ADDENDUM TO THE STANDARD FORM 1442

Revision 0003, dated 29 April 2020

MARINE CORPS SUPPORT FACILITY- BLOUNT ISLAND MANINTENANCE

DREDGING, 38-FOOT PROJECT, DUVAL COUNTY, FLORIDA

NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO

THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER

SOLICITATION NUMBER W912EP18R0029, GROUP 2 – SMALL BUSINESS SET

ASIDE:

Cavache, Inc. (W912EP19D0038); CJW Construction (W912EP19D0039); Coastal Dredging Company, Inc. (W912EP19D0040); Cottrell Contracting Corporation (W912EP19D0041); Florida Dredge and Dock, LLC (W912EP19D0042); Southern Dredging Co., Inc. (W912EP19D0043); Southwind Construction Corp (W912EP19D0044); Waterfront Property Services, LLC dba Gator Dredging

(W912EP19D0045);

PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE

PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 2 – SMALL BUSINESS

SET-ASIDE DREDGING MATOC POOL.

PRE-PROPOSAL TELECONFERENCE:

A Pre-Proposal Teleconference will be held on 24 April 2020 at 2:00pm, local time.

The call-in information is as follows:

Phone: 1-877-402-9753 Access Code: 6546236 Security Code: 2873

TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA) evaluation method. To be considered technically acceptable, an offeror’s proposal must be rated “Acceptable under all non-price factors. The factors for evaluation will be as follows:

FACTOR 1 – Availability of technically acceptable dredge(s)

FACTOR 2 – Past performance

FACTOR 3 – Price

SUBMISSION REQUIREMENTS: Contractors are required to submit the following:

FACTOR 1 - Availability of technically acceptable dredge(s).

The contractor shall provide a letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the current location of dredge(s).

GROUP2-18-R-J005 SF1442-A1 Revision 0003

Evaluation Method:

The Government will evaluate all identified dredge(s) submitted to determine whether the identified dredge(s) have been found technically acceptable by the Contracting Officer prior to the proposal due date. The Government will also determine whether the dredge(s) are available to meet the required period of performance as stated in the Notice of Intent.

To be determined Acceptable for Factor 1, the identified dredge(s) must have been found technically acceptable prior to the proposal due date and be available to meet the required period of performance.

FACTOR 2 - Past performance.

NO SUBMISSION REQUIREMENT. Past Performance information submitted in response to the Dredging MATOC (Solicitation No. W912EP18R0029) will be used to determine the offeror’s record of complying with contractual requirements and meeting acceptable levels of performance risk.

Past Performance was recently evaluated for all contractors under the Dredging MATOC. An "Acceptable" rating was earned under Past Performance for all offerors that received an award in accordance with the solicitation evaluation criteria for the Dredging MATOC (Solicitation No. W912EP18R0029). Therefore, for this task order, all offerors will receive the Past Performance rating of "Acceptable".

Note: For future task orders, the Government reserves the right to use recent and relevant project data independently obtained from other Government or commercial sources or from any other sources available to include, but not limited to: (1) the Past Performance Information Retrieval System (PPIRS), (2) Federal Awardee Performance and Integrity Information System (FAPIIS) or Electronic Subcontract Reporting System (eSRS), or other data bases; (3) interviews with Program/Project Managers and Contracting Officers or rely upon personal business experience with the offeror; and (4) consider any information the offeror submits which explains any problems encountered on the identified contract and the offeror's corrective actions. The Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate. Information related to the contractor’s (or contractor’s team) performance in Quality, Schedule, Management, Regulatory Compliance and Safety/Security will be reviewed from the aforementioned additional sources to determine if the offeror is “Acceptable” or “Unacceptable.

FACTOR 3 – Price.

The Offeror’s submission for this factor shall be fully completed. Offeror completeness addresses the extent to which the elements of the price proposal are consistent with the requirements of the RFP.

GROUP2-18-R-J005 SF1442-A2 Revision 0003

Offerors are required to submit the following:

(1) Completed Bid Schedule (see Section 00010A).

(2) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Attachment 8, Paragraph 2.4.3, of the MATOC

(3) Completed “Addendum to the Standard Form 1442” with the latest revision.

In accordance with Task Order Procedures of the Dredging MATOC Solicitation, price or cost will be one of the evaluation factors for each task or delivery order in accordance with FAR 16.505(b)(1)(ii)(E). Price is not rated.

THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:

Block 7. ISSUED BY:

USA Engineer District Jacksonville Contracting Division 701 San Marco Blvd.

Jacksonville, FL 32207-8175

Block 9 -- For additional information contact:

A. NAME: Frederick L. Cooper or Anelis Nazario-Castillo

EMAIL ADDRESS: frederick.l.cooper@usace.army.mil and Anelis.I.Nazario- Castillo@usace.army.mil

B. TELEPHONE NO.: (904) 232-1186 / (904) 232-3285

Block 10 – THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS: Project work consists of maintenance dredging at the Marine Corps Support Facility – Blount Island (MCSF-BI) from Station 0+00 to Station 56+09.1 with a 38-foot required Mean Lower Low Water (MLLW) maintenance depth as shown on the drawings. The placement location of the dredged material will be Dayson Island DMPF (D/A-D) as shown on the drawings. Additional work also includes Bird monitoring, Turbidity and Disposal Monitoring, Standby Time, and Partnering Regroup. This contract incorporates two feet of allowable overdepth throughout.

DESCRIPTON OF WORK: Refer to Section 01 11 00 for complete description.

MAGNITUDE OF CONSTRUCTION: Between $1,000,000 and $5,000,000.

THIS SOLICITATION IS FOR GROUP 2 - SMALL BUSINESS SETASIDE

GROUP2-18-R-J005 SF1442-A1 Revision 0003 mailto:frederick.l.cooper@usace.army.mil mailto:Anelis.I.Nazario-Castillo@usace.army.mil mailto:Anelis.I.Nazario-Castillo@usace.army.mil

YOU MUST BE REGISTERED IN SAM IN ORDER TO RECEIVE AN AWARD FROM

THIS NOTICE OF INTENT. THE SAM WEBSITE IS LOCATED AT WWW.SAM.GOV.

THE NAICS CODE FOR THIS NOTICE OF INTENT IS 237990 AND THE SMALL

BUSINESS SIZE STANDARD IS $27.5 MILLION.

Block 11 -- The performance period is mandatory. (See FAR Clause 52.211-10 in Section 00700).

Block 12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE

AND PAYMENT BONDS: YES

Block 12B. PAYMENT BONDS DUE WITHIN 10 CALENDAR DAYS AFTER AWARD.

Block 13 ADDITIONAL SOLICITATION REQUIREMENTS:

A. Offers to perform the work required are due electronically at the following email address by 2:00 PM, local time on 05 May 2020: frederick.l.cooper@usace.army.mil; Anelis.I.Nazario- Castillo@usace.army.mil and carbon copy (cc) tedra.n.thompson@usace.army.mil and griselle.gonzalez@usace.army.mil.

B. An offer guarantee is required. Electronic copy of the bid guarantee shall be submitted with the offer and the Original must be received within two calendar days of the submission date for proposals.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the Notice Intent in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, 16, 17, 19 and 20A- 20D below:

Block 14. NAME AND ADDRESS OF OFFEROR (including Zip Code)

DUNS: CAGE:

Block 15. TELEPHONE NO. (Include area code):

Block 16. REMITTANCE ADDRESS: (Include only if different than Item 14)

GROUP2-18-R-J005 SF1442-A1 Revision 0003 http://www.sam.gov./ mailto:frederick.l.cooper@usace.army.mil mailto:Anelis.I.Nazario-Castillo@usace.army.mil mailto:Anelis.I.Nazario-Castillo@usace.army.mil mailto:tedra.n.thompson@usace.army.mil mailto:griselle.gonzalez@usace.army.mil

Block 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this Notice of Intent, if this offer is accepted by the Government in writing within 60 calendar days after the date offers are due.

Block 18. The offeror agrees to furnish any required performance and payment bonds.

Block 19. ACKNOWLEDGMENT OF REVISIONS (The offeror acknowledges receipt of revisions to the notice of intent -- give number and date of each)

REVISION

NO.

DATE

Block 20A. NAME AND

TITLE OF PERSON

AUTHORIZED TO SIGN

OFFER (Type or print)

Block 20B. EMAIL

ADDRESS

Block 20C. SIGNATURE Block 20D.

OFFER DATE

Block 26 --This Task Order will be administered by:

Melbourne Resident Office 4070 Boulevard Center Dr.

Suite 201, Jacksonville, FL 32207

Block 27 -- Payment will be made by:

USACE Finance Center 5722 Integrity Drive

ATTN: CEFC-AO-P

Millington, TN 38054-5005

GROUP2-18-R-J005 SF1442-A5 Revision 0003

SF 30 CONTINUATION SHEET

Marine Corps Support Facility – Blount Island, Maintenance Dredging, 38-Foot Project, Duval County, Florida

GROUP2-18-R-J005 2 Revision 0003

SUMMARY OF CHANGES

1. SPECIFICATIONS:

DELETE the Addendum to the Standard Form 1442 and REPLACE with the attached revised Addendum to the Standard Form 1442

DELETE Section 35 20 23 and REPLACE with the attached revised Section 35 20 23.

2. DRAWINGS: No change to drawings.

(End of Summary of Changes)

Marine Corps Support Facility - Blount Island Maintenance Dredging, 38-Foot Project

SECTION TABLE OF CONTENTS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

SECTION 35 20 23

DREDGING

PART 1 GENERAL

1.1 SCOPE

1.2 REFERENCES

1.3 SUBMITTALS

1.4 DREDGING RESTRICTIONS

1.4.1 Order of Work

1.4.1.1 Marine Corps Support Facility - Blount Island (MCSF-BI)

Maintenance Dredging

1.4.2 Hopper Restriction

1.4.3 Rehandling Facility

1.5 CONCRETE SILL REMOVAL CONTRACT

1.6 SPECIAL INSTRUCTIONS

1.7 PUMPING OF BILGES

1.8 HISTORICAL PERIOD SHIPWRECK SITES

1.9 UTILITY CROSSINGS

1.9.1 General

1.10 PERMITS

1.11 FUEL OIL TRANSFER OPERATIONS

1.12 SIGNAL LIGHTS

1.13 NOTICE TO MARINERS -- DREDGING CONTRACTS

1.14 FINAL CLEANUP

1.15 WORK VIOLATIONS

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 NOTIFICATION OF COAST GUARD

3.1.1 Relocation of Navigation Aids

3.1.2 Dredging Aids

3.2 WORK AREA

3.2.1 Access

3.2.2 Port Security Barrier (PSB) Operations

3.2.3 Protection of Existing Waterways

3.2.4 Adjacent Property and Structures

3.2.5 Subaqueous Cable Crossings

3.3 CHARACTER OF MATERIALS

3.4 DREDGE LOCATION CONTROL

3.5 DISPOSAL OF EXCAVATED MATERIAL

3.5.1 General

3.5.1.1 Disposal Area Details

3.5.2 Location of Pipeline Discharge Area

3.5.3 Upland Disposal Area Management

3.5.3.1 Maximum Height of Dredged Materials at D/A-D

SECTION 35 20 23 Page 1 GROUP2-18-R-J005 Revision 0003

3.5.3.2 Control of Water Outside Containment Dike

3.5.3.3 D/A-D Weir Operations

3.5.3.4 Foam Elimination Using Floating Boom During Outfall

Structure Discharge

3.5.3.5 Existing Dredge Pipe Segment

3.5.4 Placing of Dredged Material

3.5.5 Dredge Pipelines

3.5.5.1 Dredge Discharge Pipeline

3.5.5.2 Submerged Pipeline

3.5.5.3 Floating Pipeline

3.5.6 Booster Pumps

3.5.7 Misplaced Material

3.6 REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SIDE SLOPES

3.6.1 Required Depth

3.6.2 Allowable Overdepth

3.6.3 Side Slopes

3.6.4 Excessive Dredging

3.6.5 Sensitive Structures

3.6.6 Areas to be Dredged

3.6.7 Acceptance Sections

3.7 SURVEYS

3.7.1 General

3.7.2 Contractor Representative

3.7.3 Survey Conflict Identification, Notification and Resolution

3.7.4 Tide Data

3.7.4.1 Real Time Kinematic (RTK) GPS

3.7.4.2 Kinematic Tidal Datum (KTD Data File)

3.7.4.3 Non-Operational Reference Station

3.8 INSPECTION

3.8.1 Quality Assurance Representative (QAR)

3.8.2 Failure to Comply

3.9 FINAL EXAMINATION AND ACCEPTANCE

3.9.1 Final Examination of Work

3.9.2 Bed Leveling

3.9.2.1 Reporting and Documenting

3.9.3 Final Acceptance

3.10 SHOALING

3.11 CONTINUITY OF WORK

3.12 NOISE CONTROL

3.13 DREDGE CERTIFICATION

3.14 CERTIFICATION OF ATTENDANT AND AUXILIARY PLANT

3.15 CONSTRUCTION FORMS AND DETAILS

-- End of Section Table of Contents --

SECTION 35 20 23 Page 2

SECTION 35 20 23

DREDGING

PART 1 GENERAL

1.1 SCOPE

The work covered by this section consists of furnishing all labor, materials, and equipment, and performing all excavation and disposal of all material as specified herein or indicated on the drawings. This scope also includes all necessary measures for protection of the environment.

Environmental protection requirements under this contract are as important to overall completion of the work as other technical aspects. Failure to meet the requirements of these specifications for environmental protection may result in work stoppages or termination for default. No part of the time lost due to any such work stoppages shall be made the subject of claims for extensions of time or for excess costs or damages by the Contractor. If the Contractor fails or refuses to promptly repair any damage caused by violation of the provisions of these specifications, the Contracting Officer may have the necessary work performed and charge the cost thereof to the Contractor.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 Safety and Health Requirements Manual

EM 1110-1-1000 (1993) Photogrammetric Mapping

EM 1110-1-1002 (1990) Survey Markers and Monumentation

EM 1110-1-1003 (1996) NAVSTAR Global Positioning System Surveying

EM 1110-1-2909 (1998; Chg 2) Geospatial Data and Systems

EM 1110-2-1003 (2013) Hydrographic Surveying

EM 1110-2-1009 (2002) Structural Deformation Surveying

FLORIDA BOARD OF PROFESSIONAL SURVEYORS AND MAPPERS (FBPSM)

FBPSM Minimum Technical Standards, Chapters 177, 472, 61G17

TRI-SERVICE STANDARDS (TSS)

TSS (2006) A/E/C CADD Standards

SECTION 35 20 23 Page 3

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Notice of Intent to Dredge

Prior to commencement of work on this contract, the Contractor shall notify the Commander, Seventh Coast Guard District of his intended operations to dredge and request that it be published in the Local Notice to Mariners. This notification must be given in sufficient time so that it appears in the Notice to Mariners at least two weeks prior to the commencement of this dredging operation. A copy of the notification shall be provided to the Contracting Officer.

Relocation of Navigation Aids

The Contractor shall not remove, change the location of, obstruct, willfully damage, make fast to, or interfere with any aid to navigation. Within 7 calendar days following receipt of Notice of Award, the Contractor shall notify the Commander, Seventh Coast Guard District, Miami, Florida, of his plan to dredge adjacent to any aids which require relocation to facilitate dredging. The notification shall be sent via Fax to 305-415-6757, ATTN: Mr. Gene Stratten. This notification shall be immediately followed by a formal written request with a copy to the Contracting Officer. The Contractor shall also contact the U.S.

Coast Guard, 305-415-6750, for information concerning the position to which the aids will be relocated.

SD-02 Shop Drawings

Drag Bar ; G, RO

Submit drawings and one photograph showing drag bar equipment used for final leveling work indicated in the paragraph FINAL EXAMINATION AND ACCEPTANCE below.

Acceptance Sections Plan ; G, DO

Submit an acceptance sections plan for approval by the Government prior to commencement of work. See subparagraph "Acceptance Sections" in paragraph REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SIDE SLOPES below.

Dredging and Disposal Plan ; G, AO

For Base work, the Contractor shall submit a dredging and disposal plan thirty (30) days prior to commencement of dredging, to be approved by the Contracting Officer prior to the commencement of dredging. For work required in options, the Contractor shall submit a dredging and disposal plan thirty (30) days prior to commencement of dredging, to be approved by the

SECTION 35 20 23 Page 4

Contracting Officer prior to the commencement of dredging. The dredging and disposal plan must include the dredging plant the Contractor intends to use on each bid item and a schedule indicating starting and completion dates for each dredging section. The Contractor's dredging and disposal plan as well as operations plan shall ensure the following:

a. Sufficient ponding area within the disposal area(s) for proper effluent water quality.

b. Dredge size and production rates suitable to the disposal area(s) size and proper effluent discharge rates.

c. The dredging plan shall also include (but is not limited to) the following:

(1) A description and schedule of all operations that will be performed in connection with the removal and transport of material. The operations shall be described in the sequence in which they will be performed.

(2) A description of all plant (including names of dredges) and equipment that will be utilized in connection with the removal and transport of material.

(3) Plant to be used in each section.

(4) A description of the plan of operation of the weir, including which weirs will be used during dredging operations.

d. The Contracting Officer must approve the operations plan prior to mobilization and any operation plan modifications prior to their implementation. The operations plan must be explicit and must include, but is not limited to the following:

(1) Shifts and crew sizes.

(2) Communications.

(3) How the depth and horizontal positioning of the dredge head will be monitored and how the depth measurement will be calibrated.

Dredge Equipment Position And Depth

Submit daily as indicated in paragraph DREDGE LOCATION CONTROL below.

SD-07 Certificates

Equipment and Performance Data

The Contractor shall furnish proof of electronic positioning equipment calibration to the Contracting Officer. See paragraph DREDGE LOCATION CONTROL below.

Historical Period Shipwreck Sites

The Contractor shall immediately notify the Contracting Officer if any shipwreck, artifact, or other objects of antiquity that

SECTION 35 20 23 Page 5 have scientific or historical value, or are of interest to the public, are discovered, located, and/or recovered.

Surveys

The Contractor shall give 10 days advance notice, in writing, to the Contracting Officer of the need for a pre-dredging survey or after-dredging survey for final acceptance for each acceptance section.

Daily/Monthly Report of Operations

The Contractor shall prepare on RMS and submit one (1) hard copy of the Daily Report of Operations, using ENG Form No. 4267, for each dredge and/or unloader working. This report shall be submitted on a daily basis and not in groups (groups = multi-days reports packaged together at one time). In addition to the daily report, the Contractor shall prepare a Monthly Report of Operations for each month or partial month's work on ENG Form No.

4267. The monthly report shall be submitted on or before the 7th of each month, consolidating the previous month's work. Upon completion of the job, the Contractor shall submit a consolidated job report, combining the monthly reports. The Contractor shall distribute one copy of each report to the District Engineer;

ATTN: CESAJ-EN-C; U.S. Army Engineer District, Jacksonville, P.O.

Box 4970; Jacksonville, Florida 32232-0019. Reports shall be submitted on a monthly basis with daily reports accompanying the monthly report and job report.

Additionally, one copy of the form(s) shall be maintained by the Contractor on the dredge(s) for the Contracting Officer's inspection purpose. Further instructions on the preparation of the reports will be furnished at the Preconstruction Conference.

Misplaced Material

The Contractor shall notify the U.S. Coast Guard Marine Safety Office of any misplaced material as stated in the Clause OBSTRUCTION OF NAVIGABLE WATERWAYS of Section 00700 CONTRACT CLAUSES in Volume 1.

Declaration of Inspection for Refueling

Refer to paragraph FUEL OIL TRANSFER OPERATIONS below for submittal.

1.4 DREDGING RESTRICTIONS

1.4.1 Order of Work

The Contractor shall perform the Order of Work as directed by the Contracting Officer. Incoming Naval Vessels move into and out at any time without notice; therefore, dredging operations may have to move if so directed by the Contracting Officer.

1.4.1.1 Marine Corps Support Facility - Blount Island (MCSF-BI) Maintenance Dredging

There is no order of work specified for dredging relative to performance

SECTION 35 20 23 Page 6 of the dredging.

1.4.2 Hopper Restriction

The use of hopper dredges is prohibited for this location.

1.4.3 Rehandling Facility

No agitation dredging is permitted.

1.5 CONCRETE SILL REMOVAL CONTRACT

It is anticipated that another contractor will perform concrete sill structure removal work within the project channel prior to and during the commencement of work under this maintenance dredging contract. The concrete sill structure is located between Stations 7+00 to 7+32.6 between channel Range 713.25 and Range 286.75. Coordination between the Contracting Officer and the other contractors will be necessary in order to dredge in the vicinity of the concrete sill structure. See Appendix B attached after the end of this section to view historic sill construction photos for reference.

1.6 SPECIAL INSTRUCTIONS

Dredging of insitu rock is not required; but if encountered, the location and extent of any insitu rock above grade or required depth shall be reported to the Contracting Officer. All debris encountered during the dredging process shall become property of the Contractor and shall be removed and disposed in an offsite landfill selected by the Contractor and approved by the Contracting Officer.

1.7 PUMPING OF BILGES

Contractors are warned that pumping oil or bilge water containing oil into navigable waters, or into areas which would permit the oil to flow into such waters, is prohibited by Section 13 of the River and Harbor Act of 1899, approved 3 March 1899 (30 Stat. 1152; 33 U.S.C. 407). Violation of this prohibition is subject to the penalties under the referenced Acts.

1.8 HISTORICAL PERIOD SHIPWRECK SITES

If any shipwreck, artifact, or other objects of antiquity that have scientific or historical value, or are of interest to the public, are discovered, located, and/or recovered, the Contractor acknowledges that:

a. The site(s), articles, or other materials are the property of the State of Florida, with title vested in the Department of State, Division of Historical Resource; and that,

b. They will immediately notify the Contracting Officer.

1.9 UTILITY CROSSINGS

1.9.1 General

It is the Contractor's responsibility to investigate the location of all utility crossings. The Contractor shall take precautions against damages which might result from his operations in the vicinity of the utility crossings. If any damage occurs as a result of his operations, the

SECTION 35 20 23 Page 7

Contractor will be required to suspend dredging until the damage is repaired and approved by the Contracting Officer. Costs of such repairs and downtime of the dredge and attendant plant shall be at the Contractor's expense.

1.10 PERMITS

The Contractor's attention is directed to the Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1 and the paragraph PERMITS AND AUTHORIZATIONS of Section 01 57 20 ENVIRONMENTAL

PROTECTION.

1.11 FUEL OIL TRANSFER OPERATIONS

In accordance with U.S. Coast Guard regulations (33 CFR 156.120), couplings used in fuel oil transfer operations on any vessel with a capacity of 250 or more barrels of oil shall be either a bolted or full-threaded connection; or a quick-connect coupling approved by the Commandant; or an automatic back-pressure shutoff nozzle used to fuel the vessel. An executed fuel oil transfer (Declaration) form signed by the tanker operator shall be submitted to the Contracting Officer for each refueling operation. The U.S. Coast Guard shall also be notified prior to any refueling. A copy of the Declaration of Inspection for Refueling is on the web site indicated in the paragraph CONSTRUCTION FORMS AND DETAILS below.

1.12 SIGNAL LIGHTS

The Contractor shall display signal lights and conduct operations in accordance with the General Regulations of the Department of the Army and of the Coast Guard governing lights and day signals to be displayed by towing vessels with tows on which no signals can be displayed, vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations, lights to be displayed on dredge pipe lines, and day signals to be displayed by vessels of more than 65 feet in length moored or anchored in a fairway or channel, and the passing by other vessels of floating plant working in navigable channels, as set forth in Commandant U.S. Coast Guard Instruction M16672.2, Navigation Rules: International-Inland (COMDTINST M16672.2), or 33 CFR 81 Appendix A (International) and 33 CFR 84 through 33 CFR 89 (Inland) as applicable.

1.13 NOTICE TO MARINERS -- DREDGING CONTRACTS

Should the Contractor, during operations, encounter any objects on the channel bottom which could be a hazard to navigation, the Contractor shall immediately notify the Contracting Officer as to the location of said object and shall provide any other pertinent information necessary for the Contracting Officer to prepare and issue a Notice to Mariners.

1.14 FINAL CLEANUP

Final cleanup, as stated in the paragraph COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK of Section 00700 CONTRACT CLAUSES in Volume 1, shall include the removal of all the Contractor's plant and equipment either for disposal or reuse. Plant and/or equipment and/or materials to be disposed of shall only be disposed in a manner and at locations approved by the Contracting Officer. Unless otherwise approved by the Contracting Officer, the Contractor will not be permitted to abandon any equipment in

SECTION 35 20 23 Page 8 the disposal area or other areas adjacent to the worksite. Failure to promptly remove all plant, pipeline, equipment, and materials upon completion of the dredging will be considered a delay in the completion of the final cleanup and demobilization work. In such case, the Government will exercise its right as stated in Clause DEFAULT (FIXED-PRICE CONSTRUCTION) of Section 00700 CONTRACT CLAUSES in Volume 1 to remove any plant and/or equipment and/or materials at the Contractor's expense.

1.15 WORK VIOLATIONS

Work done in violation of these specifications or a verbal or written stop order of the Contracting Officer will be considered as unsatisfactory progress for purposes of progress payments in accordance with Clause PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS of Section 00700 CONTRACT CLAUSES in Volume 1.

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 NOTIFICATION OF COAST GUARD

3.1.1 Relocation of Navigation Aids

Navigation aids located within or near the areas required to be dredged will be removed, if necessary, by the U.S. Coast Guard in advance of dredging operations. The Contractor shall not remove, change the location of, obstruct, willfully damage, make fast to, or interfere with any aid of navigation.

3.1.2 Dredging Aids

The Contractor shall obtain approval from the U.S. Coast Guard for all buoys, dredging aid markers to be placed in the water, and dredging aid markers affixed with a light prior to the installation. Dredging aid markers and lights shall not be colored or placed in a manner that they will obstruct or be confused with navigation aids.

3.2 WORK AREA

The Contractor will be permitted to exclude the public from the work areas in the immediate vicinity of his dredging, transporting, and disposal operations. Enforcement shall be the Contractor's responsibility at no additional cost to the Government. The enforcement shall be coordinated with local enforcement agencies and will be subject to approval of the Contracting Officer.

3.2.1 Access

The Contractor shall be responsible for providing and maintaining access necessary for his equipment and plant to and from the work site, mooring area, and disposal area. The Contractor shall ascertain the environmental conditions which can affect the access such as climate, winds, currents, waves, depths, shoaling, and scouring tendencies. A crew change waterside access point, inside the port security barrier, will be provided to the Contractor after award.

SECTION 35 20 23 Page 9

3.2.2 Port Security Barrier (PSB) Operations

The PSB located at approximately STA 35+00 requires advanced scheduling to perform an opening. There is a large gate which requires a tug to open, and a smaller gate for small vessels. An opening must be requested with the USMC Watch Commander. Requests have to be made during normal business hours 0600-1430. Refer to Section 01 11 00 Appendix A, CmdO 5560.1E, section 3002.g for further detail. More details will be provided after contract award.

3.2.3 Protection of Existing Waterways

The Contractor shall conduct his operations in such a manner that material or other debris are not pushed outside of dredging limits or otherwise deposited in existing side channels, basins, docking areas, or other areas being utilized by vessels. The Contractor will be required to change his method of operations as may be required to comply with the above requirements. Should any bottom material or other debris be pushed into areas described above, as a result of the Contractor's operations, the same must be promptly removed by and at the expense of the Contractor to the satisfaction of the Contracting Officer.

3.2.4 Adjacent Property and Structures

Material is required to be removed adjacent to berthing structures.

Dredging adjacent to any structure will not be permitted any closer than 15 feet or 25 feet of the structures as shown on the drawings. Any damage to private or public property or structures resulting from the dredging or disposal operations shall be repaired promptly by the Contractor at his expense. Any damage to private or public property or structures resulting from the Contractor's negligence will result in suspension of dredging and require prompt repair at the Contractor's expense as a prerequisite to the resumption of dredging.

3.2.5 Subaqueous Cable Crossings

The Contractor shall be responsible for verifying the locations and depths of all utility crossings and take precautions against damages which might result from his operations, especially the sinking of dredge spuds and/or anchors into the channel bottom, in the vicinity of utility crossings. If any damage occurs as a result of his operations, the Contractor will be required to suspend dredging until the damage is repaired and approved by the Contracting Officer. Costs of such repairs and downtime of the dredge and attendant plant shall be at the Contractor's expense.

3.3 CHARACTER OF MATERIALS

a. Materials to be removed under this contract are described in Section 00 31 32 GEOTECHNICAL DATA REPORT as referred to in Section

01 11 00 SUMMARY OF WORK.

b. Due to typical harbor activities, debris such as trash, rope, chain, cable, tires, miscellaneous scrap metal, woody debris, etc., may be encountered in the channel. All such materials shall be brought to the surface and disposed of in a disposal area obtained by the Contractor in a manner approved by the Contracting Officer.

c. Prior dredging contracts encountered significant amount of rocks, stones, broken concrete, concrete with attached rebar varying

SECTION 35 20 23 Page 10 in size from several inches to 12-18 inches especially in the area between stations 6+00 and 8+32.6. Therefore, the Contractor should account for the possibility of encountering some amount of stones, rocks, and debris intake in the subject sizes while dredging in the allowable overdepth especially at the limit of the allowable overdepth.

3.4 DREDGE LOCATION CONTROL

The Contractor shall have, in continuous operation on the dredge, electronic positioning equipment that will accurately and continuously compute and plot the position and the deepest penetration of the dredge.

Dredges shall meet all of the following requirements, and this information ( dredge equipment position and depth ) shall be compiled and submitted to the Contracting Officer daily:

a. The Contractor is required to have electronic positioning equipment that shall horizontally locate the dredge when operating on the project, as well as determine the depth of dredging. Continuous locations of the dredge shall be made at all times during dredging.

b. A color-coded plot, in the project reference datum of the cutterhead, or other hydraulic or mechanical dredging device shall also be recorded daily depicting the vertical and horizontal limits of the material dredged that day. Any horizontal or vertical dredge violations shall be clearly defined.

c. The Contractor is required to calibrate the equipment as required by the manufacturer or as required by the Contracting Officer. Proof of calibration, equipment and performance data , shall be submitted to the Contracting Officer.

d. For Horizontal control, the location of the dredge is to be computed by coordinates with a probable range error not to exceed +/- 3 feet. The Contractor's method of horizontal location of the dredge shall be submitted for review. LORAN-C shall not be permitted for location control.

e. The Contractor is also required to have a depth of dredging indicator accurate to within one foot. The instrument used shall indicate the depth of dredging at all times. This equipment shall include real-time measurement of the water (tide) level. The reported elevation of dredging shall be adjusted by the measured water level elevation and shall have a probable range error not to exceed 1-foot vertical.

f. If the dredge is outside the dredging limits, the Contractor shall provide reason the dredge is outside the dredge limits in the Contractor's Quality Control Report for each occurrence.

g. Provide daily deliverable to the Government on a CD or via email containing data depicting XYZ locations of the cutterhead. File format delivered shall be raw text format listing XYZ coordinates, one coordinate per line with one space between each coordinate number.

Coordinates shall be delivered with location in feet or decimal degrees using NAD_1983_StatePlane_Florida_East_FIPS_0901_Feet Projected Coordinate System. See Appendix E for an example of an acceptable text file format.

SECTION 35 20 23 Page 11

3.5 DISPOSAL OF EXCAVATED MATERIAL

3.5.1 General

Material excavated shall be transported to and deposited in the disposal area designated on the drawings. The placement of dredged material will be at Dayson Island Disposal Area (D/A-D). The approximate maximum and average distances in statute miles to which the material will have to be transported is as follows:

Disposal Areas Maximum Distance Average Distance

D/A-D 2.8 miles 2.3 miles

3.5.1.1 Disposal Area Details

The Contractor shall place dredged material in the D/A-D at the location shown on the drawings and as indicated in Section 01 11 00 SUMMARY OF WORK. The access gate to D/A-D is to be locked at all times during construction of this project. Contractor is allowed to attach their own pad lock in a daisy chain configuration to existing pad locks, for the duration of the project. Contractor employees accessing D/A-D must go through the same badging process as specified in Section 01 11 00 SUMMARY OF WORK and have their badges on them while at D/A-D. A storage box (for daily support items for equipment, oil, fuel, etc.) may be placed at D/A-D if needed. The exact location will be provided to the Contractor after award.

3.5.2 Location of Pipeline Discharge Area

The pipeline discharge area shall be placed at the location shown on the project drawings as agreed to by the Contracting Officer. Any deviation from the approximate pipeline discharge area shown on the drawings must be approved by the Contracting Officer prior to placement of the dredge pipe in the disposal area. The Contracting Officer may direct periodic movement of the pipeline discharge area as necessary to efficiently maintain the disposal area.

3.5.3 Upland Disposal Area Management

The dredged material shall be placed in the Dayson Island Disposal Area (D/A-D) in such a manner as to not scour out or damage the crown and side slopes of the existing dikes. Damages to dikes or scouring of the crown and side slopes shall be repaired by the Contractor to the original pre-award condition at no additional cost to the Government. Upon completion of disposal operations, the Contractor shall continue to remove the ponded water from the disposal area using weir operations or pumping methods that incorporate discharging water through the weir outflows.

Both of these methods shall be required to produce an effluent quality meeting the turbidity requirements specified in Section 01 57 25 TURBIDITY

AND DISPOSAL MONITORING.

3.5.3.1 Maximum Height of Dredged Materials at D/A-D

Dredged materials and/or water shall not be placed higher than 4 feet below the lowest point on the dike crest. The Contractor shall constantly monitor the water height while pumping to insure that this clearance is maintained. Materials deposited in the disposal area above the maximum height or outside the disposal area will result in suspension of dredging

SECTION 35 20 23 Page 12 operations and require the removal of such materials as a prerequisite to the resumption of dredging.

Drainage of areas adjacent to the diked disposal area shall not be blocked or impaired in any manner by the Contractor's operations. The Contractor shall excavate and maintain ditches necessary to prevent blocking or impairing drainage. The ditches shall be of adequate number and size to eliminate all blockage or impairment of drainage adjacent to the diked disposal area.

3.5.3.2 Control of Water Outside Containment Dike

If there is seepage around the base and outside of the existing containment dike due to the water level inside the dike, the Contracting Officer may ask the Contractor to excavate a trench outside of the dike parallel to the base to divert the seepage water into the nearby water body. The depth, width, and length of the trench may vary depending on the amount of seepage and effectiveness of the excavated trench. When/if directed by the contracting officer, the contractor shall continuously maintain the size and shape of the subject trench to ensure proper drainage. This is to ensure to minimize the impact on the adjacent private properties. During demobilization, grade to pre-construction conditions.

3.5.3.3 D/A-D Weir Operations

The Contractor shall operate and adjust the weirs in order to ensure that water discharges meeting the turbidity requirements specified in Section 01 57 25 TURBIDITY AND DISPOSAL MONITORING or as directed by the Contracting Officer. The Contractor shall wedge the riser boards in place and seal the joints between the riser boards, as needed, to stop fill material or suspended material from passing through the weirs.

a. The existing weirs shall be operated by the Contractor to control discharge of disposal area effluent during disposal and decanting operations. Riser boards for the weirs are stored on site in a secure location. Access to the riser boards will be provided by the Contracting Officer's Representative.

b. The Contractor shall install riser boards in the weirs to a crest elevation which produces an effluent quality meeting the turbidity requirements specified in Section 01 57 25 TURBIDITY AND DISPOSAL MONITORING. Additionally, the weir crest elevation shall provide a minimum of two to three feet of ponding at the weirs during dredging. The Contractor shall wedge the riser boards in place and seal the end and between-board joints as needed to prevent soil slurry and turbid water from passing through the weirs.

c. Upon completion of disposal operations, the Contractor shall continue to dewater the containment dike until the edges of the ponded water have receded to a minimum distance of 25 feet from the closest point on the containment dike toe. Dewatering operations may be accomplished by ditching, pumping or decanting to convey the ponded water from the disposal area. Dewatering operations shall continue for a minimum of 15 days during which time the Contractor shall adjust the elevations of the crests to provide for drainage of ponding while maintaining proper turbidity levels within the effluent. The elevation adjustment to the weirs shall be the same on all weirs in the disposal area. The weir riser boards shall be removed one row at

SECTION 35 20 23 Page 13 a time. The next row of boards shall not be removed until the water level is drawn down to not more than one inch above the weirs' crest.

This process shall be continued until the interface with the suspended dredged material is reached. Alternately, if the suspended sediment interface lies below the weir invert, dewatering will be considered complete when the water surface has been lowered to the weir invert.

After the interface is reached, the Contractor shall continue to inspect the disposal area until completion of the work under this contract, and shall remove another row of boards each time the material has consolidated sufficiently so that it will not flow from the disposal area. The effluent from this final drainage for eliminating ponding shall meet the applicable requirement specified in Section 01 57 20 ENVIRONMENTAL PROTECTION and/or Section 01 57 25

TURBIDITY AND DISPOSAL MONITORING.

3.5.3.4 Foam Elimination Using Floating Boom During Outfall Structure Discharge

The Contractor shall be required to eliminate the sea foam created at the outfall pipelines of the Dayson Island Dredge Material Disposal Facility into Clapboard Creek. See Appendix C after the end of this section for existing outfall pipeline information. Contractor shall assemble and install a floating containment boom assembly, including connecting the booms to two (2) government supplied land anchors and two government supplied (2) submerged anchors with buoy and chain to secure the boom in a U-shaped configuration as shown on the drawings. The Government supplied containment boom assembly will be 24 inches in diameter double wall HDPE pipe, orange in color, UV resistant, with closed cell foam inside all pipe for buoyancy, flexible solid membrane between all boom sections, and 'DANGER - KEEP OUT' or similar signs installed on each section of boom.

All hardware and fasteners other than the anchors themselves shall be Type 316 Stainless Steel. Each boom section shall be 20 feet in length and the entire assembly will be a maximum total length of 200 feet. The Contracting Officer will provide the Contractor the location of all the supplied pieces in the field and the exact number of booms needed to be installed. Lights shall be installed on the booms as required in paragraph "SIGNAL LIGHTS" and "Floating Pipeline" above. The Contractor shall install the boom prior to discharging from the disposal area, and after all dewatering operations are complete, the Contractor shall remove the boom and store within the staging area on site as directed by the Contracting Officer. All boom and appurtenances shall remain Government property at the end of the Contract.

3.5.3.5 Existing Dredge Pipe Segment

A segment of pipeline has been installed on the Dayson Island DMPF at the approximate location shown on the drawings to provide vehicular access over the dredge discharge line during disposal operations. The Contractor may connect to the end structures of this pipeline at the approximate location shown on the drawings. The Contractor may also remove the existing pipe and run their own pipe through it. The existing pipe will be set aside at a location approved of by the Contracting Officer. See Appendix D after the end of this section for an as-built of the pipeline.

The exact location of the pipeline segment will be shown to the Contactor in the field by the Contracting Officer. The type of pipe the Contractor may connect to is 24-inch Ductile Iron Pipe Size (DIPS) Polyethylene (PE) 4710 material with a Dimension Ratio (DR) of 11 and a weight of 76.229 pound per foot. The average Outside Diameter (OD) is 25.80 inches and the Inside Diameter (ID) is 20.828 inches. The minimum wall thickness is

SECTION 35 20 23 Page 14

2.345 inches. See Appendix A attached after the end of this section for pipe and connection information. The pipeline segment is approximately 100 linear feet. The Contractor shall provide all the necessary equipment for operations within the DMPF to discharge material at the location shown on the drawings.

3.5.4 Placing of Dredged Material

During placement of dredged material in the designated disposal areas, the Contractor will be required to provide an attendant at each disposal area who shall maintain constant radio contact with the dredge, and conduct a minimum of two inspections per day of pipeline and dike. This will enable the Contractor's personnel at the disposal areas to immediately notify the dredge in the event of dike or pipeline failure. The Contractor shall provide a monitor at the disposal area at all times when the dredge is discharging materials. In the event of dike or pipeline failure, the dredging operations shall be immediately suspended and require prompt repair of the dike or pipeline as a prerequisite to the resumption of dredging. Dredging shall not be resumed until the necessary dike repair or pipeline repairs have been completed. The Contractor shall inform the Contracting Officer daily of conditions of any problems associated with the dikes, pipeline, and disposal area discharge. The Contractor shall inform the Contracting Officer at what time the problems were found and time when action was taken to correct the problems. Plant down time to meet the water quality standards or to make dike or pipeline repairs will be at no added cost to the Government or a basis for time extension.

3.5.5 Dredge Pipelines

3.5.5.1 Dredge Discharge Pipeline

The Contractor shall plainly mark the pipeline access routes with conspicuous stakes, targets and/or buoys to be maintained throughout the contract operations. A tight dredge discharge pipeline shall be maintained to prevent spilling of dredged material or dredge water outside of the disposal area. The Contractor shall provide and maintain radio communication between the dredge and the disposal areas and the dredge and the Contracting Officer. The pipeline shall be inspected at least twice daily for leaks. The Contractor shall provide a monitor at the disposal area at all times when the dredge is discharging materials. Failure to immediately repair leaks in the discharge pipeline will result in suspension of dredging operations and require prompt repair of pipeline as a prerequisite to the resumption of dredging. Any damage to private or public property resulting from the Contractor's operations shall be repaired by the Contractor at his expense. At the Dayson Island Disposal area, the dredge discharge pipeline shall not be placed on the disposal area dike crest except at the location where it crosses the dike for disposal into the interior or the Contractor may utilize the Existing Dredge Pipe Segment described in Section "Existing Dredge Pipe Segment" above. The Contractor shall provide an earthen ramp over the dredge pipeline at the crossover location to allow for passage of vehicular traffic. During demobilization, remove earthen ramp and grade dirt road to pre-construction conditions. During demobilization, remove earthen ramp and grade dirt road to pre-construction conditions.

3.5.5.2 Submerged Pipeline

In the event the Contractor elects to submerge his pipeline, the pipeline shall rest on the bottom, and the top of the submerged pipeline and any

SECTION 35 20 23 Page 15 anchor securing the submerged pipeline shall be no higher than the required project depth for the channel in which the submerged pipeline is placed. Should the Contractor elect to use a pipeline material which is buoyant or semi-buoyant, such as PVC pipe or similar low density materials, the Contractor shall securely anchor the pipeline to prevent the pipeline from lifting off the bottom under any conditions. The Contractor shall make daily inspections of the submerged pipeline to ensure buoyancy has not loosened the anchors nor leaked any spoil material. Any leakage of material must be reported to the Contracting Officer immediately. The Contractor shall remove all anchors when the submerged pipeline is removed. The location of the entire length of submerged pipeline shall be marked with signs, buoys, lights, and flags conforming to U.S. Coast Guard regulations.

3.5.5.3 Floating Pipeline

Should the Contractor's pipeline not rest on the bottom, it will be considered a floating pipeline and shall be visible on the surface and clearly marked. In no case will the Contractor's pipeline be allowed to fluctuate between the surface and the bottom, or lie partly submerged.

Lights shall be installed on the floating pipeline as required in paragraph SIGNAL LIGHTS above. The lights shall be supported either by buoys or by temporary piling, provided by the Contractor and approved by the Contracting Officer. Where the pipeline does not cross a navigable channel, the flashing yellow all-around lights shall be spaced not over 200 feet apart, unless closer spacing is required by U.S.