SF30_0003-_RFI_No._1.pdf
PDF 320 KB Posted
- Solicitation number
- GS-02-P-15-DT-C-7002
About this file
GSA Response to Questions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Proposal_Conference_Q As.pdf | ||
| SF1442-14a_(Page_2).pdf | ||
| SF30_0006-_Pre-Proposal_Conference.pdf | ||
| SF30_0005.pdf | ||
| SF30-_0002.pdf | ||
| SF30_0001.pdf | ||
| Pre-Solicitation_Conference_Attendance_Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
GSA, Public Buildings Service, Northeast & Caribbean Region Acquisition Management Division, Operations Branch C Degetau Federal Building and Nazario U.S. Courthouse Hato Rey, Puerto Rico 00918
GS-02-P-15-DT-C-7002
1 2
08/19/2015
08/05/2015
See attached continuation page.
STANDARD FORM 30 CONTINUATION SHEET
No. Question GSA Response
Block 13 of the SF 1442 states we should submit offers in original and 1 copy; however, Paragraph II.B says to submit two CDs (one for the Technical Proposal and one for the Price Proposal). Can you please clarify the submission requirements?
Two sets of CDs for the Technical Proposal and two sets of CDs for the Price Proposal.
Would it be acceptable to include the bid guarantee (Standard Form 24) in the Price Proposal?
Yes.
Would it be acceptable to include Representations and Certifications in the Price Proposal?
Yes.
Would it be acceptable to include GSA Form 527 – Contractor’s Qualification and Financial Information in the Price Proposal?
Yes.
Page 8 of 23 of the RFP states that each project narrative shall be no more than one 8 ½” x 11” page, one sided, single spaced, with a minimum 11 point Times New Roman font. Given the amount of information required in the project narrative, would the GSA consider increasing the page count for each project? The one-page limit will be nearly impossible to meet, given the additional requirement to provide two photographs for each project.
GSA will allow a maximum of two-single sided pages.
Page 8 of 23 of the RFP states that each project narrative shall be no more than one 8 ½” x 11” page, one sided, single spaced, with a minimum 11 point Times New Roman font. Please confirm that the project narrative is a separate requirement from Attachment 2 – Project Fact Sheet? For example, project #1 will have a one-page narrative AND a completed Attachment 2 – Project Fact Sheet.
Yes. These are separate.
Request for Information
Solicitation No. GS-02-P-15-DT-C-7002 General Contractor for Construction Services for the High Performance Green Building Follow-On Project at the Nazario U.S.
The purpose of this amendment is to respond to Request for Information (RFI), Questions and/or Clarifications.
Attachment 3 - Key Personnel Resume (sample) was issued with the original RFP files; however, not mentioned anywhere in the solicitation. Are we required to use this form in response to Sub-Factor 2:
Qualifications of Key Personnel or should we respond to the information required ( qualifications, professional designation, experience, education, skills and professional background information (resumes must list the key personnel’s roles/responsibilities for the projects listed) on Page 2 of 23 of the solicitation.
The resume was a sample only. Other formats can be used as long as it is clear that the individual meets the qualification criteria.
Page 2 of 23 of the solicitation says Key Personnel include: 1) Project Manager; 2) Construction Superintendent; 3) Mechanical Superintendent and 4) Move Coordinator. However, Attachment 3 - Key Personnel Resume (sample) is only required for: 1) Project Manager and 2) Construction Superintendent.
Can you please clarify which positions are considered key personnel, requiring resumes?
The key personnel are as listed in the solicitation: 1) Project Manager; 2) Construction Superintendent; 3) Mechanical Superintendent and 4) Move Coordinator.
Page 11 of 23 of the solicitation limits Sub-Factor 3:
Project Execution and QC Plan to five single-sided pages. Given the amount of information required in this Sub-Factor, would the GSA consider eliminating the organizational chart from the page count?
GSA will allow a maximum of six single- sided pages.
Attachment 1 - Past Performance for Prime Contractor Reference Check was issued with the solicitation;
however, I didn't see it referenced in the solicitation requirements. Are we supposed to submit this form with our proposal?
Attachment 1- Past Perfromance for Prme Contractor Refrence Check is referenced in the soliciation document under Evaluation Factor 2. Yes, this form is to be submitted with the technical proposal.
File details come from the government source that posted it. Updated .