GROUP1-26-R-J003_NSB Kings Bay_Pre-Bid Site Visit Agenda _ Roster.pdf
PDF 1 MB Posted
- Solicitation number
- GROUP126RJ003
About this file
This is a Presolicitation document for Naval Submarine Base Kings Bay maintenance dredging operations in Camden County, Georgia, issued by the U.S. Army Corps of Engineers (USACE).
The contract (Solicitation Number GROUP1-26-R-J003) encompasses base dredging work to maintain specified channel depths at multiple locations including ranges, basins, wharves, and facilities at the submarine base. Base work involves dredging to depths ranging from 12 feet to 47 feet across ten primary locations, with an estimated 647,000 cubic yards of material to be placed in Disposal Areas 1 and 2. The contract includes three options: Option A for supplying additional weir riser boards, Option B for secondary maintenance dredging at five locations with an estimated 57,000 cubic yards, and Option C for mobilization/demobilization if secondary dredging occurs. Water quality monitoring and environmental compliance are integral components requiring weekly sampling and reporting to Georgia Department of Natural Resources and the Corps. Key contract requirements mandate U.S. citizenship for contractor employees, National Crime Information Center background checks, Defense Biometrics Identification System registration, and Waterfront Restricted Area access clearance. The contractor must provide marine survey inspection certificates for all floating plant within the previous 12 months and maintain current National Dredging Quality Management Program certification for cutter suction dredge instrumentation systems. The presolicitation establishes a prebid site visit on April 23, 2026, at 9:00 AM, a virtual pre-bid conference on April 27, 2026, at 10:00 AM EDT, and a bidder inquiry deadline of April 27, 2026, end of day via ProjNet (Bidder Inquiry Key: REMJ79-SXA7SQ). All solicitation questions should be directed to Contract Specialist Mr. Guesley Leger at guesley.leger@usace.army.mil.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
**All questions regarding this solicitation should be referred to Mr. Guesley Leger, Contract Specialist, via email at guesley.leger@usace.army.mil
PREBID SITE VISIT
SOLICITATION NUMBER: GROUP1-26-R-J003, NAVAL SUBMARINE BASE KINGS BAY MAINTENANCE
DREDGING, CAMDEN COUNTY, GEORGIA
Date: April 23, 2026 Time: 9:00 AM Location: Naval Submarine Base Kings Bay – Franklin Contractor Gate
Purpose: Allow prospective contractors access to the sites, formulate questions, and make appropriate considerations in their proposal preparations. Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) 27 APRIL 2026, End of Day. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment / question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet.
The Solicitation Number is: GROUP1-26-R-J003 The Bidder Inquiry Key is: REMJ79-SXA7SQ
Pre-Bid Conference: A Pre-Bid Conference will be held virtually on Monday, 27 April 2026, atn10:00 AM, EDT. Please utilize the link and call information provided below to join the TEAMS Meeting:
• LINK: HTTPS://WWW.MICROSOFT.COM/EN-US/MICROSOFT-TEAMS/JOIN-AMEETING
• Meeting ID: 993 325 182 157 / PASSCODE: 85YU3Wy3
• DIAL IN BY PHONE: +1 503-207-9433 / PHONE CONFERENCE ID: 793 526 23#
Summary of Work: Work consists of maintenance dredging the locations to required depths indicated in the table below and shown on the drawings. The placement of the dredged material will be at Disposal Area 1 (D/A-1) and Disposal Area 2 (D/A-2) as shown on the drawings and as directed by the Contracting Officer. Additional Base work also includes environmental and water quality monitoring and standby time.
**All questions regarding this solicitation should be referred to Mr. Guesley Leger, Contract Specialist, via email at
Location Required Depth Range H to I and Upper Turning Basin 45-foot and 47-foot Range G to H and Explosive Handling Basin 44-foot and 47-foot Range E to G and Magnetic Silencing Facility (MSF) North 44-foot Site Six North 39-foot Site Six Operating Area South and Medium Auxiliary Repair Dock (ARDM) Yoke 45-foot Explosive Handling Wharves (EHW) 47-foot Refit Wharves 47-foot Small Boat Basin 24-foot Port Security Barrier Mooring Area 12-foot Dry Dock Caisson Gate Sill and Dry Dock Caisson Gate Mooring Facility 46-foot
Option A Work consists of supplying additional field cut weir riser boards as requested by the Contracting Officer.
Option B Work consists of secondary maintenance dredging. The locations and required depths are indicated in the table below and shown on the drawings. The placement of the dredged material will be at both Disposal Areas (D/A-1 and D/A-2) as shown on the drawings and as directed by the Contracting Officer. Option B work also includes bird monitoring and standby time.
Location Required Depth Site Six Operating Area South and Medium Auxiliary Repair Dock (ARDM) Yoke Area 45-foot Site Six North 39-foot Explosive Handling Wharves (EHW) 47-foot Refit Wharves 47-foot Dry Dock Caisson Gate Sill and Dry Dock Caisson Gate Mooring Facility 46-foot
Option C Work consists of Mobilization/Demobilization for secondary maintenance dredging if demobilization from the site occurs after completing all the Base work.
**All questions regarding this solicitation should be referred to Mr. Guesley Leger, Contract Specialist, via email at
**All questions regarding this solicitation should be referred to Mr. Guesley Leger, Contract Specialist, via email at
Key Contract Requirements:
Specification Section 01 11 00:
1.7.2.1 Citizenship
Contractor employees and representatives performing work under this contract are required to be United States citizens and will not have dual citizenship.
1.7.2.2 Security Requirements
Access to SUBASE Kings Bay requires consent to a National Crime Information Center (NCIC) background check.
Consent to an NCIC is codified using Department of the Navy Population Identification Card Base Access Pass Registration (SECNAV Form 5512/1), which is available at https://www.cnic.navy.mil/om/dbids.html.Specific conditions or offenses considered prejudicial to good order, discipline, and morale of the installation constitute permanently disqualifying fitness determination standards.
Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS).
Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html. No fees are associated with obtaining a DBIDS credential.
Additional security screening for access to worksite is required and accomplished through a government issued trustworthiness determination and in accordance with the Waterfront Restricted Area (WRA) access requirements
(SWFLANTINST 5530.7)
Specification Section 01 57 20:
1.7.4 Water Quality Monitoring Plan
Submit, no later than 30 calendar days after NTP, the following:
a. Names of qualified persons who are responsible for water quality monitoring and reporting to be performed.
b. Method of water quality monitoring and reporting that will be performed.
c. A Draft Water Quality Sampling Map is to have a georeferenced map, overlaid on an aerial photograph, indicating the location of the current construction activity, the sampling locations (background and compliance), the visible plume pattern of the applicable mixing zone, and the direction of flow. Also include on the map the boundaries of any benthic resources or location of nearby designated Georgia Wild or Scenic Waters, if applicable.
d. The water quality monitoring requirements of any special areas such as designated Georgia Wild or Scenic Waters.
**All questions regarding this solicitation should be referred to Mr. Guesley Leger, Contract Specialist, via email at
e. Documentation that the person(s) who will be conducting the water quality monitoring meet(s) the following requirements:
(1) Is independent of the Contractor;
(2) has formal training in water quality monitoring; and
(3) has professional experience in monitoring water quality for coastal construction projects; and submit a scope of work for the water quality monitoring to ensure that the appropriate equipment is available to conduct the monitoring correctly at any location, and under any safe conditions.
3.1.4.3 Water Quality
The Contractor is to conduct his operations in a manner to minimize turbidity and Total Suspended Solids (TSS) discharges. The Contractor is to conform to all water quality standards as prescribed by Section 303 State of Georgia Department of Natural Resources. In accordance with 01 45 05 DREDGING/BEACH FILL PLACEMENT - CONTRACTOR QUALITY CONTROL, the Contractor shall provide for surveillance and sampling of water quality of effluent from the disposal area.
a. Testing: Conduct weekly sampling at the discharge from the end of each operating weir outfall pipe. If the end of the discharge pipe is not safely accessible, then samples may be collected at the weir overflow with the approval of the Contracting Officer. Analyze each sample without undue delay after the sample is taken, for turbidity (ntu), salinity(ppt), pH, dissolved oxygen (mg/L and salinity corrected), total suspended solids (TSS) (mg/L) date, time, and flow. Should any effluent exceeding 1 cubic foot per second appear to violate a state standard, resampling will occur at the end of the mixing zone in the receiving water (generally 100 feet down current from the point at which the effluent enters the receiving water).
Water Quality Standards are as follows:
-- Total Suspended Solids (TSS) less than 500 mg/L.
-- Dissolved Oxygen greater than 3.0 mg/L (June - October).
-- Dissolved Oxygen greater than 3.5 mg/L (May - November).
-- Dissolved Oxygen greater than 4.0 mg/L (December - April).
-- pH greater than 6.0 and less than 8.5.
b. Record of Results: Record the following information on the Contractor Quality Control Report for each sampling:
(1) Date, time and location of sample (Include this information on the sample label also).
(2) Depth of flow over each weir crest.
(3) Ponding depth at each weir.
(4) Crest elevation of each weir.
(5) Report all results to the Contracting Officer.
**All questions regarding this solicitation should be referred to Mr. Guesley Leger, Contract Specialist, via email at
(6) Record all results in the daily Quality Control reports.
(7) Report all results monthly to Georgia EPD (EPD.WQC@dnr.ga.gov, dewey.richardson@dnr.ga.gov, david.hedeen@dnr.ga.gov); CESAJ-PD-E POC (michael.j.hollingsworth@usace.army.mil); and the Contracting Officer.
c. Submit all Water Quality Monitoring Reports electronically to the Contracting Officer within 24 hours after completion of each test and submitted weekly to the Environmental Branch (CESAJ-PD-E) within 7 days of collection.
d. Provide a Water Quality Exceedance Report to the Contracting Officer within 24 hours of the time when the Contractor first becomes aware of the discharge (email acceptable).
Specification Section 35 20 23:
1.5.1 Order of Work
The Order of Work for base dredging will be directed insofar as practicable to provide for efficient operation of the dredging equipment. Dredging operations at piers and facilities may require moving a dredge outside of a security zone to work an adjacent area until the security zone becomes available to dredge again. Every effort will be made to keep the moves local so as not to require the relocation of the head section to the floating pipe. These moves are normally planned at least 24 hours ahead of time. The channel between station 40+500 of Range-G to station 44+250 of Range-H requires the most coordination due to the frequency and size of the security arcs. Orders to the Contractor's Representative at the site of the work will be in writing.
1.5.2 Hopper Restriction
The use of hopper dredges is prohibited.
1.6 SPECIAL INSTRUCTIONS
Dredging of insitu rock is not required; but if encountered, report the location and extent of any insitu rock above grade or required depth to the Contracting Officer. All anchors and wires need to be clear of the channel. In the past dredging projects, there were high spots encountered at several locations the dredge could not reach the required depth because they were hitting hard bottom. Those areas were near the non-open end of the Explosive Handling Wharf-2 at approximately station 41+300, at the edge of the security arc next to the Explosive Handling Wharf 1 (outside the finger pier) at approximately station 42+700, and at the North end of Refit Wharf-1 at approximately station 48+800. All debris encountered during the dredging process will become property of the Contractor and be removed and disposed in an offsite landfill selected by the Contractor and approved by the Contracting Officer.
mailto:EPD.WQC@dnr.ga.gov
**All questions regarding this solicitation should be referred to Mr. Guesley Leger, Contract Specialist, via email at
1.18 EQUIPMENT AND PERFORMANCE DATA
If electronic positioning equipment is used, submit documentation of compliance with manufacturer recommendations for calibration to the Contracting Officer. Documentation may include a calibration report or some other documentation showing positioning equipment maintenance or verification results.
1.19 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM (NDQMP) SYSTEM (DREDGES AND DUMP
SCOWS)
1.19.1 System Requirements
See Section 35 20 27 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM - PIPELINE HYDRAULIC DREDGE. However, in the event of NDQMP System failure (not fully operational), notify the Contracting Officer. If the Contractor cannot use the NDQMP System within 48 hours of failure, cease all dredging operations for the vessel until the NDQMP System is fully operational. Any delays resulting from NDQMP System failure will be at the Contractor's expense.
3.3.3 Adjacent Property and Structures
Material is required to be removed adjacent to waterfront structures. Controlled dredging will be required in these areas to prevent damage to the structures. Assure that there is no dredging within 15 feet offset distance of any pier, dock faces, buoys and their chains, anchor chains, or other waterfront structures in order to prevent damage to fender pilings and any other part of these structures unless otherwise indicated on the drawings or directed by the Contracting Officer. However, there is no offset from the Drydock Caisson Gate Sill and Drydock Caisson Gate Mooring Facility as indicated on the drawings, unless otherwise directed by the Contracting Officer. Do not use wire rope on bollards and cleats. Use only manila or nylon line. The Contractor will be responsible for any damage to these structures caused by the Contractor's operations and will be responsible for the cost of repairs made to that structure.
3.3.3.1 Magnetic Silencing Facility (MSF)
The Magnetic Silencing Facility (MSF) slip has limited accessibility and accurate positioning will be required for dredging near the MSF slip. Expensive underwater sensors and bundled cables are located directly beneath and in the vicinity of the slip. No dredging is allowed within the Dredging Exclusion Zone shown on the drawings.
3.3.3.2 Explosive Handling Wharves (EHW)
EHW berthing areas are covered by buildings with a clear opening of approximately 86 feet 6 inches wide by 55 feet high at Mean High Water (MHW). Inside the EHW buildings, the vertical clearance is approximately 115 feet at MHW. There is a warping wharf between the two buildings approximately 1,000 feet long, along which dredging is required. Immediately make repairs to or replace and return to original condition all damaged lumber and concrete after completion of work
**All questions regarding this solicitation should be referred to Mr. Guesley Leger, Contract Specialist, via email at within this area. It is possible that debris may be encountered within the limits of EHW Buildings #1 and #2. The debris could potentially consist of tools and other small items, steel cable, and sheeting material.
3.3.3.3 Refit Wharves
The shoreline underneath the refit wharves has been riprapped. A riprap keyway was constructed at the toe of the slope as shown on the cross-sections of the drawings. Do not remove this riprap keyway. When working in this area, do not use wire rope on bollards and cleats. Use only manila or nylon line. Immediately make repairs to or replace and return to original condition all damaged lumber and concrete after completion of work within this area.
3.3.3.4 Drydock Caisson Gate Sill and Mooring Facility
The Drydock Caisson Gate Sill area is from the end of the navigation channel (Range-I) to the steel caisson gate. The Drydock Caisson Gate Mooring Facility is adjacent to the caisson gate mooring dolphins and caisson gate. If a cutter suction dredge is to be used, remove the cutter head for the removal of the material from the concrete sill and mooring facility grillage without damaging the concrete sill and metal grillage. The dredging location at the Drydock Caisson Gate Sill and the Drydock Caisson Gate Mooring Facility is shown on the drawings or as directed by the Contracting Officer.
3.3.5 Port Operations Small Boat Basin
The Small Boat Basin area is located in Range-H. There is a T-shaped pier and other structures within this area therefore no dredging will be allowed within 15 feet of the structures. The northwest corner of the North side is truncated by 25 feet because of complications with the shore rip rap. Additionally, the landside edge of the south portion should have no dredging within 25 feet of the shore rip rap.
3.3.6 Port Security Barrier Mooring Area
Hurricane mooring anchors (ST-1 through ST-4) have been placed about 100 feet east of the Upper Turning Basin next to Big Crab Island in 13 to 30 feet of water. Use of these anchors by the Contractor is not permitted. These buoys are located within the Port Security Barrier Mooring Dredge Area. Buoys within the project area are fixed by a chain and driven plate anchors to the sea bed. With these conditions, the mooring buoys must be positioned during dredging activities where the material to be dredged can be collected sufficiently without impediment to the buoys and their chains as well as to the cutter head dredge equipment. This shall be accomplished by positioning the mooring buoys to allow for proper alignment of chain and other attaching components during dredging activities and assuring that there is no dredging within 15 feet of the buoys and their chain structures. See as-built records of the mooring anchors in Appendix E at the end of this section.
**All questions regarding this solicitation should be referred to Mr. Guesley Leger, Contract Specialist, via email at
3.5.4.2 Operations of Weirs
Weir riser boards are stored in an on base facility outside the waterfront restricted area. Coordinate with the Contracting Officer to obtain access to these boards to operate disposal facilities. Return any boards not required to be left in the weir stacks to the same storage location upon completion of work. Additional weir boards may be required to fully execute the work under this contract. Return any additional boards provided, that are not required to be left in the weir stacks, to the same location upon completion of work.
Use reasonable care in the use of the disposal area, and for the operation and control of the weirs. From commencement of dredging, the operation of the weir system needs to be managed to minimize the return of suspended solids and associated turbidity to the receiving water body to meet contract and permit requirements. Monitor and manage, with oversight provided by the Contractor's quality control manager and the Corps' quality assurance representative, the dredge output and the weirs to control water elevation, ponding depth, dredge inflow rate, and other parameters to maintain effluent discharge from the DMMA at or below required turbidity standards. Adjust weir crest elevations to facilitate drainage while maintaining proper turbidity levels in the effluent.
Remove weir riser boards one row at a time, ensuring the water level is no more than one inch above the crest before removing the next row. The drainage effluent must comply with Section 01 57 20 ENVIRONMENTAL PROTECTION. Manage flows so that all release of effluent can be stopped if required by the Contracting Officer. Correct any damage caused by the Contractor's operations to disposal area outfalls, riprap and erosion control works must be repaired.
3.5.6.1.1 Existing Dredge Pipe Installed by the Navy
The Navy has constructed a segment of permanent pipeline into Disposal Area 2 (D/A-2) as shown on the drawings.
Connect to the end structures of this pipeline at the approximate locations shown on the drawings. The exact location of the end structures will be shown to the Contractor in the field by the Contracting Officer. Prior to connecting to the end structures, coordinate the work with base security through the Contracting Officer. The type of pipe the Contractor shall connect to is 24-inch Ductile Iron Pipe Size (DIPS) Polyethylene (PE) 4710 material with a Dimension Ratio (DR) of 11, pressure rating of 200 psi, and a weight of 75.78 pounds per foot. The average Outside Diameter (OD) is 25.80 inches and the Inside Diameter (ID) is 20.829 inches. The minimum wall thickness is 2.345 inches. See the pipe connection information appended after the end of this section (Appendix A). A copy of the hydrostatic pressure testing of the dredge pipeline are also included in Appendix B. The pre-flanged pipeline at D/A-2 to extend to the designated pipeline discharge areas will be located at the site. Provide flange fasteners for connecting these sections.
**All questions regarding this solicitation should be referred to Mr. Guesley Leger, Contract Specialist, via email at
3.5.6.1.2 Existing Dredge Pipe Isolation Box
Install the spool pieces supplied by the Navy in the isolation box. Supply flange gaskets and fasteners. Prior to installing the spool pieces, coordinate the work with base security through the Contracting Officer.
3.8 ENCOUNTER OF MUNITIONS AND EXPLOSIVES OF CONCERN (MEC) IN PROJECT AREA
See the "Naval Submarine Base Kings Bay, Probability Assessment for Munitions and Explosives of Concern, Camden County, GA" in Appendix D after the end of this section.
3.8.1 Munitions and Explosives of Concern (MEC)
Munition and Explosives of Concern (MEC) are military munitions that may pose unique explosives safety risks and include Unexploded Ordnance (UXO), Discarded Military Munitions (DMM), and Munitions Constituents (MC) present in high enough concentrations to pose an explosive hazard.
3.8.2 Procedure Upon MEC Encounter
Use due caution when working in coastal areas. In the event a suspect MEC is encountered, follow the 3Rs of explosive safety: Recognize, Retreat, Report. Recognize that munitions are dangerous; Retreat - do not approach, touch, move or disturb it, but carefully leave the area; and Report immediately what you saw and where you saw it to local law enforcement - call Explosive Ordinance Disposal (EOD) at 912-573-2078. However, if it is after hours or EOD can't be reached, call 911 dispatch who can recall them and then inform the Contracting Officer. Cease all work efforts until the suspect MEC has been evaluated by emergency response personnel. In the event that the suspect MEC is positively identified as MEC, cease further work efforts until a new MEC probability assessment has been conducted.
3.8.3 Formerly Used Defense Sites (FUDS)
In accordance with EM 385-1-97 the probability assessment merits a 0 score for this project location, which based on regulatory definitions is designated as No Probability. More information on the FUDS program and sites throughout Georgia and North Florida can be found at the below web address.
https://www.usace.army.mil/Missions/Environmental/Formerly-Used-Defense-Sites/FUDS-GIS/ FUDS are not the only source of MEC along the coast. MEC may be found along the entire coastline, both on land and in State and Federal waters. The militaries of the U.S. and other countries have conducted live-fire training and combat operations at sea for centuries, and commonly disposed of excess, obsolete, and unserviceable munitions in coastal waters.
**All questions regarding this solicitation should be referred to Mr. Guesley Leger, Contract Specialist, via email at
3.14 GENERAL DREDGING SAFETY REQUIREMENTS
3.14.1 Certification of Attendant and Auxiliary Plant
In addition to the requirements of EM 385-1-1, all supporting floating plant for dredging operations (to include, but not limited to, anchor barges, deck barges, deck/work barges, tug boats, tenders, workboats, pump-out barges, derrick barges, and spider barges) must have a current marine survey inspection certificate. The only exceptions to this requirement include pipeline support pontoons or floats and outboard skiffs under 16 feet in length. The certification must be issued by a licensed and accredited marine surveyor within the previous 12 months. The marine surveyor must be accredited by either the National Association of Marine Surveyors or the Society of Accredited Marine Surveyors. No attendant plant that does not have a valid certification will be used on this Contract. The certifications and inspection must be appropriate for the intended use of the plant in all locations specified in this Contract. Prior to commencement of work, submit marine survey inspection certificates of all floating plant and equipment.
Specification Section 35 20 27:
1.4 NATIONAL DREDGING QUALITY MANAGEMENT PROGRAM CERTIFICATION
The Contractor is required to have a current certification from the DQM Program for the cutter/suction head hydraulic dredge instrumentation system to be used under this contract. Standard Operating Procedures (SOP) and criteria for certification are presented on the DQM website at https://dqm.usace.army.mil.
https://dqm.usace.army.mil/