About this file

Amendment 0002

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This PDF Package contains multiple files grouped together within a single PDF file.

Nuance PDF Converter Professional 5, and other recent PDF viewers, can be used to view and work with the files contained within this package.

To get started, click any file in this PDF Package to view it.

·PDFpackagesgroupmultiplefilesandfiletypestogether
foreaseofdistributionandsharing.
·PDFpackagesorganizerelatedfilesforeasierviewing
andprinting.
·PDFpackagesmaintaintheoriginalsecuritysettingsfor
eachdocumentincludedinthepackage.

Note: In older PDF viewers/editors, the files are stored as attachments.

Don’t have PDF Packaging capabilities today?

Click here to find out more about PDF Converter Professional http://www.nuance.com/pdfconverter/professional/

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 21

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

12/06/2010

4. REQUISITION/PURCHASE REQ. NO.

1PSM-11-0007

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 1PL 7. ADMINISTERED BY (If other than Item 6) CODE

General Services Administration Public Buildings Service T.P. O'Neill FOB, Room 1100 10 Causeway Street Boston, MA 022226

Same as Block 7 Attn: Ms. Laura Park, Contract Specialist

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

THIS AMENDMENT MUST BE ACKNOWLEDGED

See Block 11 below

9A. AMENDMENT OF SOLICITATION NO.

GS-01P-11-BW-D-0005

9B. DATED (SEE ITEM 11)

11/10/2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such Change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The Subject solicitation referenced in Block #9A for Single Award, Term, Indefinite Delivery, Indefinite Quantity (IDIQ) Contract for Small Construction Projects, is hereby amended as follows:

(1.) The proposal due date has NOT been extended and remains December 10, 2010 at 2:00pm (Local Time)

(2.) The Frederick C. Murphy Federal Records Center located at 380 Trapelo Road, Waltham, MA 02052 is hereby added to the Scope of Work. The types of finishes applicable to this building are of equal to the John F. Kennedy building. Add to The Agreement, Paragraph 1.A Project Summary after “J.W. McCormack Federal Building (MA0013ZZ) 5 Post Office Square, Boston, MA 02109” “Frederick C. Murphy Federal Records Center (MA00XXZZ) 380 Trapelo Road, Waltham, MA 02452”

(Continued) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or Print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Jim Adamo, Contracting Officer

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

- 2 -

Solicitation Number GS-01P-11-BZ-D-0005 Amendment Number 0002

Insert the attached Fredrick C. Murphy Federal Records Center building description as page 21 to the Statement of Work.

(3.) The following written questions were submitted by potential offerors and are answered as part of this amendment:

Q1. Will faxed or scanned and emailed forms be accepted if they come directly from the respondent?

A1. No. Electronic proposals are not accepted. The forms shall be mailed or hand delivered directly from the vendor providing the evaluation to GSA.

Q2. According to Par II.C.1(b), page 7 of 21 of the Solicitation, item (1), if the offeror has provided Past Performance Evaluations for other recent solicitations, we could have the Project Owner’s submit those in lieu of filling out a new form. Can you clarify this?

A2. No. Vendor past performance must be submitted using the forms provided.

(4.) Wage Determination is hereby replaced with the following current General Decision Number: MA100001 11/26/2010 MA1 R19.

The Fredrick C. Murphy Federal Records Center

380 Trapelo Rd Waltham Ma 02452

The Fredrick C. Murphy Federal Records Center is a single story, steel frame structure with precast concrete and concrete masonry wall panels. It contains 138,216 rsf on 11.9 acres in Waltham, MA. The site, which was part of a larger site owned by the military until 2002, has a large parking area. The building was developed as a warehouse facility and is currently being used as a National Archives and Records

Administration(NARA) facility. Approximately 30,000 sqft is climate controlled to support their archiving function for original records and documents. Approximately 7% of the building is office space with the remainder being utilized as research, training and exhibit space. Built in

1966, with several additions in the following decades, the building is not historically significant. In 1994, the building was named after

Fredrick C. Murphy, a recipient of the Medal of Honor, who was killed in World War II.

