AMENDMENT NUMBER 0001
U.S. PROBATION SPACE ALTERATIONS, 1
ST
, 2
ND
FLOORS – RNY 00367
JAMES M. HANLEY FEDERAL BUILDING, SYRACUSE, NEW YORK
SOLICITATION NUMBER GS-02P-11-PWC0019
DATE: MAY 9, 2011
PART A: CHANGES TO CONTRACT DOCUMENTS, SPECIFICATIONS, AND
DRAWINGS.
The IFB is amended as indicated herein. This Amendment 0001 is divided into parts, A and B. Part A provides the changes to the terms of the IFB.
BID OPENING IS EXTENDED TO MAY 12, 2011, AT 3 PM EST.
WAGE DECISION NY100017 UPDATED 05/06/2011/.
PART B: QUESTIONS AND ANSWERS FROM POTENTIAL BIDDERS
Part B provides the questions submitted by prospective bidders, and the Government's response. Part B does not change the terms of the IFB.
PART A
CHANGES TO DRAWINGS:
A. Drawing A-100 is changed as follows:
1. Revise “DRAWING KEYED NOTE 4” so it reads: REMOVE CERAMIC TILE
FLOOR, +/- 3” CEMENTITOUS MUDSET SUBSTRATE TO EXISTING
SOLID CONCRETE FLOORING, AND THE CERAMIC TILE COVERED 8’-
0” HIGH METAL STUDS PARTITION WALLS.
2. Refer to FIRST FLOOR – SELECTIVE DEMOLITION NOTES: Add
SELECTIVE DEMOLITION NOTE 8 which reads: “THE GSA HAD
REMOVED THE BOTTOM 2’ TO 4’ OF CERAMIC COVERED DRYWALL
SURFACES FROM MANY OF THE WALL SURFACES THAT ARE
LOCATED AT THE EXISTING MEN’S ROOM AND EXISTING WOMEN’S
ROOM. THE GSA HAD REMOVED THE CERAMIC COVERED DRYWALL
SURFACES BECAUSE THE DRYWALL IN MEN’S ROOM AND WOMEN’S
ROOM WAS CONTAMINATED WITH MOLD.
B. Drawing A-108 is changed as follows:
1. Refer to the “Type C” door shown on Detail 3/A108 and 14/A108: Revise note next to the Type C door which reads “ETCHED SEAL” to read “SEAL”. Add note: Color seal furnished by the GSA shall be laminated between two layers of glass by glazing manufacturer. The Contractor will submit the shop drawing of door 100B (door type C) showing exact location of seal and description of procedures that will be used to the Owner for approval.
C. Drawing P01 is changed as follows:
1. Add DRAWING NOTE 3 which reads:
3. ALL PLUMBING FIXTURES AT THE EXISTING FIRST FLOOR MEN’S
ROOM AND THE EXISTING FIRST FLOOR WOMEN’S ROOM HAD
BEEN REMOVED FROM THE CHAIR CARRIERS AND PLACED ON
THE BATHROOM FLOORS. THE CONTRACTOR SHALL DISPOSE OF
ALL PLUMBING FIXTURES THAT ARE LOCATED IN THE EXISTING
FIRST FLOOR MEN’S ROOM AND EXISTING FIRST FLOOR
WOMEN’S ROOM.
CHANGES TO SPECIFICATIONS:
A. The “INDEX OF SPECIFICATIONS” is changed as follows:
1. Add Specification Section 102113 TOILET COMPARTMENTS to “INDEX OF
SPECIFICATIONS.
B. Specification Section 088000 GLAZING is changed as follows:
1. Add specification paragraph 088000-2.1.A.5 which reads:
5. Laminated glazing will be provided in the Type B and Type C doors shown on detail 3/A108.
C. Specification Section 093000 TILING is changed as follows:
1. Add specification paragraph 093000-3.2.C which reads:
C. The Contractor shall install a +/-3” deep lightweight concrete topping on the existing concrete floor slab at the area shown on drawing A100 that is referenced by KEYED DRAWING NOTE 4. The top of the new lightweight concrete topping shall be installed at a height that allows the top of the new flooring systems to be installed at the same elevation.
D. Specification Section 102113 TOILET COMPARTMENTS is added to the contract documents.
E. Specification Section 211313 WET PIPE SPRINKLER SYSTEMS is changed as follows:
1. Delete specification paragraph 211313-2.7.B.3.b which reads “Provide full coverage of upright heads in the work area to light hazard density.”
PART B
QUESTIONS AND ANSWERS:
Question 1: Please confirm that the glass required in the doors, indicated as Glass Type
“A” on Architectural Drawing A108 shall consist of what is indicated as “Laminated
Glass” in specification paragraph 088000-2.1.A.
Answer 1: The Glass Type “A” shown on Architectural Drawing A108 is “Laminated
Glass” and the laminated glass specification is referenced by specification paragraph
088000-2.1.A. Specification paragraph 088000-2.1.A.5 is being added to the contract documents to clarify the Glass Type “A” requirements.
Question 2: Please indicate the type of etching required (acid etching or sandblasted) for the glass in Door 100B.
