Revision_0002.pdf
PDF 39 KB Posted
- Solicitation number
- GROUP2-10-R-J015
About this file
Revision 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| G2J015Revision0003.pdf | ||
| G2J015PlansRevision0001.pdf | ||
| G2J015SpecsRevision0001.pdf | ||
| FtMyersGRD2016final28Mar2016_Revision0001.pdf | ||
| FDEP_Survey.zip | ZIP file | |
| G2J015Plans.pdf | ||
| Ft_Myers_GRD2016-29feb2016.pdf | ||
| G2J015Specs.pdf | ||
| Nearshore_Survey.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUP2-10-R-J015 SF 1442 – A1 Revision 0002
ADDENDUM TO THE STANDARD FORM 1442
Fort Myers Beach Harbor, Florida, Maintenance Dredging, 12-Foot Project
SPECIAL NOTIFICATION: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING
CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER
W912EP-10-R-0024: Cottrell Contracting Corporation (W912EP-11-D-0011); Southern Dredging Co., Inc. (W912EP-11-D-0012); Southwind Construction Corp. (W912EP-11-D-0014); Coastal Dredging Company, Inc. (W912EP-11-D-0016); Florida Dredge and Dock, LLC (W912EP-11-D- 0017); Barnett Southern Corporation (W912EP-11-D-0018); 4H Construction Corporation (W912EP-11-D-0019); Goodloe Marine, Inc (W912EP-11-D-0020); Caldwell Marine International and Palm Beach Marine Construction, JV (W912EP-11-D-0021); Inland Marine Services, LLC (W912EP-11-D-0024); and Vortex Marine Construction, Inc. (W912EP-11-D-0025); C.F. Bean LLC (W912EP-13-D-0023); Cavache, Inc. (W912EP-13-D-0024); Matthews Marine, Inc (W912EP-13-D-0025); and Inland Dredging Company, LLC (W912EP-13-D-0026); PROPOSALS
WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED
FIRMS INCLUDED IN THE Group 2 Dredging MATOC Pool.
TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the technical evaluation factors are:
(1) Availability of technically acceptable dredge(s) no smaller than 16”.
(2) Past performance, to include the MATOC (The government reserves the right to obtain copies of all Construction Contract Administration Support System (CCASS) records contained in the US Army Corps of Engineers CCASS database for the Prime Contractor (Offeror) and all Major Sub-Contractors).
SUBMISSION REQUIREMENTS: Contractors are required to submit the following:
(1) A letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the location of dredge(s). The identified dredge(s) must also have been found technically acceptable by the Contracting Officer prior to the proposal due date.
(2) Completed Bid Schedule (see Section 00010A)
(3) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph 2.4(c) of the MATOC
(4) Completed “Addendum to the Standard Form 1442 with the latest revision”.
(5) Revisions – Offers must acknowledge receipt of this Revision by completing “Notice to Offerors--Blocks 14, 15 and 20.”
THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:
Block 9 -- For additional information contact:
John Vohlken 904-232-1884 john.d.vohlken@usace.army.mil.
Block 10 -- Magnitude of Construction is between $1,000,000.00 and $5,000,000.00.
GROUP2-10-R-J015 SF 1442 – A1 Revision 0002
Block 11 -- The Contractor shall begin performance within 45 calendar days and complete it within 100 calendar days after receiving notice to proceed. This performance period is mandatory. NOTE: If there are optional line items, refer to FAR 52.211-10 for breakdown of period of performance.
Block 12 -- The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order.
Block 13 -- Sealed offers to perform the work required shall be delivered to the following address not later than: April 12, 2016 at 3:00 P.M. EST.
U.S. Army Corps of Engineers Jacksonville Regional Contracting Center (CESAJ-CT-C) Prudential Office Building 701 San Marco Blvd.
Jacksonville, Florida 32207-8175
NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, and 20 below:
Block 14 -- Name and Address of Offeror (including Zip Code):
DUNS: ___________________ CAGE: _______________
Block 15 -- Telephone No. (include area code): _____________________
Block 20 -- Name and Title of Person Authorized to Sign Offer (type or print):
Type/Print ________________________________________________
Signature: ________________________________________________ e-Mail: ________________________________________________
Offer Date: _______________________________________________
Block 26 -- This Task Order will be administered by:
TAMPA PROJECT OFFICE
U.S. ARMY CORPS OF ENGINEERS (CESAJ-CD-GT)
4211 WEST BOY SCOUT BLVD., SUITE 170
TAMPA, FL 33607-5767
PHONE: (813) 348-0690
Block 27 -- Payment will be made by:
USACE Finance Center 5722 Integrity Drive
ATTN: CEFC-AO-P
Millington, TN 38054-5005
CONTINUATION SHEET
Fort Myers Beach Harbor, Florida, Maintenance Dredging 12-Foot Project, Lee County, Florida
Summary of Changes
DELETE Section 00010A LINE ITEMS AND PRICING SCHEDULE, and REPLACE with the attached revised Section 00010A LINE ITEMS AND
PRICING SCHEDULE.
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
FORT MYERS BEACH HARBOR, FLORIDA
MAINTENANCE DREDGING, 12-FOOT PROJECT
LEE COUNTY, FLORIDA
GROUP2-10-R-J015 00010A-1 REVISION 0002
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
0001 MOBILIZATION AND DEMOBILIZATION 1 LUMP SUM $_______________
0002 EXCAVATION, UNCLASSIFIED
CUT-1 STA. 20+00 TO 45+00 AND
CUT-3 STA. 7+00 TO 18+54.84
(ESTIMATED QUANTITY) 130,000 CUBIC YARD $___________ $_______________
0003 TURBIDITY MONITORING 1 LUMP SUM $_______________
0004 MANATEE OBSERVER (CLAMSHELL ONLY) 1 LUMP SUM $_______________
0005 STANDBY TIME (SEE NOTE 4) 72 HOUR $___________ $_______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0005) $_______________
NOTES: (1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEYS SHOWN ON THE DRAWINGS AND ACTUAL DREDGING. THE CONTRACTOR SHALL NOT PERFORM WORK IN EXCESS OF THE TOTAL ESTIMATED QUANITITY GIVEN FOR EACH CLIN WITHOUT PRIOR APPROVAL OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AT LEAST ONE WEEK PRIOR TO THE ANTICIPATED DATE THAT THE ESTIMATED QUANTITY MAY
BE EXCEEDED. ACTUAL QUANTITIES MAY VARY.
(2) ALL BIDS MUST BE FOR THE ENTIRE WORK AND MUST HAVE EACH BLANK SPACE COMPLETED.
(3) FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSIONS (SF 1442, SECTION 00010A, SECTION 00101 AND BID GUARANTEE) COULD RENDER YOUR BID NON-RESPONSIVE. SEE PARAGRAPH 999.214-4018 OF SECTION 00100. SEE
CLAUSE 52.214-18 PREPARATION OF BIDS--CONSTRUCTION OF SECTION 00100.
(4) STANDBY TIME MAY BE EXERCISED WHEN THE DREDGE PLANT IS NOT IN OPERATION AT THE DIRECTION OF THE CONTRACTING OFFICER. THIS LINE ITEM IS NOT SUBJECT TO THE VARIATION IN ESTIMATED QUANTITY CLAUSE, AND PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER.
| 00010A_FtMyersBeachHarbor.pdf |
| Bid Sheet |
File details come from the government source that posted it. Updated .