GROUP4-10-R-J027
US Army Corps of Engineers Jacksonville District
SHORE PROTECTION PROJECT
DUVAL COUNTY, FLORIDA
RENOURISHMENT 2016
Duval County, Florida
Construction Solicitation and Specifications Volume 1 of 1
25 April 2016 k3endmms Corps logo k3endmms Typewritten Text k3endmms Typewritten Text k3endmms Typewritten Text k3endmms Typewritten Text
GROUP4-10-R-J027 SF 1442-A1
ADDENDUM TO THE STANDARD FORM 1442
Shore Protection Project, Duval County, Florida, Renourishment 2016
SPECIAL NOTIFICATION: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING
CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER
W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003); Cavache, Inc.
(W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13-D-0005);
Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W912EP-13-D-0007); Dutra Dredging Company (W912EP-13-D-0008);
Marinex Construction, Inc. (W912EP-13-D-0009); Norfolk Dredging Company (W912EP-13- D-0010); Mike Hooks, Inc. (W912EP-13-D-0011); Weeks Marine, Inc. (W912EP-13-D-0012);
Southern Dredging Co., Inc. (W912EP-13-D-0013); Manson Construction Company (W912EP-13-D-0014); C. F. Bean LLC (W912EP-13-D-0015) PROPOSALS WILL NOT BE
CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS
INCLUDED IN THE Group 4 Dredging MATOC Pool.
TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the technical evaluation factors are:
(1) Availability of technically acceptable dredge(s). Note: Coast Guard Certified Equipment is REQUIRED.
(2) Past performance, to include the MATOC (The government reserves the right to obtain copies of all Contractor Performance Assessment Reporting System (CPARS) records contained in the US Army Corps of Engineers CPARS database for the Prime Contractor (Offeror) and all Major Sub-Contractors).
SUBMISSION REQUIREMENTS: Contractors are required to submit the following:
(1) A letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the location of dredge(s). The identified dredge(s) must also have been found technically acceptable by the Contracting Officer prior to the proposal due date.
(2) Completed Bid Schedule (see Section 00010A)
(3) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph 2.4(c) of the MATOC
(4) Completed “Addendum to the Standard Form 1442 with the latest revision”.
(5) Revisions – Offers must acknowledge receipt of this Revision by completing “Notice to Offerors--Blocks 14, 15 and 20” of each revision.
THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:
Block 9 -- For additional information contact:
Timothy Humphrey 904-232-1072 Timothy.G.Humphrey@usace.army.mil.
Block 10 -- Magnitude of Construction is between $10,000,000.00 and $20,000,000.00. Coast Guard Load line, Certified Equipment is required for this project.
GROUP4-10-R-J027 SF 1442-A2
Block 11 -- The Contractor shall begin performance within 45 calendar days and complete it within 104 calendar days after receiving notice to proceed. This performance period is mandatory. NOTE: If there are optional line items, refer to FAR 52.211-10 for breakdown of period of performance.
Block 12 -- The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order.
Block 13 -- Sealed offers to perform the work required shall be delivered to the following address not later than May 27, 2016 at 3:00 P.M. EST.
U.S. Army Corps of Engineers Jacksonville Regional Contracting Center (CESAJ-CT-C) Prudential Office Building 701 San Marco Blvd.
Jacksonville, Florida 32207-8175
NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, and 20 below:
Block 14 -- Name and Address of Offeror (including Zip Code):
DUNS: ___________________ CAGE: _______________
Block 15 -- Telephone No. (include area code): _____________________
Block 20 -- Name and Title of Person Authorized to Sign Offer (type or print):
Type/Print ________________________________________________
Signature: ________________________________________________ e-Mail: ________________________________________________
Offer Date: _______________________________________________
Block 26 -- This Task Order will be administered by:
North Florida Area Office 4070 Boulevard Center Drive Suite 201 Jacksonville, FL 32207
Block 27 -- Payment will be made by:
USACE Finance Center 5722 Integrity Drive
ATTN: CEFC-AO-P
Millington, TN 38054-5005
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
GROUP4-10-R-0027 00010A-1
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0001 MOBILIZATION AND DEMOBILIZATION LUMP SUM $_______________
0002 BEACH FILL (ESTIMATED QUANTITY) 650,000 CUBIC YARD $___________ $_______________
0003 SCREENING (ESTIMATED QUANTITY) 650,000 CUBIC YARD $___________ $_______________
0004 BEACH TILLING (ESTIMATED QUANTITY) 20 ACRE $___________ $_______________
0005 DISPOSAL OF MATERIAL (ESTIMATED QUANTITY) 10 CUBIC YARD $___________ $_______________
0006 REMEDIATION OF NONCOMPLIANT MATERIAL 1 ACRE $___________ $_______________
(ESTIMATED QUANTITY, SEE NOTE 4)
0007 CONSTRUCTION/VIBRATION CONTROLS AND LUMP SUM $_______________
MONITORING
0008 ENVIRONMENTAL SPECIES MONITORING LUMP SUM $_______________
0009 TURBIDITY MONITORING LUMP SUM
0010 MOBILIZATION AND DEMOBILIZATION FOR NON- LUMP SUM $_______________
CAPTURE SEA TURTLE TRAWL SWEEPING
AND RELOCATION (HOPPER DREDGE ONLY)
0011 SEA TURTLE NON-CAPTURE TRAWL SWEEPING 10 DAY $___________ $_______________
AND RELOCATION (ESTIMATED QUANTITY)
0012 STANDBY TIME (SEE NOTE 6) 72 HOUR $___________ $_______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0012) $_______________
NOTES: (1) OFFER MUST PRICE ALL LINE ITEMS. SEE PROVISION AT 52.214-18 (SECTION 00100).
(2) FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSIONS (SF 1442, SECTION 00010A, AND
SECTION 00101) COULD RENDER YOUR BID NON-RESPONSIVE.
(3) ACTUAL QUANTITIES MAY VARY
(4) REMEDIATION OF NONCOMPLIANT MATERIAL IS SUBJECT TO VARIATION IN ESTIMATED QUANTITY CLAUSE, BUT PAYMENT WILL ONLY BE MADE FOR ACTUAL EXECUTION OF THIS LINE ITEMS AS APPROVED BY THE
CONTRACTING OFFICER.
(5) SEA TURTLE NON-CAPTURE TRAWL SWEEPING IS REQUIRED WHEN DIRECTED BY THE CONTRACTING
OFFICER. SEE SECTION 01 57 20 ENVIRONMENTAL PROTECTION.
DUVAL COUNTY, FLORIDA
SHORE PROTECTION PROJECT
BEACH RENOURISHMENT 2016
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
GROUP4-10-R-0027 00010A-2
DUVAL COUNTY, FLORIDA
SHORE PROTECTION PROJECT
NOTES (CONTINUED):
((6) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION AT THE DIRECTION OF THE CONTRACTING OFFICER OR ADMINISTRATIVE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO THE PRESENCE OF ENDANGERED SPECIES IN THE IMMEDIATE AREA OF THE DREDGING OPERATIONS, DIFFERING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE CONTRACTING OFFICER. STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS. THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN
ESTIMATED QUANTITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME
REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT
AND SECTION 01 57 20 ENVIRONMENTAL PROTECTION.
(7) IN ACCORDANCE WITH FAR 9.104-2, SPECIAL STANDARDS, THE GOVERNMENT HAS DETERMINED THAT IN ORDER TO BE CONSIDERED FOR AWARD OF THIS TASK ORDER, THE CONTRACTOR MUST MEET ALL THE REQUIREMENTS OF RESPONSIBILITY IDENTIFIED IN FAR PART 9 AS WELL AS PROVIDE A USCG CERTIFICATION AND/OR CURRENT MARINE SURVEY INSPECTION CERTIFICATE(S) FOR DREDGE AND ALL PLANT. FAILURE TO PROVIDE THIS DOCUMENTATION AS REQUIRED BY THIS SOLICITATION MAY RENDER YOUR PROPOSAL INELIGIBLE FOR AWARD OF THIS TASK ORDER. REFER TO COE EM 385-1-1 FOR ADDITIONAL INFORMATION.
00010A – A1
SECTION 00010A, Attachment A
INSTRUCTIONS FOR TECHNICAL INQUIRIES AND QUESTIONS
Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) 17 May 2016 (5:00 pm). To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment / question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.
All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted on the FedBizOps in the form of a report generated from ProjNet as soon as the comment/question entering period is over and all answers are all finalized.
The Solicitation Number is: GROUP4-10-R-J027
The Bidder Inquiry Key is: WV26VT-C9WINC
Specific Instructions for ProjNet Bid Inquiry Access from ProjNet home page:
1. Identify the Agency. This should be marked as USACE.
2. Email. Enter the email address you would like to use for communication.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret
Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access from ProjNet home page:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. Identify the Agency. This should be marked as USACE.
3. Email. Enter the email address you used to register previously in ProjNet.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
THE FOLLOWING PAGES CONTAIN ADDENDUMS TO SPECIFIC SECTIONS OF THE
ORIGINAL SOLICITATION NUMBER W912EP-10-R-0026
THESE ADDENDUMS ARE ONLY APPLICABLE TO THIS
SPECIFIC TASK ORDER
REQUEST FOR PROPOSAL NUMBER: GROUP4-10-R-J027
TASK ORDER PROJECT TITLE:
SHORE PROTECTION PROJECT, DUVAL COUNTY,
FLORIDA, RENOURISHMENT 2016
NOTICE TO OFFERORS: The information on the following pages is provided for the various clauses and/or paragraphs which require information to be filled in (when applicable) on each Request for Proposal for Task Orders issued under the awarded contracts. All applicable clauses, terms and conditions contained in the original solicitation and subsequently awarded contracts become part of each Task Order.
GROUP-10-R-J027 Clause Addendum-1
ADDENDUM TO SECTION 00100, INSTRUCTIONS TO OFFERORS
THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00100 ARE HEREBY PROVIDED:
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
21.8% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Duval County, Florida.
(End of provision)
GROUP4-10-R-J027 00100-A1
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (ALTERNATE I) (FEB 1995) (CESAJ
ADAPTATION)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for – 12 May 2016 at 9:00 AM EST.
(c) Participants will meet at -- (Location will be provided by the contract administration office via telephone. See (d) below.)
(d) Participants should call Geoffrey Klug at 904-232-3808 (office) or 904-228-2970 (cell) on or before 10 May 2016 to make arrangements.
(e) Core borings are available. (If available, follow the instructions in the Physical Data paragraph in Section 00 11 00 and 00 31 32 of individual request for proposals issued for task orders under this contract to make arrangements to inspect the borings. Failure to follow the instructions may result in a delay ranging in duration from one hour to 4 days.)
(f) After the site visit, a memorandum summarizing the visit may be posted to the appropriate website under the solicitation number. This posting will be strictly for informational purposes only.
The memorandum will not become a part of the solicitation. If the solicitation needs to be changed as a result of information obtained during the site visit, a written amendment will be made available to all registered vendors. Questions regarding any information given in the memorandum must be directed to the person whose name appears in item 9 of the Addendum to the Standard Form 1442.
(End of provision)
GROUP4-10-R-J027 00100-A2
ADDENDUM TO SECTION 00700, CONTRACT CLAUSES
THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00700 ARE HEREBY PROVIDED:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 45 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 104 calendar days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,416.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
GROUP4-10-R-J027 00700-A1
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general—
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing Index No.
SHORE PROTECTION GROUP4-10-R-J027 G-02
PROJECT, DUVAL COUNTY,
FLORIDA, RENOURISHMENT 2016
GROUP4-10-R-J027 00700-A2
ADDENDUM TO SECTION 00800, SPECIAL REQUIREMENTS
THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00800 ARE HEREBY PROVIDED:
LIMITATIONS ON SUBSTITUTIONS FOR CERTAIN POSITIONS AND/OR
SUBCONTRACTORS
The award decision for this contract was based, in part, on an evaluation of the personnel and/or subcontractors the Contractor included in its proposal for the positions and/or items of subcontracted work identified at the end of this paragraph. The Contractor agrees these personnel and/or subcontractors will be employed as described in its proposal and no substitutes will be employed without prior written approval of the Contracting Officer or Administrative Contracting Officer. The Contractor further agrees that any proposed substitutes shall meet or exceed the qualifications of the original personnel and/or subcontractors. If the Contractor’s proposal did not name a subcontractor for an identified item of work, the Contractor will not be allowed to subcontract that item of work without prior approval of the Contracting Officer or Administrative Contracting Officer. The limitations described herein shall apply to the following:
plant and equipment.
(End of paragraph number 999.215-4001)
GROUP4-10-R-J027 00800-A1
GROUP4-10-R-J027 00800A-i
SECTION 00800A
WAGE DETERMINATIONS & OTHER ATTACHMENTS
LIST OF CONSTRUCTION CONTRACT ATTACHMENTS
NO. TITLE DATE NO. OF PAGES
1 NOTE 1
2 General Decision Number FL160154 04/01/2016 6
3 General Decision Number FL160002 01/08/2016 4 4 General Decision Number FL160003 01/08/2016 3
NOTE NOTE NOTE NOTE NOTE NOTE
THE HEAVY CONSTRUCTION WAGE DECISION MAY ONLY BE
APPLIED TO OPERATIONS OCCURRING ON LAND. It cannot be applied to work of any sort conducted aboard vessels or floating plants of any type.
If you have any questions concerning the application of the wage decisions furnished for this project, please contact:
Fran Russell, Office of Counsel, Jacksonville District, U.S, Army Corps of Engineers. 904-232-3761, fax 904-232-1954.
GROUP4-10-R-J027 00800A-1
General Decision Number: FL160154 04/01/2016 FL154
Superseded General Decision Number: FL20150154
State: Florida
Construction Type: Heavy
County: Duval County in Florida.
HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 04/01/2016
* ELEC0177-002 11/30/2015
Rates Fringes
ELECTRICIAN......................$ 26.49 11.23
ENGI0673-010 05/01/2013
Rates Fringes
OPERATOR: Oiler.................$ 19.52 9.05
IRON0597-005 02/01/2015
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 22.26 9.10
LABO0517-002 05/01/2014
Rates Fringes
LABORER: Grade Checker..........$ 18.35 6.45
PAIN0164-006 08/01/2014
Rates Fringes
GROUP4-10-R-J027 00800A-2
PAINTER: Brush, Roller and Spray............................$ 19.50 8.83
SUFL2009-150 06/24/2009
Rates Fringes
CARPENTER........................$ 15.92 0.00
CEMENT MASON/CONCRETE FINISHER...$ 13.23 2.15
LABORER: Common or General......$ 9.84 1.74
LABORER: Landscape..............$ 7.25 0.00
LABORER: Pipelayer..............$ 12.38 1.31
LABORER: Power Tool Operator (Hand Held Drills/Saws, Jackhammer and Power Saws Only)............................$ 10.63 2.20
OPERATOR: Asphalt Paver.........$ 11.59 0.00
OPERATOR: Backhoe Loader Combo............................$ 16.10 2.44
OPERATOR: Backhoe/Excavator.....$ 12.94 1.49
OPERATOR: Bulldozer.............$ 13.40 1.19
OPERATOR: Crane.................$ 25.00 0.00
OPERATOR: Grader/Blade..........$ 16.00 2.84
OPERATOR: Loader................$ 11.31 2.02
OPERATOR: Mechanic..............$ 14.32 0.00
OPERATOR: Roller................$ 10.03 0.00
OPERATOR: Scraper...............$ 11.00 1.74
OPERATOR: Trackhoe..............$ 20.92 5.50
OPERATOR: Tractor...............$ 10.54 0.00
TRUCK DRIVER, Includes Dump Truck............................$ 14.50 0.00
TRUCK DRIVER: Lowboy Truck......$ 13.06 2.18
TRUCK DRIVER: Off the Road Truck............................$ 12.21 1.97
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
GROUP4-10-R-J027 00800A-3
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
GROUP4-10-R-J027 00800A-4
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
GROUP4-10-R-J027 00800A-5
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
GROUP4-10-R-J027 00800A-6
General Decision Number: FL160002 01/08/2016 FL2
Superseded General Decision Number: FL20150002
State: Florida
Construction Type: Heavy Dredging
Counties: Florida Statewide.
Dredging Construction Projects FLORIDA (Excluding West of the Aucilla River and its tributary waterways)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016
* ENGI0025-002 10/01/2014
Rates Fringes
Dredging : (Hydraulic Dredges Over 20") CLASS A.....................$ 35.63 12.39+a CLASS B1....................$ 30.81 12.00+a CLASS B2....................$ 29.01 11.86+a CLASS C1....................$ 28.22 11.55+a CLASS C2....................$ 27.30 11.47+a CLASS D.....................$ 22.68 10.85+a Hydraulic Dredges Under 20" Cook........................$ 8.11 1.73+b Deckhand....................$ 7.77 1.73+b Engineer....................$ 9.59 1.73+b Launchman...................$ 8.19 1.73+b Leverman....................$ 10.03 1.73+b Mate........................$ 8.82 1.73+b Mess Cook...................$ 7.71 1.73+b Messman & Janitor...........$ 7.53 1.73+b Oiler & Fireman.............$ 8.11 1.73+b Shoreman....................$ 7.82 1.73+b Spider Barge Operator.......$ 8.68 1.73+b Spill Barge Operator........$ 8.68 1.73+b Welder......................$ 9.79 1.73+b
CLASSIFICATIONS:
CLASS A: Leverman, Operator.
CLASS B1: Licensed Tug Operator over 1000 HP, Derrick Operator, Spider/Spill Barge Operator, Timber Fork
GROUP4-10-R-J027 00800A-7
Operator, Dozer Operator, Engineer, Blaster/Driller, Fill Placer, Electrician.
CLASS B2: Licensed Boat Operator, Certified Welder.
CLASS C1: Mate, Drag Barge Operator, Welder, Assistant Fill Placer, Steward.
CLASS C2: Boat Operator.
CLASS D: Shoreman, Deckhand, Rodman, Scowman, Cook, Messman, Oiler, Janitor.
PREMIUMS: Additional 20% for hazardous material work
FOOTNOTE APPLICABLE TO ABOVE CRAFTS:
a. New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
Vacation Contribution of 8% of straight time rate multiplied by the total hours worked.
b. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day. Plus Vacation contribution of 8% of straight time pay for all hours worked.
INCENTIVE PAY : (Add to Hourly Rate)
Operator (NCCCO License/Certification) $0.50; Licensed Tug Operator over 1000 HP (Assigned as Master) USCG licensed Master of Towing Vessels (MOTV) $1.00; Licensed Boat Operator (assigned as lead boat captain) USCG licensed boat operator $0.50; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $0.50; Oiler QMED and Tankerman endorsement (USCG) $0.50; All classifications Tankerman endorsement only (USCG) $0.50; Deckhand or Mater AB w/Lifeboatman only (USCG) $0.25; Welder (ABS certification) $0.50
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed
GROUP4-10-R-J027 00800A-8
in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
GROUP4-10-R-J027 00800A-9
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
GROUP4-10-R-J027 00800A-10
General Decision Number: FL160003 01/08/2016 FL3
Superseded General Decision Number: FL20150003
State: Florida
Construction Types: Heavy Dredging
Counties: Florida Statewide.
HOPPER DREDGE CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016
SUFL1993-010 05/24/1993
Rates Fringes
Self-Propelled Hopper Dredge Drag Tenders................$ 8.21
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
GROUP4-10-R-J027 00800A-11
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
GROUP4-10-R-J027 00800A-12
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
GROUP4-10-R-J027 00800A-13
Shore Protection Project, Duval County, Florida, Renourishment 2016
PROJECT TABLE OF CONTENTS
DIVISION 00 - TECHNICAL INFORMATION
00 31 21 CONTROL MONUMENT DESCRIPTIONS
00 31 32 GEOTECHNICAL DATA REPORT
00 33 50 WEATHER, WATER STAGE AND TIDE DATA
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE PROCEDURES
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 25 OWNER SAFETY REQUIREMENTS - DIVING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 05 DREDGING/BEACH FILL PLACEMENT - CONTRACTOR QUALITY CONTROL
01 50 02 TEMPORARY CONSTRUCTION FACILITIES
01 57 20 ENVIRONMENTAL PROTECTION
01 57 25 TURBIDITY AND DISPOSAL MONITORING
DIVISION 02 - EXISTING CONDITIONS
02 22 13 VIBRATION MONITORING REQUIREMENTS FOR EXISTING STRUCTURES
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 25 BEACH FILL
35 20 26 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM SCOW -
ULLAGE PROFILE
35 20 28 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM HOPPER DREDGE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
Section 00 31 21
CONTROL MONUMENT DESCRIPTIONS
00 31 21 - i
DESIGNATION - R 67
PID - BC1553
TIDAL BM - This is a Tidal Bench Mark.
MARKER: SURVEY DISK
SETTING: SET IN PREFABRICATED CONCRETE POST IMBEDDED IN GROUND
STAMPING: DUVAL R-67 1974
MARK LOGO: FLDNR
PROJECTION: FLUSH
MAGNETIC: NO MAGNETIC MATERIAL
STABILITY: MARK OF QUESTIONABLE OR UNKNOWN STABILITY
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR SATELLITE
OBSERVATIONS - March 03, 2009
HISTORY - Date Condition Report By
HISTORY - 1974 MONUMENTED FLDNR
HISTORY - 20090303 GOOD FLDEP
STATION DESCRIPTION/RECOVERY (2007)
RECOVERY NOTE BY FL DEPT OF ENV PRO 2007 (JLM)
THE MARK IS IN JACKSONVILLE BEACH, IN SECTION 33, TOWNSHIP 2 SOUTH, RANGE 29
EAST.
TO REACH THE MARK FROM THE INTERSECTION OF U.S. HIGHWAY 90 (BEACH BOULEVARD)
AND STATE ROAD A1A (THIRD STREET SOUTH) IN JACKSONVILLE BEACH, GO SOUTH-
SOUTHEAST ON STATE HIGHWAY A1A FOR 0.1 MI (0.2 KM) TO THE INTERSECTION OF
FIRST AVENUE SOUTH, TURN LEFT ON FIRST AVENUE SOUTH AND GO EAST TO ITS END
AND THE MARK ON THE RIGHT, SET IN THE TOP OF A PREFABRICATED CONCRETE POST
FLUSH WITH THE GROUND AND 1.0 FT (0.3 M) ABOVE THE LEVEL OF FIRST AVENUE
SOUTH.
LOCATED 37.5 FT (11.4 M) SOUTH-SOUTHWEST OF THE APPROXIMATE CENTERLINE OF A
WOODEN BEACH ACCESS DOCK, 31.0 FT (9.4 M) SOUTH-SOUTHWEST OF A CONCRETE LIGHT
POLE, 0.4 FT (0.1 M) WEST OF THE WEST SIDE OF A 8.0 FT (2.4 M) WIDE CONCRETE
SIDEWALK AND 0.2 FT (0.1 M) NORTH OF THE NORTH SIDE OF A SIDEWALK LEADING
WEST.
STATION RECOVERY (2009)
NOTE BY FL DEPT OF ENV PRO 2009 (JLM) / RECOVERED AS DESCRIBED.
00 31 21-1GROUP4-10-R-J027
DESIGNATION - Y 324
PID - BC0502
TIDAL BM - This is a Tidal Bench Mark.
MARKER: BENCH MARK DISK
SETTING: SET IN A RETAINING WALL OR CONCRETE LEDGE
SP_SET: SEAWALL
STAMPING: Y 324 1970
MARK LOGO: CGS
MAGNETIC: NO MAGNETIC MATERIAL
STABILITY: MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO SURFACE MOTION
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR SATELLITE
OBSERVATIONS - March 03, 2009
HISTORY - Date Condition Report By
HISTORY - 1970 MONUMENTED NGS
HISTORY - 20090303 GOOD FLDEP
STATION DESCRIPTION
STATION RECOVERY (2007)
RECOVERY NOTE BY FL DEPT OF ENV PRO 2007 (JLM)
THE MARK IS IN JACKSONVILLE BEACH, IN SECTION 33, TOWNSHIP 2 SOUTH, RANGE 29
EAST.
TO REACH THE MARK FROM THE INTERSECTION OF U.S. HIGHWAY 90 (BEACH BOULEVARD)
AND STATE ROAD A1A (THIRD STREET SOUTH) IN JACKSONVILLE BEACH, GO EAST ON
BEACH BOULEVARD FOR 0.15 MI (0.2 KM) TO ITS END AND THE MARK ON THE RIGHT,
SET FLUSH IN THE TOP OF A 2.0 FT (0.6 M) WIDE CONCRETE SEAWALL, ACROSS THE
ROAD FROM THE AMERICAN RED CROSS VOLUNTEER LIFE SAVING CORPORATION BUILDING.
LOCATED 38.0 FT (11.6 M) EAST OF THE SOUTHERLY PROJECTION OF THE EAST FACE OF
THE RED CROSS BUILDING, 28.5 FT (8.7 M) SOUTH OF THE CENTERLINE OF BEACH
BOULEVARD, 20.5 FT (6.2 M) NORTH OF AND LEVEL WITH THE SOUTH EDGE OF A 5.0 FT
(1.5 M) WIDE CONCRETE SIDEWALK ALONG THE SOUTH SIDE OF BEACH BOULEVARD AND
2.0 FT (0.6 M) SOUTH-SOUTHWEST OF THE NORTHEAST CORNER OF THE SEAWALL.
STATION RECOVERY (2009)
NOTE BY FL DEPT OF ENV PRO 2009 (JLM) / RECOVERED AS DESCRIBED.
00 31 21-2GROUP4-10-R-J027
DESIGNATION - 872 0218 A
PID - DI9221
MARKER: FLANGE-ENCASED ROD
SETTING: STAINLESS STEEL ROD W/O SLEEVE (10 FT.+)
STAMPING: 0218 A 1995
MARK LOGO: NOS
PROJECTION: FLUSH
MAGNETIC: NO MAGNETIC MATERIAL
STABILITY: PROBABLY HOLD POSITION/ELEVATION WELL
SATELLITE: THE SITE LOCATION WAS REPORTED AS SUITABLE FOR SATELLITE
OBSERVATIONS - May 23, 2007 ROD/PIPE-DEPTH: 20.7 meters
HISTORY - Date Condition Report By
HISTORY - 1995 MONUMENTED NOS
HISTORY - 20070523 GOOD FLDEP
STATION DESCRIPTION/RECOVERY (2007)
THE MARK IS IN MAYPORT, AT THE SAINT JOHNS BAR PILOT ASSOCIATION, ESTIMATED
SECTION 30, TOWNSHIP 1 SOUTH, RANGE 29 EAST.
TO REACH THE MARK FROM THE OVERPASS OF ATLANTIC BOULEVARD (STATE HIGHWAY 10)
AND MAYPORT ROAD (STATE HIGHWAY A1A) ON THE SOUTH SIDE OF MAYPORT, GO NORTH
ON MAYPORT ROAD (STATE HIGHWAY A1A) FOR 2.25 MI (3.6 KM) TO THE JUNCTION OF
STATE HIGHWAY 101 (MAYPORT ROAD-MAIN STREET) AND STATE HIGHWAY A1A NORTH
(STATE ROAD) ON THE LEFT, TURN LEFT ON STATE HIGHWAY A1A NORTH (STATE ROAD-
OCEAN STREET) AND GO NORTHWEST FOR 3.65 MI (5.9 KM) TO THE ENTRANCE TO THE
SAINT JOHNS BAR PILOT ASSOCIATION AND THE MARK ON THE LEFT, A STAINLESS STEEL
ROD DRIVEN TO REFUSAL AT A DEPTH OF 67.8 FT (23.1 M) WITH A NOS LOGO CAP
FLUSH WITH THE GROUND AND LEVEL WITH OCEAN STREET, THE DATUM POINT IS
RECESSED 0.3 FT (0.1 M) BELOW THE LEVEL OF THE NOS LOGO CAP.
LOCATED 462.5 FT (141.0 M) NORTH OF THE APPROXIMATE CENTERLINE OF OCEAN
STREET, 218.5 FT (66.6 M) WEST OF THE CENTER OF THE PILOT ASSOCIATION DOCK,
218.0 FT (66.4 M) SOUTHWEST OF THE PILOT ASSOCIATION BUILDING, 122.6 FT (37.4
M) WEST OF THE NORTHWEST CORNER OF THE PILOT ASSOCIATION CLUB, 63.0 FT (19.2
M) NORTH-NORTHWEST OF A POWER POLE WITH TWO LIGHTS ATTACHED AND 1.0 FT (0.3
M) SOUTHWEST OF THE NORTHWEST END OF A 6.0 FT (1.8 M) TALL CHAIN LINK FENCE.
NOTE ACCESS TO THE DATUM POINT IS HAD THROUGH A 5-INCH (13 CM) NOS LOGO CAP.
Shore Protection Project, Duval County, 00 31 21-3GROUP4-10-R-J027
SECTION 00 31 32
Geotechnical Data Report for
Beach Erosion Control Project, Duval County, Florida Beach Reourishment
Prepared by
Geotechnical Branch
Engineering…