JA43-1 - Langley Electrical Training Requirements
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF_30SolMod2_120913.pdf | ||
| SF_30SolMod1_120913.pdf | ||
| Q A_Langley_UP_(1)122013.docx | DOCX document | |
| JA1-JBLE-L-EL-v07-24Sep13.pdf | ||
| JA39_Past_Performance.doc | DOC document | |
| JR1_AF_Sample_Bill_of_Sale_(1)_(1).pdf | ||
| Langley_UP_RFP_Jan_2013.docx | DOCX document | |
| JA42_Langley__AFB_Schedules_and_Price_Data_Sheets_5_and_6.xlsx | XLSX spreadsheet | |
| JR2_Tech_Eval_Categories_(1).pdf | ||
| JA41_Lan_Wage_Determination.pdf | ||
| JA40_Example_Completion_of_Schedules_for_FP-EPA_Type_Contracts_(2).pdf | ||
| JE1__Subcontracting_Plan.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GS-00P-13-BSC-0949 UTILITY SYSTEM PRIVATIZATION
LANGLEY AFB, VA
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA
ATTACHMENT JA43-1
Langley AFB
Training Requirements for
Electrical Distribution System
The new system owner (SO) shall provide training to government personnel as requested to ensure that such personnel are fully capable of operating and properly certified to operate the system in the event that the Government must resume operations, temporarily or permanently, for any reason.
The majority of the training required for personnel will be hands-on job site training.
Students will be trained to the level defined in Table 2 Master Task List (MTL) at the end of this document. All students for job site training and/or classroom training will have prior working knowledge of the tasks contained in the MTL.
JA43.1 Minimum Training Requirement
JA43.1.1 Training Plan
The SO shall submit a training plan to the Administrative Contract Officer (ACO) for approval by the government. All approved training is subject to onsite review by government quality control personnel. Each plan shall contain:
A description of all course instructional blocks. Each task requirement (or combination thereof) listed in Table 2 MTL shall be uniquely developed into two specific course offerings. One course instructional block shall meet the needs of Upgrade Training (UGT); the other shall meet the need of Proficiency Training. (See paragraph JA43.1.14 & JA43.1.15 for details on both training criteria)
Note: Each course instructional block shall be logically assembled using all tasks necessary to complete a specified training objective. Any qualifications (prerequisites) needed to attend a particular course as well as any required Personal Protective equipment (PPE) must be clearly identified by the SO within the instructional block description.
Lesson Plans and Performance Objectives for all task requirements or logical grouping of tasks.
Note: Plans and objectives shall be reviewed and approved by the government. As a minimum, developed plans/objectives shall:
1. Use discernable trade language.
2. Identify specific learning objectives.
3. Identify required tools and equipment (to include student personal protective equipment requirements) needed to perform the task.
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA
4. Contain appropriate performance evaluation checklists to measure task performance as outlined in the Career Field Education Training Plan (CFETP) and the Quality Training Package (QTP) for each utility system career field.
A proposed one-year schedule of course offerings necessary to meet government training requirements. The proposed schedule shall clearly identify each course’s target audience (UGT or Proficiency Training as well as all proposed prerequisites.
A list of instructors capable of administering the intended training. (See paragraph
JA43.1.5)
A list (to include addresses and phone numbers) of all fixed training locations and facilities. If On-The-Job-Training (OJT) or Formal Classroom training is necessary to conduct various courses, the SO shall identify the titles of those courses and method of delivery in the training plan. A list of OJT sites will not be necessary for inclusion in the submitted training plan but may be required by the government at a later date for emergency contact purposes.
Exception: the SO shall list those fixed OJT locations such as power plants in the submitted training plan.
JA43.1.2 Training Criteria/Standards The SO shall follow industry accepted instructional methods to train and educate students.
As a minimum, SO trainers shall:
Plan, conduct, and document training by preparing and using Lesson Plans and Performance Objectives; giving trainees theory, background information, and hands-on education to enhance training performance.
Train students as outlined in Table 2 MTL.
Comply with Air Force Social Actions and Human Relation standards. In general, the SO shall provide a training environment that is free from unlawful discrimination, sexual harassment, drugs, and alcohol abuse. It shall provide equal opportunity and treatment for all government trainees irrespective of color, national origin, race, ethnic group, religion, or gender.
Comply with all Occupational Safety and Health (OSHA) requirements. The government shall utilize applicable OSHA and supplemental AFOSH requirements as a baseline for conducting periodic training-site inspections (See paragraph JA43.1.13). In such cases where Air Force directives exceed specified OSHA requirements (IAW AFI 91-301, AF Occupation & Environmental Safety Fire Protection, & Health Program), those AF directives will be listed in Table 1 below.
TABLE 1
AF Directives that Exceed Specified OSHA Requirements
None
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA
JA43.1.3 Training Implementation Timeline
Every effort shall be made to begin course offerings no later than (NLT) 60 days following the completion of the transition period.
JA43.1.4 Training Roles and Responsibilities (General)
JA43.1.4.1 System Owner
Administers training as requested by the government.
Provides all necessary resources (site locations, expendable materials, required equipment, etc) in which to conduct training. [See JA43 1.12 for Personnel Protective Equipment (PPE) exclusion]
Develops course schedules; provides required instructional blocks for both UGT and Proficiency Training.
Develops course prerequisite requirements; instructs those not meeting prerequisite/skill requirements to return to their assigned units.
Provides hands on job site training or formal classroom training for all assigned government utilities personnel not to exceed the quantity to be trained listed in Table 2
MTL.
Appoints primary and alternate points of contact (POC) to oversee program goals and objectives. Submits information on POCs (name, phone number, and methods of contact) to the government.
Works directly with the government to ensure course schedules are clearly identified, student requirements are effectively programmed, and prerequisites are met.
Coordinates with the government when trainees are ready for task(s) evaluation(s).
Provides the government with feedback on student performance by completing Air Force Form 803, Report of Task Evaluation and submitting it to the government within 10 working days of course completion. Submits forms via mail or any other government approved channel.
JA43.1.5 Trainer Qualification Requirements
The SO shall:
Submit a list of instructors and their credentials to the government for review and approval. The information shall include, as a minimum, years of work experience, instructional background, and credentials attained.
Advise the government of any changes to the instructor list (i.e. instructor additions/deletions). Does so within 10 working days; submits information via mail or any other government approved channel.
JA43.1.6 Training Reference Material
JA43.1.6.1 Use The SO shall use the best engineering and management practices to develop an appropriate lesson plan/performance objective. All lesson plans/performance objectives must be
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA reviewed and approved by the government. A typical course instructional block example can be found in the Career Field Education Training Plan (CFETP) Quality Training Package (QTP). A current copy can be obtained from Air Force e-Pubs @ http://www.e-publishing.af.mil/shared/media/epubs/CFETP3E0X1.pdf for the Electrical career field or http://www.e-publishing.af.mil/shared/media/epubs/CFETP3E4X1.pdf for the Water and Fuel Systems Maintenance career field.
JA43.1.6.2 Acquirement Table 2 MTL will make reference to several AF Standards/References relevant to a specific numbered task on the list. SOs that do not have or have limited Internet capability, may request training reference material acquisition support from the government in the form of:
Access to specified "gov" Uniform Resource Locators (URL) addresses.
Hard copies of reference material.
A specified combination of both limited URL access and hard copy reference material.
JA43.1.7 Training Assessments
Assessments may also be conducted by the SO prior to the start of each instructional block. Such assessments, if conducted, shall be used to determine whether training prerequisites were met and the student possesses enough experience to safely complete the block of instruction. Students assessed by the SO as not meeting prerequisite requirements may be refused training. In such cases, the SO shall:
1. Instruct students to return to their unit of assignment.
2. The SO shall also complete and submit an Air Force Form 803, Report of Task Evaluation to the government. In cases of training denials the SO shall provide the student’s name, course denied, and reason for denial. This form shall be submitted to the government within 10 working days of training denial. SO submits information via mail (preferred) or any other government approved channel to the civil engineer unit training manager, the Operations Flight Superintendent, and the
Contracting Officer Representative (COR).
JA43.1.8 Training Evaluations Evaluations are used during and after training to determine if training was successful. They also let trainees know how well they are progressing. Structured training frequently uses a combination of performance/written evaluations to measure whether trainees have met their performance objective(s). Training task are met when the trainee has met the performance objective IAW the performance evaluation criteria specified for each task training objective in Table 2 MTL..
JA43.1.8.1 Performance/Written Evaluations The SO shall use performance evaluations to measure the effectiveness of course material. A performance evaluation is a formal “observed” appraisal of a student’s hands-on performance as it applies to meeting a predetermined standard. The SO may develop and administer written evaluations to measure appropriate levels of task knowledge. Such evaluations will likely be used during classroom settings to ensure task knowledge objectives have been attained.
http://www.e-publishing.af.mil/shared/media/epubs/CFETP3E0X1.pdf http://www.e-publishing.af.mil/shared/media/epubs/CFETP3E0X1.pdf http://www.e-publishing.af.mil/shared/media/epubs/CFETP3E4X1.pdf
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA
JA43.1.9 Training Adjustments
JA43.1.9.1 Course Schedule Changes/ Individual Cancellations
Unforeseen changes in business company demands, daily workload requirements, and inclement weather often result in course changes and cancellations. In cases where the company’s demands and/or non-emergency workload adjustments require the SO to request course schedule changes, the SO shall notify the government NLT 10 working days prior to the course’s original start date. In cases of an emergency workload increase, the SO shall notify the government as soon as possible but preferably NLT 48 hours prior to course start time. Inclement weather is considered unavoidable and courses may be cancelled/rescheduled by the SO as deemed appropriate.
The government has an obligation to inform the SO of any student cancellations. Student cancellations of a non-emergency nature (i.e. scheduled leaves. noted TDYs, etc.) shall be done no later than five working days prior to the course start date/time. Government student cancellations of an emergency nature (unscheduled military requirement, sickness, etc) shall be done as soon as possible.
JA43.1.9.2 Course Curriculum Changes
In cases where course curriculum adjustments are required, the Administrative Contracting Officer (ACO) shall submit to the SO a comprehensive list of those changes. The SO, after reviewing the list, shall present to the ACO a proposal for providing the requested changes.
Following coordination and approval of the modification, the SO shall implement changes to the affected course curriculum in time for the next course offering.
JA43.1.10 Training Categories
As stated throughout this JA43-3, it is imperative that all government training be planned, developed, implemented, and managed using a structured approach. Although many training avenues exist to deliver such training, the two most commonly employed mediums are Formal Training and On-the-Job Training (OJT). The SO may develop and use a combination of formal training and OJT.
JA43.1.10.1 Formal Training
Formal training can be described as a process of teaching students specific skills under defined conditions in pursuit of a task certification. More specifically, formal training is defined simply as training conducted in either a classroom and/or on a dedicated training site. The SO shall make every attempt to provide formal training when and wherever possible to satisfy the lower levels of learning (cognitive, comprehension, and application) before engaging in task training.
JA43.1.10.2 On-The-Job (OJT)
OJT can best be described as jobsite conducted, hands-on, over the shoulder training designed to certify trainees on specific tasks. Although not quite as regimented as formal training, OJT still remains a structured event and must be administered by means of a logical and systematic process. When the SO chooses to use OJT as a training medium, they shall use a structured approach (i.e. lesson plans/performance objectives) as a way to deliver necessary task knowledge prior to the OJT. The SO shall deliver this task knowledge
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA to the student prior to any scheduled OJT session. Unless otherwise stipulated by the government, all task certifications shall be conducted on the OJT training site upon completion of each OJT session.
JA43.1.11 Transportation Requirements
The SO shall be responsible for student transportation requirements while on the training site. Cost for the SO provided transportation is considered part of the total cost of SO provided training.
The government shall be responsible for providing student transportation to and from contract training sites. The government shall refer to the Joint Federal Travel Regulation (JFTR) for guidance in cases where trainee travel exceeds acceptable driving distances.
JA43.1.12 Training Resources
The government shall provide all Personal Protective Equipment necessary to meet training objectives. Accordingly, it will be the student’s responsibility to bring all PPE identified in the Instructional Block Description (see paragraph JA43.1.1) to the scheduled training. It is the government’s responsibility to ensure all PPE conforms to OSHA standards. The SO shall be responsible for all other resources needed to conduct scheduled training.
JA43.1.13 Air Force Occupation Safety & Health (AFOSH) Evaluations & Inspections
System owner is responsible for compliance with OSHA and any supplemental AFOSH standards specified by the government. The Air Force’s interest is to protect its personnel training under the Utility Privatization SO. Accordingly, the Air Force must ensure a safe and healthy training environment for its personnel.
To ensure appropriate training environments are maintained, government safety, fire protection, and bioenvironmental engineers may enter the SO’s training site to assess the training conditions of its Air Force personnel. Such visits shall be coordinated through the ACO.
Air Force safety, fire protection, and bioenvironmental engineers do not have the authority to direct contract training activities unless conditions exists that present’s imminent danger to Air Force personnel. Inspection results will be forwarded to the
ACO, COR. and SO for review and action as needed.
JA43.1.14 Upgrade Training (UGT)
Mandatory training that leads to attainment of a higher level of proficiency. UGT is required for members after completing the apprentice course for the award to journeyman (higher level). The intent is to provide members a level of training that ensures they can perform the task during normal and emergency repair operations without supervision.
JA43.1.15 Proficiency Training
Additional training provided to personnel to increase their skills and knowledge. The intent is to provide members the opportunity to complete tasks identified in Table 2 MTL to ensure these members will maintain proficiency in a particular task.
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA
JA43.1.16 Guest Instructors
There may be occasions when, through prior coordination and approval, the SO allows a representative of the government to act as a “guest instructor”. In such cases, the guest instructor must first present any verifying work and instruction experience credentials on the selected topic for the SO to review. Due to its potential impact on contract deliverables, all guest instructor requests shall first be coordinated with the ACO.
JA43.1.17 Classroom Protocols / Student Discipline
The ultimate responsibility for classroom discipline lies with the course instructor. Students shall adhere to any instruction (given by the instructor or designated representative orally or in writing) that is not illegal, immoral, or unsafe. Rules and consequences shall be clearly stated by the SO within the Instructional Block Description and reinforced during the opening of each class. To assist with classroom protocols and student discipline, the ranking military member shall be responsible for the class and be prepared to assist the instructor as necessary. In cases where issues of military protocol apply, the ranking military member may act on the inappropriate conduct of the student(s). Any grievances relating to classroom protocols/student discipline shall first be handled through the course instructor.
Unresolved issues shall be addressed through the government.
JA43.1.18 Glossary of References, Abbreviations, and Acronyms
JA43.1.18.1 References
- AFI 36-2201, Vol 3 Air Force Training Program, On-The-Job Training Administration
- AF Form 803, Report of Task Evaluation
- AF Form 623a, On-The-Job Training Record Continuation Sheet
- AFI 91-301, AF Occupation & Environmental Safety Fire Protection, & Health Program
JA43.1.18.2 Abbreviations and Acronyms
The following list of abbreviations and acronyms may or may not be used in the text of the JA43-3 document but may be referenced in Table 2 MTL or other utility system JA43s:
AF – Air Force
ACO – Administrative Contracting Officer
AFI – Air Force Instruction
AFQTP – Air Force Qualification and Training Package
AF(J)R – Air Force (Joint) Regulation
AFJMAN – Air Force Joint Manual
AFOSH – Air Force Occupational Safety and Health Standard
AWWA – American Water Works Association
COR – Contracting Officer Representative
IAW – In Accordance With
L&C HB – Lineman’s and Cableman’s Handbook
MTL – Master Task List
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA
Mfg Manual/Instr – Manufacturer’s Manuals and Instructions
PPE – Personal Protective Equipment
SO – System Owner
STS – Specialized Training Standard
TDY – Temporary Duty
UGT – Upgrade Training
UTC – Unit Type Code
UP – Utility Privatization
UPC – Uniform Plumbing Code
URL – Uniform Resource Locator
JA43.1.19 Terms
On-the-Job Training (OJT)—Hands-on, "over-the-shoulder" training performed by the trainee and observed by the trainer to determine if trainee has mastered the task to AF standard and is ready to be certified in that task.
Specialty Training Standard (STS)—An Air Force publication that describes skills and knowledge that an airman in a particular career needs on the job. It further serves as an official “contract” between the Air Force education and training process and the actual student to illustrate the overall training requirements for an Air Force career field that formal Air Force schools are required to teach.
Trainer— A trained person who teaches personnel to perform specific tasks through OJT and/or classroom instruction methods.
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA
Table 2 Master Tasks List (MTL)
Electrical Distribution System – Air Force Specialty (3E0X1)
OFFERORS NOTES:
1. This document corresponds to the CFETP 3E0X1 dated 1 October 2007.
2. It is not the government user’s intent that an individual course be developed for each listed task. Conversely, it is strongly suggested that the offeror logically group similar-type tasks into a series of course instructional blocks. A typical course instructional block example can be found in the Career Field Education Training Plan (CFETP) Quality Training Package (QTP). A current copy can be obtained from Air Force e-Pubs @ http://www.e-publishing.af.mil/shared/media/epubs/CFETP3E0X1.pdf
3. A variety of references may be used to develop course instructional block curriculum (to include identified Air Force standards and reference material).
Regardless of the choice, any curriculum developed shall reflect only those approved standards/techniques used throughout the industry. Questions relating to the description of a particular task requirement (to include queries on proposed training standards, methods, and instructional block composition) shall be forwarded to the contracting officer for consultation and clarification.
4. Training identified in the following task numbers with an oblonged circle () will be accomplished with conductors/circuits "de-energized". Note: Some tasks will require energizing a conductor/circuit to train on test equipment and to ensure circuits are operational. Contractors are responsible for providing training identified on this Master Task List which contains tasks relevant to safety and electrical distribution equipment/components for installing, maintaining and repairing utilities that were awarded in the privatization contract.
5. The intent of each task below is to provide military members the opportunity to meet mandatory upgrade training (UGT) requirements as prescribed in the CFETP.
To include qualification training (QT) proficiency deemed necessary by the Career Field Manager.
* A core task that must be met and signed off by the trainer, certifier & trainee in order for trainee to be qualified to work on the system at the AF 5-skill Level.
** A core task, that must be met and signed off by the trainer, certifier & trainee in order for trainee to be qualified to work on the system at the AF 7-skill Level.
Task # Task Title/Performance Objective/Evaluation
Student Required Frequency
Proficiency Upgrade
Trainee Quantity
Total Hours
Trainee Quantity
Total Hours
TASK 8 – AFSC SPECIFIC SAFETY STANDARDS Ref: AFI 32-1064; AFOSH STD 91-10, 91-25;
American Red Cross Adult CPR Handbook, American Heart Association; AFOSH 91-501; UFC 3-
560-01; NFPA 70E
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA
8.2 Install
8.2.2.1 & 8.2.2.2
Task Title: Safety Standards for AFSs, Confined space, safe entry procedures, test and ventilate for safe entry.
Performance Objective: Students will open the access point to an enclosed space, test, and then ventilate the air within that space, re-test the air following ventilation, and then enter the space.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
<Insert, i.e., Annual, semi-annual, etc.>
22 1 6 6
8.3 Perform Rescue
8.3.1 Task Title: Safety Standards for AFSs, Perform rescue, Pole top.
Performance Objective: Given an overhead line rescue situation, understand and implement procedures associated with pole top rescue operations.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 1 6 6
8.3.2 Task Title: Safety Standards for AFSs, Perform rescue, manhole.
Performance Objective: Given a manhole rescue situation, understand and implement procedures associated with man hole rescue operations.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 1 6 6
8.4 Conduct Supervisory Safety Assessment
of:
8.4.1.1 & 8.4.1.2
Task Title: Maintenance of distribution system.
Performance Objective: Maintenance of distribution system over and under 600 volts.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for
Annual 22 1 6 4
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA doing the task.
8.4.2.1 & 8.4.2.2
Task Title: Work on de-energized circuits.
Performance Objective: Work on de-energized circuits over and under 600 volts.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 2 6 8
8.5 Conduct Safety Inspections:
* 8.5.1 & 8.5.2
Task Title: Hotline tools and Rubber protective equipment.
Performance Objective: Conduct safety inspections of hotline tools and rubber.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the operating principles.
Annual 22 2 6 6
13 Task - 13. SUBSTATION EQUIPMENT Ref: AFI 32-1064; AFOSH STD 91-10, Lineman's and Cable man’s Handbook;
ANSI C-2; National Electrical Safety Code
13.2 Install
13.2.1 Task Title: Substation equipment, Install, Potential transformers
Performance Objective: Using hand tools, safety equipment, and blocking and tagging procedures safely install potential transformers.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 2 6 8
13.2.2 Task Title: Substation equipment, Install, Current transformers.
Performance Objective: Using hand tools, safety equipment, and blocking and tagging procedures safely install current transformers.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to
Annual 22 2 6 8
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA
13.4 Troubleshoot Substation Equipment.
13.4.1 Task Title: Substation equipment, Inspect/Troubleshoot substation equipment.
Performance Objective: Using hand tools, safety equipment, and blocking and tagging procedures inspect/troubleshoot substation equipment to restore correct operations.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 2 6 8
14 Task - 14. OVERHEAD DISTRIBUTION SYSTEMS Ref: AFM 88-9; AFJMAN 32- 1082; AFIs 32-1031, 32-1064, 32-1063;
AFOSH STD 91-10, 91-501; Lineman's and Cable man’s Handbook; ANSI C-2;
National Electrical Code; Hot Stick Manual (AB Chance)
14.1 Climb Poles
* 14.1.1 Task Title: Overhead distribution systems, Climb poles, using gaffs.
Performance Objective: Use approved methods to safely ascend and descend a wooden utility pole. Accomplish this task using required climbing equipment without falling.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the operating principles.
Annual 22 2 6 6
* 14.1.2 Task Title: Overhead distribution systems, Climb poles, working on pole components.
Performance Objective: Using approved methods, safely belt-in and un-belt using a safety strap to circle, hitchhike up & down, and obtain a correct work position on a wooden utility pole. Accomplish this task using required climbing equipment without falling.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the
Annual 22 2 6 6
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA operating principles.
14.1.3 Task Title: Overhead distribution systems, Climb poles, traversing obstacles.
Performance Objective: Using approved methods, safely traverse a single cross arm, double cross arm or clevis to obtain a work position on a wooden utility pole.
Accomplish this task using required climbing equipment without falling.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 2 6 8
14.2 Handle Poles/Install
14.2.1 Task Title: Overhead distribution systems, Handle poles, Load/Unload poles.
Performance Objective: Using approved industry standards, safely handle, load, and unload poles. Accomplish this task without damaging the pole.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 2 6 6
14.2.2 Task Title: Overhead distribution systems, Handle poles, Transport poles.
Performance Objective: Using approved industry standards safely transport pole to and from work sites. Accomplish this task without damaging the pole.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 1 6 4
14.2.3 Task Title: Overhead distribution systems, Handle poles, Frame poles.
Performance Objective: Using approved industry standards safely frame a three-phase wood pole on the ground.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 1 6 4
14.2.4 Task Title: Overhead distribution systems, Handle poles, Set utility poles. Annual 22 1 6 4
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA
Performance Objective: Using all necessary equipment, safely install a 40 ft wooden pole.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task
14.3.1
Task Title: Overhead distribution systems, Install, Guys.
Performance Objective: Using a variation of gauged wires, properly install guys such as Sidewalk, Overhead, Span, Down, and Stub guys.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 2 6 4
* 14.3.2
Task Title: Overhead distribution systems, Install, Overhead line conductors.
Performance Objective: Given various scenarios, use necessary equipment to safely install, sag, secure, and energize overhead line conductors.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the operating principles.
Annual 22 2 6 8
14.3.3 () Task Title: Overhead distribution systems, Install, Anchors
Performance Objective: Given various scenarios, properly calculate anchor installation points/depths and install anchors.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 1 6 6
14.3.4. Pole Equipment
* 14.3.4.1
Task Title: Overhead distribution systems, Install, Pole equipment, Conductor support devices.
Performance Objective: Given various scenarios, use necessary equipment to safely install conductor support devises
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA such as Wooden cross arms, epoxy arms, pin insulators, suspension insulators, and spool insulators.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the operating principles.
* 14.3.4.2
Task Title: Overhead distribution systems, Install, Pole equipment, Transformers.
Performance Objective: Given various scenarios, use necessary equipment to safely and properly install transformers using three approaches; installation manually (using a tagline, block & tackle, and transformer gin) directly to utility pole, installation manually using cluster brackets, and installation mechanically (no block & tackle or transformer gin) using a derrick truck winch.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the operating principles.
Annual 22 2 6 6
* 14.3.4.3 Task Title: Overhead distribution systems, Install, Pole equipment, Protective devices.
Performance Objective: Given various scenarios, use necessary equipment to safely and properly install over voltage/current protective devises such as lightning arresters and fuse cutouts.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the operating principles.
Annual 22 2 6 6
* 14.3.7 Task Title: Overhead distribution systems, Install, Grounding set
Performance Objective: Using all necessary equipment, properly determine grounding set requirements and install on overhead lines.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA
14.3.8 Services
14.3.8.1
Task Title: Overhead distribution systems, Install, Service, Drops.
Performance Objective: Using all necessary equipment, accurately determine service drop wire dimension and distance.
Use acquired information to safely install drop from the service entrance to the transformer.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 1 6 5
14.3.8.2
Task Title: Overhead distribution systems, Install, Service, Laterals
Performance Objective: Using all necessary equipment, safely install service lateral.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
14.4 Inspect Poles
* 14.4 Task Title: Overhead distribution systems, Inspect poles and installed equipment.
Performance Objective: Given equipment, safely perform an inspection of an overhead distribution system pole and installed equipment.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the operating principles.
Annual 22 2 6 6
14.6 Perform Recurring Maintenance on
Overhead Distribution Equipment
14.6 Task Title: Overhead distribution systems, Perform recurring maintenance on overhead distribution equipment
Performance Objective: Using hand tools, test equipment, and blocking and tagging procedures perform recurring maintenance on overhead distribution equipment.
Performance Evaluation: Trainee can do all
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for
14.7 Isolate System Faults.
14.7
Task Title: Overhead distribution systems, Isolate system faults.
Performance Objective: Using test equipment, safety equipment, and blocking and tagging procedures isolate system faults for repair or replacement.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 2 6 8
14.8
Task Title: Overhead distribution systems, Splice de-energized overhead conductor.
Performance Objective: Given various scenarios, use necessary equipment to safely and properly install a compression sleeve splice and an automatic tension splice on de-energized overhead conductors.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 2 6 6
14.9
Task Title: Overhead distribution systems, Splice non-energized overhead conductor
Performance Objective: Given various scenarios use necessary safety and hot line equipment to safely and properly splice non-energized overhead conductors.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task
Annual 22 2 6 6
14.12 () Task Title: Overhead distribution systems, Transfer de-energized conductors from old pole to new pole
Performance Objective: After reaching a working position on the pole, use necessary safety and hotline equipment to properly transfer de-energized conductors from an old pole to an adjacent new pole.
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
14.14 () Task Title: Overhead distribution systems, Perform transformer connections.
Performance Objective: Given various scenarios, select the proper method to make internal and external connections to a de-energized pole mounted transformer.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the operating principles.
Annual 22 11 6 12
Task - 15. UNDERGROUND DISTRIBUTION SYSTEMS Ref: AFM 88-9; AFJAM 32-1082; AFI 32-1064; AFOSH STD 91-10, 91-25; Lineman's and Cable man’s Handbook; ANSI C-2; National Electrical Safety Code
15.1 Install
15.1.1 Task Title: Underground distribution
systems, Install, Direct burial cable.
Performance Objective: Using necessary equipment, properly install direct burial cable.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 3 6 10
15.1.2 Underground Duct Systems
15.1.2 Task Title: Underground distribution
systems, Install, Underground duct systems.
Performance Objective: Using necessary equipment, properly select and install earthen buried plastic duct systems.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 2 6 8
15.1.3 Task Title: Underground distribution
systems, Install, Underground cable in duct
Performance Objective: Using necessary equipment, properly install direct buried cable through a plastic duct system.
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for
15.1.4 Transformers
* 15.1.4.1 Task Title: Underground distribution systems, Install, Transformers, On pads.
Performance Objective: Using necessary equipment, properly position, place, anchor (if required), connect and energize a transformer on a concrete or equivalent type pad.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the operating principles.
Annual 22 4 6 12
15.1.4.2 Task Title: Underground distribution
systems, Install, Transformers, In Vaults.
Performance Objective: Using lifting equipment such as forklift or line truck and working in a two or three man team, install a transformer in a vault.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 2 6 8
* 15.1.5 Task Title: Underground distribution systems, Install, Transformers, Grounding set.
Performance Objective: Using necessary equipment, properly install a grounding set on a pad mounted transformer.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the operating principles.
15.2 Splice High Voltage Underground Cable
* 15.2.1 Task Title: Underground distribution systems, Splice high voltage underground cable, Using tape.
Performance Objective: Using necessary
Annual 22 3 6 10
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA equipment, properly apply the correct layers of rubber, plastic, semi conductive, and conductive tape to perform a tape splice on a single conductor, jacketed primary cable.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the operating principles.
15.2.2 Task Title: Underground distribution
systems, Splice high voltage underground cable, Using pre-form kits.
Performance Objective: Using necessary equipment, properly apply a Slip-On Splice and a Heat Shrink Spice to a single conductor, jacketed primary cable.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task
Annual 22 2 6 8
* 15.3 Task Title: Underground distribution systems, Terminate high voltage underground cable.
Performance Objective: Using necessary equipment, fabricate a cold shrink type termination and a tape termination to a single conductor, jacketed primary cable.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the operating principles.
15.4 Inspect
15.4.1 Task Title: Underground distribution
systems, Inspect, Termination.
Performance Objective: Using necessary equipment, properly check terminations for serviceability and maintenance.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 2 6 4
15.4.2 Task Title: Underground distribution
systems, Inspect, Underground splices. Annual 22 2 6 6
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA
Performance Objective: Properly check underground splices for serviceability and maintenance.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
15.5 Task Title: Underground distribution
systems, Perform High Potential DC Test on Underground Cable.
Performance Objective: Using a high potential test set (hy-pot) and a high voltage fault locator (thumper), perform a high potential DC Test on an underground cable.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 2 6 6
15.6 Task Title: Underground distribution
systems, Troubleshoot underground cables for faults.
Performance Objective: Using necessary equipment, troubleshoot duct housed and direct burial cable for opens, shorts and grounds; conduct locates using a megohmmeter in conjunction with a cable tracer/fault locator.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 2 6 8
* 15.7 Task Title: Underground distribution systems, Trace underground cables with a cable test set.
Performance Objective: Using industry accepted trace equipment, trace the location and direction of direct burial cable.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the operating principles.
Annual 22 1 6 4
15.8 Task Title: Underground distribution
systems, Isolate system faults
Performance Objective: Use approved
ATTACHMENT JA43-1 ELECTRICAL DISTRIBUTION SYSTEM TRAINING REQUIREMENTS – OCT 2010 Langley AFB, VA industry standards to properly and safely isolate (remove voltage from) a system fault.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
* 15.9 Task Title: Underground distribution systems, Fabricate load break elbow.
Performance Objective: Using applicable load break elbow kit instructions, properly prepare for and install a load break elbow.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must identify why and when the task must be done and why each step is needed to understand the operating principles.
Annual 22 4 6 10
TASK – 18. LIGHTING SYSTEMS (STREET, TRAFFIC, FACILITY, SECURITY, RECREATIONAL) AF Standards/References: AFJMAN 32-1082; Facilities Engineering, Electrical Exterior Facilities Mfg Manuals/Instr ; NFPA
70E; UFC 3-560-01
18.1 Install
18.1.2 Task Title: Lighting Systems (Street, Security, Recreational), Install, Quartz fixtures.
Performance Objective: Using applicable manufactures manuals and instructions, properly prepare for and install a Quartz Light Fixture.
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of completed work to determine if trainee is competent in task. Trainee must be able to determine the step by step procedures for doing the task.
Annual 22 2 6 8
18.1.3 Task Title: Lighting Systems (Street, Security, Recreational), Install, Lighting control components.
Performance Objective: Using necessary equipment, properly install per manufacture guidance a Central “type” lighting control (i.e. Time switch with an astronomical dial and Contactors controlled by a photo cell) and a Integral “type” control (i.e. Photo cells on each luminaire) on a designated lighting system
Performance Evaluation: Trainee can do all parts of the task, needs only a spot check of…