SOLICITATION COMP .pdf
PDF 3 MB Posted
- Attached to
- Solicitation Re-issue NO CHANGE FROM PREVIOUS Federal contract opportunity
- Solicitation number
- GS01P12BWD0050
About this file
Reissue of Solicitation to unlock viewing. No changes from original issue.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q A 5.pdf | ||
| FormSF30.pdf | ||
| Q A 4.pdf | ||
| Q A 3.pdf | ||
| Amendment 0004.pdf | ||
| Questions 2.pdf | ||
| FormSF30.pdf | ||
| FormSF30.pdf | ||
| FormSF30.pdf | ||
| Call in Number.docx | DOCX document | |
| Per-Proposal Conf Notice.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NUMBER: G S - 01P-12-BW-D-0050
SERVICE: OPERATIONS AND MAINTENANCE COMBINED SERVICES
LOCATIONS: Group A United States Border Station (USBS) Calais Ferry Point, Calais, ME.
United States Border Station (USBS) Calais Milltown, Calais, ME.
United States Border Station (USBS) Calais New Bridge, Calais, ME.
United States Border Station (USBS) Vanceboro, Vanceboro, ME.
United States Border Station (USBS) St Pamphile, T15, R15, ME Group B United States Border Station (USBS) Estcourt Station, Estcourt Sta. ME.
United States Border Station (USBS) Fort Kent, Fort Kent, ME.
United States Border Ststion (USBS) Madawaska, Madawaska, ME.
United States Border Station (USBS) Van Buren, Van Buren, ME.
PERIOD OF PERFORMANCE: 01 September 2012 – 31 August 2013
SOLICITATION ISSUE DATE: 09 May, 2012
OFFER RECEIPT DATE and TIME: 08 June 2012 1300 EDT
U.S. General Services Administration
552.219-71 Notice to Offerors of Subcontracting Plan Requirements.
NOTICE TO OFFERORS OF SUBCONTRACTING PLAN REQUIREMENTS (JUNE 2005)
The General Services Administration (GSA) is committed to assuring that maximum practicable opportunity is provided to small, HUBZone small, small disadvantaged, women-owned, veteran-owned, and service-disabled veteran owned small business concerns to participate in the performance of this contract consistent with its efficient performance. GSA expects any subcontracting plan submitted pursuant to FAR 52.219-9, Small Business Subcontracting Plan, to reflect this commitment. Consequently, an offeror, other than a small business concern, before being awarded a contract exceeding $500,000 ($1,000,000 for construction), must demonstrate that its subcontracting plan represents a creative and innovative program for involving small, HUBZone small, small disadvantaged, women-owned, veteran-owned, and service-disabled veteran owned small business concerns as subcontractors in the performance of this contract.
(End of provision)
THIS PAGE LEFT BLANK
Contents
A. SOLICITATION/CONTRACT FORM
B. SERVICES, ORDERING AND PRICES
C. DESCRIPTION/SPECIFICATION/STATEMENT OF WORK
C.1.0 GENERAL
C.1.1 THE CONTRACTOR SHALL
C.1.2 BUILDING INFORMATION DATA SHEET ESTIMATES
C.1.3 ADDITIONAL SERVICES
C.1.4 EXCLUDED FROM THIS SCOPE ARE:
C.1.5 TYPICAL SUBCONTRACTED WORK
C.1.6 ACCEPTANCE
C.1.7 APPROVAL
C.1.8 BUILDING
C.1.9 CONTRACTING OFFICER (CO)
C.1.10 CONTRACTING OFFICER'S REPRESENTATIVE (COR)
C.1.11 CONTRACTOR
C.1.12 FEDERAL HOLIDAYS
C.1.13 GUIDING PRINCIPLES FOR SUSTAINABLE EXISTING BUILDINGS
C.1.14 PRODUCT PREFERENCE
C.1.15 ENVIRONMENTALLY PREFERABLE
C.1.16 LEED-EB
C.1.17 MODIFICATION
C.1.18 ORDERING OFFICIAL
C.1.19 PERFORMANCE BASED SERVICE CONTRACTINGERROR! BOOKMARK NOT DEFINED.
C.1.20 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
C.1.21 QUALITY CONTROL PROGRAM (QCP)
C.1.22 BASIC SERVICES
C.1.23 ADDITIONAL SERVICES
C.1.24 SERVICE REQUESTS
C.1.25 STEWARDSHIP
C.1.26 NORMAL WORKING HOURS
C.1.27 TOUR
C.1.28 INDEFINITE QUANTITY
C.1.29 JANITORIAL
C.1.30 GREEN CLEANING
C.1.31 SANITIZE
C.1.32 ADVANCED METERS
C.1.33 ADVANCED METERING SYSTEMS
C.1.34 ARCHITECTURAL AND STRUCTURAL
C.1.35 BUILDING AUTOMATION SYSTEM (BAS)
C.1.36 BUILDING OPERATING PLAN
C.1.37 COMMISSIONING
C.1.38 COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM (CMMS)
C.1.39 CONSUMABLE PARTS
C.1.40 CONTROLS AND CONTROL SYSTEM
C.1.41 EMERGENCY CALLBACK
C.1.42 EXISTING DEFICIENCY LIST REPORT
C.1.43 FIRE PROTECTION AND LIFE SAFETY SYSTEMS
C.1.44 NON-REIMBURSABLE REPAIR
C.1.45 OCCUPANT EMERGENCY PLAN (OEP)
C.1.46 OPERATIONS
C.1.47 PREDICTIVE MAINTENANCE
C.1.48 PREVENTIVE MAINTENANCE (SCHEDULED AND UNSCHEDULED)
C.1.49 REPAIR
C.1.50 REIMBURSABLE REPAIR
C.1.51 SEQUENCE OF OPERATIONS
C.1.52 VERTICAL TRANSPORTATION SYSTEMS
C.1.53 WATCH
C.1.54 DIVERSION OF WORKFORCE
C.2 REFERENCES
C.3 STARTUP PHASE/TRANSITION PHASE
C.3.1 TRANSITION PHASE STARTUP
C.3.2 VAN BUREN NEW LPOE STARTUP PHASE
C.4 PHASE-OUT TRANSITION PERIOD
C.5 DEFICIENCY LIST COMPLETION AND WITHHOLDING OF FINAL PAYMENT
C.6 GENERAL AND ADMINISTRATIVE REQUIREMENTS
C.6.1 STAFFING AND ABILITY TO CONTACT AND COMMUNICATE WITH THE COR
C.6.2 COMMUNICATION EQUIPMENT
C.6.3 ON-SITE RECORDS
C.6.4 SERVICE REQUEST AND ADMINISTRATIVE SUPPORT
C.6.5 QUALITY CONTROL PROGRAM
C.6.6 GOVERNMENT QUALITY ASSURANCE PROGRAM
C.6.7 PROTECTION AND DAMAGE
C.6.8 NEGLIGENCE
C.6.9 CONTINUITY OF OPERATIONS (COOP)
C.6.10 WORKPLACE SAFETY
C.7 GENERAL REPORTING REQUIREMENTS
C.7.1 MONTHLY PROGRESS REPORTS
C.7.2 ENVIRONMENTAL REPORTING
C.7.3 RECYCLING REPORTS
C.7.4 WASTE HAULING REPORTS
C.7.5 REPORT CALCULATIONS
C.7.6 GREEN PROCUREMENT REPORT
C.7.7 LEED EB-O&M REQUIREMENTS (APPLIES TO BUILDINGS PURSUING LEED CREDITS)
C.7.8 INTEGRATED PEST MANAGEMENT
C.7.9 SUPPORTING DOCUMENTATION
C.7.10 FILING DATES
C.7.11 REPORTING FORMATS
C.8 PERFORMANCE EVALUATION AND REVIEW
C.9 HAZARDOUS WASTE
C.10 FACILITY HAZARDS
C.11 WORKPLACE SAFETY
C.12 ASBESTOS MANAGEMENT
C.13 JANITORIAL STANDARDS
C.13.1 JANITORIAL STANDARD SERVICES
C.13.1.1 INTERIOR
C.13.2 ABOVE STANDARD SERVICES
C.13.2.1 CARPET EXTRACTION (PRIVATE AREAS)
C.13.2.2 WINDOW WASHING
C.13.2.3 BLINDS AND COVERINGS (NOT INCLUDING DRAPES, CURTAINS, AND UNIQUE COVERINGS)
C.13.2.4 HIGH CLEANING
C.13.2.5 WASTE MANAGEMENT AUDIT
C.13.3 TRASH AND SOLID WASTE DISPOSAL AND REMOVAL
C.13.3.0 EXTENT OF WORK
C.13.3.1 SOLID WASTE RECORDS AND REPORTS
C.13.3.2 RECYCLING
C.13.3.3 EXTENT OF WORK
C.13.3.4 RECYCLABLE MATERIALS DISPOSITION
C.13.3.5 RECYCLING CONTAINERS
C.13.3.6 RECYCLABLES
C.13.3.7 PICK-UPS ON CALL
C.13.3.8 RESTRICTION ON USE
C.13.3.9 RECYCLING PROCEEDS
C.13.3.10 RECYCLING RECORDS AND REPORTS
C.13.4 INTEGRATED PEST MANAGEMENT
C.13.4.0 EXTENT OF WORK
C.13.4.1 GENERAL
C.13.4.2 PEST INCLUDED AND EXCLUDED
C.13.4.3 INITIAL PEST ASSESSMENT
C.13.4.4 PEST CONTROL PLAN
C.13.4.5 PESTICIDE APPLICATION
C.13.4.6 STRUCTURAL AND PROCEDURAL RECOMMENDATIONS
C.13.4.7 RECORD KEEPING
C.13.4.8 MANNER AND TIME TO CONDUCT SERVICE
C.13.4.9 INSECT CONTROL
C.13.4.10 RODENT CONTROL
C.13.4.11 SAFETY AND HEALTH
C.14 MECHANICAL MAINTENANCE AND REPAIR SERVICES SPECIFICATIONS
C.14.1 EXISTING DEFICIENCY INSPECTION/INITIAL DEFICIENCY LIST
C.14.2 BUILDING OPERATING PLAN
C.14.2.0 PURPOSE
C.14.2.1 COMPONENTS OF THE BUILDING OPERATING PLAN (BOP)
C.14.3 EQUIPMENT INVENTORY
C.14.4 EQUIPMENT CONDITION ASSESSMENT
C.14.5 USE OF CMMS
C.14.6 OCCUPANT FEEDBACK PROGRAM
C.14.7 REFERENCE LIBRARY
C.14.8 REVIEW OF DESIGN DOCUMENTS
C.14.9 INSPECTION ASSISTANCE FOR SPACE BUILD-OUTS
C.14.10 EMERGENCY SHUTDOWN INSTRUCTIONS AND TOUR CHECKLISTS
C.14.11 LABELING OF ELECTRICAL CIRCUITS
C.14.12 OPERATIONAL REQUIREMENTS
C.14.12.0 GENERAL
C.14.12.1 EXTENDED OPERATING HOURS
C.14.12.2 CONTINUITY OF OPERATIONS (COOP)
C.14.12.3 OCCUPANT EMERGENCY PLAN
C.14.12.4 TENANT ENVIRONMENT
C.14.12.5 ENERGY AND WATER CONSERVATION
C.14.13 SYSTEM PERFORMANCE STANDARDS OR PROCEDURES
C.14.13.1.0 SERVICE REQUESTS
C.14.13.1.1 GENERAL
C.14.13.1.2 EMERGENCY SERVICE REQUEST AND CALLBACK RESPONSE
C.14.13.1.3 ROUTINE SERVICE REQUEST RESPONSE
C.14.13.1.4 MISCELLANEOUS WORK
C.14.13.2 TOURS
C.14.13.2.0 GENERAL
C.14.13.2.1 OPERATING LOGS AND TOUR CHECK SHEETS
C.14.13.2.2 TOUR FREQUENCIES
C.14.13.2.3 CONDENSATE PANS
C.14.13.2.4 MONITORING OF CENTRAL PLANT EQUIPMENT
C.14.13.3 DEMAND RESPONSE PROGRAMS
C.14.13.4 CURTAILMENT PROGRAM
C.14.13.5 BAS ALARM RESPONSE
C.14.13.6 ADVANCED METERING
C.14.13.7 KEY CONTROL
C.14.13.8 DISRUPTIVE OR HAZARDOUS TOOLS
C.14.13.9 DISRUPTION TO UTILITIES, LIGHTING, OR SPACE CONDITIONING
C.14.13.10 PLUMBING AND RESTROOMS
C.14.14 MAINTENANCE PROGRAM
C.14.14.0 GENERAL
C.14.14.1 MAINTENANCE STANDARD
C.14.14.2 APPLICATION OF DIAGNOSTIC SOFTWARE
C.14.14.3 CONTROL SYSTEMS
C.14.14.4 UNINTERRUPTIBLE POWER SYSTEM (UPS)
C.14.15 WATER TREATMENT
C.14.15.0 GENERAL
C.14.15.1 TOLERANCES
C.14.15.2 INITIAL REPORT AND DEVELOPMENT OF PROGRAM
C.14.15.3 CORROSION MONITORING
C.14.15.4 MONTHLY TESTING
C.14.16 OIL ANALYSIS AND OIL CHANGES
C.14.16.0 PERIODIC OIL ANALYSIS
C.14.16.1 OIL AND REFRIGERANT ADDITIVES
C.14.17 LAMPS AND BALLASTS
C.14.18 ARCHITECTURAL AND STRUCTURAL SYSTEMS MAINTENANCE
C.14.18.0 GENERAL
C.14.18.1 MAINTENANCE AND REPAIR
C.14.18.2 REPAIR AND REPLACEMENT WORK
C.14.18.3 PAINTING
C.14.18.4 INTERIOR SIGNAGE AND DIRECTORIES
C.14.18.5 FINISHES MAINTENANCE
C.14.18.6 HISTORIC BUILDING PRESERVATION
C.14.19 VERTICAL TRANSPORTATION AND ASSOCIATED EQUIPMENT
C.14.20 REPAIRS
C.14.20.0 GENERAL
C.14.20.1 NON-REIMBURSABLE REPAIRS
C.14.20.2 SHARED LIABILITY / REIMBURSABLE REPAIRS
C.14.20.3 APPROVAL OF WORK
C.14.20.4 INVOICING
C.14.20.5 ORDERING REPAIRS FROM OUTSIDE SOURCE
C.14.20.6 FORCE MAJEURE (UNCONTROLLABLE EVENTS)
C.14.20.7 WARRANTIES
C.14.20.8 QUALITY OF MATERIALS AND REPLACEMENT PARTS
C.14.21 SAFETY AND ENVIRONMENTAL MANAGEMENT
C.14.21.1 SCHEDULING AND RECORDKEEPING
C.14.21.2 REFRIGERANT CONTROL AND CERTIFICATION
C.14.21.3 AQMD OPERATING PERMITS
C.14.21.4 UNDERGROUND STORAGE TANKS
C.14.21.5 POLYCHLORINATED BIPHENYL (PCB) CONTROL
C.14.21.6 FACILITY HAZARDS
C.14.21.7 ELECTRICAL SAFETY
C.14.21.8 FALL PROTECTION
C.14.21.9 POWERED PLATFORMS
C.14.21.10 LOCK OUT/TAG OUT
C.14.21.11 CONFINED SPACES
C.14.21.12 HAZARDOUS MATERIALS AND WASTE
C.14.21.13 BOILER/PRESSURE VESSEL OPERATION AND INSPECTION STANDARDS
C.14.21.14 BACKFLOW PREVENTION DEVICES
C.14.21.15 POTABLE WATER SYSTEMS
C.14.21.16 LABELING AND SIGNAGE
C.14.21.17 ROOF ANCHORAGE POINTS
C.14.22 FIRE PROTECTION AND LIFE SAFETY EQUIPMENT AND SYSTEMS
C.14.22.0 GENERAL
C.14.22.1 FIRE ALARM SYSTEM
C.14.22.2 FIRE ALARM SYSTEM MAINTENANCE
C.14.22.3 FIRE ALARM SYSTEM CENTRAL STATION MONITORING
C.14.22.4 WATER-BASED FIRE SUPPRESSION SYSTEMS
C.14.22.5 FIRE DOORS AND OTHER OPENING PROTECTIVE
C.14.22.6 FIRE AND COMBINATION FIRE / SMOKE DAMPERS
C.14.22.7 SMOKE DOORS AND OTHER OPENING PROTECTIVES
C.14.22.8 SMOKE DAMPERS
C.14.22.9 PORTABLE FIRE EXTINGUISHERS
C.14.22.10 SMOKE CONTROL SYSTEMS
C.14.22.11 SMOKE MANAGEMENT SYSTEMS
C.14.22.12 EMERGENCY AND STANDBY POWER SYSTEMS
C.14.22.13 EMERGENCY LIGHTING AND EXIT SIGNAGE
D. PACKAGING & MARKING
[RESERVED]
E. INSPECTION & ACCEPTANCE
[RESERVED]
F. DELIVERIES OR PERFORMANCE
[RESERVED]
G. CONTRACT ADMINISTRATION DATA
[RESERVED]
H. SPECIAL CONTRACT REQUIREMENTS
H.1. SECURITY
H1.1 SECURITY REQUIREMENTS AND PERSONAL IDENTITY VERIFICATION PROCEDURES
(NON-CLASSIFIED CONTRACT)
H.2. IDENTIFICATION CREDENTIAL
H.3. ESCORT REQUIREMENTS
H.4. STANDARDS OF CONDUCT
H.5. REMOVAL FROM CONTRACT WORK
H.6. SENSITIVE BUT UNCLASSIFIED (SBU) BUILDING INFORMATION
H.7. RECORDING PRESENCE
H.8. GOVERNMENT FORMS
H.9. OTHER CONTRACTORS
H.10. ORDINANCES, TAXES, PERMITS, AND LICENSES
H.11. DISCREPANCY IN THE SPECIFICATIONS
H. 12. GREEN PURCHASE PROGRAM (GPP)
H.13. ASBESTOS AWARENESS TRAINING
H.14. UNIFORMS
H.15.1 ONSITE SUPERVISORS
H.15.2 QUALIFICATIONS OF PROJECT MANAGER AND ONSITE SUPERVISORY PERSONNEL
H.15.3 QUALIFICATIONS OF TECHNICIANS
H.15.4 SUBMISSION OF RESUMES FOR NEW EMPLOYEES
H.15.5 STATE LICENSING
H.15.6 COMPLIANCE WITH FEDERAL, STATE, AND LOCAL CODES
H.16. GOVERNMENT-FURNISHED MATERIALS
H.17. CONTRACTOR-FURNISHED MATERIALS
H.18. ADDITIONAL SERVICES [INDEFINITE QUANTITY PROVISIONS]
H.18.1 GENERAL
H.18.2 PRICE PROPOSAL FOR ADDITIONAL SERVICES WORK
H.18.3 PRICING
H.19. AWARD FEE
H.20. STRIKE CONTINGENCY PLAN (SCP)
H.21. OCCUPANCY EMERGENCY PLAN (OEP)
H.22. CONTRACTOR PANDEMIC PLAN
I. CONTRACT CLAUSES
J. LIST OF ATTACHMENTS (LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS)
J.1. INDOOR FIRING RANGE CLEANING
J.2 ASBESTOS CONTROL REQUIREMENTS
J.3. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
J.4 BUILDING INFORMATION SHEETS
J.5 GSA SAMPLE FORMS
J.6 SCHEDULE OF DELIVERABLES
J.7 EQUIPMENT INVENTORY LIST
J.8 ELEVATOR TOUR LOG
J.9 PRICING EXHIBIT _ SNOW SERVICES
J.10 CHANGES IN REQUIREMENTS OF BUILDING INTERIOR
J.11 DOL WAGE DETERMINATION
K. REPRESENTATIONS AND CERTIFICATIONS
L. INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS/OFFERERS
M. EVALUATION FACTORS FOR AWARD
A. SOLICITATION/CONTRACT FORM
GSAR 514.201-1 UNIFORM CONTRACT FORMAT
The information collection requirements contained in this solicitation/contract that are not required by regulation have been approved by the Office of Management and Budget pursuant to the Paperwork Reduction Act and assigned OMB Control No.
3090-0163.
GSAR 514.201-2 PART I - THE SCHEDULE
Offerors are reminded that block 13 of the Standard Form 33, Solicitation, Offer and Award, is to be used to offer prompt payments discounts. Payment terms are set forth in the Prompt Payment clause of this solicitation. Offerors are cautioned against inserting any statement in block 13 which indicates that payment is due sooner than the time stipulated in the Prompt Payment clause.
EXAMPLE: Inserting "Net 20" in block 13 will cause the offer to be rejected as nonresponsive because the entry would be contrary to the 30-day payment terms specified in the Prompt Payment clause.
B. SERVICES, ORDERING AND PRICES
This solicitation contains a work statement for a performance-based service. This means that the Government has described WHAT is to be accomplished, not HOW to accomplish it, and states a basis for determining whether finished work meets the Government quality requirements. It does not state detailed procedures for accomplishing the work unless there are safety, security or communication requirements.
It is the responsibility of the contractor to ensure that they build into their bid/proposal price the necessary hours that it will take to meet the performance standards specified.
The contractor will be required to maintain a quality control program to ensure that the requirements of this contract are met. This program shall be created for identifying and correcting deficiencies in the quality of services before the performance becomes unacceptable.
The Contractor shall provide all management, supervision, labor, materials, supplies and equipment (except as otherwise provided), and shall plan, schedule, coordinate and assure effective performance of all services described herein. The Contractor will be required to provide management, operations and maintenance, janitorial and related services during the initial year of service in accordance with the requirements of this solicitation and prices for basic and alternate services.
Provision for the exercise of 4 additional twelve-month periods, which may be exercised upon 30 days written notice to the Contractor at the Government’s option and shall be contained in the resulting contract awarded. Evaluation of options does not obligate the government to extension of the contract term past the initial year of service.
The General Services Administration will develop an Independent Government Cost Estimate (IGCE) for the services to be provided under this contract to be used determine a reasonable cost per square foot for these services.
Offerors must quote a price per man-hour for providing additional services when ordered by the Contracting Officer’s Representative in addition to the services specified as “basic services” in Section C. This additional services provision is to be used to satisfy the Government’s short-term non-recurring need for service.
Should a continuing need for additional service arise; a contract modification will be negotiated pursuant to the “Changes” clause contained on the Supplemental Contract Clauses for Building Service Contracts.
Orders for additional services may be placed orally by the COR. All orders for each month will be confirmed by issuance of a GSA Form 300, Order for Supplies or Services. The GSA Form 300 will describe the service provided and will establish the hours of service for which the Contractor will be compensated, based on the COR’s authorization log. Monthly orders totaling less than $3,000 will be processed via use of the Government Visa credit card or direct pay system as shown in Section G, and will not be confirmed in writing.
Individual orders more than 40 man-hours will only be issued with the consent of the Contractor. The total number of hours of additional services ordered during the initial twelve-month period or any option period shall not exceed 200 hours. However, this estimate neither obligates nor restricts the Government to order such stated hours
Offerors/bidders shall price the option requirements for the 4 additional 12 month periods by assuming that the minimum hourly wages and fringe benefits established by the U.S. Department of Labor, for the initial 12 month period of performance will apply to the additional four (4) 12 month option periods. The minimum wage rates and fringe benefits applicable to the initial twelve-month period of performance are outlined in
Wage Determination No. 2005-2241 Rev 12 Dated 6/13/2011.
In the event the option(s) is exercised by the Government, the contract price(s) will be adjusted upward or downward at the time the option is exercised in accordance with the clause entitled Fair Labor Standards Act and Service Contract Act - Price Adjustment (Option Contract). (See Sec. I)
Offerors/bidders are cautioned that any bid/offer may be rejected as non-responsive if it is materially unbalanced as to prices for the option and the initial periods. A bid/offer is unbalanced when it is based on prices, which are significantly less than cost for some work, and prices, which are significantly overstated for other work.
RFQ IFB RFP
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER PAGE OF
2. CONTRACT NO. 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODEFACILITY
CODE
CODE
TELEPHONE NO.
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
29. AWARD OF CONTRACT: REF.
DATED . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 3/2011)
Prescribed by GSA - FAR (48 CFR) 53.212
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
OFFER
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
17a CONTRACTOR/
OFFEROR.
CODE
8 (A)
SIZE STANDARD:
NAICS:
% FOR:SET ASIDE:UNRESTRICTED OR
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
10. THIS ACQUISITION IS
STANDARD FORM 1449 (REV. 3/2011) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PAGE 3 OF 37 GS-01P-12-BW-D-0050
Janitorial and Mechanical Maintenance services at the following LPOE's. Base Period 09/01/2012 thru 08/31/2013.
GROUP A - Includes the following LPOE's: Calais New Bridge;Calais Ferry Point;Calais Milltown;Vanceboro;St.
Pamphile.
NOTE: Offerors can propose on either or both Groups, but MUST propose on all items within a Group.
0001 Calais New Bridge LPOE (ME0851BI)
0.00 MO
0001A Janitorial Services
12.00 MO
0001B Snow Removal Services (Oct through April)
7.00 MO
0001C Landscaping Services
0001D Mechanical Maintenance & Repair Services
0001E Fire Protection & Life Safety Equipment & Systems
Maintenance Services
0001F Indoor Firing Range Janitorial Services Calais New
Bridge LPOE Estimated Quantity 12 MO
NOTE: THIS ITEM WILL BE ORDERED UNDER A
SEPERATE TASK ORDER.
0001G Carpet Extraction - Estimated Quantity 6025 SF
0.00 SF
0001H Window Washing. Estimated quantity 494 EA.
0.00 EA
0001I Blinds & Coverings (Not Including Drapes, Curtains &
Unique Coverings) Estimated Quantity 63 EA.
0001J Machine Strip and Apply Four (4) Coats of Finish to
Resilient Office Space Floors Estimated Quantity 9654 SF
0001K Spray Buff Resilient Office Space Floors
Estimated Quantity 9654 SF.
0002 Calais Ferry Point LPOE (ME0501BC)
0002A Janitorial Services
0002B Snow Removal Services (Oct thru April)
0002C Landscaping Services
0002D Mechanical Maintenance & Repair Services
PAGE 4 OF 37 GS-01P-12-BW-D-0050
0002E Carpet Extraction Estimated Quantity: 1533 SF
0002F Window Washing
Estimated Quantity 80 EA
0002G Blinds & Coverings (Not Including Drapes, Curtains &
Estimated Quantity: 53 EA
0002H Machine Strip and Apply Four (4) Coats of Finish to
Estimated Quantity: 3547 SF
0002I Spray Buff Resilient Office Space Floors
0003 Calais Milltown LPOE (ME0009ZZ)
0003A Janitorial Services
0003B Snow Removal Services (Oct thru April)
0003C Landscaping Services
0003D Mechanical Maintenance & Repair Services
0003E Window Washing
Estimated Quantity: 18 EA
0003F Blinds & Coverings (Not Including Drapes, Curtains &
Estimated Quantity: 3 EA
0003G Machine Strip and Apply Four (4) Coats of Finish to
Estimated Quantity: 872 SF
0003H Spray Buff Resilient Office Space Floors
0004 Vanceboro LPOE (ME0831BV)
0004A Janitorial Services
0004B Snow Removal Services (Oct thru April)
0004C Landscaping Services
0004D Mechanical Maintenance & Repair Services
0004E Carpet Extraction
Estimated Quantity: 323 SF
PAGE 5 OF 37 GS-01P-12-BW-D-0050
0004F Window Washing Estimated Quantity: 82 EA
0004G Blinds & Coverings (Not Including Drapes, Curtains &
Estimated Quantity: 10 EA
0004H Machine Strip and Apply Four (4) Coats of Finish to
Estimated Quantity: 4772 SF
0004I Spray Buff Resilient Office Space Floors
0005 St. Pamphile LPOE (ME0012ZZ)
0005A Janitorial Services
0005B Snow Removal Services (Oct thru April)
0005C Landscaping Services
0005D Mechanical Maintenance & Repair Services
0005E Window Washing
Estimated Quantity: 9 EA
0005F Blinds & Coverings (Not Including Drapes, Curtains &
Estimated Quantity 9 EA
0005G Machine Strip and Apply Four (4) Coats of Finish to
Estimated Quantity: 470 SF
0005H Spray Buff Resilient Office Space Floors
ADDITIONAL SERVICES - Base Period 09/01/2012 thru 08/31/2013
GROUP A
** Estimated Quantities are based on all buildings and shall be priced for all locations
**All additional service hourly rates are billing rates and include all associated markup. The numbers provided are for bidding purposes only.
0006 Additional Services Rate / Janitorial Services Estimated Quantity: 75 HR
0.00 HR
0007 Additional Services Rate / Operations & Maintenance
Services Estimated Quantity: 290 HR
PAGE 6 OF 37 GS-01P-12-BW-D-0050
0008 Additional Services Rate / Fire Protection & Life Safety
Equipment & Systems Maintenance Services Estimated Quantity: 55 HR
0009 Emergency Callback/Overtime Rate � Janitorial
Estimated Quantity: 70 HR
0010 Emergency Callback/Overtime Rate for Operations
Maintenance & Repair Services Estimated Quantity: 230 HR
0011 Emergency Callback/Overtime Rate for Fire Protection & Life Safety Equipment & Systems Maintenance Services
Administrative Fee Percentage markup applies to all materials, equipment, and approved subcontractor costs under Additional Service, Emergency Callback/ OT and Reimbursable Repair requests.
0012 Administrative Fee for requests from $0k to $5k.
0.00 P1
0013 Administrative Fee for requests from $5k to 25k.
0014 RESERVED
GROUP B - Includes the following LPOE's: Van Buren (Old); Van Buren (New); Madawaska; Fort Kent; and, Estcourt Station.
NOTE: Offerors can propose on either or both Groups, but MUST propose on all items within a Group.
0015 Van Buren LPOE (ME0841BX)
(Note this LPOE to be removed when new LPOE comes on line late 2012 or early 2013)
0015A Janitorial Services
4.00 MO
0015B Snow Removal Services (Oct thru Dec 2012)
3.00 MO
0015C Landscaping Services
0015D Mechanical Maintenance & Repair Services
0015E Window Washing
Estimated Quantity: 10 EA.
0015F Blinds & Coverings (Not Including Drapes, Curtains &
0015G Machine Strip and Apply Four (4) Coats of Finish to
PAGE 7 OF 37 GS-01P-12-BW-D-0050
Estimated Quantity: 1360 SF
0015H Spray Buff Resilient Office Space Floors
Estimated Quantity: 1360 SF
0016 NEW Van Buren LPOE (ME0843BX)
0016A Janitorial Services
Estimated Start 11/01/2012
10.00 MO
0016B Snow Removal Services (Oct thru April)
6.00 MO
0016C Landscaping Services
0016D Mechanical Maintenance & Repair Services
Estimated Start: 11/01/2012
0016E Fire Protection & Life Safety Equipment & Systems
0016F Carpet Extraction
Estimated Quantity: 1320 SF
0016G Window Washing
Estimated Quantity: 50 EA
0016H Blinds & Coverings (Not Including Drapes, Curtains &
Estimated Quantity: 25 EA
0016I Machine Strip and Apply Four (4) Coats of Finish to
Estimated Quantity: 4643 SF
0016J Spray Buff Resilient Office Space Floors
0016K Commissioning Services IAW SOW Para. C.3.2
Estimated Quantity: 2 MO
0017 Madawaska LPOE (ME0051ZZ)
0017A Janitorial Services
0017B Snow Removal Services (Oct thru April)
0017C Landscaping Services
0017D Mechanical Maintenance & Repair Services
PAGE 8 OF 37 GS-01P-12-BW-D-0050
0017E Window Washing Estimated Quantity: 37 EA
0017F Blinds & Coverings (Not Including Drapes, Curtains &
0017G Machine Strip and Apply Four (4) Coats of Finish to
Estimated Quantity: 7498 SF
0017H Spray Buff Resilient Office Space Floors
0018 Fort Kent LPOE (ME0088ZZ)
0018A Janitorial Services
0018B Snow Removal Services (Oct thru April)
0018C Landscaping Services
0018D Mechanical Maintenance & Repair Services
0018E Fire Protection & Life Safety Equipment & Systems
0018F Carpet Extraction
Estimated Quantity: 2202 SF
0018G Window Washing
Estimated Quantity: 45 EA
0018H Blinds & Coverings (Not Including Drapes, Curtains &
0018I Machine Strip and Apply Four (4) Coats of Finish to
Estimated Quantity: 1744 SF
0018J Spray Buff Resilient Office Space Floors
0019 Estcourt Station LPOE (ME4033ZZ)
0019A Janitorial Services
0019B Snow Removal Services (Oct thru April)
0019C Landscaping Services
0019D Mechanical Maintenance & Repair Services 12.00 MO
PAGE 9 OF 37 GS-01P-12-BW-D-0050
0019E Window Washing Estimated Quantity: 11 EA
0019F Blinds & Coverings (Not Including Drapes, Curtains &
0019G Machine Strip and Apply Four (4) Coats of Finish to
Estimated Quantity: 134 SF
0019H Spray Buff Resilient Office Space Floors
0019I Wipe Down and Treat Wood Wall Surfaces
Estimated Quantity: 250 SF
ADDITIONAL SERVICES - Base Period 09/01/2012 thru 08/31/2013
GROUP B
** Estimated Quantities are based on all buildings and shall be priced for all locations
**All additional service hourly rates are billing rates and include all associated markup. The numbers provided are for bidding purposes only.
0020 Additional Services Rate / Janitorial Services
0021 Additional Services Rate / Operations & Maintenance
ServicesTo Be Negotiated.
0022 Additional Services Rate / Fire Protection & Life Safety
0023 Emergency Callback/Overtime Rate for Janitorial
0024 Emergency Callback/Overtime Rate for Operations
0025 Emergency Callback/Overtime Rate for Fire Protection & and approved subcontractor costs under Additional Service, Emergency Callback/ OT and Reimbursable
0026 Administrative Fee for requests from $0k to $5k. 0.00 P1
PAGE 10 OF 37 GS-01P-12-BW-D-0050
0027 Administrative Fee for requests from $5k to 25k.
the following LPOE's. Option 1 Period 09/01/2013 thru 08/31/2014.
GROUP A - Includes the following LPOE's: Calais New Bridge;Calais Ferry Point;Calais Milltown;Vanceboro;St.
Pamphile.
NOTE: Offerors can propose on either or both Groups, 1001 Calais New Bridge LPOE (ME0851BI)
1001A Janitorial Services
1001B Snow Removal Services (Oct through April)
1001C Landscaping Services
1001D Mechanical Maintenance & Repair Services
1001E Fire Protection & Life Safety Equipment & Systems
1001F Indoor Firing Range Janitorial Services Calais New
Estimated Quantity 12 MO
1001G Carpet Extraction - Estimated Quantity 6025 SF
1001H Window Washing. Estimated quantity 494 EA.
1001I Blinds & Coverings (Not Including Drapes, Curtains &
1001J Machine Strip and Apply Four (4) Coats of Finish to
1001K Spray Buff Resilient Office Space Floors
1002 Calais Ferry Point LPOE (ME0501BC)
1002A Janitorial Services
1002B Snow Removal Services (Oct thru April)
PAGE 11 OF 37 GS-01P-12-BW-D-0050
1002C Landscaping Services
1002D Mechanical Maintenance & Repair Services
1002E Carpet Extraction
1002F Window Washing
1002G Blinds & Coverings (Not Including Drapes, Curtains &
1002H Machine Strip and Apply Four (4) Coats of Finish to
1002I Spray Buff Resilient Office Space Floors
1003 Calais Milltown LPOE (ME0009ZZ)
1003A Janitorial Services
1003B Snow Removal Services (Oct thru April)
1003C Landscaping Services
1003D Mechanical Maintenance & Repair Services
1003E Window Washing
1003F Blinds & Coverings (Not Including Drapes, Curtains &
1003G Machine Strip and Apply Four (4) Coats of Finish to
1003H Spray Buff Resilient Office Space Floors
1004 Vanceboro LPOE (ME0831BV)
1004A Janitorial Services
1004B Snow Removal Services (Oct thru April)
1004C Landscaping Services
PAGE 12 OF 37 GS-01P-12-BW-D-0050
1004D Mechanical Maintenance & Repair Services
1004E Carpet Extraction
1004F Window Washing
1004G Blinds & Coverings (Not Including Drapes, Curtains &
1004H Machine Strip and Apply Four (4) Coats of Finish to
1004I Spray Buff Resilient Office Space Floors
1005 St. Pamphile LPOE (ME0012ZZ)
1005A Janitorial Services
1005B Snow Removal Services (Oct thru April)
1005C Landscaping Services
1005D Mechanical Maintenance & Repair Services
1005E Window Washing
1005F Blinds & Coverings (Not Including Drapes, Curtains &
1005G Machine Strip and Apply Four (4) Coats of Finish to
1005H Spray Buff Resilient Office Space Floors
ADDITIONAL SERVICES - Option 1 period 09/01/2013 thru 08/31/2014
GROUP A
** Estimated Quantities are based on all buildings and shall be priced for all locations
**All additional service hourly rates are billing rates and include all associated markup. The numbers provided are for bidding purposes only.
1006 Additional Services Rate / Janitorial Services
PAGE 13 OF 37 GS-01P-12-BW-D-0050
1007 Additional Services Rate / Operations & Maintenance
1008 Additional Services Rate / Fire Protection & Life Safety
1009 Emergency Callback/Overtime Rate � Janitorial
1010 Emergency Callback/Overtime Rate for Operations
1011 Emergency Callback/Overtime Rate for Fire Protection & and approved subcontractor costs under Additional Service, Emergency Callback/ OT and Reimbursable
1012 Administrative Fee for requests from $0k to $5k.
1013 Administrative Fee for requests from $5k to 25k.
1014 RESERVED
Estcourt Station.
NOTE: Offerors can propose on either or both Groups, 1015 Van Buren LPOE (ME0841BX)
1015A RESERVED
1015B RESERVED
1015C RESERVED
1015D RESERVED
1015E RESERVED
1015F RESERVED
1015G RESERVED
PAGE 14 OF 37 GS-01P-12-BW-D-0050
1015H RESERVED
1016 NEW Van Buren LPOE (ME0843BX)
1016A Janitorial Services
1016B Snow Removal Services (Oct thru April)
1016C Landscaping Services
1016D Mechanical Maintenance & Repair Services
1016E Fire Protection & Life Safety Equipment & Systems
1016F Carpet Extraction
1016G Window Washing
1016H Blinds & Coverings (Not Including Drapes, Curtains &
1016I Machine Strip and Apply Four (4) Coats of Finish to
1016J Spray Buff Resilient Office Space Floors
1017 Madawaska LPOE (ME0051ZZ)
1017A Janitorial Services
1017B Snow Removal Services (Oct thru April)
1017C Landscaping Services
1017D Mechanical Maintenance & Repair Services
1017E Window Washing
1017F Blinds & Coverings (Not Including Drapes, Curtains &
PAGE 15 OF 37 GS-01P-12-BW-D-0050
1017G Machine Strip and Apply Four (4) Coats of Finish to
1017H Spray Buff Resilient Office Space Floors
1018 Fort Kent LPOE (ME0088ZZ)
1018A Janitorial Services
1018B Snow Removal Services (Oct thru April)
1018C Landscaping Services
1018D Mechanical Maintenance & Repair Services
1018E Fire Protection & Life Safety Equipment & Systems
1018F Carpet Extraction
1018G Window Washing
1018H Blinds & Coverings (Not Including Drapes, Curtains &
1018I Machine Strip and Apply Four (4) Coats of Finish to
1018J Spray Buff Resilient Office Space Floors
1019 Estcourt Station LPOE (ME4033ZZ)
1019A Janitorial Services
1019B Snow Removal Services (Oct thru April)
1019C Landscaping Services
1019D Mechanical Maintenance & Repair Services
1019E Window Washing
1019F 0.00 EA
PAGE 16 OF 37 GS-01P-12-BW-D-0050
Blinds & Coverings (Not Including Drapes, Curtains &
1019G Machine Strip and Apply Four (4) Coats of Finish to
1019H Spray Buff Resilient Office Space Floors
1019I Wipe Down and Treat Wood Wall Surfaces
ADDITIONAL SERVICES - Option Period 1 09/01/2013 thru 08/31/2014
GROUP B
** Estimated Quantities are based on all buildings and shall be priced for all locations
**All additional service hourly rates are billing rates and include all associated markup. The numbers provided are for bidding purposes only.
1020 Additional Services Rate / Janitorial Services Estimated Quantity: 75
1021 Additional Services Rate / Operations & Maintenance
1022 Additional Services Rate / Fire Protection & Life Safety
1023 Emergency Callback/Overtime Rate for Janitorial
1024 Emergency Callback/Overtime Rate for Operations
1025 Emergency Callback/Overtime Rate for Fire Protection & and approved subcontractor costs under Additional Service, Emergency Callback/ OT and Reimbursable
1026 Administrative Fee for requests from $0k to $5k.
1027 Administrative Fee for requests from $5k to 25k.
PAGE 17 OF 37 GS-01P-12-BW-D-0050
the following LPOE's. Option 2 Period 09/01/2014 thru 08/31/2015.
GROUP A - Includes the following LPOE's: Calais New Bridge;Calais Ferry Point;Calais Milltown;Vanceboro;St.
Pamphile.
NOTE: Offerors can propose on either or both Groups, 2001 Calais New Bridge LPOE (ME0851BI)
2001A Janitorial Services
2001B Snow Removal Services (Oct through April)
2001C Landscaping Services
2001D Mechanical Maintenance & Repair Services
2001E Fire Protection & Life Safety Equipment & Systems
2001F Indoor Firing Range Janitorial Services Calais New
Estimated Quantity 12 MO
2001G Carpet Extraction - Estimated Quantity 6025 SF
2001H Window Washing. Estimated quantity 494 EA.
2001I Blinds & Coverings (Not Including Drapes, Curtains &
2001J Machine Strip and Apply Four (4) Coats of Finish to
2001K Spray Buff Resilient Office Space Floors
2002 Calais Ferry Point LPOE (ME0501BC)
2002A Janitorial Services
2002B Snow Removal Services (Oct thru April)
2002C Landscaping Services
2002D Mechanical Maintenance & Repair Services 12.00 MO
PAGE 18 OF 37 GS-01P-12-BW-D-0050
2002E Carpet Extraction
2002F Window Washing
2002G Blinds & Coverings (Not Including Drapes, Curtains &
2002H Machine Strip and Apply Four (4) Coats of Finish to
2002I Spray Buff Resilient Office Space Floors
2003 Calais Milltown LPOE (ME0009ZZ)
2003A Janitorial Services
2003B Snow Removal Services (Oct thru April)
2003C Landscaping Services
2003D Mechanical Maintenance & Repair Services
2003E Window Washing
2003F Blinds & Coverings (Not Including Drapes, Curtains &
2003G Machine Strip and Apply Four (4) Coats of Finish to
2003H Spray Buff Resilient Office Space Floors
2004 Vanceboro LPOE (ME0831BV)
2004A Janitorial Services
2004B Snow Removal Services (Oct thru April)
2004C Landscaping Services
2004D Mechanical Maintenance & Repair Services
2004E
PAGE 19 OF 37 GS-01P-12-BW-D-0050
Carpet Extraction
2004F Window Washing
2004G Blinds & Coverings (Not Including Drapes, Curtains &
2004H Machine Strip and Apply Four (4) Coats of Finish to
2004I Spray Buff Resilient Office Space Floors
2005 St. Pamphile LPOE (ME0012ZZ)
2005A Janitorial Services
2005B Snow Removal Services (Oct thru April)
2005C Landscaping Services
2005D Mechanical Maintenance & Repair Services
2005E Window Washing
2005F Blinds & Coverings (Not Including Drapes, Curtains &
2005G Machine Strip and Apply Four (4) Coats of Finish to
2005H Spray Buff Resilient Office Space Floors
ADDITIONAL SERVICES - Option 2 period 09/01/2014 thru 08/31/2015
GROUP A
** Estimated Quantities are based on all buildings and shall be priced for all locations
**All additional service hourly rates are billing rates and include all associated markup. The numbers provided are for bidding purposes only.
2006 Additional Services Rate / Janitorial Services
2007 Additional Services Rate / Operations & Maintenance
PAGE 20 OF 37 GS-01P-12-BW-D-0050
2008 Additional Services Rate / Fire Protection & Life Safety
2009 Emergency Callback/Overtime Rate � Janitorial
2010 Emergency Callback/Overtime Rate for Operations
2011 Emergency Callback/Overtime Rate for Fire Protection & and approved subcontractor costs under Additional Service, Emergency Callback/ OT and Reimbursable
2012 Administrative Fee for requests from $0k to $5k.
2013 Administrative Fee for requests from $5k to 25k.
2014 RESERVED
Estcourt Station.
NOTE: Offerors can propose on either or both Groups, 2015 Van Buren LPOE (ME0841BX)
2015A RESERVED
2015B RESERVED
2015C RESERVED
2015D RESERVED
2015E RESERVED
2015F RESERVED
2015G RESERVED
2015H RESERVED
PAGE 21 OF 37 GS-01P-12-BW-D-0050
2016 NEW Van Buren LPOE (ME0843BX)
2016A Janitorial Services
2016B Snow Removal Services (Oct thru April)
2016C Landscaping Services
2016D Mechanical Maintenance & Repair Services
2016E Fire Protection & Life Safety Equipment & Systems
2016F Carpet Extraction
2016G Window Washing
2016H Blinds & Coverings (Not Including Drapes, Curtains &
2016I Machine Strip and Apply Four (4) Coats of Finish to
2016J Spray Buff Resilient Office Space Floors
2017 Madawaska LPOE (ME0051ZZ)
2017A Janitorial Services
2017B Snow Removal Services (Oct thru April)
2017C Landscaping Services
2017D Mechanical Maintenance & Repair Services
2017E Window Washing
2017F Blinds & Coverings (Not Including Drapes, Curtains &
2017G Machine Strip and Apply Four (4) Coats of Finish to
PAGE 22 OF 37 GS-01P-12-BW-D-0050
2017H Spray Buff Resilient Office Space Floors
2018 Fort Kent LPOE (ME0088ZZ)
2018A Janitorial Services
2018B Snow Removal Services (Oct thru April)
2018C Landscaping Services
2018D Mechanical Maintenance & Repair Services
2018E Fire Protection & Life Safety Equipment & Systems
2018F Carpet Extraction
2018G Window Washing
2018H Blinds & Coverings (Not Including Drapes, Curtains &
2018I Machine Strip and Apply Four (4) Coats of Finish to
2018J Spray Buff Resilient Office Space Floors
2019 Estcourt Station LPOE (ME4033ZZ)
2019A Janitorial Services
2019B Snow Removal Services (Oct thru April)
2019C Landscaping Services
2019D Mechanical Maintenance & Repair Services
2019E Window Washing
2019F Blinds & Coverings (Not Including Drapes, Curtains &
2019G
PAGE 23 OF 37 GS-01P-12-BW-D-0050
Machine Strip and Apply Four (4) Coats of Finish to
2019H Spray Buff Resilient Office Space Floors
2019I Wipe Down and Treat Wood Wall Surfaces
ADDITIONAL SERVICES - Option Period 2 09/01/2014 thru 08/31/2015
GROUP B
** Estimated Quantities are based on all buildings and shall be priced for all locations
**All additional service hourly rates are billing rates and include all associated markup. The numbers provided are for bidding purposes only.
2020 Additional Services Rate / Janitorial Services
2021 Additional Services Rate / Operations & Maintenance
2022 Additional Services Rate / Fire Protection & Life Safety
2023 Emergency Callback/Overtime Rate for Janitorial
2024 Emergency Callback/Overtime Rate for Operations
2025 Emergency Callback/Overtime Rate for Fire Protection & and approved subcontractor costs under Additional Service, Emergency Callback/ OT and Reimbursable
2026 Administrative Fee for requests from $0k to $5k.
2027 Administrative Fee for requests from $5k to 25k.
the following LPOE's. Option 3 Period 09/01/2015 thru 08/31/2016.
PAGE 24 OF 37 GS-01P-12-BW-D-0050
GROUP A - Includes the following LPOE's: Calais New Bridge;Calais Ferry Point;Calais Milltown;Vanceboro;St.
Pamphile.
NOTE: Offerors can propose on either or both Groups, 3001 Calais New Bridge LPOE (ME0851BI)
3001A Janitorial Services
3001B Snow Removal Services (Oct through April)
3001C Landscaping Services
3001D Mechanical Maintenance & Repair Services
3001E Fire Protection & Life Safety Equipment & Systems
3001F Indoor Firing Range Janitorial Services Calais New
Estimated Quantity 12 MO
3001G Carpet Extraction - Estimated Quantity 6025 SF
3001H Window Washing. Estimated quantity 494 EA.
3001I Blinds & Coverings (Not Including Drapes, Curtains &
3001J Machine Strip and Apply Four (4) Coats of Finish to
3001K Spray Buff Resilient Office Space Floors
3002 Calais Ferry Point LPOE (ME0501BC)
3002A Janitorial Services
3002B Snow Removal Services (Oct thru April)
3002C Landscaping Services
3002D Mechanical Maintenance & Repair Services
3002E Carpet Extraction
PAGE 25 OF 37 GS-01P-12-BW-D-0050
3002F Window Washing
3002G Blinds & Coverings (Not Including Drapes, Curtains &
3002H Machine Strip and Apply Four (4) Coats of Finish to
3002I Spray Buff Resilient Office Space Floors
3003 Calais Milltown LPOE (ME0009ZZ)
3003A Janitorial Services
3003B Snow Removal Services (Oct thru April)
3003C Landscaping Services
3003D Mechanical Maintenance & Repair Services
3003E Window Washing
3003F Blinds & Coverings (Not Including Drapes, Curtains &
3003G Machine Strip and Apply Four (4) Coats of Finish to
3003H Spray Buff Resilient Office Space Floors
3004 Vanceboro LPOE (ME0831BV)
3004A Janitorial Services
3004B Snow Removal Services thru April)
3004C Landscaping Services
3004D Mechanical Maintenance & Repair Services
3004E Carpet Extraction
3004F Window Washing
PAGE 26 OF 37 GS-01P-12-BW-D-0050
3004G Blinds & Coverings (Not Including Drapes, Curtains &
3004H Machine Strip and Apply Four (4) Coats of Finish to
3004I Spray Buff Resilient Office Space Floors
3005 St. Pamphile LPOE (ME0012ZZ)
3005A Janitorial Services
3005B Snow Removal Services (Oct thru April)
3005C Landscaping Services
3005D Mechanical Maintenance & Repair Services
3005E Window Washing
3005F Blinds & Coverings (Not Including Drapes, Curtains &
3005G Machine Strip and Apply Four (4) Coats of Finish to
3005H Spray Buff Resilient Office Space Floors
ADDITIONAL SERVICES - Option Period 3 09/01/2015 thru 08/31/2016
GROUP A
** Estimated Quantities are based on all buildings and shall be priced for all locations
**All additional service hourly rates are billing rates and include all associated markup. The numbers provided are for bidding purposes only.
3006 Additional Services Rate / Janitorial Services
3007 Additional Services Rate / Operations & Maintenance
3008 Additional Services Rate / Fire Protection & Life Safety
PAGE 27 OF 37 GS-01P-12-BW-D-0050
3009 Emergency Callback/Overtime Rate � Janitorial
3010 Emergency Callback/Overtime Rate for Operations
3011 Emergency Callback/Overtime Rate for Fire Protection & and approved subcontractor costs under Additional Service, Emergency Callback/ OT and Reimbursable
3012 Administrative Fee for requests from $0k to $5k.
3013 Administrative Fee for requests from $5k to 25k.
3014 RESERVED
Estcourt Station.
NOTE: Offerors can propose on either or both Groups, 3015 Van Buren LPOE (ME0841BX)
3015A RESERVED
3015B RESERVED
3015C RESERVED
3015D RESERVED
3015E RESERVED
3015F RESERVED
3015G RESERVED
3015H RESERVED
3016 NEW Van Buren LPOE (ME0843BX)
3016A Janitorial Services
PAGE 28 OF 37 GS-01P-12-BW-D-0050
3016B Snow Removal Services (Oct thru April)
3016C Landscaping Services
3016D Mechanical Maintenance & Repair Services
3016E Fire Protection & Life Safety Equipment & Systems
3016F Carpet Extraction
3016G Window Washing
3016H Blinds & Coverings (Not Including Drapes, Curtains &
3016I Machine Strip and Apply Four (4) Coats of Finish to
3016J Spray Buff Resilient Office Space Floors
3017 Madawaska LPOE (ME0051ZZ)
3017A Janitorial Services
3017B Snow Removal Services (Oct thru April)
3017C Landscaping Services
3017D Mechanical Maintenance & Repair Services
3017E Window Washing
3017F Blinds & Coverings (Not Including Drapes, Curtains &
3017G Machine Strip and Apply Four (4) Coats of Finish to
3017H Spray Buff Resilient Office Space Floors
PAGE 29 OF 37 GS-01P-12-BW-D-0050
3018 Fort Kent LPOE (ME0088ZZ)
3018A Janitorial Services
3018B Snow Removal Services (Oct thru April)
3018C Landscaping Services
3018D Mechanical Maintenance & Repair Services
3018E Fire Protection & Life Safety Equipment & Systems
3018F Carpet Extraction
3018G Window Washing
3018H Blinds & Coverings (Not Including Drapes, Curtains &
3018I Machine Strip and Apply Four (4) Coats of Finish to
3018J Spray Buff Resilient Office Space Floors
3019 Estcourt Station LPOE (ME4033ZZ)
3019A Janitorial Services
3019B Snow Removal Services thru April)
3019C Landscaping Services
3019D Mechanical Maintenance & Repair Services
3019E Window Washing
3019F Blinds & Coverings (Not Including Drapes, Curtains &
3019G Machine Strip and Apply Four (4) Coats of Finish to
3019H Spray Buff Resilient Office Space Floors
PAGE 30 OF 37 GS-01P-12-BW-D-0050
3019I Wipe Down and Treat Wood Wall Surfaces
ADDITIONAL SERVICES - Option Period 3 09/01/2015 thru 08/31/2016
GROUP B
** Estimated Quantities are based on all buildings and shall be priced for all locations
**All additional service hourly rates are billing rates and include all associated markup. The numbers provided are for bidding purposes only.
3020 Additional Services Rate / Janitorial Services Estimated Quantity: 75
3021 Additional Services Rate / Operations & Maintenance
3022 Additional Services Rate / Fire Protection & Life Safety
Estimated Quantity: 55
3023 Emergency Callback/Overtime Rate for Janitorial
3024 Emergency Callback/Overtime Rate for Operations
Estimated Quantity: 230
3025 Emergency Callback/Overtime Rate for Fire Protection &
Estimated Quantity: 55 and approved subcontractor costs under Additional Service, Emergency Callback/ OT and Reimbursable
3026 Administrative Fee for requests from $0k to $5k.
3027 Administrative Fee for requests from $5k to 25k.
the following LPOE's. Option 4 Period 09/01/2016 thru 08/31/2017.
GROUP A - Includes the following LPOE's: Calais New Bridge;Calais Ferry Point;Calais Milltown;Vanceboro;St.
Pamphile.
NOTE: Offerors can propose on either or both Groups, 4001 Calais New Bridge LPOE (ME0851BI) 0.00 MO
PAGE 31 OF 37 GS-01P-12-BW-D-0050
4001A Janitorial Services
4001B Snow Removal Services (Oct through April)
7.00 EA
4001C Landscaping Services
4001D Mechanical Maintenance & Repair Services
4001E Fire Protection & Life Safety Equipment & Systems
4001F Indoor Firing Range Janitorial Services Calais New
Estimated Quantity 12 MO
4001G Carpet Extraction - Estimated Quantity 6025 SF
4001H Window Washing. Estimated quantity 494 EA.
4001I Blinds & Coverings (Not Including Drapes, Curtains &
4001J Machine Strip and Apply Four (4) Coats of Finish to
4001K Spray Buff Resilient Office Space Floors
4002 Calais Ferry Point LPOE (ME0501BC)
4002A Janitorial Services
4002B Snow Removal Services (Oct through April)
4002D Mechanical Maintenance & Repair Services
4002E Carpet Extraction
4002F Window Washing
4002G Blinds & Coverings (Not Including Drapes, Curtains &
4002H 0.00 SF
PAGE 32 OF 37 GS-01P-12-BW-D-0050
Machine Strip and Apply Four (4) Coats of Finish to
4002I Spray Buff Resilient Office Space Floors
4003 Calais Milltown LPOE (ME0009ZZ)
4003A Janitorial Services
4003B Snow Removal Services (Oct thru April)
4003C Landscaping Services
4003D Mechanical Maintenance & Repair Services
4003F Window Washing
4003G Blinds & Coverings (Not Including Drapes, Curtains &
4003H Machine Strip and Apply Four (4) Coats of Finish to
4003I Spray Buff Resilient Office Space Floors
4004 Vanceboro LPOE (ME0831BV)
4004A Janitorial Services
4004B Snow Removal Services thru April)
4004C Landscaping Services
4004D Mechanical Maintenance & Repair Services
4004E Carpet Extraction
4004F Window Washing
4004G Blinds & Coverings (Not Including Drapes, Curtains &
4004H Machine Strip and Apply Four (4) Coats of Finish to
PAGE 33 OF 37 GS-01P-12-BW-D-0050
4004I Spray Buff Resilient Office Space Floors
4005 St. Pamphile LPOE (ME0012ZZ)
4005A Janitorial Services
4005B Snow Removal Services (Oct thru April)
4005C Landscaping Services
4005D Mechanical Maintenance & Repair Services
4005E Window Washing
4005F Blinds & Coverings (Not Including Drapes, Curtains &
4005H Spray Buff Resilient Office Space Floors
ADDITIONAL SERVICES - Option Period 4 09/01/2016 thru 08/31/2017
GROUP A
** Estimated Quantities are based on all buildings and shall be priced for all locations
**All additional service hourly rates are billing rates and include all associated markup. The numbers provided are for bidding purposes only.
4006 Additional Services Rate / Janitorial Services
4006G Machine Strip and Apply Four (4) Coats of Finish to
4007 Additional Services Rate / Operations & Maintenance
4008 Additional Services Rate / Fire Protection & Life Safety
4009 Emergency Callback/Overtime Rate � Janitorial
4010 Emergency Callback/Overtime Rate for Operations
PAGE 34 OF 37 GS-01P-12-BW-D-0050
4011 Emergency Callback/Overtime Rate for Fire Protection & and approved subcontractor costs under Additional Service, Emergency Callback/ OT and Reimbursable
4012 Administrative Fee for requests from $0k to $5k.
4013 Administrative Fee for requests from $5k to 25k.
4014 RESERVED
Estcourt Station.
NOTE: Offerors can propose on either or both Groups, 4015 Van Buren LPOE (ME0841BX)
4015A RESERVED
4015B RESERVED
4015C RESERVED
4015D RESERVED
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .