KH AMENDMENT 1 TOILET COMP SECT 102113.pdf
PDF 55 KB Posted
- Solicitation number
- GS02P11PWC0019
About this file
SECTION 102113 TOILET COMPARTMENTS
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. PROBATION SPACE ALTERATION, 1
ST
, 2
ND
FLOORS RNY00367
JAMES M. HANLEY COURTHOUSE & FEDERAL BUILDING PB REGION 2
PROPERTY OF THE UNITED STATES GOVERNMENT
FOR OFFICIAL USE ONLY
Do Not Remove this Notice TOILET COMPARTMENTS Properly destroy documents when no longer needed 102113-1
SECTION 102113 - TOILET COMPARTMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and General Provisions of Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This section includes toilet compartments.
B. Type of toilet compartments: Metal, Powder Coated Baked Enamel.
C. Construction style of toilet compartments: Ceiling Hung.
D. Supports for attaching compartments to overhead structural systems are specified in a Division 5 Section 055000.
F. Related Sections include the following:
1. Division 06 Section "Rough Carpentry" for blocking and wall support of floor-and wall anchored units.
2. Division 09 Section “Gypsum Board” for overhead support of ceiling-anchored compartments and for supports and reinforcing for attaching units to walls.
3. Division 09 Section “Tiling” for floor and wall ceramic tiles.
4. Division 10 "Toilet and Kitchen Accessories" for toilet tissue dispensers, grab bars, and similar accessories.
1.3 SUBMITTALS
A. Product Data: For each type and style of toilet compartment and screen specified. Include details of construction relative to materials, fabrication, and installation. Include details of anchors, hardware, and fastenings.
B. Shop Drawings: For fabrication and installation of toilet compartment assemblies. Include plans, elevations, sections, details, and attachments to other work.
C. Samples for Initial Selection: Manufacturer's color charts consisting of sections of actual units showing the full range of colors, textures, and patterns available for each type of compartment indicated.
D. Samples for Verification: Of each compartment color and finish required, prepared on 6-inch-square samples of same thickness and material indicated for Work.
1.4 QUALITY ASSURANCE
, 2
ND
Do Not Remove this Notice TOILET COMPARTMENTS Properly destroy documents when no longer needed 102113-2
A. Environmentally safe and Recycled Materials: Provide toilet partitions complying with the U.S.
Environmental Protection Agency’s Comprehensive Procurement Guidelines for use of environmentally safe and recycled materials.
B. Comply with requirements in GSA's CID-A-A-60003, "Partitions, Toilets, Complete”.
C. Surface-Burning Characteristics: As determined by testing identical products according to ASTM E 84, or another standard acceptable to authorities having jurisdiction, by a qualified testing agency. Identify products with appropriate markings of applicable testing agency
1. Flame-Spread Index: 75 or less.
2. Smoke-Developed Index: 450 or less.
D. Regulatory Requirements: Comply with applicable provisions in the U.S. Architectural &
Transportation Barriers Compliance Board's "Americans with Disabilities Act (ADA) and Architectural Barriers Act (ABA) Accessibility Guidelines for Buildings and Facilities" for toilet compartments designated as accessible.
E. Coordination: Furnish inserts and anchorages that must be built into other work for installation of toilet compartments and related items.
1.5 PROJECT CONDITIONS
A. Field Measurements: Verify dimensions in areas of installation by field measurements before fabrication and indicate measurements on Shop Drawings. Coordinate fabrication schedule with construction progress to avoid delaying the Work.
1. Established Dimensions: Where field measurements cannot be made without delaying the Work, establish dimensions and proceed with fabricating units without field measurements. Coordinate supports, adjacent construction, and fixture locations to ensure actual dimensions correspond to established dimensions.
PART 2 –PRODUCTS
2.1 MANUFACTURERS:
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Ampco Southwest.
2. Mills Toilet Partitions/Bradley corporation.
3. Accurate Partitions Corporation.
4. Hadrian Manufacturing, Inc.
5. General Partitions Mfg. Corp.
6. Global Steel Products Corp.
2.2 MATERIALS
, 2
ND
Do Not Remove this Notice TOILET COMPARTMENTS Properly destroy documents when no longer needed 102113-3
A. General: Provide material that have been selected for surface flatness and smoothness. Exposed surfaces that exhibit pitting, seam marks, roller marks, stains, discoloration, telegraphing of core, or other imperfections on finished units are not acceptable.
B. Toilet compartments:
1. Metal, Powder Coated Baked Enamel:
a. Galvanized-bonderized steel sheets for Powder Coated Baked Enamel shall meet ASTM A-591, Class C. Minimum thickness shall be:
1. Stiles (Overhead Braced): 20 gage
2. Stiles (Unbraced): 18 gage
3. Doors, Panels and Screens: 22 gage
b. Core material for Metal Compartments shall be sound-deadening resin impregnated honeycomb kraft paper. Provide finished thickness 1" for doors, panels, and screens and 1-1/4" for stiles.
C. Toilet enclosure style: Ceiling-hung.
D. Stile Caps: Shall be 20 gage ASTM A-167, Type 304 stainless steel, not less than 3" high, Number 4 Satin (brushed) finish.
F. Brackets: Ampco's standard design for attaching panels to walls, stiles to walls, and panels to stiles of the following material:
1. Powder Coated Baked Enamel shall be cast chrome plated non-ferrous hardware.
G. Anchorages and Fasteners: Standard chromium-plated exposed fasteners are finished to match hardware with theft-resistant type heads (one-way). All concealed steel fasteners shall have a zinc-plated, rust-resistant, protective coating. All fasteners shall be pre-packed, marked and labeled for ease of identification.
H. Color and Pattern: Contractor shall provide or match color 0412 Warm Gray (by Mills/Bradley
Corporation) for an approval by the Architect.
2.3 FABRICATION
A. General: Furnish standard doors, panels and stiles fabricated for compartment system. Furnish units with cutouts and drilled holes to receive compartment hardware as indicated.
B. Door Dimensions: Unless otherwise indicated, furnish 24" wide in-swing doors for ordinary toilet compartments and minimum 32" wide (clear opening) out-swing doors for compartments that meet the requirements of the ADA-ABAAG.
C. Restroom Compartments:
1. Metal, Powder Coated Baked Enamel: One-piece face sheets shall be bonded to core material. Edges shall have a continuous rolled- formed interlocking strip. Corners shall be welded and ground smooth. Mechanical corner fastenings will not be acceptable.
D. Construction Type of Restroom Compartments:
, 2
ND
Do Not Remove this Notice TOILET COMPARTMENTS Properly destroy documents when no longer needed 102113-4
1. Ceiling Hung: Furnish galvanized steel anchorage devices complete with threaded rods, lock washers, and leveling adjustment nuts at stile connection for structural support above finished ceiling. Provide structure and devices that are designed to support stiles from structure without transmitting load to finished ceiling. Provide shoe at each stile to conceal anchorages.
E. Hardware: Furnish hardware to comply with ANSI A117.1 and Title III of the ADA-ABAAG as follows:
a. Hinges: Supply gravity-acting cam allowing all doors to be set at various positions.
b. Latch and Keeper: Cast chrome plated non-ferrous slide latch and combination stop with emergency release.
c. Coat Hook: Cast chrome plated non-ferrous coat hook (O/S) and/or combination coat hook and bumper (I/S).
d. Door Pull: Cast chrome plated non-ferrous metal.
PART 3 -EXECUTION
3.1 INSTALLATION
A. General: Comply with manufacturer's recommended procedures and installation sequence. Install compartment units rigid, straight, plumb and level. Provide clearance of not more than 1/2" between stiles and panels and not more than 1" between panels and walls. Secure panels to walls with not less than two brackets attached near top and bottom of panel. Locate wall brackets so that holes for wall anchorages occur in masonry or tile joints. Secure panels to stiles with not less than two brackets located to align with brackets at wall. Secure panels in position with manufacturer's recommended anchoring devices.
B. Ceiling Hung Compartments: Provide supporting structure above finished ceiling. Secure stiles to supporting structure and level, plumb and tighten installation with devices furnished. Hang doors and adjust so door bottoms are level with bottoms of stiles when doors are in closed position.
3.2 ADJUST AND CLEAN
A. Hardware Adjustment: Adjust and lubricate hardware for proper operation. Set hinges on in-swing doors to hold open approximately 30 degrees from closed position when unlatched. Set hinges on out-swing doors (and entrance swing doors) to return to fully closed position.
B. Clean and Protect: Clean exposed surfaces of compartment systems using materials and methods recommended by manufacturer, and provide protection as necessary to prevent damage during remainder of construction period.
C. Provide final protection and maintain conditions that ensure toilet compartments and screens are without damage or deterioration at the time of Substantial Completion.
END OF SECTION 102113
File details come from the government source that posted it. Updated .