GROUP4-10-R-J032 SF 1442-A1 Revision 0004
ADDENDUM TO THE STANDARD FORM 1442
Palm Beach Harbor Maintenance and Advanced Maintenance Dredging, 33--foot Project, Entrance Channel, Southern and Northern Turning Basins, and Settling
Basins, Palm Beach County, Florida
SPECIAL NOTIFICATION: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING
CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER
W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003); Cavache, Inc.
(W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13-D-0005);
Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W912EP-13-D-0007); Dutra Dredging Company (W912EP-13-D-0008);
Marinex Construction, Inc. (W912EP-13-D-0009); Norfolk Dredging Company (W912EP-13- D-0010); Mike Hooks, Inc. (W912EP-13-D-0011); Weeks Marine, Inc. (W912EP-13-D-0012);
Southern Dredging Co., Inc. (W912EP-13-D-0013); Manson Construction Company (W912EP-13-D-0014); C. F. Bean LLC (W912EP-13-D-0015) PROPOSALS WILL NOT BE
CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS
INCLUDED IN THE Group 4 Dredging MATOC Pool.
TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the technical evaluation factors are:
(1) Availability of technically acceptable dredge(s).
(2) Past performance, to include the MATOC (The government reserves the right to obtain copies of all Contractor Performance Assessment Reporting System (CPARS) records contained in the US Army Corps of Engineers CPARS database for the Prime Contractor (Offeror) and all Major Sub-Contractors).
SUBMISSION REQUIREMENTS: Contractors are required to submit the following:
(1) A letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the location of dredge(s). The identified dredge(s) must also have been found technically acceptable by the Contracting Officer prior to the proposal due date.
(2) Completed Bid Schedule (see Section 00010A)
(3) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph
2.4(c) of the MATOC
(4) Completed “Addendum to the Standard Form 1442 with the latest revision”.
(5) Revisions – Offers must acknowledge receipt of this Revision by completing “Notice to Offerors--Blocks 14, 15 and 20” of each revision.
THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:
Block 9 -- For additional information contact:
Susan Forchette 904-232-2158 Susan.j.forchette@usace.army.mil.
Block 10 -- Magnitude of Construction is between $5,000,000.00 and $10,000,000.00.
mailto:Susan.j.forchette@usace.army.mil
GROUP4-10-R-J032 SF 1442-A2 Revision 0004
Block 11 -- The Contractor shall begin performance within 45 calendar days and complete it within 85 115 calendar days after receiving notice to proceed. This performance period is mandatory. NOTE: If there are optional line items, refer to FAR 52.211-10 for breakdown of period of performance.
Block 12 -- The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order.
Block 13 -- Sealed offers to perform the work required shall be delivered to the following address not later than 16 Aug 2017 at 2:00 P.M. Local Time.18 Aug 2017 at 2:00 PM Local Time.
USA Engineering District, Jacksonville Contracting Division 701 San Marco Blvd.
Jacksonville, Florida 32207- 8175
NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, and 20 below:
Block 14 -- Name and Address of Offeror (including Zip Code):
DUNS: CAGE: _ _
Block 15 -- Telephone No. (include area code): _
Block 20 -- Name and Title of Person Authorized to Sign Offer (type or print):
Type/Print _ _
Signature: _ e-Mail: _ _ _
Offer Date: _ _ _
Block 26 -- This Task Order will be administered by:
West Palm Beach Resident Office 4400 PGA Blvd Suite 203 Palm Beach Gardens, FL 33410
Block 27 -- Payment will be made by:
USACE Finance Center 5722 Integrity Drive
ATTN: CEFC-AO-P
Millington, TN 38054-5005
GROUP4-10-R-J032 SF 1442-A3 Revision 0004
Revision 0004 Summary Sheet
GROUP4-10-R-J032
Palm Beach Harbor Maintenance and Advanced Maintenance Dredging, 33-foot Project, Entrance Channel, Southern and Northern Turning Basins, and
Settling Basins, Palm Beach County, Florida
SUMMARY OF CHANGES
1. Contract Documents Volume 1 of 2:
1. DELETE Line Item and Pricing Schedule and REPLACE with the attached revised Line Item and Pricing Schedule.
2. Technical Specifications Volume 2 of 2:
No Change
3. Plans:
DELETE Sheet G-02 and REPLACE with the attached revised Sheet G-02.
DELETE Sheet C-04 and REPLACE with the attached revised Sheet C-04.
DELETE Sheet C-06 and REPLACE with the attached revised Sheet C-06.
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
PALM BEACH HARBOR MAINTENANCE AND ADVANCED MAINTENANCE DREDGING, 33-FOOT PROJECT, ENTRANCE CHANNEL, SOUTHERN AND NORTHERN TURNING BASINS, AND SETTLING BASINS
PALM BEACH COUNTY, FLORIDA
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
BASE
0001 MOBILIZATION AND DEMOBILIZATION 1 JOB $____________
0002 EXCAVATION, UNCLASSIFIED 79,000 CUBIC YARD $____________ $____________
ENTRANCE CHANNEL STATIONS 30+00 TO
61+01.45, SOUTHERN TURNING BASIN
STATIONS 0+00 TO 22+50, NORTHERN TURNING
BASIN STATIONS 9+83.06 TO 22+50,
ESTIMATED QUANTITY (SEE NOTE 2)
0003 TURBIDITY MONITORING 1 JOB $____________
0004 ENDANGERED SPECIES OBSERVERS 1 JOB $____________
0005 STANDBY TIME (SEE NOTE 6) 24 HOUR $____________
0006 MOBILIZATION AND DEMOBILIZATION FOR 1 JOB $____________
SEA TURTLE NON-CAPTURE TRAWL SWEEPING
(HOPPER DREDGE ONLY, SEE NOTE 3)
0007 SEA TURTLE NON-CAPTURE TRAWL SWEEPING 13 DAY $____________ $____________
(HOPPER DREDGE ONLY, ESTIMATED QUANTITY)
(SEE NOTE 3)
0008 BEACH TILLING, ESTIMATED QUANTITY 3 ACRE $____________ $____________
(SEE NOTE 4)
0009 REMEDIATION OF NONCOMPLIANT MATERIAL 1 ACRE $____________ $____________
ESTIMATED QUANTITY (SEE NOTE 5)
0010 SCREENING AND DISPOSAL OF ROCK 50 CUBIC YARD $____________ $____________
ESTIMATED QUANTITY (SEE NOTE 5)
0011 CONSTRUCTION VIBRATION MONITORING AT 1 JOB $____________
BEACH DISPOSAL AREA
TOTAL BASE (ITEMS 0001 THROUGH 0011) $____________
OPTION A
0012 EXCAVATION, UNCLASSIFIED 151,000 CUBIC YARD $____________ $____________
SETTLING BASIN, EXTENDED SETTLING BASIN,
AND EXPANDED SETTLING BASIN. ESTIMATED
QUANTITY (SEE NOTE 2)
0013 TURBIDITY MONITORING 1 JOB $____________
0014 ENDANGERED SPECIES OBSERVERS 1 JOB $____________
0015 STANDBY TIME (SEE NOTE 6) 12 HOUR $____________ $____________
0016 SEA TURTLE NON-CAPTURE TRAWL SWEEPING 27 DAY $____________ $____________
(HOPPER DREDGE ONLY, ESTIMATED
QUANTITY, SEE NOTE 3)
0017 BEACH TILLING, ESTIMATED QUANTITY 6 ACRE $____________ $____________
(SEE NOTE 4)
0018 REMEDIATION OF NONCOMPLIANT MATERIAL 2 ACRE $____________ $____________
ESTIMATED QUANTITY (SEE NOTE 5)
0019 SCREENING AND DISPOSAL OF ROCK 50 CUBIC YARD $____________ $____________
GROUP4-10-R-J032 00010A-1 Revision 0004
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
PALM BEACH HARBOR MAINTENANCE AND ADVANCED MAINTENANCE DREDGING, 33-FOOT PROJECT, ENTRANCE CHANNEL, SOUTHERN AND NORTHERN TURNING BASINS, AND SETTLING BASINS
PALM BEACH COUNTY, FLORIDA
0 TO 50 CUBIC YARDS
ESTIMATED QUANTITY (SEE NOTE 5)
0020 SCREENING AND DISPOSAL OF ROCK 50 CUBIC YARD $____________ $____________
51 TO 100 CUBIC YARDS
ESTIMATED QUANTITY (SEE NOTE 5)
0021 CONSTRUCTION VIBRATION MONITORING AT 1 JOB $____________
BEACH DISPOSAL AREA
TOTAL OPTION A (ITEMS 0012 THROUGH 0021) $____________
(SEE NOTE 7)
TOTAL BASE PLUS OPTION A (ITEMS 0001 THRU 0021) $____________
NOTES:
(1) BIDDERS MUST PRICE ALL LINE ITEMS. SEE PROVISION 52.214-18 OF SECTION 00100, "PREPARATION OF
BIDS - CONSTRUCTION".
(2) QUANTITY INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR
BETWEEN THE DATES OF THE SURVEYS AND THE ACTUAL DREDGING.
(3) SEA TURTLE NON-CAPTURE TRAWL SWEEPING IS REQUIRED WHEN DIRECTED BY THE CONTRACTING
OFFICER. SEE PARAGRAPH 3.1.5.8 OF SECTION 01 57 20.
(4) ACTUAL QUANTITY OF BEACH TILLING MAY VARY FROM ESTIMATED QUANTITY. SEE PARAGRAPH 3.1.5.10c
OF SECTION 01 57 20.
(5) ACTUAL QUANTITIES MAY VARY.
(6) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION BY REQUEST OF THE CONTRACTING OFFICER OR CONTRACTING OFFICER'S REPRESENTATIVE. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO ENDANGERED (OR THREATENED) SPECIES TAKES (EST) OR CONSULTATION EFFORTS, BUT NOT DUE TO ADVERSE WEATHER CONDITIONS OR MECHANICAL/OPERATIONAL ISSUES WITH THE CONTRACTOR'S PLANT. THIS LINE ITEM IS NOT SUBJECT TO VARIATION IN ESTIMATED QUANTITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR THE ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER SUBSEQUENT TO THE INITIAL 24-HOUR PERIOD FOLLOWING AN EST (FOR WHICH CONSIDERATION WILL NOT BE PROVIDED). ADDITIONALLY, IF IT IS SUBSEQUENTLY
DETERMINED BY THE GOVERNMENT THAT THE TAKE(S) RESULTED FROM IMPROPER OPERATIONAL
PROCEDURES, CONSIDERATION MAY BE WITHHELD BY THE GOVERNMENT.
(7) THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE OPTIONAL ITEMS ANYTIME PRIOR TO DEMOBILIZATION OF EQUIPMENT. SEE CLAUSE 52.217-7 (SECTION 00700). THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER, IN WRITING, A MINIMUM OF 7 DAYS PRIOR TO THE ANTICIPATED DATE OF THE DEMOBILIZATION OF A
DREDGE PLANT
(8) ALL SPECIFICATION REFERENCES TO LUMP SUM SHALL APPLY TO LINE ITEMS INDICATING "JOB" AS THE UNIT.
GROUP4-10-R-J032 00010A-2 Revision 0004
SINGER ISLAND
GENERAL NOTES:
PALM BEACH
PORT OF
PALM BEACH
TOWN OF
TURNING BASIN
NORTHERN
FOR COORDINATES
REFER TO DRAWING C-04
OPEN WATER STAGING AREA
SEAGRASSESSEAGRASSES
SETTLING BASINS
AND D.A. PERMIT 10374)
(REFER TO DEP PERMIT 0216012-007-JC
TOP OF PIPE: -52 FEET MLLW OR DEEPER
(2) TWO 12" SAND TRANSFER PLANT PIPELINE CROSSINGS
N
G-02
-P
B H
-G
I0 in d .d g n
A T L A N T I C O C E A N
S T
A T .B
VI
GENERAL
CIVIL
DWG NO. TITLE
INDEX TO DRAWINGS
ABBREVIATIONS
LEGEND:
L A K E W O R T H
L A K E W O R T H
G E
N E
R A
L
1000'500'0500'
VICINITY MAP
ENTRANCE CHANNEL
TURNI
NG
BASI
N
SOUTHERN
INFO
PROJECT CHANNEL
AIDS TO NAVIGATION
CHANNEL LIMITS
CONTROL MONUMENT
HORIZONTAL AND VERTICAL
APPROXIMATE
CENTERLINE
ELEVATION (FEET)
MLLW
NAVD88
STA.
RGE.
NORTH AMERICAN VERTICAL DATUM OF 1988
RANGE
NAD83 NORTH AMERICAN DATUM OF 1983
EL. / ELEV.
S. SOUTH
NO. NUMBER
N. NORTH
DRAWING
DISPOSAL AREA
W. WEST
VERTICAL
N.T.S. NOT TO SCALE
P.I. POINT OF INTERSECTION
APPROX.
E.C. ENTRANCE CHANNEL
MEAN HIGH WATERMHW
MLW MEAN LOW WATER
EAST
MEAN LOWER LOW WATER
STATION
C/L
D/A
DWG.
E.
HORIZONTAL
NGS NATIONAL GEODETIC SERVICE
PERMANENT IDENTIFIERPID
FT FOOT
TURNING BASINT.B.
HORZ.
VERT
G-01
G-02
CHANNEL CONTROL DATA
COVER SHEET
DREDGING PLAN - E.C. STA. 56+00 THRU CUT-2 STA. 86+00
DREDGING PLAN - E.C. STA. 25+00 THRU E.C. STA. 56+00
DREDGING PLAN - CUT-2 STA. 86+00 THRU T.B. STA. 22+50
C-02
G-03
C-03
C-04
C-05
FDEP RANGE MONUMENT
ELEVATION AND LOCATION
49.5
LOCATION
S T
A E .C
CHANNEL C/L PI POINTS
C-06
SEAGRASSES
PROJECT OVERVIEW
DREDGING CROSS SECTIONS
LIMITS TCEJROP
P R
O J
E C
T O
V E
R V
IE
W
GRAPHIC SCALE
A E
ESTIMATED DREDGING QUANTITIES IN CUBIC YARDS (CY)
C-01 DREDGING PLAN - E.C. STA. 0+00 THRU E.C. STA. 25+00
C-07
DREDGING CROSS SECTIONS
CORE BORING
SOIL SAMPLE
VIBRACORE
SOIL SAMPLE
VB-LWI2012-08
CB-PBH91-5
R-81 R-81
ELEMENT
PROJECT
AREA
DREDGE
TOTALSVOLUME
DEPTH
REQUIRED
VOLUME
OVERDEPTH
ALLOWABLE
BASE
OPTION A
ENTRANCE CHANNEL
SOUTHERN TURNING BASIN
NORTHERN TURNING BASIN
31,000
BETWEEN THE DATE OF THE SURVEY AND THE COMMENCEMENT OF DREDGING.
REQUIRED DEPTH AND OVERDEPTH VOLUMES INCLUDE SHOALING ANTICIPATED TO OCCUR
NOTE:
DISPOSAL AREA - BEACH
21,000
3,000
18,000
58,000
4,000
25,000
29,000
79,000
7,000
25,000
47,000
BASE TOTALS
DREDGING AREA (BASE)
DREDGING AREA (OPTION A)
EXPANDED SETTLING BASIN
EXTENDED SETTLING BASIN
SETTLING BASIN
151,000120,000
4. SEE DWG. NO. C-01 FOR CHANNEL SURVEY NOTES.
3. SEE DWG. NO. G-03 FOR CHANNEL CONTROL DATA.
CONSTRUCTION OF THIS PROJECT.
HE/SHE DETERMINES ARE NECESSARY FOR OR AFFECT THE PERFORMANCE OF
SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL SUCH FEATURES THAT
NOT ALL EXISTING STRUCTURES ARE INDICATED ON THE DRAWINGS. THE CONTRACTOR
ONLY AND WERE NOT PHYSICALLY LOCATED BY SURVEY UNLESS OTHERWISE INDICATED.
2. ALL PLANIMETRIC LAND FEATURES DEPICTED ON THESE PLANS ARE FOR INFORMATION
THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS WITHIN
CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION
1. THIS PROJECT WAS DESIGNED BY THE JACKSONVILLE DISTRICT OF THE U.S. ARMY
1 DREDGING AREA DESIGNATOR
R-80.35
PIPELINE CROSSING
SAND TRANSFER PLANT
L A K E W O R T H I N L E T
R E
V
IS
E D T
O A
C C
O M
P A
N Y R
E V
IS
IO
N
A
ALABAMA
GEORGIA
TALLAHASSEE
PENSACOLA
JACKSONVILLE
ORLANDO
FT MYERS
MIAMI
TAMPA
KEY WEST
ATLANTIC
OCEAN
N.T.S.
LOCATION MAP
CANAVERAL
ST AUGUSTINE
N
GAINESVILLE
WEST PALM BEACH
FLORIDA
GULF OF MEXICO
OF WORK
LOCATION
R-80
R-79
R-78
R-77
R-76
F
E
D
C
B
A
F
E
D
C
B
A
10 9 8 7 6 5 4 3 2
10 9 8 7 6 5 3 2 1
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E E
R S
DEPENDS ON YOU
SAFTEY ON THIS JOB
D E
P A
R T
M E
N T O
F T
H E A
R M
Y M .L .C
J .E .B
/1
/2
P A
L M B
E A
C H H
A R
B O
R F
L O
R
ID
A
M .R .2 /D .B .V
E N
T R
A N
C E C
H A
N N
E L
S O
U T
H E
R N A
N D N
O R
T H
E R
N
T U
R N
IN
G B
A S
IN
S
A N
D S
E T
T L
IN
G B
A S
IN
S
M A
Y
M A
IN
T E
N A
N C
E A
N D A
D V
A N
C E
D M
A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J
E C
T
CUT-1
Y=890,000
Y=889,000
Y=888,000
Y=887,000
Y=885,000
Y=886,000
Y=884,000
Y=883,000
Y=882,000
X ,0
X ,0
X ,0
X ,0
X ,0
X ,0
X ,0
X ,0
X ,0
X ,0
X ,0
X ,0
CUT-
PEANUT ISLAND
A P
P R
O X ,8
F
E E
T
B E
A C
H D
IS
P
O S
A L A
R E
A
.9
.6
.0
.8
.7
.5
V B -L
W I2
-1
C B -W
P -1
C B -W
P -6
C B -W
P -7
C B -P
B H -1
C B -2
V B -L
W I2
-1
C B -W
P -1
C B -L
W I1
-3
V B -L
W I2
-1
C B -3
C B -P
B H -6
C B -W
P -1
C B -W
P -1
C B -L
W I1
-4
V B -L
W I2
-1
C B -W
P -2
.4
.4
.3
.2
.1
.0
.B
T .B .6
.5
9.
.1
BASIN
SOUTHERN TURNING
.5
4.
4.
H
P
E D
D E
RI
U
Q E
R T O
OF-33
3.
W
S T
E R
L Y L
IM
IT
O
F P
R O J
E C
T S
T A
.1
H
P E
D R
E V
O E
L B
A W
O L
L A T
O
OF-2 S
ULP
.0
.7
9.
9.
9.
.6
.4
.4
.1
.7
.7
"RLM-12" 8.
8.
PLANE COORDINATES
YX
CORNER
IN-WATER STAGING AREA COORDINATES
.5
7.
7.
5.
APPROX. SHORELINE
APPROX. BULKHEAD
IN-WATER STAGING AREA
C-04
N
-P
B H
-C
N P
L N .d g n
C
IV
IL
D R
E D
G
IN
G P
L A
N
X
,0
X
,5
X
,0
X
,5
X
,0
X
,5
X
,0
Y= 887,500
Y= 887,000
Y= 886,500
Y= 886,000
Y= 885,500
Y= 885,000
NOTE:
200'100'0100'
X
,5
LAKE WORTH
P.I. STA. 0+00 T.B.
P.I. STA. 10+99.69 CUT-2
RG
E.
V
ARI
ES
RGE.
RGE.
RGE.
RGE. VARIES
RGE. VARIES
R G
E
V A
R
IE
S
RGE. VARIES
RGE. VARIES
R G
E V
A R
IE
S
RGE.
PEANUT ISLAND
P.I. STA. 22+50 T.B.
T .B . 1
2. SEE DRAWING C-01 FOR SURVEY NOTES.
1. SEE DRAWING G-02 FOR PROJECT OVERVIEW, GENERAL NOTES AND MAPS.
T .B . 2
.1
RGE. 481.52
STA. 0+00
GRAPHIC SCALE
S T
A . 1
C U
T -2 S
T A
T
H R
U T .B
S T
A
M A
T C
H L
IN
D W
G
N O
C -0
S
T A
U
T -2
PALM BEACH
PORT OF
25-FOOT REQUIRED DEPTH
PLUS 1-FOOT ALLOWABLE OVERDEPTH
NW
NE
SW
SE
966,615.85 885,072.97
967,296.82 885,094.64
966,655.97 884,825.88
967,272.96 884907.16
A
E
R E
V
IS
E D T
O A
C C
O M
P A
N Y R
E V
IS
IO
N
A
6E
6F
6G
6H
6I
6A
6B
6D
6C
6J
S T
A T .B
BASIN
TURNING
NORTHERN
V
VI
BASIN
TURNING
SOUTHERN
PLANE COORDINATES
YX
AIDS TO NAVIGATION
C B -W
P -1
C B -W
P -6
C B -W
P -7
C B -P
B H -1
C B -2
V B -L
W I2
-1
C B -W
P -1
C B -L
W I1
-3
V B -L
W I2
-1
C B -3
V B -L
W I2
-1
C B -P
B H -6
C B -W
P -1
C B -W
P -1
C B -L
W I1
-4
V B -L
W I2
-1
C B -W
P -2
D
C-06
D
C-06
F
E
D
C
B
A
F
E
D
C
B
A
10 9 8 7 6 5 4 3 2
10 9 8 7 6 5 3 2 1
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
DEPENDS ON YOU
SAFTEY ON THIS JOB
D E
P A
R T
M E
N T O
F T
H E A
R M
Y M .L .C
J .E .B
/1
/2
P A
L M B
E A
C H H
A R
B O
R F
L O
R
ID
A
M .R .2 /D .B .V
E N
T R
A N
C E C
H A
N N
E L
S O
U T
H E
R N A
N D N
O R
T H
E R
N
T U
R N
IN
G B
A S
IN
S
A N
D S
E T
T L
IN
G B
A S
IN
S
M A
Y
M A
IN
T E
N A
N C
E A
N D A
D V
A N
C E
D M
A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J
E C
T
NW
NE
SW
SE
LT-1 (02/17) 966,426 885,080
LT-12 (02/17) 966,886 886,602
LT-13 (02/17) 967,272 885,083
967,906 886,317LT-11 (02/17)
"GLM-13"
R G
E . V
A R
IE
S
"GLM-1"
"GLM-11"
RGE.
RGE.
.28
-P
B H
-C
N T
C S .d g n
C
IV
IL
D R
E D
G
IN
G
C R
O S
S S
E C
T
IO
N S
A
E
R E
V
IS
E D T
O A
C C
O M
P A
N Y R
E V
IS
IO
N
C-06
F
E
D
C
B
A
F
E
D
C
B
A
10 9 8 7 6 5 4 3 2
10 9 8 7 6 5 3 2 1
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
F
IL
E N
U M
B E
R
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
C O
N T
R A
C T N
O of Engineers
US Army Corps
Jacksonville District
DRAWING NO.
D E
S C
R
IP
T
IO
N N o
S Y
M Z
O N
E
J A
C K
S O
N V
IL
L E F
L O
R
ID
A
J A
C K
S O
N V
IL
L E D
IS
T R
R P
S O
F E
N G
IN
E E
R S
DEPENDS ON YOU
SAFTEY ON THIS JOB
D E
P A
R T
M E
N T O
F T
H E A
R M
Y M .L .C
J .E .B
/1
/2
P A
L M B
E A
C H H
A R
B O
R F
L O
R
ID
A
M .R .2 /D .B .V
E N
T R
A N
C E C
H A
N N
E L
S O
U T
H E
R N A
N D N
O R
T H
E R
N
T U
R N
IN
G B
A S
IN
S
A N
D S
E T
T L
IN
G B
A S
IN
S
M A
Y
M A
IN
T E
N A
N C
E A
N D A
D V
A N
C E
D M
A
IN
T E
N A
N C
E D
R E
D G
IN
G
-F
O O
T P
R O J
E C
T
A
GRAPHIC SCALES
"A" 100'50'050'
"B"
20'10'010'
NOTES:
"SIDE SLOPES" FOR SIDE SLOPE DREDGING.
SEE SPECIFICATIONS SECTION 35 20 23 PARAGRAPH TITLED
CONTRACTUAL PAYMENT PROPOSES ONLY.
3. SIDE SLOPES SHOWN ON CROSS SECTIONS ARE FOR
THE CONTRACTING OFFICER.
PILING, OR ANY OTHER STRUCTURE EXCEPT AS DIRECTED BY
2. NO DREDGING WILL BE PERMITTED WITHIN 25' OF ANY PIER,
AND VICINITY MAP.
ABBREVIATIONS, LOCATION MAP, ESTIMATED QUANTITIES, LEGEND,
1. REFER TO DWG. NO. G-02 FOR INDEX TO DRAWINGS, GENERAL NOTES,
D
C-04
VERT = SCALE "B"
HORIZ = SCALE "A"
D
C-04
VERT = SCALE "B"
HORIZ = SCALE "A"
TYPICAL SECTION TURNING BASINS
TYPICAL SECTION TURNING BASINS
EXISTING BOTTOM
EXISTING BOTTOM
E L E
V A
T
IO
N I
N F
E E
T
(M
L L
W
9501050 250450550650750850 350RANGE 11501250135014501550
AREA TO BE DREDGED
V A
R
IE
S
R A
N G
E
R A
N G
E
M A
T C
H L
IN
E R
A N
G E
S
E E B
E L
O W
-150-50 -850-650-550-450-350-250150
M A
T C
H L
IN
E R
A N
G E
S
E E A
B O
V E
50 -750
E L E
V A
T
IO
N I
N F
E E
T
(M
L L
W
-950 -1050 -1150 -1350
-1250RANGE
V A
R
IE
S
R A
N G
NORTHERN TURNING BASIN
1' ALLOWABLE OVERDEPTH
25' REQUIRED DEPTH
33' REQUIRED DEPTH
2' ALLOWABLE OVERDEPTH
2' ALLOWABLE OVERDEPTH
33' REQUIRED DEPTH
SOUTHERN TURNING BASIN
SOUTHERN TURNING BASIN
AREA TO BE DREDGED
V A
R
IE
S
R A
N G
| ADDENDUM TO THE STANDARD FORM 1442 |
| W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003); Cavache, Inc. (W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13-D-0005); Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W9... |
| THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER: |
| Palm Beach Harbor MD17_20170811_AMEND.pdf |
| G-02 |
| C-04 |
| C-06 |
| Dredging Cross Sections |