Amendment 0002.doc
DOC document 84 KB Posted
- Solicitation number
- GS-01P-09-BZ-C-0028
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0007 SF30.doc | DOC document | |
| Amendment 0003.doc | DOC document | |
| list of attendees.pdf | ||
| PreProposalConference Minutes.doc | DOC document | |
| Amendment 0001.doc | DOC document | |
| MC Smith - SF 1442.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| 1. Contract ID Code |
| Page of Pages |
| 1 |
| 2 |
| 2. Amendment/Modification No. |
| 3. Effective Date |
| 4. Requisition/Purchase Req. No. |
| 5. Project No. (if applicable) |
| GS-01P-09-BZC-0028-0002 |
| Feb 5, 2010 |
| 1PCM-09-0085 |
| VME0001 |
| 6. Issued By |
| Code 1PC |
| 7. Administered By (If other than Item 6) |
| Code 1PC |
| GSA/PBS Design and Construction Division(1PC) |
| GSA/PBS Design and Construction Division(1PC) |
| T.P. O'Neill Federal Building |
| T.P. O'Neill Federal Building |
| 10 Causeway St., 11th Floor |
| 10 Causeway St., 11th Floor |
| Boston, MA 02222-1077 |
| Boston, MA 02222-1077 |
Kathryn Thomas (617) 565-8826
| 8. Name and Address of Contractor (No., Street, County, and Zip Code) |
| (X) |
| 9A. Amendment of Solicitation No. |
| X |
| GS-01P-09-BZC-0028 |
9B. Date (See Item 11)
January 26, 2010
10A. Modification of Contract/Order No.
10B. Date (See Item 13)
| Code |
| Facility Code |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers |
| is extended |
| X |
| is not extended. |
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
| (a) By completing items 8 and 15, and returning |
| 1 |
| copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer |
submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGE-
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (x) |
| A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A. |
| B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) |
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
| C. This supplemental agreement is entered into pursuant to authority of: |
| D. Other (Specify type of modification and authority) |
| E. IMPORTANT: Contractor |
| is not, |
| is required to sign this document and return copies to the issuing office. |
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
1. Specifications:
a. Lined out Division 1, demolition, asbestos/lead, elevator, and controls specifications will be available approximately February 11, 2010, and will be incorporated into the solicitation via amendment and posted on the Federal Business Opportunities website (www.fbo.gov).
b. A security scope of work description with a bidding allowance will be available at the same time.
2. The following changes are made to the “Solicitation”
a. III.C.2.d. – (Key Personnel) – Change the paragraph to read:
“Provide three references for Key Personnel (name of contact/company name/phone number). For the Project Manager and the General Superintendent, one of the three references should be from the projects provided in response to Factor 2a. Submit the references with the proposal.
b. II.D.1, Representations and Certifications – Change the paragraph to read:
“The Offeror shall complete electronic annual representations and certifications at http://orca.bpn.gov in conjunction with required registration in the Central Contractor Registration (CCR) database and provide a completed set (hard copy) with the proposal.”
3. Disregard all references to Forms C221 and C301 in both the “Solicitation” and the “Agreement”.
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. Name and Title of Signer (Type or Print) |
| 16A. Name and title of Contracting Officer (Type or Print) |
| 15B. Contractor/Offeror |
| 15C. Date Signed |
| 16B. United States of America |
(Signature of Contracting Officer) 16C. Date Signed
_____________________________________________(Signature of person authorized to sign)
| NSN 7540-01-152-8070 |
| 30-105 |
STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE
Prescribed by GSA FAR (48 CFR) 53.243
GS-01P-09-BZC-0028-0002
File details come from the government source that posted it. Updated .