JR2_Tech_Eval_Categories_(1).pdf
PDF 135 KB Posted
- Solicitation number
- GS-00P-13-BSC-0949
About this file
JR2 - Tech Eval
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF_30SolMod2_120913.pdf | ||
| SF_30SolMod1_120913.pdf | ||
| Q A_Langley_UP_(1)122013.docx | DOCX document | |
| JA1-JBLE-L-EL-v07-24Sep13.pdf | ||
| JA39_Past_Performance.doc | DOC document | |
| JR1_AF_Sample_Bill_of_Sale_(1)_(1).pdf | ||
| Langley_UP_RFP_Jan_2013.docx | DOCX document | |
| JA42_Langley__AFB_Schedules_and_Price_Data_Sheets_5_and_6.xlsx | XLSX spreadsheet | |
| JA43-1_-_Langley_-_Electrical_Training_Requirements_ver02-_22_Oct_10.pdf | ||
| JA41_Lan_Wage_Determination.pdf | ||
| JA40_Example_Completion_of_Schedules_for_FP-EPA_Type_Contracts_(2).pdf | ||
| JE1__Subcontracting_Plan.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GS-00P-13-BSC-0949 UTILITY SYSTEM PRIVATIZATION
Langley AFB, VA
ATTACHMENT JR2
Technical Evaluation Categories
JR2.1 Technical Evaluation Overview
The following are general categories of information that are reasonably and logically related to or encompassed within the evaluation factors stated in Section M of the solicitation and that the
Government may look at when evaluating offerors’ Volume I, Technical Proposals. This non-exhaustive set of information is provided solely for informational purposes to assist offerors in understanding the level of detail the Government seeks and is subject to change, without notice, as circumstances for a given procurement/installation warrant.
JR2.1.1 Technical Capability
JR2.1.1.1 Service Interruption/Contingency and Catastrophic Loss Plan
Ability (during normal daily operations and during disaster/contingency situations) to receive service requests; to classify their severity; to appropriately respond to those requests; to provide status to the customer; and to access proper manning, materials, equipment, and vehicles.
JR2.1.1.1.1 Service Call/Dispatch Procedures and Material, Equipment, and Vehicle
Availability during Normal Daily Operations
The level of effectiveness of service call/dispatch procedures to support Installation utility requirements during normal daily operations, taking into account the following:
Communication Line -- nature of line and level of line dedication to Government customer
Ease of Submitting Service Requests
Service Call Classification -- process accuracy and consistency
Response and Remedy/Downgrade Times
Service Call Status/Feedback to Government Customer
Service Call Data Collection -- detail and sufficiency
Location of Service Call Center
Expected Causes of Service Interruption
Coordination of Scheduled Outages
Rescheduling of Work -- level of flexibility
Real-Time System Monitoring/Controlling Capability
Qualifications of Initial Responder
Availability of Management
Availability of Materials
Availability of Vehicles and Equipment
JR2.1.1.1.2 Service Call/Dispatch Procedures and Manpower, Material, Equipment, and
Vehicle Availability during Disaster/Contingency Operations
The level of effectiveness of service call/dispatch procedures to support Installation utility requirements during Installation disaster/exercise/contingency operations, taking into account the following:
Emergency Operations Center (EOC) -- availability of, or capability of establishing, an EOC
Capability/Plans for Handling an Increased Volume of Service Requests -- receipt, processing, and maintenance/provision of status
Management of Resources
Availability of Management
In-House Communication -- capability and effectiveness
Availability of Manpower
Availability of Materials
Availability of Vehicles and Equipment
Experience with Disaster/Contingency Operations
Catastrophic Loss -- plans for bringing system back into operational status after a catastrophic loss
JR2.1.1.2 Operations and Maintenance/Quality Management Plan
Overall quality philosophy and the adequacy of procedures used to ensure that contract requirements are met (or exceeded) and that the system is being operated and maintained in a manner consistent with its long-term ability to provide reliable, cost-effective, and compliant service; ability to modify service practices and Quality Management Plan as necessary to accommodate changes in legal requirements or industry standards.
JR2.1.1.2.1 Performance and Service Standards
Performance standards and/or specifications that the offeror will comply with for construction, operation, maintenance, management, environmental, disaster recovery, and safety of the utility system; detailed discussion of the standards, procedures, and/or specifications that must be complied with to meet each of the service standards criteria listed in Table L-1 of the RFP. Take into account the following:
Federal, State, Local, Installation-Specific, and Industry Performance Standards
Discussion of Specific Offeror-proposed Performance Standards and Associated Procedures
JR2.1.1.2.2 Planned Maintenance Activities
Detailed description of operations and maintenance policies and procedures, including:
Policies and Procedures -- effectiveness of specific polices/procedures
Activities, Tests, and Inspections
JR2.1.1.2.3 Staffing Plan
Proposed workforce, position by position (from apprentice through Installation Project Manager) and the qualifications (training, certifications, experience, and education) that a new hire is required to have to fill each position, including:
In-House Staff
Subcontractors
JR2.1.1.2.4 Advanced Operational System Planning/Analysis
Advanced planning/analysis techniques to help determine future operations, maintenance, and upgrade activities that may be required on the utility system, including:
Determining Current and Future System Capacity
Identifying Component Malfunctions in Advance
JR2.1.1.2.5 Obtaining Feedback/Measuring Job Performance/Continuous Improvement
Methods of obtaining, reviewing, and implementing customer feedback; detailed description of policies, procedures, and techniques for ensuring quality work is performed, including:
Customer Feedback
Measuring Job Performance/Continuous Improvement
JR2.1.1.2.6 Quality/Performance Awards and Certificates
Discussion of widely recognized awards or certificates the Offeror has received and the significance of these awards or certificates, including:
Significance of Awards/Certificates – level, number of times received
Applicability of Awards/Certificates to the specific utility service(s) required
JR2.1.1.2.7 Specialty Skills Training for Military Personnel
Plan for providing Specialty Skills Training for military personnel (if required by the Solicitation), including:
Levels of Training -- skill level provided, scheduling, trainer qualifications, training demand, currency of curriculum
Location of Training
JR2.1.1.2.8 Service Connections/Disconnections
Expected process for submitting and supporting requirements for adding service points and/or for deleting any service points that are no longer required, including:
Coordination/Notification Process for Service Connections/Disconnections
Level of Involvement in Planning -- meeting attendance, field inspections, etc.
JR2.1.1.2.9 Environmental Compliance
Approach and responsibilities to ensure environmental compliance in the ownership, management, operation, maintenance, and upgrade of the utility system, including:
Permits
Spill Plan
Hazardous Waste Minimization and Handling of Hazardous Materials
Other Environmental Plans and Assessments (including status of ownership of wastewater treatment facilities, if applicable)
JR2.1.1.3 Initial System Deficiency Corrections/Upgrades/Connections and Renewals and
Replacements Plan
The comprehensiveness, feasibility, and effectiveness to which upgrade, renewal, and replacement activities are identified, planned, and executed to ensure a long-term efficient utility system.
JR2.1.1.3.1 Initial Plan for System Deficiency Corrections
The comprehensiveness, feasibility, and effectiveness to which the Initial System Deficiency
Corrections Plan addresses the initial repair, replacement, and improvement activities (to be completed within the first 5 years of the contract) that are required to bring the utility system up to all applicable requirements and standards imposed by law, as well as the standards typically applied by the Offeror to its other utility systems, taking into account the following:
Government-Identified Deficiencies
Offeror-Recommended System Upgrades -- identification and rationale
Initial System Deficiency Corrections Schedule
JR2.1.1.3.2 Renewals and Replacements (R&R) Plan
The comprehensiveness, feasibility, and effectiveness to which the Renewals and Replacements Plan addresses the continuing maintenance, repairs, and upgrades that will be required to permit the long-term safe and reliable operation of the utility system once the system has been brought up to standards by the initial system deficiency corrections, taking into account the following:
Conceptual Methodology for R&R
Life-Cycle Replacement of Major Components
Addressing System Condition at Beginning of Contract
JR2.1.1.3.3 Addressing New or Revised Requirements and Standards
Comprehensiveness, feasibility, and effectiveness of the process used to identify, assess, and implement any new or revised standards that may require system upgrades or modification or affect system operation, including:
Identifying and Determining Potential Effect of New or Revised Standards/Technologies
Implementation of New or Revised Standards/Technologies
JR2.1.1.4 Operational Transition Plan
Adequacy and effectiveness in maintaining continuous utility service and minimizing service impacts, while smoothly and effectively transferring responsibility and accountability for utility system capital assets, permits, personnel resources, administration, and other system responsibilities.
JR2.1.1.4.1 Length of Transition Period
Clarity and appropriateness of the length of the Transition Plan, for both the overall transition period, as well as for individual transition-related activities. Take into account the following:
Clarity of the Defined Length of the Transition Period
Sufficiency of the Length of the Transition Period – Is overall length appropriate for required transition activities?
Sufficiency of Allotted Time for Individual Transition Activities
JR2.1.1.4.2 Transition Activities
Effectiveness of the description of transition activities to which the Government has confidence that the Transition Plan will result in a “seamless” transition, taking into account the following:
Overall Schedule of Transition Activities – Are they clearly defined and logically arranged?
Description of Individual Transition Activities