LUZERNE COUNTY

Rates Fringes

Marble &amp; Tile Setter.............$ 26.42 12.66

BRPA0055-001 05/01/2009

COLUMBIA COUNTY

Rates Fringes

Marble &amp; Tile Setter.............$ 24.20 12.92

BRPA0055-002 05/01/2010

COLUMBIA COUNTY

Rates Fringes

TERRAZZO WORKER/SETTER...........$ 27.21 17.32

CARP0076-012 06/01/2010

COLUMBIA AND LUZERNE (Black Creek, Butler, Dennison, Foster, Freeland, Hazle, Hazleton. Hollenback, Nespeck, the lower part of Salem, and Sugarloaf Townships) COUNTIES

Rates Fringes

Carpenter &amp; Soft Floor Layer.....$ 25.71 12.02

* CARP0076-013 05/01/2011

COLUMBIA COUNTY, LUZERNE COUNTY TOWNSHIPS OF BLACK CREEK,

BUTLER, DENNISON, FOSTER, HAZLE, HOLLENBACK, NESCOPECK, LOWER

PART OF SALEM AND SUGARLOAF

MILLWRIGHT.......................$ 30.27 14.58

* CARP0454-001 07/01/2010

Rates Fringes

PILEDRIVERMAN....................$ 37.60 27.57

CARP0514-001 06/01/2010

LUZERNE COUNTY (Remainder)

Rates Fringes

Carpenter &amp; Soft Floor Layer.....$ 25.39 12.31

* CARP0514-008 05/01/2011

REMAINDER OF LUZERNE COUNTY

Rates Fringes

MILLWRIGHT.......................$ 30.27 14.58

ELEC0081-005 06/01/2010

LUZERNE COUNTY (Area East of a line following the Susquehanna River south to the city of Pittson, east and south on the limits of Pittson but excluding it, to U.S. Highway 11, east on 11 to Dupont Borough and Highway 215, and southeast on 215.

Also that portion of Luzerne County south and east of a line following the Thornhurst Road, southwest to State Highway 115 and southeast on 115 to the Monroe County line)

ELECTRICIAN......................$ 30.15 18.12

ELEC0163-003 06/01/2009

LUZERNE COUNTY (Remainder)

Rates Fringes

ELECTRICIAN......................$ 31.19 3%+11.67

ELEC0607-002 11/01/2009

COLUMBIA COUNTY (Except Berwick Borough)

Rates Fringes

ELECTRICIAN......................$ 27.35 16.92

ELEV0084-001 01/01/2010

Rates Fringes

ELEVATOR MECHANIC................$ 40.08 20.04

FOOTNOTES:

A. VACATION CREDIT: Employer contributes 8% basic hourly rate for 5 years or more of service as vacation pay credit, and 6% for 6 months to 5 years of service.

B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.

* ENGI0542-008 05/01/2009

LUZERNE COUNTY

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 29.34 16.87+A

GROUP 1a....................$ 31.59 17.53+A

GROUP 2.....................$ 29.06 16.78+A

GROUP 2a....................$ 31.31 17.44+A

GROUP 3.....................$ 26.65 16.07+A

GROUP 4.....................$ 25.87 15.85+A

GROUP 5.....................$ 25.38 15.70+A

GROUP 6.....................$ 24.50 15.44+A

FOOTNOTE: A. PAID HOLIDAYS: Washington 's Birthday, Good Friday, Memorial Day, Labor Day, Presidential Election Day, Veterans Day; Thanksgiving Day and Christmas Day.

***TOXIC/HAZARDOUS WASTE REMOVAL***

Add 20% to basic hourly rate for all classifications

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Machines doing hook work, any machine handling machinery, cable spinning machines, helicopters, lulltype forklift with boom attachment, concrete boom. truck, machines similar to the above including remote control equipment.

GROUP 1a: Machines doing hook work; Machines handling machinery; All types of cranes 15 ton and over factory rating; Cableways; Draglines 15 ton and over factory rating; High Rail/Burro Crane 15 ton and over factory rating; Rail Loader (Winch Boom Type) 5 ton and over factory rating; Concrete Pumps 145 feet of Boom length or less (150 yard pur, or less); Machines similar to above including remote control equipment.

GROUP 2: All types of cranes (except cranes doing hook work) backhoes, cableways, draglines, keystones, shovels, derricks, trench shovels, trenching machines, hoist with two towers, pavers 21E and over, overhead cranes, building hoists (double drum) gradalls, mucking machines in tunnels, front end loaders, tandem scrapers, pippin type backhoes, boat captains, batch plant operators concrete drills, self-contained rotary drills, fork lifts, 20ft, lift and over, scrapers, tournapulls, spreaders, bulldozers and tractors, rollers (high grade finishing), mechanic-welder, motor patrols, concrete pumps, grease truck, directionall drill machines 8" and up, skid steer, hydraulic pipe pusher 8" and up, hydro ax, environmental recycling machine and grinder type machines, lull type lifts masonry tenders, shear attached to machines, grease truck, concreate placer machine, machines similar to the above including remote control equipment.

GROUP 2a: Crawler backhoes and crawler gradalls over one cubic yard factory rating; Hydraulic backhoes over one cubic yard factory rating; Equipment 15 ton and over factory rating; Machines similar to above including remote control

GROUP 3: Conveyors, building hoist (single drum), high or low pressure boilers, well drillers, asphalt plant engineers, ditch witch type trencher, core drill operators, forklift trucks under 20ft. lift, fine grade machines, directional drill machine 7" or less, hydraulic pipe pusher 7" or less, skid-steer forklift, machines with concrete mixer attachment, machines similar to the above including remote control equipment, miscellaneous equipment operator.

GROUP 4: Welding machines, well points, compressors, pumps, heaters, farm tractors, form line graders, road finishing machines, concrete breaking machines, rollers, seaman pulverzing mixer, power boom, seeding spreader, tireman (for power equipment), grout pump 4" and up, power broom, power sweeper, seeding spreader (self-propelled) machines similar to the above including remote control equipment.

GROUP 5: Fireman

GROUP 6: Oilers and deck hands (personnel boats)

* ENGI0542-021 05/01/2011

COLUMBIA COUNTY

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 32.06 18.85

GROUP 1a....................$ 34.31 19.51

GROUP 2.....................$ 31.77 18.77

GROUP 2a....................$ 34.02 19.44

GROUP 3.....................$ 28.85 17.91

GROUP 4.....................$ 27.72 17.57

GROUP 5.....................$ 27.27 17.44

GROUP 6.....................$ 26.39 17.20

FOOTNOTE: A - PAID HOLIDAYS: Washington 's Birthday, Good Friday, Memorial Day, Labor Day, Presidential Election Day, Veterans Day; Thanksgiving Day and Christmas Day.

***TOXIC/HAZARDOUS WASTE REMOVAL***

Add 20 per cent to basic hourly rate for all classifications

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Machines doing hook work, any machine handling machinery, cable spinning machines, helicopters, lulltype forklift with boom attachment, concrete boom. truck, machines similar to the above including remote control equipment.

GROUP 1a: Machines doing hook work; Machines handling machinery; All types of cranes 15 ton and over factory rating; Cableways; Draglines 15 ton and over factory rating; High Rail/Burro Crane 15 ton and over factory rating; Rail Loader (Winch Boom Type) 15 ton and over factory rating; Concrete Pumps 145 feet of Boom length or less (150 yard pour, or less); Machines similar to avoe, including remote control equipment; Equipment in this Wage Group that does not require an oiler.