Answer 2: The contract drawing is amended to clarify the “seal requirements”.
Question 3: Transfer ducts all appear to be lined duct. Schedule calls for Industrial
Acoustic Company # Type C quiet vent silencers for TD-A,B,C and D by 48” long. If
TD’s are in fact just ductwork. Does each Transfer need to be 48” long? Or as shown on the drawings, which is plus/minus two feet?
Answer 3: The salient characteristics for the Sound Attenuators – TD-A, TD-B, TD-C, TD-D are described in the SOUND ATTENUATOR SCHEDULE listed on drawing
M01. The GSA will approve Sound Attenuators from other manufacturers that are not the basis of design if the sound attenuator submittal demonstrates that the salient characteristics are met. If the proposed sound attenuators for TD-A, TD-B, TD-C and
TD-D comply with all salient characteristics except length, the GSA will approve sound attenuators that have small length variations if the Engineer determines that the mechanical and electrical equipment layouts shown on the drawings are not affected the length variations of the sound attenuators. Note 2 on the SOUND ATTENUATOR
SCHEDULE indicates that TD-E and TD-F shall be constructed of 22 gage sheetmetal with 1” lining in accordance with requirements outlined by detail 1/M51.
Question 4: Existing floor tile is installed over a 3” mud set. Existing walls were framed on concrete floor. Removal of tile can cause extensive damage to mud set and there will be 4” +/- gap at existing wall framing. Are we to remove and reinstall new mud set or try and repair existing.?
Answer 4: Drawing Keyed Note 4 shown on drawing A100 will be revised under this amendment to require the Contractor to remove the +/- 3” cementitious substrate that is located beneath the ceramic tile floors that is specified to be removed.
Question 5: Armstrong does not make a Lino (linoleum) tile, they only produce sheet goods, Please advise if Forbo will be acceptable as equal for the tile?
Answer 5: Specification paragraph 096516-2.1.A.1 LINEOLEUM FLOORING indicates that “Forbo Flooring: Marmoleum” and “Armstrong Work Industries, Inc:
Marmorette” are acceptable linoleum flooring materials. The following web address provides additional information about the Armstrong “Marmorette” linoleum flooring -http://www.armstrong.com/commflooringna/products?Ntt=marmorette.
Question 6: The bid documents ask for two (2) colors of carpet; however they do not list the colors A and B. Please advise the intent here.
Answer 6: The Room Finish Schedule shown on drawing A108 indicates that CARPET
TYPE A – CARPET TILE and CARPET TYPE B – BROADLOAM CARPET will be furnished with Color 3A and Color 3B. Color 3A is the same color for both the CARPET
TILE and for the BROADLOAM CARPET. Similarly, Color 3B is to be the same color for both the CARPET TILE and for the BROADLOAM CARPET. The carpet tile, color and pattern specification is referenced by specification paragraph 096816-2.2.B.15 which reads: “Pattern and Color: Provide of match Posso, two custom colors, by Bentley Prince
Street.” The carpet and pattern specification for the broadloom carpet is referenced by specification paragraph 096816-2.3.15 which reads “Pattern and Color: Provide or match
Posso, two custom colors, by Bentley Prince Street.” The Contractor may submit carpets from a carpet manufacturer that is different than Bentley Prince Street but the Contractor must submit a carpet pattern that is similar to “Posso” and which has a wide variety of premium colors that are the same for both the carpet tile and the broadloom carpet. The contract document do not specifically identify the carpet colors but the contract documents allow the GSA to select colors from the wide variety of carpet colors that are specified by Bentley Prince Street for the “Posso” pattern. The U.S. Probation Office had advised the GSA that they intend to select a carpet that predominantly has blue tones.
Question 7: Toilet partitions are shown but not specified. Who is furnishing and installing these items?
Answer 7: The contract drawings require the Contractor to provide toilet partitions but
Specification Section 102113 – TOILET PARTITIONS is added to the contract by this amendment to clarify this material and construction requirements for this toilet partitions.
Question 8: The wet pipe sprinkler systems specification 211313-7 section 2.7 sprinklers, B-3b states “Fire safety during construction shall comply with the requirements of the international building code (IBC). International fire code (IFC) and national fire protection association (NFPA) 241 and shall include but not be limited to:
http://www.armstrong.com/commflooringna/products?Ntt=marmorette
b. Provide full coverage of upright heads in the work area to be light hazard density.
The FP demo drawings show the sprinkler system being removed from service within the work are and heat detectors being installed as interim life safety measures. Can we assume that upright heads will not be needed if the heat detectors are not installed?
Answer 8: The Contractor does not need to provide a temporary sprinkler system in the work site if the INTERIM LIFE SAFETY MEASURES described on the fire protection drawings are provided. Specification paragraph 211 313-2.7.B.3.b which requires the
Contractor to provide a temporary sprinkler system will be deleted by this amendment.
The Contractor is still required by drawing FD11 to maintain fire protection in the first floor SECURITY OFFICE during the entire construction period.
ATTACHMENTS:
1. Specification Section 102113 – TOILET PARTITIONS.
---END---