Amendment 0003.doc
DOC document 87 KB Posted
- Solicitation number
- GS-01P-09-BZ-C-0028
About this file
Amendment 0003 - SF30
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0007 SF30.doc | DOC document | |
| list of attendees.pdf | ||
| PreProposalConference Minutes.doc | DOC document | |
| Amendment 0002.doc | DOC document | |
| Amendment 0001.doc | DOC document | |
| MC Smith - SF 1442.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| 1. Contract ID Code |
| Page of Pages |
| 1 |
| 2 |
| 2. Amendment/Modification No. |
| 3. Effective Date |
| 4. Requisition/Purchase Req. No. |
| 5. Project No. (if applicable) |
| GS-01P-09-BZC-0028-0003 |
| Feb 12, 2010 |
| 1PCM-09-0085 |
| VME0001 |
| 6. Issued By |
| Code 1PC |
| 7. Administered By (If other than Item 6) |
| Code 1PC |
| GSA/PBS Design and Construction Division(1PC) |
| GSA/PBS Design and Construction Division(1PC) |
| T.P. O'Neill Federal Building |
| T.P. O'Neill Federal Building |
| 10 Causeway St., 11th Floor |
| 10 Causeway St., 11th Floor |
| Boston, MA 02222-1077 |
| Boston, MA 02222-1077 |
Kathryn Thomas (617) 565-8826
| 8. Name and Address of Contractor (No., Street, County, and Zip Code) |
| (X) |
| 9A. Amendment of Solicitation No. |
| X |
| GS-01P-09-BZC-0028 |
9B. Date (See Item 11)
January 26, 2010
10A. Modification of Contract/Order No.
10B. Date (See Item 13)
| Code |
| Facility Code |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers |
| is extended |
| X |
| is not extended. |
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
| (a) By completing items 8 and 15, and returning |
| 1 |
| copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer |
submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGE-
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (x) |
| A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A. |
| B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) |
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
| C. This supplemental agreement is entered into pursuant to authority of: |
| D. Other (Specify type of modification and authority) |
| E. IMPORTANT: Contractor |
| is not, |
| is required to sign this document and return copies to the issuing office. |
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
1. Specifications: The following are attached and incorporated into the solicitation:
a. Elevator:
i. Section 142050 General Elevator Requirements
ii. Section 142100 New Traction Elevators
iii. Section 142150 Modernized Traction Elevators.
b. Section 024119 Selective Structure Demolition
c. Section 02085 Asbestos Abatement
d. Section 0202086 – Lead Mitigation
e. Controls:
i. Section 250000 Integrated Automation Systems (IAS) General
ii. Section 250500 Common Work Results for Integrated Automation
iii. Section 250800 Commissioning of Integrated Automation
iv. Section 251100 Integrated Automation Materials, I/O Devices and Sensors
v. Section 251105 Integrated Automation Network Electronics
vi. Section 251200 Third Party Interfaces for Integrated Automation
vii. Section 251400 IAS Field Panels
viii. Section 251500 IAS Software and Programming
ix. Section 256000 Integrated Automation Operation and Maintenance Manuals
x. Section 257000 Integrated Automation Training Requirements
xi. Section 259000 Sequence of Operations for Integrated Automation
f. Smart Building Systems
i. Section 17110 System Integrator Qualifications
ii. Section 17115 Summary of Work
iii. Section 17120 Codes, References, Standards, Abbreviations and Definitions
iv. Section 17125 Submittal Requirements
v. Section 17130 Input/Output and Ancillary Hardware Requirements
vi. Section 17134 Power Quality Monitoring and Metering Requirements
vii. Section 17135 Electrical Requirements
viii. Section 17140 DDC Control System
ix. Section 17143 DALI Lighting Control System
x. Section 17143 Sun and Blind Control Systems Requirement
xi. Section 17145 Network Management
xii. Section 17148 IAS Local Area Network
xiii. Section 17150 Graphical User Interface
xiv. Section 17155 Testing and Commissioning
xv. Section 17160 Operation and Maintenance Manuals
xvi. Section 17165 Training Requirements
xvii. Section 17195 Sequences of Operations
g. Division One:
i. Section 01020 Allowances
ii. Section 01045 Cutting and Patching
iii. Section 01090 Definitions and Standards
iv. Section 01210 Commissioning
v. Section 01300 Submittals
vi. Section 01305 Schedules and Reports
vii. Section 01310 Critical Path Method Scheduling
viii. Section 01546 Safety and Health
ix. Section 01593 Security Regulations
x. Section 01632 Products
xi. Section 01700 Project Close Out
xii. Section 01782 Operations and Maintenance Data
xiii. Section 01800 Miscellaneous Requirements
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. Name and Title of Signer (Type or Print) |
| 16A. Name and title of Contracting Officer (Type or Print) |
| 15B. Contractor/Offeror |
| 15C. Date Signed |
| 16B. United States of America |
(Signature of Contracting Officer) 16C. Date Signed
_____________________________________________(Signature of person authorized to sign)
| NSN 7540-01-152-8070 |
| 30-105 |
STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE
Prescribed by GSA FAR (48 CFR) 53.243
GS-01P-09-BZC-0028-0003