Pre-Proposal_Conference_Q As.pdf
PDF 7 KB Posted
- Solicitation number
- GS-02-P-15-DT-C-7002
About this file
Pre-Proposal Conference Q As (Non-RFI)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF1442-14a_(Page_2).pdf | ||
| SF30_0006-_Pre-Proposal_Conference.pdf | ||
| SF30_0005.pdf | ||
| SF30_0003-_RFI_No._1.pdf | ||
| SF30-_0002.pdf | ||
| SF30_0001.pdf | ||
| Pre-Solicitation_Conference_Attendance_Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. Question/ Statement Response 1 Will there be an Engineer on-site? Yes. A local engineer and Construction Manager.
Who is the current Mechanical Maintenance Contractor?
Brooks Range Contract Services, Inc.
The solicitation states the contractor is to commence performance within 1- day of Notice to Proceed issuance?
Correct.
What if we have an existing clearance from another Federal Government project?
If the clearance is a HSPD-12, it may be found acceptable, it would need to be verified.
5 How much does the security clearance/ ID Card cost? There is no cost to the Contractor.
6 Does the Municipal Tax apply? Yes.
7 Does the Davis - Bacon Act apply? Yes, it applies to ARRA-funded projects.
8 Does the Executive Order 13658 apply? No.
9 How can we arrange a site visit?
Site visits should be requested through the CO. Participation is limited to 4- individuals per firm. Each firm will have approximately 1-hour.
10 Can we take pictures at the site visit? Yes. [Above ceiling only]
11 What about warranty?
Warranty applies to both equipment and installation. Trane Equipment and all other equipment indicated in specs.
Are we responsible for picking up the existing equipment.
Yes. It's located in Carolina, PR.
13 What is the Period of Performance? 27 Months Total.
14 Where can we find the list of existing equipment? Solicitation package, Schedule/ Summary.
15 Is there an onsite office for the CM? Yes.
16 When is award expected? Anticipated for the beginning of November [2015].
Pre-Proposal Conference Q&As (Non-RFI) General Contractor for Construction Services for the High Performance Green Building Follow-On Project at the Nazario U.S.
Courthouse, Hato Rey, Puerto Rico
Solicitation No. GS-02-P-15-DT-C-7002
File details come from the government source that posted it. Updated .