GROUP4-10-R-J032_Revision_0005.pdf
PDF 2 MB Posted
- Solicitation number
- GROUP4-10-R-J032
About this file
GROPU4-10-R-J032 Revision 0005
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUP4-10-R-J032 SF 1442-A1 Revision 0005
ADDENDUM TO THE STANDARD FORM 1442
Palm Beach Harbor Maintenance and Advanced Maintenance Dredging, 33--foot Project, Entrance Channel, Southern and Northern Turning Basins, and Settling
Basins, Palm Beach County, Florida
SPECIAL NOTIFICATION: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING
CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER
W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003); Cavache, Inc.
(W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13-D-0005);
Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W912EP-13-D-0007); Dutra Dredging Company (W912EP-13-D-0008);
Marinex Construction, Inc. (W912EP-13-D-0009); Norfolk Dredging Company (W912EP-13- D-0010); Mike Hooks, Inc. (W912EP-13-D-0011); Weeks Marine, Inc. (W912EP-13-D-0012);
Southern Dredging Co., Inc. (W912EP-13-D-0013); Manson Construction Company (W912EP-13-D-0014); C. F. Bean LLC (W912EP-13-D-0015) PROPOSALS WILL NOT BE
CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS
INCLUDED IN THE Group 4 Dredging MATOC Pool.
TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the technical evaluation factors are:
(1) Availability of technically acceptable dredge(s).
(2) Past performance, to include the MATOC (The government reserves the right to obtain copies of all Contractor Performance Assessment Reporting System (CPARS) records contained in the US Army Corps of Engineers CPARS database for the Prime Contractor (Offeror) and all Major Sub-Contractors).
SUBMISSION REQUIREMENTS: Contractors are required to submit the following:
(1) A letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the location of dredge(s). The identified dredge(s) must also have been found technically acceptable by the Contracting Officer prior to the proposal due date.
(2) Completed Bid Schedule (see Section 00010A)
(3) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph 2.4(c) of the MATOC
(4) Completed “Addendum to the Standard Form 1442 with the latest revision”.
(5) Revisions – Offers must acknowledge receipt of this Revision by completing “Notice to Offerors--Blocks 14, 15 and 20” of each revision.
THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:
Block 9 -- For additional information contact:
Susan Forchette 904-232-2158 Susan.j.forchette@usace.army.mil.
Block 10 -- Magnitude of Construction is between $5,000,000.00 and $10,000,000.00.
mailto:Susan.j.forchette@usace.army.mil
GROUP4-10-R-J032 SF 1442-A2 Revision 0005
Block 11 -- The Contractor shall begin performance within 45 calendar days and complete it within 85 115 calendar days after receiving notice to proceed. This performance period is mandatory. NOTE: If there are optional line items, refer to FAR 52.211-10 for breakdown of period of performance.
Block 12 -- The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order.
Block 13 -- Sealed offers to perform the work required shall be delivered to the following address not later than 16 Aug 2017 at 2:00 P.M. Local Time.18 Aug 2017 at 2:00 PM Local Time.
USA Engineering District, Jacksonville Contracting Division 701 San Marco Blvd.
Jacksonville, Florida 32207- 8175
NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, and 20 below:
Block 14 -- Name and Address of Offeror (including Zip Code):
DUNS: CAGE: _ _
Block 15 -- Telephone No. (include area code): _
Block 20 -- Name and Title of Person Authorized to Sign Offer (type or print):
Type/Print _ _
Signature: _ e-Mail: _ _ _
Offer Date: _ _ _
Block 26 -- This Task Order will be administered by:
West Palm Beach Resident Office 4400 PGA Blvd Suite 203 Palm Beach Gardens, FL 33410
Block 27 -- Payment will be made by:
USACE Finance Center 5722 Integrity Drive
ATTN: CEFC-AO-P
Millington, TN 38054-5005
GROUP4-10-R-J032 SF 1442-A3 Revision 0005
Revision 0005 Summary Sheet
GROUP4-10-R-J032
Palm Beach Harbor Maintenance and Advanced Maintenance Dredging, 33-foot Project, Entrance Channel, Southern and Northern Turning Basins, and
Settling Basins, Palm Beach County, Florida
SUMMARY OF CHANGES
1. Contract Documents Volume 1 of 2:
No Change
2. Technical Specifications Volume 2 of 2:
No Change
3. Plans:
DELETE Sheet C-04 and REPLACE with the attached revised Sheet C-04.
.9
.6
.0
.8
.7
.5
V B -L
W I2
-1
C B -W
P -1
C B -W
P -6
C B -W
P -7
C B -P
B H -1
C B -2
V B -L
W I2
-1
C B -W
P -1
C B -L
W I1
-3
V B -L
W I2
-1
C B -3
C B -P
B H -6
C B -W
P -1
C B -W
P -1
C B -L
W I1
-4
V B -L
W I2
-1
C B -W
P -2
.4
.4
.3
.2
.1
.0
T .B
T .B .6
.5
9.
.1
BASIN
SOUTHERN TURNING
.5
4.
4.
H
P
E D
D E
RI
U
Q E
R T O
OF-33
3.
W E
S T
E R
L Y L
IM
IT
O
F P
R O J
E C
T S
T A
.1
H
P E
D R
E V
O E
L B
A W
O L
L A T
O
OF-2 S
ULP
.0
.7
9.
9.
9.
.6
.4
.4
.1
.7
.7
"RLM-12" 8.
8.
PLANE COORDINATES
YX
CORNER
IN-WATER STAGING AREA COORDINATES
.5
7.
7.
5.
APPROX. SHORELINE
APPROX. BULKHEAD
IN-WATER STAGING AREA
C-04
N
-P
B H
-C
N P
L N .d g n
C
IV
IL
D R
E D
G
IN
G P
L A
N
X
,0
X
,5
X
,0
X
,5
X
,0
X
,5
X
,0
Y= 887,500
Y= 887,000
Y= 886,500
Y= 886,000
Y= 885,500
Y= 885,000
NOTE:
200'100'0100'
X
,5
LAKE WORTH
P.I. STA. 0+00 T.B.
P.I. STA. 10+99.69 CUT-2
RG
E.
V
ARI
ES
RGE.
RGE.
RGE.
RGE. VARIES
RGE. VARIES
R G
E
V A
R
IE
S
RGE. VARIES
RGE. VARIES
R G
E V
A R
IE
S
RGE.
PEANUT ISLAND
P.I. STA. 22+50 T.B.
T .B . 1
2. SEE DRAWING C-01 FOR SURVEY NOTES.
1. SEE DRAWING G-02 FOR PROJECT OVERVIEW, GENERAL NOTES AND MAPS.
T .B . 2
.1
RGE. 481.52
STA. 0+00
GRAPHIC SCALE
S T
A . 1
C U
T -2 S
T A
T
H R
U T .B
S T
A
M A
T C
H L
IN
E
D W
G
N O
C -0
S
T A
C U
T -2
PALM BEACH
PORT OF
25-FOOT REQUIRED DEPTH
PLUS 1-FOOT ALLOWABLE OVERDEPTH
NW
NE
SW
SE
966,615.85 885,072.97
967,296.82 885,094.64
966,655.97 884,825.88
967,272.96 884907.16
A
E
R E
V
IS
E D T
O A
C C
O M
P A
N Y R
E V
IS
IO
N
A
B
B
E
R E
V
IS
E D T
O A
C C
O M
P A
N Y R
E V
IS
IO
N
6E
6F
6G
6H
6I
6A
6B
6D
6C
6J
S T
A T .B
BASIN
TURNING
NORTHERN
V
VI
BASIN
TURNING
SOUTHERN
PLANE COORDINATES
YX
AIDS TO NAVIGATION
C B -W
P -1
C B -W
P -6
C B -W
P -7
C B -P
B H -1
C B -2
V B -L
W I2
-1
C B -W
P -1
C B -L
W I1
-3
V B -L
W I2
-1
C B -3
V B -L
W I2
-1
C B -P
B H -6
C B -W
P -1
C B -W
P -1
C B -L
W I1
-4
V B -L
W I2
-1
C B -W
P -2
D
C-06
D
C-06
F
E
D
C
B
A
F
E
D
C
B
A
10 9 8 7 6 5 4 3 2
10 9 8 7 6 5 3 2 1
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
C O
R P
S O
F E
N G
IN
E E
R S
DEPENDS ON YOU
SAFTEY ON THIS JOB
D E
P A
R T
M E
N T O
F T
H E A
R M
Y M .L .C
J .E .B
/1
/2
P A
L M B
E A
C H H
A R
B O
R F
L O
R
ID
A
M .R .2 /D .B .V
E N
T R
A N
C E C
H A
N N
E L
S O
U T
H E
R N A
N D N
O R
T H
E R
N
T U
R N
IN
G B
A S
IN
S
A N
D S
E T
T L
IN
G B
A S
IN
S
M A
Y
M A
IN
T E
N A
N C
E A
N D A
D V
A N
C E
D M
A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J
E C
T
NW
NE
SW
SE
LT-1 (02/17) 966,426 885,080
LT-12 (02/17) 966,886 886,602
LT-13 (02/17) 967,272 885,083
967,906 886,317LT-11 (02/17)
"GLM-13"
R G
E . V
A R
IE
S
"GLM-1"
"GLM-11"
RGE.
RGE.
.28
| ADDENDUM TO THE STANDARD FORM 1442 |
| W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003); Cavache, Inc. (W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13-D-0005); Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W9... |
| THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER: |
| PBH_MD17_C-04_20170815.pdf |
| C-04 |
File details come from the government source that posted it. Updated .