General Decision Number: MA100001 11/26/2010 MA1

Superseded General Decision Number: MA20080001

State: Massachusetts

Construction Type: Building

Counties: Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk and Suffolk Counties in

Massachusetts.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 03/12/2010

1 03/19/2010

2 03/26/2010

3 04/02/2010

4 04/09/2010

5 04/16/2010

6 04/23/2010

7 05/07/2010

8 05/14/2010

9 06/04/2010

10 07/09/2010

11 07/16/2010

12 07/23/2010

13 08/06/2010

14 08/20/2010

15 09/03/2010

16 10/08/2010

17 10/22/2010

18 11/05/2010

19 11/26/2010

ASBE0006-001 09/01/2010

BARNSTABLE (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet and Yarmouth); BRISTOL (Easton); ESSEX; MIDDLESEX; AND NORFOLK (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Holbrook, Hull, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon, Stoughton, Walpole, Wellesley, Westwood, and Weymouth); AND SUFFOLK COUNTIES

Rates Fringes

Insulator/asbestos worker

Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems..........$ 40.66 21.18

ASBE0006-002 12/01/2009

BARNSTABLE (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet and Yarmouth); BRISTOL (Easton); ESSEX; MIDDLESEX; NORFOLK (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Holbrook, Hull, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon Stoughton, Walpole, Wellesley, Westwood, and

Weymouth) AND SUFFOLK COUNTIES

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not).... $ 25.70 14.75

ASBE0006-010 09/01/2010

BARNSTABLE (Barnstable, Bourne, Falmouth, Mashpee and Sandwich); BRISTOL (Acushnet, Attleboro city, Berkeley, Dartmouth, Dighton, Fairhaven, Fall river City, Freetown, Marion, Mansfield, New Bedford

City, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton City and

Westport); DUKES; NANTUCKET; NORFOLK (Bellingham, Franklin, Plainville, and Wrentham); PLYMOUTH

(Lakeville, Mattapoisett, Middleboro, Rochester and Wareham)

Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.).... $ 40.66 21.18

BOIL0029-001 10/01/2009

BOILERMAKER...................... $ 38.25 17.04

BRMA0001-008 03/01/2010

FOXBORO CHAPTER

BRISTOL (Attleboro, Berkley, Dighton, Mansfield, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Taunton) AND NORFOLK (Bellingham, Canton, Dedham, Foxboro, Franklin, Norfolk, Norwood, Plainville, Sharon, Walpole, Westrwood, Wrentham) COUNTIES

Bricklayer, Cement Mason, Plasterer........................ $ 43.86 24.15

BRMA0001-009 03/01/2010

LOWELL CHAPTER

MIDDLESEX (Acton, Asby, Ayer, Bedford, Billerica, Boxboro, Carlisle, Chemsford, Dracut, Dunstble, Ft.

Denvens, Groton, Littleton, Lowell, North Acton, Pepperell, Shirley, South Acton, Tewksbury, Townsend, Tyngsboro, West Acton, Westford, Wilmington)

Bricklayer and plasterer......... $ 43.86 24.15

BRMA0001-010 03/01/2010

LOWELL CHAPTER

MIDDLESEX (Ashland, Framingham, Holliston, Hopkinton, Hudson, Maynard, Natick, Sherbvorn, Stow);

and NORFOLK (Medfield, Medway,Millis)

BRICKLAYER.......................$ 43.86 24.15

BRMA0003-001 02/01/2010

Marble & Tile Finisher........... $ 34.59 22.40

Marble, Tile & Terrazzo

Workers.......................... $ 44.65 23.62

TERRAZZO FINISHER................ $ 43.55 23.45

BRMA0003-003 02/01/2010

BOSTON CHAPTER

MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford, Melrose, Somerville); NORFOLK

(Brookline, Milton); and SUFFOLK

BRICKLAYER....................... $ 44.61 23.84

BRMA0003-006 02/01/2010

LYNN CHAPTER

ESSEX (Amesbury, Andover, Beverly, Boxford, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipsewich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuen, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salisbury, Salem, Saugus, Swampscott, Topsfield Wakefield, Wenham, West Newbury); and MIDDLESEX

(Reading, North Reading, Wakefield)

Bricklayer, cement mason and plasterer........................$ 44.61 23.84

BRMA0003-007 02/01/2010

WALTHAM CHAPTER

MIDDLESEX (Belmont, Burlington, Concord, Lexington, Lincoln, Stoneham, Sudbury, Waltham, Watertown, Wayland, Weston, Winchester, Woburn)

Bricklayer and plasterer......... $ 44.61 23.84

BRMA0003-008 02/01/2010

NEWTON CHAPTER

MIDDLESEX (Newton) and NORFOLK (Dover, Needham, Wellesley)

BRMA0003-009 02/01/2010

NEW BEDFORD

BARNSTABLE; BRISTOL (Acushnet, Darmouth, Farhaven, Fall River, Freetown, New Bedford, Somerset, Swansea, Westport); DUKES; and NANTUCKET COUNTIES

BRMA0003-010 02/01/2010

QUINCY CHAPTER

NORFOLK COUNTY (Avon, Braintree, Cohasset, Holbrook, Quincy, Randolph, Soughton, Weymouth)

Bricklayer, cement mason and plasterer........................ $ 44.61 23.84

CARP0026-001 03/01/2010

BRISTOL (Attleborough, North Attleborough); ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); AND NORFOLK (Bellingham, Canton, Foxboro, Franklin, Medfield, Medway, Millis, Needham, Norfolk, Norwood, Plainville, Sharon, Walpole, Wellesley, Westwood, Wrentham)

CARPENTER........................ $ 31.73 23.56

CARP0033-001 03/01/2010

MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK

CARPENTER........................ $ 37.03 24.94

CARP0056-011 08/01/2010

SUFFOLK (All of County); and those areas of BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX & NORFOLK

COUNTIES situated inside Boston Beltway (I-495) and North of Cape Cod Canal. ALL of DUKES AND

NANTUCKET COUNTIES

PILEDRIVERMAN.................... $ 37.37 25.80

CARP0056-012 08/01/2010

The areas of BARNSTABLE, BRISTOL, and NORFOLK COUNTIES situated OUTSIDE Boston Beltway (I-495) and South of Cape Cod Canal

CARP0056-013 08/01/2010

Those areas of ESSEX and MIDDLESEX COUNTIES situated OUTSIDE Boston Beltway (I-495)

CARP0424-003 03/01/2010

NORFOLK COUNTY (Braintree, Cohassett, Scituate, Weymouth, Quincy)

CARP0624-005 03/01/2010

BARNSTABLE; BRISTOL (Except Attleboro & North Attleboro); DUKES; NANTUCKET; AND NORFOLK (Avon, Holbrook, Randolph, Stoughton) COUNTIES

CARP1121-001 05/02/2010

MILLWRIGHT....................... $ 29.78 18.61

CARP2168-001 09/01/2009

MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK

FLOOR LAYER: Carpet............. $ 35.64 23.99

CARP2168-004 09/01/2009

BRISTOL; ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville);

Remainder of Norfolk County

CARP2168-005 09/01/2009

BARNSTABALE; DUKES; AND NANTUCKET

ELEC0096-001 06/01/2010

MIDDLESEX (Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend)

ELECTRICIAN...................... $ 35.91 17.58

Teledata System Installer........ $ 26.91 14.31

ELEC0099-001 06/01/2010

BRISTOL (Attleboro, North Attleboro, Seekonk)

ELECTRICIAN...................... $ 34.08 56.26%

Teledata System Installer........ $ 25.56 12.87

ELEC0103-001 09/01/2010

ESSEX; MIDDLESEX (Excluding Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend); NORFOLK (Excluding Avon, Holbrook, Plainville, Randolph, Stoughton) SUFFOLK

Teledata System Installer........ $ 31.09 24.30

ELEC0103-002 09/01/2010

ESSEX (Amesbury, Andover, Boxford, Georgetown, Groveland, Haverhill, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rowley, Salisbury, West Newbury); MIDDLESEX (Bedford, Billerica, Boxboro, Burlington, Carlisle, Chelmsford, Dracut, Dunstable littleton, Lowell, North Reading, Tewksbury, Tyngsboro, Westford, Wilmington)

ELECTRICIAN...................... $ 41.45 26.05

ELEC0103-004 09/01/2010

ESSEX (Beverly, Danvers, Essex, Gloucester, Hamilton, Ipswich, Manchester, Marblehead, Middleton, Peabody, Rockport, Salem, Topsfield, Wenham)

ELEC0103-005 09/01/2010

ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swampscott); MIDDLESEX (Acton, Arlington, Belmont, Cambridge, Concord, Everett, Framingham, Holliston, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Frankloin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH

(Hingham and Hull);SUFFOLK

ELEC0104-001 08/31/2009

Line Construction:

Cableman.................... $ 34.89 7.50+A

Equipment Operator.......... $ 34.89 11.50+A

Groundman................... $ 22.58 7.50+A

Lineman..................... $ 41.05 14.43+A

A. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day;

Christmas Day and Columbus Day, provided the employee has been employed 5 working days prior to any one of the listed holidays.

ELEC0223-005 09/01/2010

BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND

NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton)

ELECTRICIAN...................... $ 34.74 18.31

ELEC0223-006 09/01/2010

BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND

NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton)

Teledata System Installer........ $ 29.53 16.65

ELEV0004-001 01/01/2010

ELEVATOR MECHANIC................$ 48.43 20.035+a

FOOTNOTE FOR ELEVATOR MECHANICS:

A. Employer Contributes 8% of basic hourly rate for 5 years or more of service and 6% for 6 months to 5 years of service as vacation pay.

Eight paid holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.

ENGI0004-001 12/01/2009

Power equipment operators:

Group 1.....................$ 38.48 20.84+A

Group 2.....................$ 38.14 20.84+A

Group 3.....................$ 27.84 20.84+A

Group 4.....................$ 32.69 20.84+A

Group 5.....................$ 21.70 20.84+A

Group 6.....................$ 24.67 20.84+A

FOOTNOTE FOR POWER EQUIPMENT OPERATORS:

A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Labor Day, Memorial Day, Independence

Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day

HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib):

Over 150 ft. +1.99

Over 185 ft. +3.48

Over 210 ft. +4.90

Over 250 ft. +7.42

Over 295 ft. +10.29

Over 350 ft. +11.96

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

Group 1: Crane; shovel; truck crane; cherry picker; dragline; trench hoe; backhoe; three drum machine;

derrick; pile driver; elevator tower; hoist; gradall; shovel dozer; front end loader; fork lift; suger;

boring machine; rotaryu drill; post hole hammer; post hole digger; pumpcrete machine; asphalt plant (on site); concrete batching and/or mixing plant (on site); crusher plant (on site); paving concrete mixer; timber jack

Group 2: Sonic or vibratory hammer; grader; scraper; tandem scraper; concrete pump; bulldozer;

tractor; york rake; mulching machine; portable steam boiler; portable steam generator; roller;

spreader; tamper (self propelled or tractor drawn); asphalt paver; mechanic - maintenance;

paving screed machine; stationary steam boiler; paving concrete finishing machine; cal truck;

ballast regulator; switch tamper; rail anchor machine; tire truck

Group 3: Pumps (1-3 grouped); compressor; welding machine (1-3 grouped); generator; concrete vibrator; heater (power driven 1- 5); well point system (operating); syphon-pulsometer;

concrete mixer; valves controlling permanent plant air or steam; conveyor; Jackson type tamper;

single diaphragm pump; lighting plant

Group 4: Assistant engineer (fireman)

Group 5: Oiler (other than truck cranes and gradalls)

Group 6: Oiler (on truck cranes and gradalls) stant engineer (on truck crane and gradall)

IRON0007-006 09/16/2010

AREA 1: BRISTOL (Easton); ESSEX (Beverly Gloucester, Lynn,Lynnfield, Manchester, Marblehead Nahant, Salem, Saugus, Swampscott); MIDDLESEX (Arlington, Bedford, Belmont, Burlington, Cambridge, Concord, Everett, Framingham, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Except Medway); SUFFOLK

AREA 2: ESSEX (Amesbury, Andover, Boxford, Danvers, Essex, Georgetown, Hamilton, Haverhill, Ipswich, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rockport, Rowley, Salisbury, Topsfield, Wenham, West Newbury); MIDDLESEX (Action, Billericia, Carlisle, Chelmsford, Dracut, Dunstable, Groton, Groveland, Littleton, Lowell, Middleton, North Reading, Pepperell, Tewksbury, Tyngsboro, Westford, Wilmington)

Ironworkers:

AREA 1......................$ 36.28 26.41

AREA 2......................$ 31.87 26.41

IRON0007-010 09/16/2010

MIDDLESEX (Ashby, Ashland, Ayer, Boxboro, Holliston, Hopkinton, Hudson, Marlboro, Shirley, Stow, Townsend); NORFOLK (Medway)

IRONWORKER....................... $ 36.28 26.41

IRON0037-005 06/01/2009

BARNSTABLE; BRISTOL (Acushnet, Attleboro, Berkley, Dartmouth, Dighton, Fairhaven, Fall River, Freetown, Mansfield, New Bedford, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton, Westport); DUKES; NANTUCKET; NORFOLK (Billingham, Franklin, Plainville, Wrentham)

IRONWORKER....................... $ 30.45 19.47

LABO0014-001 06/01/2010

Plasterer tender

BARNSTABLE, BRISTOL, DUKES, ESSEX, NANTUCKET, MIDDLESEX (with the exception of Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn); NORFOLK (with the exception of Brookline Dedham and

Milton) COUNTIES. $ 27.85 17.35

SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer Island, Nut Island);

MIDDLESEX COUNTY (Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn only);

NORFOLK COUNTY (Brookline, Dedham, and Milton only).... $ 29.80 18.75

LABO0022-009 06/01/2010

SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer & Nut Islands); MIDDLESEX COUNTY

(Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop, and Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton only)

Laborers:

Group 1.....................$ 29.80 18.75

Group 2.....................$ 30.05 18.75

Group 3.....................$ 30.55 18.75

Group 4.....................$ 30.80 18.75

Group 5.....................$ 30.55 18.75

Group 6.....................$ 31.80 18.75

Group 7.....................$ 23.15 18.75

LABORERS CLASSIFICATIONS

GROUP 1: Laborers; Carpenter Tenders

GROUP 2: Jackhammer operator; pavement breaker; asphalt raker carbide core drilling machine; chain saw operator; pipelayer; barco type jumping tampers; laser beam; concrete pump; mason tender; motorized mortar mixer; ride-on motorized buggy; fence and beam rail erector

GROUP 3: Air track, block paver; rammer; curb setter, hydraulic and similar self-powered drills

GROUP 4: Blaster; powderman

GROUP 5: Pre-cast floor and roof plank erector

GROUP 6: Asbestos removal laborers/haz-mat laborers

GROUP 7: Flaggers

LABO0022-010 06/01/2010

Counties of BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET; MIDDLESEX (with the exception of

Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakfield, Winchester, Winthrop and Woburn); NORFOLK (with the exception of Brookline, Dedham and Milton)

Laborers:

Group 1.....................$ 27.85 17.35

Group 2.....................$ 28.10 17.35

Group 3.....................$ 28.60 17.35

Group 4.....................$ 28.85 17.35

Group 5.....................$ 28.60 17.35

Group 6.....................$ 29.85 17.35

LABORERS CLASSIFICATIONS

GROUP 1: Laborers; Carpenter Tenders

GROUP 2: Jackhammer operator; pavement breaker; asphalt raker carbide core drilling machine; chain saw operator; pipelayer; barco type jumping tampers; laser beam; concrete pump; mason tender; motorized mortar mixer; ride-on motorized buggy; fence and beam rail erector

GROUP 3: Air track, block paver; hammer; curb setter, hydraulic and similar self-powered drills

GROUP 4: Blaster; powderman

GROUP 5: Pre-cast floor and roof plank erector

GROUP 6: Asbestos removal laborers/haz-mat laborers

LABO1421-004 06/01/2010

BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET NORFOLK AND SUFFOLK COUNTIES

Laborers: (Wrecking)

Group 1.....................$ 29.80 18.75

Group 2.....................$ 30.55 18.75

Group 3.....................$ 30.80 18.75

Group 4.....................$ 25.80 18.75

Group 5.....................$ 28.90 18.75

Group 6.....................$ 29.80 18.75

Group 1: Adzeman, Wrecking Laborer.

Group 2: Burners, Jackhammers.

Group 3: Small Backhoes, Loaders on tracks, Bobcat Type Loaders, Hydraulic "Brock" Type Hammer

Operators, Concrete Cutting Saws.

Group 4: Yardman (Salvage Yard Only).

Group 5: Yardman, Burners, Sawyers.

Group 6: Asbestos, Lead Paint, Toxic and Hazardous Waste.

PAIN0011-007 06/01/2010

BARNSTABLE, BRISTOL, DUKES, AND NANTUCKET COUNTIES

GLAZIER..........................$ 32.03 15.40+A

FOOTNOTE:

A. PAID HOLIDAY: LABOR DAY (provided employee has worked any part of the week prior to Labor Day and any part of the week after Labor Day)

PAIN0035-004 01/01/2010

BARNSTABLE; BRISTOL; ESSEX; NANTUCKET; DUKES; COUNTIES; REMAINDER OF NORFOLK; MIDDLESEX

AND SUFFOLK COUNTIES

Painters:

NEW CONSTRUCTION:

Brush, Taper............... $ 32.51 21.40

Spray, Sandblast........... $ 33.91 21.40

REPAINT:

Brush, Taper............... $ 30.57 21.40

Spray, Sandblast........... $ 31.97 21.40

PAIN0035-013 01/01/2010

MIDDLESEX (Cambridge, Everett, Malden, Medford, Somerville) SUFFOLK COUNTY (Boston, Chelsea)

NORFOLK COUNTY (Brookline)

Painters:

NEW CONSTRUCTION:

Brush, Taper............... $ 38.30 21.40

Spray, Sandblast........... $ 39.70 21.40

REPAINT:

Brush, Taper............... $ 36.36 21.40

Spray, Sandblast........... $ 37.76 21.40

PAIN0035-020 01/01/2010

ESSEX; MIDDLESEX; NORFOLK; SUFFOLK

GLAZIER.......................... $ 38.30 21.40

PLAS0534-001 07/01/2010

ESSEX; MIDDLESEX; NORFOLK AND SUFFOLK COUNTY

CEMENT MASON/CONCRETE FINISHER...$ 35.00 27.91

PLAS0534-004 07/01/2010

MIDDLESEX; NORFOLK AND SUFFOLK COUNTIES

PLASTERER........................ $ 35.00 27.91

PLUM0004-001 09/01/2010

MIDDLESEX (Ashby, Ayer-West of Greenville branch of Boston and Maine Railroad, Ft. Devens, Groton, Shirley, Townsend)

Plumbers and Pipefitters.........$ 38.54 22.83

PLUM0012-005 09/01/2010

ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swampscott); MIDDLESEX (Acton, Arlington, Ashland, Ayer -except W. of Greenville Branch of Boston & Maine RR, Bedford, Belmont, Billerica, Boxboro, Burlington, Cambridge, Carlisle, Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham, Hudson, Holliston, Hopkinton, Lexington, Lincoln, Littleton, Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick, Newton, North Reading, Pepperell, Reading, Sherborn, Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro, Wakefield, Waltham, Watertown, Wayland, Westford, Wilmington, Winchester, Woburn); NORFOLK (Bellingham, Braintree, Brokline, Canton, Cohasset, Dedham, Dover,Foxboro, Franklin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); AND SUFFOLK COUNTIES

PLUMBER.......................... $ 45.22 22.98

PLUM0051-004 03/01/2010

BARNSTABLE; BRISTOL; DUKES; NANTUCKET; AND NORFOLK (Avon, Holbrook, Randolph, Stoughton)

COUNTIES

Plumbers and Pipefitters.........$ 34.36 24.47

PLUM0138-001 04/01/2010

ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence, Manchester, Marblehead, Merrimac, Methuen, Middleton, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Topsfield, Wenham, West Newbury)

Plumber, Pipefitter, Steamfitter...................... $ 41.14 22.98

* PLUM0537-005 09/01/2010

MIDDLESEX (Arlington, Cambridge, Everett, Lincoln, Malden, Medford, Melrose, Reading, Wakefield, Winchester and Woburn), NORFOLK (Bellingham, Braintree, Brookline, Canton, Cashasset, (Bellingham, Braintree, Brookline, Canton Cashasset, Dedham, Foxboro, Franklin, Millis, Milton, Sharon, Walpole, Westwood, and Wrenthan) ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swanpscott) SUFFOLK (Boston and

Chelsea)

PIPEFITTER....................... $ 46.09 23.31

ROOF0033-001 08/01/2009

Roofers:

All Tear-off and/or removal of any types of roofing and all spudding, sweeping, vacuuming and/or cleanup of any and all areas of any type where a roof is to be relaid........$ 34.56 19.87

SFMA0550-001 04/01/2010

BRISTOL (Portion within 35 mile radius from Boston City Hall; ESSEX; MIDDLESEX (Except Ashby, Townsend, and portions of Pepperell and Shirley beyond 35 mile radius from Boston City Hall);

NORFOLK; PLYMOUTH (Portion within 35 mile radius of Boston City Hall); SUFFOLK

SPRINKLER FITTER................. $ 50.50 19.46

SFMA0669-001 04/01/2010

BARNSTABLE; BRISTOL (Beyond 35 mile radius of Boston City Hall); DUKES; MIDDLESEX (Ashby, Townsend, portions of Pepperell and Shirley beyond 35 mile radius of Boston City Hall); NANTUCKET;

PLYMOUTH (Beyond 35 mile radius of Boston City Hall)

SPRINKLER FITTER................. $ 36.13 18.60

SFMA0676-001 01/01/2010

BRISTOL (Seekonk, Swansea, and Somerset)

SPRINKLER FITTER................. $ 39.50 17.85

a. PAID HOLIDAYS: Memorial Day, July 4th, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has been in the employment of a contractor 20 working days prior to any such paid holiday.

SHEE0017-003 04/01/2010

BRISTOL (Attleboro, Berkley, Easton, Mansfield, North Attleboro, Norton, Raynham, Taunton); ESSEX;

MIDDLESEX; NORFOLK; PLYMOUTH (except except Marion, Mattapoisett, Rochester, Wareham);

SUFFOLK

Sheet metal worker............... $ 39.37 27.65

SHEE0017-007 04/01/2010

BARNSTABLE; BRISTOL (Acushnet, Assonet, Dartmouth, Dighton, Fairhaven, Fall River, Freetown, New

Bedford, Rehoboth, Seeekonk, Somerset, Swansea, Westport); DUKES; AND NANTUCKET

Sheet metal worker............... $ 32.61 21.90

TEAM0379-001 06/01/2010

Truck drivers:

Group 1.....................$ 29.28 14.98+A+B

Group 2.....................$ 29.45 14.98+A+B

Group 3.....................$ 29.52 14.98+A+B

Group 4.....................$ 29.64 14.98+A+B

Group 5.....................$ 29.74 14.98+A+B

Group 6.....................$ 30.03 14.98+A+B

Group 7.....................$ 30.32 14.98+A+B

POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL

BY AXLE HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM

TRUCK DRIVERS CLASSIFICATIONS

Group 1: Station wagons; panel trucks; and pickup trucks

Group 2: Two axle equipment; & forklift operator

Group 3: Three axle equipment and tireman

Group 4: Four and Five Axle equipment

Group 5: Specialized earth moving equipment under 35 tons other than conventional type trucks; low bed; vachual; mechanics, paving restoration equipment

Group 6: Specialized earth moving equipment over 35 tons

Group 7: Trailers for earth moving equipment (double hookup)

FOOTNOTES:

A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor

Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day

B. PAID VACATION: Employees with 4 months to 1 year of service receive 1/2 day's pay per month; 1 week vacation for 1 - 5 years of service; 2 weeks vacation for 5 - 10 years of service; and 3 weeks vacation for more than 10 years of service

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those

Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29

CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the

Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION