About this file

PA21

Text of this file

From: <Saved by Windows Internet Explorer 8> Subject:

Date: Thu, 2 Jun 2011 12:14:46 -0400 MIME-Version: 1.0 Content-Type: text/html;

charset="Windows-1252" Content-Transfer-Encoding: 7bit Content-Location: http://www.wdol.gov/wdol/scafiles/davisbacon/PA21.dvb X-MimeOLE: Produced By Microsoft MimeOLE V6.00.2900.6090

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">

<HTML><HEAD>

<META content="text/html; charset=windows-1252" http-equiv=Content-Type> <META name=GENERATOR content="MSHTML 8.00.6001.19046"></HEAD> <BODY><PRE>General Decision Number: PA100021 12/03/2010 PA21

Superseded General Decision Number: PA20080021

State: Pennsylvania

Construction Type: Building

Counties: Bradford, Sullivan, Susquehanna, Tioga and Wayne Counties in Pennsylvania.

BUILDING ERECTION AND FOUNDATION EXCAVATION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stores). EXCLUDING

SEWAGE AND WATER TREATMENT PLANT PROJECTS

Modification Number Publication Date 0 03/12/2010 1 05/07/2010 2 06/11/2010 3 06/25/2010 4 07/02/2010 5 08/06/2010 6 12/03/2010

BRPA0005-030 05/01/2010

SUSQUEHANNA AND WAYNE COUNTIES

Rates Fringes

BRICKLAYER.......................$ 30.91 13.56

BRPA0005-044 05/01/2010

SULLIVAN COUNTY

Rates Fringes

BRICKLAYER.......................$ 29.65 13.17

BRPA0005-051 05/01/2010

BRADFORD AND TIOGA COUNTIES

Rates Fringes

BRICKLAYER.......................$ 30.05 13.12

CARP0261-005 06/01/2010

SUSQUEHANNA AND WAYNE COUNTIES

Rates Fringes

CARPENTER (Including Drywall Hanging, Metal Stud, Acoustical Ceiling Installation)....................$ 26.23 11.53

CARP0514-002 06/01/2010

SULLIVAN COUNTY (Red Rock Air Force Base)

Rates Fringes

CARPENTER (Including Drywall Hanging, Metal Stud, Acoustical Ceiling Installation)....................$ 25.39 12.31

CARP0514-005 06/01/2010

BRADFORD, SULLIVAN (Except Red Rock AFB), and TIOGA COUNTIES

Rates Fringes

CARPENTER (Including Drywall Hanging, Metal Stud, Acoustical Ceiling Installation)....................$ 25.71 12.02

MILLWRIGHT.......................$ 28.91 13.94

ELEC0081-004 06/01/2010

BRADFORD (Area East of the Susquehanna River), SUSQUEHANNA, AND

WAYNE COUNTIES

Rates Fringes

ELECTRICIAN......................$ 30.15 18.12

ELEC0163-002 06/01/2009

BRADFORD (Area West of Susquehanna River), AND SULLIVAN (Eastern part) COUNTIES

ELECTRICIAN......................$ 31.19 3%+11.67

ELEC0812-010 06/01/2010

BRADFORD (Townships of Armenia and Canton), AND SULLIVAN (Western part) Counties

ELECTRICIAN......................$ 26.54 16.39

ELEC0812-012 06/01/2010

TIOGA COUNTY

Rates Fringes

ELECTRICIAN......................$ 26.54 16.39

ELEV0059-002 01/01/2010

BRADFORD, SULLIVAN, AND TIOGA COUNTIES

Rates Fringes

ELEVATOR MECHANIC................$ 38.32 20.04

FOOTNOTES:

A. PAID VACATION: 8% of basic hourly rate for 5 years or more of service, and 6% for 6 months to 5 years of service.

B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.

ELEV0084-004 01/01/2010

SUSQUEHANNA AND WAYNE COUNTIES

Rates Fringes

ELEVATOR MECHANIC................$ 40.08 20.04

FOOTNOTES:

A. VACATION CREDIT: Employer contributes 8% basic hourly rate for 5 years or more of service as vacation pay credit, and 6% for 6 months to 5 years of service.

B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day;

Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.

* IRON0489-004 07/01/2010

Rates Fringes

Ironworkers:.....................$ 30.82 24.80

LABO0130-002 05/01/2010

LACKAWANNA, WAYNE, SUSQUEHANNA, AND WYOMING (Northern part)

COUNTIES

Laborers:

Brick Mason Tender..........$ 22.72 12.13 Unskilled...................$ 19.95 12.13

LABO0130-005 05/01/2010

Rates Fringes

LABORER (COUNTY OF LUZERNE:

NORTHERN PART)

GROUP 1.....................$ 19.60 12.13

GROUP 2.....................$ 21.60 12.13

GROUP 3.....................$ 22.37 12.13

GROUP 4.....................$ 23.87 12.13

GROUP 5.....................$ 24.37 12.13

Laborers: (COLUMBIA AND LUZERNE Southern part (Hazleton Township) COUNTIES)

GROUP 1.....................$ 19.97 12.13

GROUP 2.....................$ 21.97 12.13

GROUP 3.....................$ 22.37 12.13

GROUP 4.....................$ 23.87 12.13

GROUP 5.....................$ 24.37 12.13

LABORERS CLASSIFICATIONS

GROUP 1: Cleaning, scrubbing, washing and polishing of floors, furniture and windows, stripping, dismantling, oiling and moving of concrete forms, loading, unloading and carrying of reinforced steel, handling and distribution of lumber of all other building materials, unloading, carrying, distributing and laying of pre- cast concrete slabs and planks in accordance with decisions of record, wrecking, moving and demolishing, underpinning and shoring of all structures, signal person and flag person, landscaping and nursery work, toolroom person, operators of salamanders, smudge pots, propane gas and kerosene burners and all other heating methods. Cleaning of precipitators, operating of jackhammers, busters, drills and all other pneumatic and electric hand tools, wagon drills, air and hydraulic, on or off tracks, power buggies, concrete mixers, pump and vibrators, walk- along compacting equipment, vibrating and tamping, gunniting machines (including the nozzle), operation of steam jennies, sandblasting (filling the pot, cleaning up of sand, use of nozzle), pumps 2: or under conveyors, vacuum cleaners, all types (ride or walk-along), concrete saws and cutting equipment, burning and welding torches, dynamite blasters, swing scaffolds, slings and bosun chairs. Laying of non-metallic (clay, ironstone, terra cotta, vitrified concrete and plastic) pipe and making of joints for same, walk-along lifts and similar machines, pouring and placing of all concrete and related materials, all concrete curing applications.

GROUP 2: Asbestos removal, hazardous and toxic waste removal, all work in connection with handing, control, removal, abatement, encapsulation or disposal of asbestos and/or toxic waste including the erection, moving, servicing and dismantling of all tools and equipment normally used, and final clean-up and disposal of such hazardous waste material.

GROUP 3: Mason tenders, mixing of mortar, plaster and mortar pumps, plaster tenders, caisson work, blast furnaces, coke ovens and all related work, erection and dismantling of all scaffolding, including tubular frame, manual and powered climbing scaffold, swing scaffolds, slings, bosum chairs, and all associated safety protection including barricades, nets and ropes, scaffold weather enclosures; shoring;

mortar buggies;concrete pumps; walk-behind forklifts;

electric welders torches,compressors, generators and the repair and maintenance of same; jackhammers, tampers;

cut-off saws &amp; other power equipment required for demolition; rotary-hammer drills, electric &amp; pneumatic hand-tools; transit, levels &amp; lasers; tempering motar;

stocking scaffolds with masonry materials including brick, block, mortar, teera cotta, architectural pre-cast concrete, natural stone, insulation &amp; mastic, flashing, anchors &amp; ties, grount; mobile lifting platform scafforing powered by any power mode or method ; cleaning of all masonry debris.

GROUP 4: Skid-steering loader and folklift laborers.

Operation of rough terrain forklifts, skid-steering loaders.

LABORERS CLASSIFICATIONS

GROUP 1: Cleaning, scrubbing, washing and polishing of floors, furniture and windows, stripping, dismantling, oiling and moving of concrete forms, loading, unloading and carrying of reinforced steel, handling and distribution of lumber of all other building materials, unloading, carrying, distributing and laying of pre- cast concrete slabs and planks in accordance with decisions of record, wrecking, moving and demolishing, underpinning and shoring of all structures, signal person and flag person, landscaping and nursery work, toolroom person, operators of salamanders, smudge pots, propane gas and kerosene burners and all other heating methods. Cleaning of precipitators, operating of jackhammers, busters, drills and all other pneumatic and electric hand tools, wagon drills, air and hydraulic, on or off tracks, power buggies, concrete mixers, pump and vibrators, walk- along compacting equipment, vibrating and tamping, gunniting machines (including the nozzle), operation of steam jennies, sandblasting (filling the pot, cleaning up of sand, use of nozzle), pumps 2: or under conveyors, vacuum cleaners, all types (ride or walk-along), concrete saws and cutting equipment, burning and welding torches, dynamite blasters, swing scaffolds, slings and bosun chairs. Laying of non-metallic (clay, ironstone, terra cotta, vitrified concrete and plastic) pipe and making of joints for same, walk-along lifts and similar machines, pouring and placing of all concrete and related materials, all concrete curing applications.

GROUP 2: Asbestos removal, hazardous and toxic waste removal, all work in connection with handing, control, removal, abatement, encapsulation or disposal of asbestos and/or toxic waste including the erection, moving, servicing and dismantling of all tools and equipment normally used, and final clean-up and disposal of such hazardous waste material.

GROUP 3: Mason tenders, mixing of mortar, plaster and mortar pumps, plaster tenders, caisson work, blast furnaces, coke ovens and all related work, erection and dismantling of all scaffolding, including tubular frame, manual and powered climbing scaffold, swing scaffolds, slings, bosum chairs, and all associated safety protection including barricades, nets and ropes, scaffold weather enclosures; shoring; mortar buggies;concrete pumps; walk-behind forklifts; electric welders torches,compressors, generators and the repair and maintenance of same; jackhammers, tampers; cut-off saws &amp; other power equipment required for demolition; rotary-hammer drills, electric &amp; pneumatic hand-tools; transit, levels &amp; lasers;

tempering motar; stocking scaffolds with masonry materials including brick, block, mortar, teera cotta, architectural pre-cast concrete, natural stone, insulation &amp; mastic, flashing, anchors &amp; ties, grount; mobile lifting platform scafforing powered by any power mode or method ; cleaning of all masonry debris.

GROUP 4: Skid-steering loader and folklift laborers.

Operation of rough terrain forklifts, skid-steering loaders.

LABO1180-009 05/01/2010

BRADFORD AND TIOGA COUNTIES

Rates Fringes

Laborers:

Brick Manson Tender.........$ 23.26 8.68 Unskilled...................$ 19.67 8.68

PAIN0021-011 05/01/2010

Rates Fringes

Painters:

Brush, Roller...............$ 23.30 13.00 Spray.......................$ 24.30 13.00

PLAS0592-016 06/01/2010

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 29.00 8.38

PLUM0520-009 05/01/2010

BRADFORD (Western half), SULLIVAN, AND TIOGA COUNTIES

Rates Fringes

Plumbers and Pipefitters (Including HVAC Pipe Work).......$ 31.07 19.24

PLUM0524-005 06/01/2010

BRADFORD (Eastern half), SUSQUEHANNA, AND WAYNE COUNTIES

Rates Fringes

Plumbers and Pipefitters (Including HVAC Pipe Work).......$ 38.35 16.90

SHEE0044-007 05/01/2009

Rates Fringes

Sheet metal worker (Including HVAC Duct Work).................$ 28.56 17.29

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

</PRE></BODY></HTML>

Other files

File Type Posted
EasternIDIQSF30.pdf PDF
EasternidiqQuestions2.docx DOCX document
SF30EasternIDIQ.pdf PDF
EasternIDIQminutes.pdf PDF
EasternIDIQAmendment001.pdf PDF
PA23_dvb.mht MHT file
PA7_dvb.mht MHT file
EasternIDIQ1442forms.pdf PDF
PA29_dvb.mht MHT file
C101easternidiq.docx DOCX document
C201easternidiq.docx DOCX document
PA24_dvb.mht MHT file
revisedeastidiqbidsheet.xlsx XLSX spreadsheet
Construction IDIQ Specs_Northeastern_6-3-11.pdf PDF
C301easternidiq.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .