PAST PERFORMANCE QUESTIONNAIRE FOR OWNER.doc
DOC document 44 KB Posted
- Attached to
- Bridging Design Build Services Federal contract opportunity
- Solicitation number
- GS02P09DTC0022
About this file
The Past Performance Questionnaire is amended by the attached.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGING DESIGN BUILDING SERVICES FOR THE HIGH PERFORMANCE GREEN BUILDING MODERNIZATION AND OTHER ALTERATION WORK FOR THE NAZARIO COURTHOUSE AND THE DEGETAU FEDERAL OFFICE BUILDING, HATO REY, PUERTO RICO
PAST PERFORMANCE QUESTIONNAIRE FOR OWNER
Note: “Contractor” refers to the Architectural team or the General Contractor/Design Build Team. If not applicable to the Architectural Team, respond with N/A.
Instructions for returning this evaluation:
Upon completion of the evaluation, the owner shall ensure that each page of this evaluation has been accurately and completely filled out.
The Owner shall ensure that the last page of this questionnaire contains his/her original signature in ink. The survey shall then be placed in a sealed envelope. The Owner shall place his/her signature across the actual envelope seal and include the following statement: "Confidential -Information enclosed is for the sole use of the Government."
The sealed envelope shall then be returned to the contractor. The contractor shall forward the sealed envelope containing the owner evaluation with the rest of its proposal to GSA.
Contractor being evaluated:
Owner (Name, Address, Zip, and Telephone Number, Point of Contact)
Name, Date and Location of Work and Description of Work the General Contractor actually performed for you.
Original Contract Amount:______________________
Actual/Current Contract Amount:________________________
Percentage of Final Contract Amount resulting from owner initiated changes
Status:
Active:______________Completed:_________________
Original Contract Completion Date __________________________________
Actual Contract Completion Date ___________________________________
Project Completion Percentage: _____________________________________
Time Extensions Granted: _________________________________________
Type and Extent of Subcontracting ________________________________________________________
Note: An explanation must accompany the answers for all numbered questions.
A.
TIMELINESS OF PERFORMANCE
1.
Did the contractor complete the project on schedule? ______________________________________________________________________
2.
To what extent did the contractor adhere to contract delivery schedules at significant milestones?
3.
How responsive was the contractor in addressing unforeseen/unanticipated conditions? ___________________________________________________________________________
4. Did the contractor provide timely monthly schedule updates?
__________YES ___________NO
5.
How responsive was contractor in submitting proposals for owner-initiated changes?
6.
Please rate the contractor's timeliness of performance overall. (circle one)
Excellent Good Acceptable Unacceptable
B.
COST CONTROL
1.
Did the contractor submit reasonably priced change proposals? ____________________________________________________________________________
2.
Please rate the contractor's cost control overall. (circle one)
Acceptable Unacceptable
C.
QUALITY CONTROL
1.
How well has the contractor complied with contract requirements? ____________________________________________________________________________
2.
Did they conform to standards of material quality and good workmanship?
3.
Did the contractor have the ability to adapt to changing requirements while maintaining a desired level of quality?
4.
Did the contractor implement an effective safety program? ___________________________________________________________________________
Please rate the contractor's quality control overall. (circle one)
Acceptable Unacceptable
D.
BUSINESS RELATIONS
1.
How well did the contractor work with the owner and the owner's technical advisors?
2.
How effective was the contractor's on site management team? ___________________________________________________________________________
3.
Was the contractor cooperative, businesslike, and concerned with the interests of project related third party entities (i.e. tenants)?
4.
Did the contractor maintain a good relationship with the Architect/Engineer? ____________________________________________________________________________
Please rate the contractor's business relations overall. (circle one)
Acceptable Unacceptable
E. SAFETY HISTORY ON PROJECT
1.
Please rate the contractor's safety history on project overall. (circle one)
Acceptable Unacceptable
F.
CONTINUITY OF KEY PERSONNEL
1.
Did the contractor maintain a consistent project team throughout the duration of the project? ___________________________________________________________________________
Please provide any additional relevant comments:
Please rate the contractor's continuity of key personnel overall. (circle one)
Acceptable Unacceptable
G.
SUMMARY RATING
1.
Would you award a contract to this firm again for similar work? (Check appropriate block)
______YES_______NO
Please rate the contractor's overall performance. (circle one)
Acceptable Unacceptable
Evaluated By: _______________________________________________________
Signature and Date: _______________________________________________________
Name and Title: _______________________________________________________
Organization: _______________________________________________________
PAGE
File details come from the government source that posted it. Updated .