GROUP4-10-R-J030 _Revision_0004.pdf

PDF 55 KB Posted

Attached to
U. S. Naval Station Mayport, Florida Maintenance Dredging, 50-Foot Project Entrance Channel and Harbor Complex
Solicitation number
GROUP4-10-R-J030
Issued by

About this file

Revision 0004

View the file

Other files

File Type Posted
GROUP4-10-R-J030-0003.pdf PDF
MayportMDFY16REV0003Set.pdf PDF
GROUP4-10-R-J030_Amendment_0002.pdf PDF
GROUP4-10-R-J030-Revision_0001.pdf PDF
G4J030PlansMayport.pdf PDF
Mayport_O M_GDR_2016_final.pdf PDF
G4J030Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUP4-10-R-J030 SF 1442-A1 REVISION 0004

ADDENDUM TO THE STANDARD FORM 1442

U.S. NAVAL STATION MAYPORT, FLORIDA MAINTENANCE DREDGING, 50-FOOT

PROJECT ENTRANCE CHANNEL AND HARBOR COMPLEX

SPECIAL NOTIFICATION: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING

CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER

For GROUP 4 use: W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003);

Cavache, Inc. (W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13- D-0005); Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W912EP-13-D-0007); Dutra Dredging Company (W912EP-13-D-0008);

Marinex Construction, Inc. (W912EP-13-D-0009); Norfolk Dredging Company (W912EP-13- D-0010); Mike Hooks, Inc. (W912EP-13-D-0011); Weeks Marine, Inc. (W912EP-13-D-0012);

Southern Dredging Co., Inc. (W912EP-13-D-0013); Manson Construction Company (W912EP-13-D-0014); and C. F. Bean LLC (W912EP-13-D-0015)

PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE

PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 4, DREDGING POOL.

TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the technical evaluation factors are:

(1) Availability of technically acceptable dredge(s)

(2) Past performance, to include the MATOC (The government reserves the right to obtain copies of all Construction Contract Administration Support System (CCASS) records contained in the US Army Corps of Engineers CCASS database for the Prime Contractor (Offeror) and all Major Sub-Contractors).

SUBMISSION REQUIREMENTS: Contractors are required to submit the following:

(1) All submissions shall be on company letterhead identifying the dredge(s) the contractor proposes to do the work and the location of dredge(s). The identified dredge(s) must also have been found technically acceptable by the Contracting Officer prior to the proposal due date.

(2) Completed Bid Schedule (see Section 00010A)

(3) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph 2.4(c) of the MATOC

(4) Completed “Addendum to the Standard Form 1442”

(5) Revisions- offers shall acknowledge receipt of revisions by completing the “notice to offerors—blocks 14,15 and 20”

THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:

Block 9 -- For additional information contact: Timothy A. Donnellan, (904)232-3055 Timothy.A.Donnellan@usace.army.mil

Block 10 -- Magnitude of Construction is between $5,000,000.00 and $15,000,000.00

GROUP4-10-R-J030 SF 1442-A2 REVISION 0004

Block 11 – The contractor shall begin performance within 45 calendar days and complete performance within 212 230 calendar days after receipt of the notice to proceed (NTP). This performance period is mandatory.

Block 12 -- The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order.

Block 13 -- Sealed offers to perform the work required shall be delivered to the following address not later than: 2:00 pm Local Time on 14 21 October 2016.

Contracting Division – Attn: Timothy A. Donnellan U.S. Army Corps of Engineers 701 San Marco Blvd.

Jacksonville, FL 32207

NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, and 20 below:

Block 14 -- Name and Address of Offeror (including Zip Code):

DUNS: ___________________ CAGE: _______________

Block 15 -- Telephone No. (Include area code): _____________________

Block 20 -- Name and Title of Person Authorized to Sign Offer (type or print):

Type/Print ________________________________________________

Signature: ________________________________________________

E-Mail: ________________________________________________

Offer Date: _______________________________________________

Block 26 -- This Task Order will be administered by:

North Florida Area Office 4070 Boulevard Center Drive Suite 201 Jacksonville, FL 32207

Block 27 -- Payment will be made by:

USACE Finance Center 5722 Integrity Drive

ATTN: CEFC-AO-P

Millington, TN 38054-5005

GROUP4-10-R-J030 REVISION 0004

SF 30 CONTINUATION SHEET

U.S. NAVAL STATION MAYPORT, FLORIDA MAINTENANCE DREDGING,

50- FOOT PROJECT ENTRANCE CHANNEL AND HARBOR COMPLEX

CONTRACTING DOCUMENTS:

1) ADDENDUM TO THE STANDARD FROM 1442.

a. Remove and Replace with Revision 0004.

2) CLAUSES

a. Delete clause 52.211.10 and Replace with the attached Clause 52.211.10

b. Delete clause 52.211-12 and Replace with the attached Clause 52.211-12

TECHNICAL SPECIFICATIONS:

No Changes.

DRAWINGS:

No Changes.

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 45 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 230 calendar days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,715.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

File details come from the government source that posted it. Updated .