G2J015Specs.pdf

PDF 887 KB Posted

Attached to
Fort Myers Beach Harbor, Florida, Maintenance Dredging, 12-Foot Project
Solicitation number
GROUP2-10-R-J015
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
G2J015Revision0003.pdf PDF
Revision_0002.pdf PDF
G2J015PlansRevision0001.pdf PDF
G2J015SpecsRevision0001.pdf PDF
FtMyersGRD2016final28Mar2016_Revision0001.pdf PDF
FDEP_Survey.zip ZIP file
G2J015Plans.pdf PDF
Ft_Myers_GRD2016-29feb2016.pdf PDF
Nearshore_Survey.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUP2-10-R-J015

US Army Corps of Engineers Jacksonville District

FORT MYERS BEACH HARBOR, FLORIDA

MAINTENANCE DREDGING

12-FOOT PROJECT

LEE COUNTY, FLORIDA

Construction Solicitation and Specifications

11 MARCH 2016

Fort Myers Beach Harbor, Florida GROUP2-10-R-J015 Maintenance Dredging, 12-Foot Project

DESIGN AUTHENTICATION

This project was designed by the Jacksonville District, U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.

JEFF E. BERGEN, P.E.

ACTING CHIEF, WATERWAYS SECTION, DESIGN BRANCH

ENGINEERING DIVISION

LUIS A. RUIZ, P.E.

CHIEF, GEOTECHNICAL BRANCH

DAVID DUDLEY, P.E.

CHIEF, DESIGN BRANCH

LAUREEN A. BOROCHANER, P.E.

CHIEF, ENGINEERING DIVISION

GROUP2-10-R-J015 SF 1442 – A1

ADDENDUM TO THE STANDARD FORM 1442

Fort Myers Beach Harbor, Florida, Maintenance Dredging, 12-Foot Project

SPECIAL NOTIFICATION: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING

CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER

W912EP-10-R-0024: Cottrell Contracting Corporation (W912EP-11-D-0011); Southern Dredging Co., Inc. (W912EP-11-D-0012); Southwind Construction Corp. (W912EP-11-D-0014); Coastal Dredging Company, Inc. (W912EP-11-D-0016); Florida Dredge and Dock, LLC (W912EP-11-D- 0017); Barnett Southern Corporation (W912EP-11-D-0018); 4H Construction Corporation (W912EP-11-D-0019); Goodloe Marine, Inc (W912EP-11-D-0020); Caldwell Marine International and Palm Beach Marine Construction, JV (W912EP-11-D-0021); Inland Marine Services, LLC (W912EP-11-D-0024); and Vortex Marine Construction, Inc. (W912EP-11-D-0025); C.F. Bean LLC (W912EP-13-D-0023); Cavache, Inc. (W912EP-13-D-0024); Matthews Marine, Inc (W912EP-13-D-0025); and Inland Dredging Company, LLC (W912EP-13-D-0026); PROPOSALS

WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED

FIRMS INCLUDED IN THE Group 2 Dredging MATOC Pool.

TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the technical evaluation factors are:

(1) Availability of technically acceptable dredge(s) no smaller than 16”.

(2) Past performance, to include the MATOC (The government reserves the right to obtain copies of all Construction Contract Administration Support System (CCASS) records contained in the US Army Corps of Engineers CCASS database for the Prime Contractor (Offeror) and all Major Sub-Contractors).

SUBMISSION REQUIREMENTS: Contractors are required to submit the following:

(1) A letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the location of dredge(s). The identified dredge(s) must also have been found technically acceptable by the Contracting Officer prior to the proposal due date.

(2) Completed Bid Schedule (see Section 00010A)

(3) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph 2.4(c) of the MATOC

(4) Completed “Addendum to the Standard Form 1442 with the latest revision”.

(5) Revisions – Offers must acknowledge receipt of this Revision by completing “Notice to Offerors--Blocks 14, 15 and 20.”

THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:

Block 9 -- For additional information contact:

John Vohlken 904-232-1884 john.d.vohlken@usace.army.mil.

Block 10 -- Magnitude of Construction is between $1,000,000.00 and $5,000,000.00.

GROUP2-10-R-J015 SF 1442 – A2

Block 11 -- The Contractor shall begin performance within 45 calendar days and complete it within 100 calendar days after receiving notice to proceed. This performance period is mandatory. NOTE: If there are optional line items, refer to FAR 52.211-10 for breakdown of period of performance.

Block 12 -- The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order.

Block 13 -- Sealed offers to perform the work required shall be delivered to the following address not later than: April 12, 2016 at 3:00 P.M. EST.

U.S. Army Corps of Engineers Jacksonville Regional Contracting Center (CESAJ-CT-C) Prudential Office Building 701 San Marco Blvd.

Jacksonville, Florida 32207-8175

NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, and 20 below:

Block 14 -- Name and Address of Offeror (including Zip Code):

DUNS: ___________________ CAGE: _______________

Block 15 -- Telephone No. (include area code): _____________________

Block 20 -- Name and Title of Person Authorized to Sign Offer (type or print):

Type/Print ________________________________________________

Signature: ________________________________________________ e-Mail: ________________________________________________

Offer Date: _______________________________________________

Block 26 -- This Task Order will be administered by:

TAMPA PROJECT OFFICE

U.S. ARMY CORPS OF ENGINEERS (CESAJ-CD-GT)

4211 WEST BOY SCOUT BLVD., SUITE 170

TAMPA, FL 33607-5767

PHONE: (813) 348-0690

Block 27 -- Payment will be made by:

USACE Finance Center 5722 Integrity Drive

ATTN: CEFC-AO-P

Millington, TN 38054-5005

SECTION 00010A

LINE ITEMS AND PRICING SCHEDULE

FORT MYERS BEACH HARBOR, FLORIDA

MAINTENANCE DREDGING, 12-FOOT PROJECT

LEE COUNTY, FLORIDA

GROUP2-10-R-J015 00010A-1

LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

0001 MOBILIZATION AND DEMOBILIZATION 1 LUMP SUM $_______________

0002 EXCAVATION, UNCLASSIFIED

CUT-1 STA. 20+00 TO 45+28.32 AND

CUT-3 STA. 7+00 TO 18+31

(ESTIMATED QUANTITY) 130,000 CUBIC YARD $___________ $_______________

0003 TURBIDITY MONITORING 1 LUMP SUM $_______________

TOTAL BID (LINE ITEMS 0001 THROUGH 0003) $_______________

NOTES: (1) THE TOTAL QUANTITY SHOWN FOR EACH EXCAVATION CLIN INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH, AND SHOALING ESTIMATED TO OCCUR BETWEEN THE DATES OF SURVEYS SHOWN ON THE DRAWINGS AND ACTUAL DREDGING. THE CONTRACTOR SHALL NOT PERFORM WORK IN EXCESS OF THE TOTAL ESTIMATED QUANITITY GIVEN FOR EACH CLIN WITHOUT PRIOR APPROVAL OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER AT LEAST ONE WEEK PRIOR TO THE ANTICIPATED DATE THAT THE ESTIMATED QUANTITY MAY

BE EXCEEDED. ACTUAL QUANTITIES MAY VARY.

(2) ALL BIDS MUST BE FOR THE ENTIRE WORK AND MUST HAVE EACH BLANK SPACE COMPLETED.

(3) FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSIONS (SF 1442, SECTION 00010A, SECTION 00101 AND BID GUARANTEE) COULD RENDER YOUR BID NON-RESPONSIVE. SEE PARAGRAPH 999.214-4018 OF SECTION 00100. SEE

CLAUSE 52.214-18 PREPARATION OF BIDS--CONSTRUCTION OF SECTION 00100.

SECTION 00010A, Attachment A

INSTRUCTIONS FOR TECHNICAL INQUIRIES AND QUESTIONS

Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) 28 March 2016, close of business. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.

All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted on the FedBizOps in the form of a report generated from ProjNet as soon as the comment/question entering period is over and all answers are all finalized.

The Solicitation Number is: GROUP2-10-R-J015

The Bidder Inquiry Key is: 3HS95C-FT24N4

Specific Instructions for ProjNet Bid Inquiry Access from ProjNet home page:

1. Identify the Agency. This should be marked as USACE.

2. Email. Enter the email address you would like to use for communication.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret

Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access from ProjNet home page:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. Identify the Agency. This should be marked as USACE.

3. Email. Enter the email address you used to register previously in ProjNet.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Click Continue. A page will then open asking you to enter the answer to your Secret Question.

6. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

GROUP2-10-R-J015 Addendum

THE FOLLOWING PAGES CONTAIN ADDENDUMS TO SPECIFIC SECTIONS OF THE

ORIGINAL SOLICITATION NUMBER W912EP-10-R-0024.

THESE ADDENDUMS ARE ONLY APPLICABLE TO THIS SPECIFIC TASK ORDER.

REQUEST FOR PROPOSAL NUMBER: GROUP2-10-R-J015

TASK ORDER PROJECT TITLE:

Fort Myers Beach Harbor, Florida, Maintenance Dredging, 12- Foot Project, Lee County, Florida

NOTICE TO OFFERORS: The information on the following pages is provided for the various clauses and/or paragraphs which require information to be filled in (when applicable) on each Request for Proposal for Task Orders issued under the awarded contracts. All applicable clauses, terms and conditions contained in the original solicitation and subsequently awarded contracts become part of each Task Order.

ADDENDUM TO SECTION 00100, INSTRUCTIONS TO OFFERORS

THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00100 ARE HEREBY PROVIDED:

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

15.3% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Lee County, Florida

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (ALTERNATE I) (FEB 1995) (CESAJ

ADAPTATION)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for -- March 22, 2016 at 10:00 A.M. EST

(c) Participants will meet at -- (Location will be provided by the contract administration office via telephone. See

(d) below.)

(d) Participants should call Erin Duffy at 813-348-0690 on or before March 18, 2016 to make arrangements.

(e) Core borings are available.

(f) After the site visit, a memorandum summarizing the visit will be posted to the appropriate website under the solicitation number. This posting will be strictly for informational purposes only. The memorandum will not become a part of the solicitation. If the solicitation needs to be changed as a result of information obtained during the site visit, a written amendment will be made available to all registered vendors. Questions regarding any information given in the memorandum must be directed to the person whose name appears in item 9 of the Standard Form 1442.

(End of provision)

ADDENDUM TO SECTION 00700, CONTRACT CLAUSES

THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00700 ARE HEREBY PROVIDED:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 45 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 100 calendar days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,564 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

Fort Myers Beach Harbor, GROUP2-10-R-J015 G-01 Florida, Maintenance Dredging, 12-Foot Project, Lee County, Florida

ADDENDUM TO SECTION 00800, SPECIAL REQUIREMENTS

THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00800 ARE HEREBY PROVIDED:

LIMITATIONS ON SUBSTITUTIONS FOR CERTAIN POSITIONS AND/OR SUBCONTRACTORS

The award decision for this contract was based, in part, on an evaluation of the personnel and/or subcontractors the Contractor included in its proposal for the positions and/or items of subcontracted work identified at the end of this paragraph. The Contractor agrees these personnel and/or subcontractors will be employed as described in its proposal and no substitutes will be employed without prior written approval of the Contracting Officer or Administrative Contracting Officer. The Contractor further agrees that any proposed substitutes shall meet or exceed the qualifications of the original personnel and/or subcontractors. If the Contractor’s proposal did not name a subcontractor for an identified item of work, the Contractor will not be allowed to subcontract that item of work without prior approval of the Contracting Officer or Administrative Contracting Officer. The limitations described herein shall apply to the following positions and/or items of subcontracted work: NAMED DREDGE with a minimum of a 16” cutter suction.

(End of paragraph number 999.215-4001)

General Decision Number: FL160002 01/08/2016 FL2

Superseded General Decision Number: FL20150002

State: Florida

Construction Type: Heavy Dredging

Counties: Florida Statewide.

Dredging Construction Projects FLORIDA (Excluding West of the Aucilla River and its tributary waterways)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016

* ENGI0025-002 10/01/2014

Rates Fringes

Dredging : (Hydraulic Dredges Over 20") CLASS A.....................$ 35.63 12.39+a CLASS B1....................$ 30.81 12.00+a CLASS B2....................$ 29.01 11.86+a CLASS C1....................$ 28.22 11.55+a CLASS C2....................$ 27.30 11.47+a CLASS D.....................$ 22.68 10.85+a Hydraulic Dredges Under 20" Cook........................$ 8.11 1.73+b Deckhand....................$ 7.77 1.73+b Engineer....................$ 9.59 1.73+b Launchman...................$ 8.19 1.73+b Leverman....................$ 10.03 1.73+b Mate........................$ 8.82 1.73+b Mess Cook...................$ 7.71 1.73+b Messman & Janitor...........$ 7.53 1.73+b Oiler & Fireman.............$ 8.11 1.73+b Shoreman....................$ 7.82 1.73+b Spider Barge Operator.......$ 8.68 1.73+b Spill Barge Operator........$ 8.68 1.73+b Welder......................$ 9.79 1.73+b

CLASSIFICATIONS:

2/24/2016http://www.wdol.gov/wdol/scafiles/davisbacon/fl2.dvb

CLASS A: Leverman, Operator.

CLASS B1: Licensed Tug Operator over 1000 HP, Derrick Operator, Spider/Spill Barge Operator, Timber Fork Operator, Dozer Operator, Engineer, Blaster/Driller, Fill Placer, Electrician.

CLASS B2: Licensed Boat Operator, Certified Welder.

CLASS C1: Mate, Drag Barge Operator, Welder, Assistant Fill Placer, Steward.

CLASS C2: Boat Operator.

CLASS D: Shoreman, Deckhand, Rodman, Scowman, Cook, Messman, Oiler, Janitor.

PREMIUMS: Additional 20% for hazardous material work

FOOTNOTE APPLICABLE TO ABOVE CRAFTS:

a. New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.

Vacation Contribution of 8% of straight time rate multiplied by the total hours worked.

b. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day. Plus Vacation contribution of 8% of straight time pay for all hours worked.

INCENTIVE PAY : (Add to Hourly Rate)

Operator (NCCCO License/Certification) $0.50; Licensed Tug Operator over 1000 HP (Assigned as Master) USCG licensed Master of Towing Vessels (MOTV) $1.00; Licensed Boat Operator (assigned as lead boat captain) USCG licensed boat operator $0.50; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $0.50; Oiler QMED and Tankerman endorsement (USCG) $0.50; All classifications Tankerman endorsement only (USCG) $0.50; Deckhand or Mater AB w/Lifeboatman only (USCG) $0.25; Welder (ABS certification) $0.50

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

PROJECT TABLE OF CONTENTS

DIVISION 00 - TECHNICAL INFORMATION

00 31 21 CONTROL MONUMENT DESCRIPTIONS

00 33 50 WEATHER, WATER STAGE AND TIDE DATA

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 22 00 MEASUREMENT AND PAYMENT

01 30 00 ADMINISTRATIVE PROCEDURES

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 25 OWNER SAFETY REQUIREMENTS - DIVING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 05 DREDGING/BEACH FILL PLACEMENT - CONTRACTOR QUALITY CONTROL

01 50 02 TEMPORARY CONSTRUCTION FACILITIES

01 57 20 ENVIRONMENTAL PROTECTION

01 57 25 TURBIDITY AND DISPOSAL MONITORING

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23 DREDGING

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION 00 31 21 CONTROL MONUMENT DESCRIPTIONS

SECTION 00 31 21 Page 1

Designation: STALEY

PID: BBCJ30

Stamping: STALEY 2011 JAX DIST Setting: Mat foundation or concrete slab other than pavement

Description: Mark is located at the U.S. Coast Guard Station, Fort Myers Beach, Lee Co., FL. To reach from the intersection of San Carlos Blvd and Main St in Fort Myers Beach (located at the north end of concrete bridge over Matanzas Pass), go west on Main St 0.05 Mile to San Carlos Drive, turn left and proceed south on San Carlos 0.20 miles to USCG Station on right. Station is located in top of concrete slab, 5.3 ft S of edge of seawall, 13.5 ft NE of corner of Marlin building, and 25.5 ft E of FMCG-1.

Observed: 2011-05-11T11:06:00Z Source: OPUS - page5 1209.04

See Also Original

SECTION 00 31 21 Page 2

Designation: ESTERO 101

PID: BBDV83

Stamping: ESTERO 101 2015 JAX DIST Stability: May hold, commonly subject to ground movement

Setting: Mat foundation or concrete slab other than pavement Description: Station is located in Ft. Myers Beach at Newton Park. To reach from the bridge leading into Ft Myers

Beach, travel south approximately 2.5 miles on Estero Ave to Newton Park on right. Turn right on Strandview Ave to station at end of street. Station is approximately 1 foot south of a wooden ramp leading to the beach. Station is a brass disk set in the top of a concrete seawall located along the beach.

Observed: 2015-05-01T16:00:00Z Source: OPUS - page5 1209.04

SECTION 00 31 21 Page 3

DESIGNATION - 872 5366 TIDAL 2

PID - AD1372

TIDAL BM - This is a Tidal Bench Mark.

BENCH MARK DISK, SET IN A RETAINING WALL OR CONCRETE LEDGE, SEA WALL.

STAMPED “NO 2 1965”, MARK LOGO: “CGS”, HAVING NO MAGNETIC MATERIAL.

MARK MAY HOLD, BUT OF TYPE COMMONLY SUBJECT TO SURFACE MOTION.

THE SITE LOCATION WAS REPORTED AS NOT SUITABLE FOR SATELLITE OBSERVATIONS -

January 04, 2016

HISTORY - Date Condition Report By

HISTORY - 1965 MONUMENTED CGS

HISTORY - 20050516 GOOD USPSQD

HISTORY - 2008 POOR FLDEP

HISTORY - 20160104 GOOD GEOCAC

1. 1965 DESCRIPTION BY COAST AND GEODETIC SURVEY - - - AT FORT MYERS BEACH,

IN SECTION 24, R 24 E, T 46 S, ALONG ESTERO ISLAND, NEAR THE SOUTH END OF THE

STATE HIGHWAY S 865 BRIDGE OVER MATANZAS PASS, 296.9 FEET EAST OF THE CENTER

LINE OF THE HIGHWAY AT THE SOUTH END OF THE BRIDGE, 44 FEET EAST OF THE EAST

EDGE OF THE BOAT DOCK AT ROYS MARINA, 50 FEET WEST OF A CURVE IN THE SEA

WALL, 161.9 FEET EAST OF TIDAL 2 DESCRIBED, ABOUT LEVEL WITH THE GROUND AND

SET IN THE TOP OF THE SEA WALL.

2. 1984 RECOVERY - - - RECOVERED IN GOOD CONDITION EXCEPT THE OLD BRIDGE IS

GONE AND A NEW ONE BUILT EAST OF THE OLD BRIDGE. THE MARK IS 296.9 FEET EAST

OF THE CENTERLINE OF SAN CARLOS BOULEVARD, BEHIND THE ANCHOR INN RESTAURANT,

AT THE ANCHORS AWAY MARINA.

3. 2005 RECOVERY - - - NEW STATION RECOVERY DESCRIPTION THE MARK IS SET IN

THE TOP OF THE SEA WALL ON THE NORTHWEST SIDE OF THE MATANZAS INN RESTAURANT.

4. 2008 RECOVERY - - -RECOVERED AS DESCRIBED BUT IN POOR CONDITION.

5. 2016 RECOVERY - - - RECOVERED IN GOOD CONDITION.

SECTION 00 33 50 WEATHER, WATER STAGE AND TIDE DATA

SECTION 00 33 50 Page 1

1. The following water stage, wave, wind, and weather data are provided for inclusion into the subject plans and specifications. The following water level fluctuations are provided for information only and are not to be utilized in conjunction with any contract related hydrographic surveying.

2. A technical review has been performed on the following data and this memo, signed by Chief, Water Resources Engineering Branch, signifies EN-W Branch Quality Control Certification.

a) Water Stages. Water levels in the project area are mainly affected by wind and tidal fluctuations of the Gulf of Mexico which are mixed (diurnal and semi-diurnal). The project area is also subject to storm surges from hurricanes and tropical storms from June through November.

Surges from extratropical storms may affect the area during any time of the year.

Elevations of tidal datums in the vicinity of the project area are provided in the following table.

All datum elevations in this table are referred to mean lower low water (MLLW). The datums in Table 1 are taken from tide station 8725366 (Matanzas Pass, Estero Island, FL). This tide station was established by the National Oceanic and Atmospheric Administration (NOAA), National Ocean Service (NOS), for a one month analysis period in June 1973. Due to the short analysis period, an additional nearby station, 8725391 (Punta Rassa, San Carlos Bay, FL), is provided in Table 2 whose analysis period covers 1 June 1977 to 31 May 1978. Both stations are based on the 1983 to 2001 tidal epoch. Additional information on these and other nearby tide stations is available at this NOAA website: http://tidesandcurrents.noaa.gov/

Table 1: Datum Information for Tide Station 8725366 (Matanzas Pass, Estero Island, FL) Lat 26° 27.4' N, Lon 81° 57.2’ W

Mean Higher High Water (MHHW) = 2.61 Feet Mean High Water (MHW) = 2.35 Feet North American Vertical Datum-1988 (NAVD) = 2.18 Feet Mean Sea Level (MSL) = 1.46 Feet Mean Tide Level (MTL) = 1.44 Feet Mean Low Water (MLW) = 0.54 Feet Mean Lower Low Water (MLLW) = 0.00 Feet http://tidesandcurrents.noaa.gov/

SECTION 00 33 50 Page 2

Table 2: Datum Information for Tide Station 8725391 (Punta Rassa, San Carlos Bay, FL)

Lat 26° 29.3’ N, Lon 82° 00.8’ W

Higest Observed Water Level (01/09/1978) = 3.27 Feet

Mean Higher High Water (MHHW) = 2.26 Feet Mean High Water (MHW) = 2.01 Feet Mean Sea Level (MSL) = 1.27 Feet Mean Tide Level (MTL) = 1.24 Feet Mean Low Water (MLW) = 0.47 Feet Mean Lower Low Water (MLLW) = 0.00 Feet Lowest Observed Water Level (1/11/1978) = -1.49 Feet

Daily tidal predictions at locations along the coastline of North and South America, including locations in the vicinity of the project area can be found in the publication East Coast of North and South America Tide Tables, U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Ocean Service. In addition to daily tidal predictions, this publication provides mean and diurnal tide ranges as well as mean tide levels. Some astronomical data is also included, such as time of sunrise, sunset, moonrise, and moonset. This publication is available through NOAA. Tidal data provided in this publication can also be found at the following NOAA website:

http://tidesandcurrents.noaa.gov/tide_predictions.html?gid=1397#listing

b) Wind and Wave Data. The following publications include wind and wave information in the vicinity of the project area. These publications are available for review at the following websites, or they may be ordered directly from the agencies indicated.

1. U.S. Coast Pilot Volume 4, Atlantic Coast: Cape Henry to Key West, U.S.

Department of Commerce, National Oceanic and Atmospheric Administration, National Ocean Service. This publication supplements the navigational information shown on the NOAA/NOS nautical charts, and also provides miscellaneous meteorological data. This publication can be purchased through NOAA, and is available for review at the following website:

http://nauticalcharts.noaa.gov/nsd/cpdownload.htm .

2. U. S. Army Corps of Engineers’ Coastal & Hydraulics Laboratory, Wave Information Study (WIS) Database. This Internet webpage presents wave hindcast data for various stations located along the Atlantic and Gulf of Mexico coastlines within the United States. The closest of these stations (#73295) lies southwest of the project site at Latitude 26.35° N and Longitude 82.05° W. Available data includes a hindcast time series of wave heights, periods, and directions taken at 1-hour intervals for the 33-year period extending from 1980-2012, at a station located in 5.0 meters (16.4 feet) of water. This webpage also provides links to WIS summary tables and plots, as well as other sources of wave data. These data products are available at the following website: http://wis.usace.army.mil/

3. National Data Buoy Center (NDBC) Website. This Internet website provides a wide range of real-time and archived meteorological and oceanographic data collected at offshore http://tidesandcurrents.noaa.gov/tide_predictions.html?gid=1397#listing http://nauticalcharts.noaa.gov/nsd/cpdownload.htm http://wis.usace.army.mil/

SECTION 00 33 50 Page 3 and nearshore stations worldwide. Data provided on this website includes wind speed, wind gusts, atmospheric pressure, air temperature, sea temperature, wave height, and wave period. Gage readings are updated hourly, and archived data is available for most stations. The website address for data relevant to this project site is:

http://www.ndbc.noaa.gov/maps/Florida.shtml.

c) Weather Conditions. The project area is subject to tropical storms and hurricanes from June through November, and to windy and/or rainy weather during any time of the year. The climate of the area is essentially tropical, and temperatures below freezing are rare. The wet season in the project area is from May through October. Rainfall during these months is closely associated with convective activity. These rainfall events are normally of short duration and amounts are spatially variable. In general, the winter months constitute the dry season. Rainfall during the winter months is usually associated with mid-latitude systems (fronts and low pressure systems) and is distributed in a more spatially uniform pattern. Occasionally, daily rainfall in the dry season can be quite heavy as mid-latitude systems penetrate into central Florida. Dangerous thunderstorms can occur in this area at any time of the year.

It shall be the contractor's responsibility to obtain information concerning weather conditions in the project area. The Climate Data Online website http://www.ncdc.noaa.gov/cdo-web/ published by NOAA’s National Centers for Environmental Information (formerly the National Climatic Data Center) in Asheville, North Carolina contains climatological and meteorological observations and data relevant to this region. Available data includes quality controlled daily, monthly, seasonal, and yearly measurements of temperature, precipitation, wind, and degree days as well as radar data and 30-year climate normals.

3. The average number of days in each calendar month with rain equal to, or greater than, 0.1 inches is provided for the project area in the following table. This information is based on data obtained from the NOAA rain gage located closest to the project area, at Fort Myers (Page Field Airport), Florida, at Latitude 26° 35’ N, Longitude 81° 52’W. This data was obtained from http://www.ncdc.noaa.gov/cdo-web/datatools/normals for the period of record from 1981 through 2010.

Average Number of Days per Month With Rainfall > 0.1 Inches

Gage Name Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Fort Myers 3.0 3.0 4.0 3.1 4.1 11.7 12.7 13.4 10.9 4.1 2.9 2.8 Page Field Airport http://www.ndbc.noaa.gov/maps/Florida.shtml http://www.ncdc.noaa.gov/cdo-web/ http://www.ncdc.noaa.gov/cdo-web/datatools/normals

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 REFERENCES

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

1.2.2 Location

1.2.3 Safety Requirements

1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

1.4 LIQUIDATED DAMAGES - CONSTRUCTION

1.5 PHYSICAL DATA

1.5.1 Physical Conditions

1.5.2 Weather, Water Stage and Tide Data

1.5.3 Contractor Investigation

1.5.4 Maritime Traffic

1.5.5 Obstruction of Channel

1.5.6 Surveys

1.5.6.1 Channel Surveys

1.5.6.2 Nearshore Survey

1.6 LAYOUT OF WORK

1.6.1 Established Project Control

1.6.2 Layout

1.6.3 Survey

1.7 DAMAGE TO WORK

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section Table of Contents --

SECTION 01 11 00 Page 1

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

GDR Section 00 31 32, Geotechnical Data Report for Maintenance Dredging, 12-Foot Project, Fort Myers Beach Harbor, Fort Myers Beach, Lee County, Florida.

Nearshore Survey (2016) USACE Nearshore Survey 16-037 (zip file Nearshore_Survey.zip)

FDEP Survey (2015) FDEP Monitoring Survey (zip file FDEP_Survey.zip)

EM 385-1-1 Safety and Health Requirements Manual

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work will consist of maintenance dredging of Ft. Myers Beach Harbor, Lee County, Ft. Myers Beach, Florida. The Federal Channel will be dredged to a 12-foot required depth plus 2 feet of allowable overdepth. All dredged material will be placed in the nearshore disposal area located approximately a quarter mile east from Ft. Myers Beach Pier. Maximum pumping distance will be approximately 3.5 miles. Work also includes turbidity monitoring and environmental protection activities.

1.2.2 Location

The project site is located in Fort Myers Beach Harbor, Lee County, Florida

1.2.3 Safety Requirements

See Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS and EM 385-1-1.

1.3 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

a. Read this paragraph in conjunction with the Clause COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52.211-10) of Section 00700 CONTRACT CLAUSES in Volume 1.

b. In addition to the above, the following shall apply: The phrase "commence work" means "commence dredging". The commencement time

SECTION 01 11 00 Page 2 indicated applies unless precluded by inclement weather as determined by the Contracting Officer.

1.4 LIQUIDATED DAMAGES - CONSTRUCTION

Refer to the Clause LIQUIDATED DAMAGES - CONSTRUCTION (FAR 52.211-12) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.5 PHYSICAL DATA

Read this paragraph in conjunction with the Clause PHYSICAL DATA (FAR 52.236-4) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.5.1 Physical Conditions

The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys and/or by core borings. When the indicated physical conditions are the result of site investigations by core borings, the core boring logs and laboratory data are in Section 00 31 32 GEOTECHNICAL DATA REPORT (GDR) and the core boring locations are shown on the drawings. Also, see the GDR for instructions concerning availability of core borings for inspection.

1.5.2 Weather, Water Stage and Tide Data

See Section 00 33 50 WEATHER, WATER STAGE AND TIDE DATA.

1.5.3 Contractor Investigation

Refer to the Clause SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (FAR 52.236-3) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.5.4 Maritime Traffic

Channel Traffic in the project area consists of Naval, cruise ships, commercial, pleasure, and small recreational vessels of all types and sizes which can be accommodated by existing depths.

1.5.5 Obstruction of Channel

The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. The Contractor will be required to conduct the work in such manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of any vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon completion of the work the Contractor shall promptly remove his plant, including ranges, buoys, piles, and other marks placed by him under the contract in navigable waters or on shore.

1.5.6 Surveys

1.5.6.1 Channel Surveys

Hydrographic surveys are posted at the following web address:

http://www.saj.usace.army.mil/Missions/CivilWorks/Navigation/HydroSurveys

SECTION 01 11 00 Page 3

Survey numbers are indicated on the drawings.

1.5.6.2 Nearshore Survey

A Nearshore Survey was completed in 2016 at the same time as the channel survey shown on the drawings and in 2015 for shoreline monitoring. The 2015 FDEP Survey provides topographic and hydrographic elevations shots.

The survey boundaries are shown on the plans where the survey files indicated in paragraph REFERENCES above are provided as separate electronic files.

1.6 LAYOUT OF WORK

Read this paragraph in conjunction with the Clause LAYOUT OF WORK (FAR 52.236-17) of Section 00700 CONTRACT CLAUSES in Volume 1.

1.6.1 Established Project Control

The Government has established monuments along the work site(s). Each monument is represented in the contract drawings by a Designation and in most cases, an alphanumeric Permanent Identifier (PID). Information concerning the location and elevations can be found within the Survey Notes on the plan sheets. The Survey Notes for each included field survey will cite a particular survey number, and specify the control used to conduct that survey. Additional information is included in the Survey Notes that must be duplicated if an attempt to recreate the subject survey is desired.

For navigation channels, the Government has established tidal calibration sites for projects constructed and maintained to a tidal datum. Each tidal calibration site is represented in the plan sheet drawings by Station ID, and is cited in the Survey Notes. All projects constructed and maintained to a tidal datum shall be calibrated to the Station ID specified in the plan sheet drawings. Information regarding the location and associated benchmarks of the referenced Station ID is included in the Monument Description section of these specifications.

See Section 00 31 21 CONTROL MONUMENT DESCRIPTIONS.

1.6.2 Layout

From the monuments, control data and elevations established by the Government, the Contractor shall complete the layout of the work and shall be responsible for all measurements that may be required for the execution of the work to the location and limit marks prescribed in the specifications or on the contract drawings, subject to such modifications as the Contracting Officer may require to meet changed conditions or as a result of necessary modifications to the contract work.

1.6.3 Survey

The Contractor shall furnish, at his own expense, such stakes, templates, platforms, equipment, tools and material, and all labor as may be required in laying out any part of the work from the monuments, control data and elevations established by the Government. It shall be the responsibility of the Contractor to maintain and preserve all stakes and other marks established by the Contracting Officer until authorized to remove them, and if such marks are destroyed by the Contractor or through his negligence, prior to their authorized removal, they may be replaced by the Contracting Officer, at his discretion, and the expense of replacement will be deducted

SECTION 01 11 00 Page 4 from any amounts due or to become due the Contractor. The Contracting Officer may require that work be suspended at any time when location and limit marks established by the Contractor are not reasonably adequate to permit checking of the work.

1.7 DAMAGE TO WORK

The responsibility for damage to any part of the permanent work shall be as set forth in Clause PERMITS AND RESPONSIBILITIES of Section 00700 CONTRACT CLAUSES in Volume 1. However, if, in the judgment of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood, earthquake, hurricane, or tornado, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor will make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or lump sum prices as fixed and established in the contract. If, in the opinion of the Contracting Officer, there are no contract unit or lump sum prices applicable to any part of such work, an equitable adjustment pursuant to Clause CHANGES of Section 00700 CONTRACT CLAUSES in Volume 1 will be made as full compensation for the repairs of that part of the permanent work for which there are no applicable contract unit or lump sum prices. Except as herein provided, damage to all work (including temporary construction), utilities, materials, equipment and plant shall be repaired to the satisfaction of the Contracting Officer at the Contractor's expense, regardless of the cause of such damage.

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section --

SECTION 01 11 00 Page 5

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 SUMMARY

1.1.1 Reference

1.2 QUALITY CONTROL SYSTEM (QCS)

1.2.1 Definition

1.2.2 Instructions

1.3 SUBMITTALS

1.4 LUMP SUM PAYMENT ITEMS

1.4.1 Mobilization and Demobilization (Line Item 0001)

1.4.2 Turbidity Monitoring (Line Item 0003)

1.5 UNIT PRICE PAYMENT ITEMS

1.5.1 Excavation, Unclassified (Line Item 0002)

1.5.1.1 Payment

1.5.1.2 Measurement

1.5.1.3 Unit of Measure

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION

3.1 PAYMENT PROCEDURES

3.1.1 Requesting Progress Payment

3.1.2 Options and Modification CLINS

SECTION 01 22 00 Page 1

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 SUMMARY

This section describes how Line Items will be measured and paid for when making progress payments. Work to be measured is described in specification sections listed for each Line Item. Measurement procedures for payment, required quantity survey or procurement documentation and payment restrictions are described in applicable specification sections.

Allocate costs for work not specifically mentioned to the Line Item most closely associated with work involved. Unless there is a specific Line Item for administrative costs, such as Quality Control and Safety, allocate such costs proportionally across all Line Items.

1.1.1 Reference

The publication listed below forms a part of this specification to the extent referenced. This publication is referred to in the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 1110-2-1003 (2013) Engineering and Design, Hydrographic Surveying

1.2 QUALITY CONTROL SYSTEM (QCS)

1.2.1 Definition

The terms "Contract Line Item Number (CLIN)" and "Line Item" are interchangeable herein (e.g.: CLIN 0001 is Line Item 0001). The term "CLIN" is a contracting term used in the Quality Control System (QCS) payment data base.

1.2.

This is the start of the file's text. The full file is on GovTribe.