GROUP 2: All types of cranes (except cranes doing hook work) backhoes, cableways, draglines, keystones, shovels, derricks, trench shovels, trenching machines, hoist with two towers, pavers 21E and over, overhead cranes, building hoists (double drum) gradalls, mucking machines in tunnels, front end loaders, tandem scrapers, pippin type backhoes, boat captains, batch plant operators concrete drills, self-contained rotary drills, fork lifts, 20ft, lift and over, scrapers, tournapulls, spreaders, bulldozers and tractors, rollers (high grade finishing), mechanic-welder, motor patrols, concrete pumps, grease truck, directionall drill machines 8" and up, skid steer, hydraulic pipe pusher 8" and up, hydro ax, environmental recycling machine and grinder type machines, lull type lifts masonry tenders, shear attached to machines, grease truck, concreate placer machine, machines similar to the above including remote control equipment.

GROUP 2a: Crawler bachoes and crawler gradalls over one cubic yard factory rating; Hydraulic backhoes over one cubic yard factory rating; Equipment 15 ton and over factory rating; Machines similar to above, including remote control equipment; Eq;uipment in this Wage Group that does not require an oiler.

GROUP 3: Conveyors, building hoist (single drum), high or low pressure boilers, well drillers, asphalt plant engineers, ditch witch type trencher, core drill operators, forklift trucks under 20ft. lift, fine grade machines, directional drill machine 7" or less, hydraulic pipe pusher 7" or less, skid-steer forklift, machines with concrete mixer attachment, machines similar to the above including remote control equipment, miscellaneous equipment operator.

GROUP 4: Welding machines, well points, compressors, pumps, heaters, farm tractors, form line graders, road finishing machines, concrete breaking machines, rollers, seaman pulverzing mixer, power boom, seeding spreader, tireman (for power equipment), grout pump 4" and up, power broom, power sweeper, seeding spreader (self-propelled) machines similar to the above including remote control equipment.

GROUP 5: Fireman

GROUP 6: Oilers and deck hands (personnel boats).

IRON0489-001 07/01/2010

Rates Fringes

Ironworkers:.....................$ 30.82 24.80

LABO0130-007 05/01/2010

Rates Fringes

LABORER (COLUMBIA AND LUZERNE

(Hazleton Township) COUNTIES)

GROUP 1.....................$ 19.97 12.13

GROUP 2.....................$ 21.97 12.13

GROUP 3.....................$ 22.37 12.13

GROUP 4.....................$ 23.87 12.13

GROUP 5.....................$ 24.37 12.13

LABORERS CLASSIFICATIONS

GROUP 1: Cleaning, scrubbing, washing and polishing of floors, furniture and windows, stripping, dismantling, oiling and moving of concrete forms, loading, unloading and carrying of reinforced steel, handling and distribution of lumber of all other building materials, unloading, carrying, distributing and laying of pre- cast concrete slabs and planks in accordance with decisions of record, wrecking, moving and demolishing, underpinning and shoring of all structures, signal person and flag person, landscaping and nursery work, toolroom person, operators of salamanders, smudge pots, propane gas and kerosene burners and all other heating methods. Cleaning of precipitators, operating of jackhammers, busters, drills and all other pneumatic and electric hand tools, wagon drills, air and hydraulic, on or off tracks, power buggies, concrete mixers, pump and vibrators, walk-along compacting equipment, vibrating and tamping, gunniting machines (including the nozzle), operation of steam jennies, sandblasting (filling the pot, cleaning up of sand, use of nozzle), pumps 2: or under conveyors, vacuum cleaners, all types (ride or walk-along), concrete saws and cutting equipment, burning and welding torches, dynamite blasters, swing scaffolds, slings and bosun chairs. Laying of non-metallic (clay, ironstone, terra cotta, vitrified concrete and plastic) pipe and making of joints for same, walk-along lifts and similar machines, pouring and placing of all concrete and related materials, all concrete curing applications.

GROUP 2: Asbestos removal, hazardous and toxic waste removal, all work in connection with handing, control, removal, abatement, encapsulation or disposal of asbestos and/or toxic waste including the erection, moving, servicing and dismantling of all tools and equipment normally used, and final clean-up and disposal of such hazardous waste material.

GROUP 3: Mason tenders, mixing of mortar, plaster and mortar pumps, plaster tenders, caisson work, blast furnaces, coke ovens and all related work, erection and dismantling of all scaffolding, including tubular frame, manual and powered climbing scaffold, swing scaffolds, slings, bosum chairs, and all associated safety protection including barricades, nets and ropes, scaffold weather enclosures; shoring; mortar buggies;concrete pumps; walk-behind forklifts; electric welders torches,compressors, generators and the repair and maintenance of same; jackhammers, tampers; cut-off saws &amp;

other power equipment required for demolition; rotary-hammer drills, electric &amp; pneumatic hand-tools; transit, levels &amp;

lasers; tempering motar; stocking scaffolds with masonry materials including brick, block, mortar, teera cotta, architectural pre-cast concrete, natural stone, insulation &amp;

mastic, flashing, anchors &amp; ties, grount; mobile lifting platform scafforing powered by any power mode or method ;

cleaning of all masonry debris.

GROUP 4: Skid-steering loader and folklift laborers.

Operation of rough terrain forklifts, skid-steering loaders.

Laborers: (REMAINDER OF

LUZERNE COUNTY)

GROUP 1.....................$ 19.60 12.13

GROUP 2.....................$ 21.60 12.13

GROUP 3.....................$ 22.37 12.13

GROUP 4.....................$ 23.87 12.13

GROUP 5.....................$ 24.37 12.13

LABORERS CLASSIFICATIONS

GROUP 1: Cleaning, scrubbing, washing and polishing of floors, furniture and windows, stripping, dismantling, oiling and moving of concrete forms, loading, unloading and carrying of reinforced steel, handling and distribution of lumber of all other building materials, unloading, carrying, distributing and laying of pre- cast concrete slabs and planks in accordance with decisions of record, wrecking, moving and demolishing, underpinning and shoring of all structures, signal person and flag person, landscaping and nursery work, toolroom person, operators of salamanders, smudge pots, propane gas and kerosene burners and all other heating methods. Cleaning of precipitators, operating of jackhammers, busters, drills and all other pneumatic and electric hand tools, wagon drills, air and hydraulic, on or off tracks, power buggies, concrete mixers, pump and vibrators, walk- along compacting equipment, vibrating and tamping, gunniting machines (including the nozzle), operation of steam jennies, sandblasting (filling the pot, cleaning up of sand, use of nozzle), pumps 2: or under conveyors, vacuum cleaners, all types (ride or walk-along), concrete saws and cutting equipment, burning and welding torches, dynamite blasters, swing scaffolds, slings and bosun chairs. Laying of non-metallic (clay, ironstone, terra cotta, vitrified concrete and plastic) pipe and making of joints for same, walk-along lifts and similar machines, pouring and placing of all concrete and related materials, all concrete curing applications.

GROUP 2: Asbestos removal, hazardous and toxic waste removal, all work in connection with handing, control, removal, abatement, encapsulation or disposal of asbestos and/or toxic waste including the erection, moving, servicing and dismantling of all tools and equipment normally used, and final clean-up and disposal of such hazardous waste material.

GROUP 3: Mason tenders, mixing of mortar, plaster and mortar pumps, plaster tenders, caisson work, blast furnaces, coke ovens and all related work, erection and dismantling of all scaffolding, including tubular frame, manual and powered climbing scaffold, swing scaffolds, slings, bosum chairs, and all associated safety protection including barricades, nets and ropes, scaffold weather enclosures; shoring;

mortar buggies;concrete pumps; walk-behind forklifts;

electric welders torches,compressors, generators and the repair and maintenance of same; jackhammers, tampers;

cut-off saws &amp; other power equipment required for demolition; rotary-hammer drills, electric &amp; pneumatic hand-tools; transit, levels &amp; lasers; tempering motar;

stocking scaffolds with masonry materials including brick, block, mortar, teera cotta, architectural pre-cast concrete, natural stone, insulation &amp; mastic, flashing, anchors &amp; ties, grount; mobile lifting platform scafforing powered by any power mode or method ; cleaning of all masonry debris.

GROUP 4: Skid-steering loader and folklift laborers.

Operation of rough terrain forklifts, skid-steering loaders.

PAIN0021-010 05/01/2010

Rates Fringes

Painters:

Brush.......................$ 23.30 13.00 Spray.......................$ 24.30 13.00

PAIN0252-001 06/01/2008

Rates Fringes

Window Tinter....................$ 19.85 6.61

PLAS0055-001 05/01/2000

COLUMBIA COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 21.75 5.77

PLASTERER........................$ 21.75 5.77

PLAS0592-009 06/01/2010

LUZERNE COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 29.00 8.38

PLASTERER........................$ 29.86 7.60

PLUM0520-011 05/01/2010

COLUMBIA (REMAINDER OF COUNTY)

Rates Fringes

PLUMBER..........................$ 31.07 19.24

PLUM0524-007 06/01/2010

LUZERNE COUNTY, COLUMBIA (BERWICK TOWNSHIP)

Rates Fringes

PLUMBER..........................$ 38.35 16.90

ROOF0030-003 06/01/2010

LUZERNE COUNTY (North of I 80 except White Haven Township)

Rates Fringes

ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 24.00 13.96

ROOF0030-011 05/01/2009

COLUMBIA AND LUZERNE(Remainder) COUNTIES

Rates Fringes

Roofers:

Composition.................$ 30.00 22.70+A

FOOTNOTE (Composition Roofer only):

A. PAID HOLIDAY: Election Day

SFPA0669-001 04/01/2011

Rates Fringes

SPRINKLER FITTER.................$ 33.35 18.25

SHEE0044-001 05/01/2009

Rates Fringes

Sheet metal worker...............$ 28.56 17.29

SUPA2002-001 06/01/2002

Rates Fringes

Steamfitter (Including HVAC work)............................$ 24.60 10.00

* TEAM0229-001 05/01/2011

Rates Fringes

Truck drivers:

GROUP 1.....................$ 30.73 0.00

GROUP 2.....................$ 30.80 0.00

GROUP 3.....................$ 31.29 0.00

TRUCK DRIVERS CLASSIFICATIONS

GROUP 1: Flat Bed Truck (Single-Axle), Dump Trucks (Under 10 Yds Single Axle), Stake Body Trck (Single Axle), Dumpster (Single Axle)

GROUP 2: Dump Truck (Over 10 Yds), Asphalt Distributors, Transit Mix (Under 5 Yds), Transit Mix (Over 5 Yds.), Flat or Stake Body (Tandem), Fuel Truck A-Frame/Winch Trucks, Dry Batch Truck, Truck Mounted Sweeper and Vac Trucks, Buses, Dumpster (Tandem)

GROUP 3: Euclid-Type, Off Highway Equipment-Back or Double Bottom Dump Trucks (Over 20 Tons), Straddle Trucks, Pusher, Articulate Dumped Trucks, Low Boy Trailers, Semi Trailers

Water Tank, Sprinkler Trucks, Winch Trucks and Fuel Trucks shall be governed by the appropriate classification as listed above.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

</PRE></BODY></HTML>

Other files

File Type Posted
EasternIDIQSF30.pdf PDF
EasternidiqQuestions2.docx DOCX document
SF30EasternIDIQ.pdf PDF
EasternIDIQminutes.pdf PDF
EasternIDIQAmendment001.pdf PDF
PA7_dvb.mht MHT file
EasternIDIQ1442forms.pdf PDF
PA21_dvb.mht MHT file
PA29_dvb.mht MHT file
C101easternidiq.docx DOCX document
C201easternidiq.docx DOCX document
PA24_dvb.mht MHT file
revisedeastidiqbidsheet.xlsx XLSX spreadsheet
Construction IDIQ Specs_Northeastern_6-3-11.pdf PDF
C301easternidiq.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .