Amendment 0003.doc

DOC document 87 KB Posted

Attached to
RECOVERY - REQUEST FOR PROPOSALS - Modernization of the Margaret Chase Smith Federal Building in Bangor, Maine
Solicitation number
GS-01P-09-BZ-C-0028
Issued by

About this file

Amendment 0003 - SF30

View the file

Other files

File Type Posted
Amendment 0007 SF30.doc DOC document
list of attendees.pdf PDF
PreProposalConference Minutes.doc DOC document
Amendment 0002.doc DOC document
Amendment 0001.doc DOC document
MC Smith - SF 1442.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. Contract ID Code
Page of Pages
1
2
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req. No.
5. Project No. (if applicable)
GS-01P-09-BZC-0028-0003
Feb 12, 2010
1PCM-09-0085
VME0001
6. Issued By
Code 1PC
7. Administered By (If other than Item 6)
Code 1PC
GSA/PBS Design and Construction Division(1PC)
GSA/PBS Design and Construction Division(1PC)
T.P. O'Neill Federal Building
T.P. O'Neill Federal Building
10 Causeway St., 11th Floor
10 Causeway St., 11th Floor
Boston, MA 02222-1077
Boston, MA 02222-1077

Kathryn Thomas (617) 565-8826

8. Name and Address of Contractor (No., Street, County, and Zip Code)
(X)
9A. Amendment of Solicitation No.
X
GS-01P-09-BZC-0028

9B. Date (See Item 11)

January 26, 2010

10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code
Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers
is extended
X
is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning
1
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer

submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGE-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x)
A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor
is not,
is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

1. Specifications: The following are attached and incorporated into the solicitation:

a. Elevator:

i. Section 142050 General Elevator Requirements

ii. Section 142100 New Traction Elevators

iii. Section 142150 Modernized Traction Elevators.

b. Section 024119 Selective Structure Demolition

c. Section 02085 Asbestos Abatement

d. Section 0202086 – Lead Mitigation

e. Controls:

i. Section 250000 Integrated Automation Systems (IAS) General

ii. Section 250500 Common Work Results for Integrated Automation

iii. Section 250800 Commissioning of Integrated Automation

iv. Section 251100 Integrated Automation Materials, I/O Devices and Sensors

v. Section 251105 Integrated Automation Network Electronics

vi. Section 251200 Third Party Interfaces for Integrated Automation

vii. Section 251400 IAS Field Panels

viii. Section 251500 IAS Software and Programming

ix. Section 256000 Integrated Automation Operation and Maintenance Manuals

x. Section 257000 Integrated Automation Training Requirements

xi. Section 259000 Sequence of Operations for Integrated Automation

f. Smart Building Systems

i. Section 17110 System Integrator Qualifications

ii. Section 17115 Summary of Work

iii. Section 17120 Codes, References, Standards, Abbreviations and Definitions

iv. Section 17125 Submittal Requirements

v. Section 17130 Input/Output and Ancillary Hardware Requirements

vi. Section 17134 Power Quality Monitoring and Metering Requirements

vii. Section 17135 Electrical Requirements

viii. Section 17140 DDC Control System

ix. Section 17143 DALI Lighting Control System

x. Section 17143 Sun and Blind Control Systems Requirement

xi. Section 17145 Network Management

xii. Section 17148 IAS Local Area Network

xiii. Section 17150 Graphical User Interface

xiv. Section 17155 Testing and Commissioning

xv. Section 17160 Operation and Maintenance Manuals

xvi. Section 17165 Training Requirements

xvii. Section 17195 Sequences of Operations

g. Division One:

i. Section 01020 Allowances

ii. Section 01045 Cutting and Patching

iii. Section 01090 Definitions and Standards

iv. Section 01210 Commissioning

v. Section 01300 Submittals

vi. Section 01305 Schedules and Reports

vii. Section 01310 Critical Path Method Scheduling

viii. Section 01546 Safety and Health

ix. Section 01593 Security Regulations

x. Section 01632 Products

xi. Section 01700 Project Close Out

xii. Section 01782 Operations and Maintenance Data

xiii. Section 01800 Miscellaneous Requirements

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print)
16A. Name and title of Contracting Officer (Type or Print)
15B. Contractor/Offeror
15C. Date Signed
16B. United States of America

(Signature of Contracting Officer) 16C. Date Signed

_____________________________________________(Signature of person authorized to sign)

NSN 7540-01-152-8070
30-105

STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE

Prescribed by GSA FAR (48 CFR) 53.243

GS-01P-09-BZC-0028-0003

File details come from the government source that posted it. Updated .