Graphic_Designer_Request_for_Proposals.pdf

PDF 387 KB Posted

Attached to
Graphic Designer Request for Proposals
Solicitation number
2023-RFP-209
Issued by
Los Angeles County, California

About this file

This Request for Proposals (RFP) is issued by the Rose Bowl Operating Company (RBOC) and the City of Pasadena, California, seeking a graphic designer for the Rose Bowl Stadium and Brookside Golf Courses. The contract will cover graphic design services for a one-year initial term beginning July 1, 2023, with two optional one-year renewal periods at the sole discretion of the RBOC Chief Executive Officer. The scope of work includes designing stadium and campus signage, creating credentials and marketing materials, managing event signage, developing logos and design materials for enterprise and community events, updating brand assets, and designing the annual stadium report. Proposals are due by 5:30 pm on April 13, 2023, and must be submitted electronically through the City of Pasadena's eProcurement Portal.

The proposal requires a monthly pricing structure covering up to 25 major events (over 20,000 attendees), five produced events per year, and three community events annually. Proposers will be evaluated on a 100-point scale, with points awarded for experience (15 points), assigned personnel (15 points), scope of services (10 points), performance standards (25 points), cost proposal (25 points), and local business preferences (10 points). Minimum qualifications include three to five years of relevant graphic design experience, strong communication skills, availability during standard business hours and event periods, and ability to work in a fast-paced environment. Proposers must submit a comprehensive technical proposal, portfolio, statement of qualifications, and various required forms, with the entire proposal limited to 50 total pages.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSALS

FURNISH AND DELIVER

GRAPHIC DESIGNER REQUEST FOR PROPOSALS

FOR THE

ROSE BOWL

CITY OF PASADENA, CALIFORNIA

Request for Proposals - Graphic Designer Request for Proposals Release Date: Monday, March 20, 2023

Attachments:

A - Master Services Contract B - REQUIRED_FORMS_-_AAs_-_SIG-LEGAL-STATUS_-_DECLARATION_OF_NONCOLUSION (27)

C - DISQUALIFICATION_DISCLOSURE (4)

D - CONFLICT_OF_INTEREST (5)

E - Pasadena_Taxpayer_Protection_Amendment_Disclosure (2) G - DESIGNATED REPRESENTATIVESdocx J - Stake Holder Calendar March 2023 - March 2024

1. INTRODUCTION

1. Summary

The Rose Bowl Operating Company (RBOC) is seeking the services of a qualified graphic designer to fulfill needs for the Rose Bowl Stadium and adjacent Brookside Golf Courses. The Rose Bowl Stadium is an 89,766-seat outdoor stadium and is the venue for UCLA home football games, the annual Rose Bowl Game®, international soccer games, large concerts and multi-day music festivals. The initial term of the contract is for one (1) year, commencing on July 1, 2023, with two (2) one-year options to renew, at the sole discretion of the RBOC Chief Executive Officer / General Manager with all terms and conditions of the initial term of the contract applying to any such extensions. Additional information regarding contract scope, terms and other conditions are contained in this RFP.

2. Contact Information

Dealine for Questions

The deadline to submit questions related to this solicitation is Tuesday, April 4, 2023, prior to 5:30 pm.

Questions regarding this solicitation should be submitted directly through the City's eProcurement Portal Q&A function. Do not contact any City employee or official regarding this solicitation. Any questions submitted after the date and time specified may not be considered.

Nancy Silver Chief Compliance Officer Email: nsilver@rosebowlstadium.com Phone: (626) 577-3100 Ext: 224 Department:

Rose Bowl

3. Timeline

Release Project Date March 20, 2023

Question Submission Deadline April 4, 2023, 5:30pm

Proposal Submission Deadline April 13, 2023, 5:30pm mailto:nsilver@rosebowlstadium.com tel:(626)577-3100;ext=224

2. GENERAL INSTRUCTIONS

1. NOTICE REGARDING DISCLOSURE OF CONTENTS OF DOCUMENT

All responses to this Request for Proposal (RFP) accepted by the Rose Bowl Operating Company (RBOC) shall become the exclusive property of the RBOC/City. At such time as the RBOC Chief Executive Officer / General Manager recommends a contractor to the RBOC Board of Directors, and such recommendation, with any recommended contract appears on the RBOC Board agenda, all proposals accepted by the RBOC/City shall become a matter of public record and shall be regarded as public, with the exception of those elements of each proposal which are defined by the contractor as business or trade secrets and plainly marked as "Trade Secret", "Confidential" or "Proprietary". Each element of a proposal which a contractor desires not to be considered a public record must be clearly marked as set forth above, and any blanket statement (i.e. regarding entire pages, documents or other non-specific designations) shall not be sufficient and shall not bind the RBOC/City in any way whatsoever. If disclosure is required or permitted under the California Public Records Act or otherwise by law, the RBOC/City shall not in any way be liable or responsible for the disclosure of any such records or part thereof.

2. Electronic Submission and Delivery Instructions

Parties interested in responding are required to submit proposals electronically through the City of Pasadena's eProcurement Portal no later than 5:30 pm on Thursday, April 13, 2023. Please upload sufficiently early electronically through the city's eProcurement Portal before the time and day listed in the Notice Inviting Proposals. Proposals must be received in the system prior to the deadline.

The entire proposal must be formatted on standard-size 8½”x11” pages; 12 point font only. The "Technical Proposal," "Additional Data," and "Statement of Qualifications" can be no more than 50 grand total pages.

The Price Proposal must include all costs associated with the Technical Proposal as described in the Price Proposal instructions in the “#Proposer's Submittals/Checklist.”

The Technical Proposal should disclose your technical approach in as much detail as possible, including, but not limited to, the requirements of the technical proposal instructions. Along with all required forms and submittals (See #Attachments, and #Proposer's Submittals/Checklist. No Pricing shall be included in this part.

Proposals received after the Proposal Deadline may not be accepted by the RBOC/City.

3. Separation of Technical, and Price Proposals

The proposal must be prepared in two parts: a "Technical Proposal" and a "Price Proposal." Each of the parts shall be separate and complete in itself so evaluation of one may be accomplished separate from the evaluation of the other.

https://procurement.opengov.com/portal/pasadena https://procurement.opengov.com/portal/pasadena/projects/40522?section=330574 https://procurement.opengov.com/portal/pasadena/projects/40522?section=330581 https://procurement.opengov.com/portal/pasadena/projects/40522?section=330574

1. The Price Proposal must include all costs associated with the Technical Proposal as described in the Price Proposal instructions in the “#Proposer's Submittals/Checklist.”

2. The Technical Proposal should disclose your technical approach in as much detail as possible, including, but not limited to, the requirements of the technical proposal instructions. Along with all required forms and submittals (See #Attachments, and #Proposer's Submittals/Checklist. No Pricing shall be included in this part.

4. PRICE PROPOSAL: PRICE Proposal Submittal

Parties interested in responding are required to submit their Price Proposal separate from their Technical proposal through the City's eProcurement Portal as a "Cost File."

The pricing must include the total price proposed to accomplish all the performance and deliverables requested in this RFP, and offered by your firm. Each Proposer must submit a Price Proposal containing all costs associated with the technical proposal. The Price Proposal shall describe both the total and the detailed price for which the consultant will commit to complete the total scope of work and end products. The price proposal detail shall describe costs for each professional’s time, for the completion of each proposed task, and for all materials and supplies.

The fee information is relevant to a determination of whether the fee is fair and reasonable in light of the services to be provided. Price shall include the proposed costs and, if necessary, the approximate number of hours to provide the services as described in your proposal. Any additional fees outside the scope of the agreement must be approved in writing before commencing services for said fees. Vendor’s RFP response must be inclusive of all costs and expenses associated with travel, lodging, and any other incidental costs. The City will not separately reimburse costs not included in the proposal.

5. PRICE PROPOSAL: Price Proposal Submittal

Parties interested in responding are required to submit their Price Proposal with their Technical proposal through the City's eProcurement Portal.

The pricing must include the total price proposed to accomplish all the performance and deliverables requested in this RFP, and offered by your firm. Each Proposer must submit a Price Proposal containing all costs associated with the technical proposal. The price proposal shall describe both the total and the detailed price for which the consultant will commit to complete the total scope of work and end products. The price proposal detail shall describe costs for each professional’s time, for the completion of each proposed task, and for all materials and supplies.

The fee information is relevant to a determination of whether the fee is fair and reasonable in light of the services to be provided. Costs shall include the proposed costs and, if necessary, the approximate number of hours to provide the services as described in your proposal. Any additional fees outside the scope of the agreement must be approved in writing before commencing services for said fees. Vendor’s RFP response must be inclusive of all costs and expenses associated with travel, lodging, and any other incidental costs. The RBOC will not separately reimburse costs not included in the proposal.

https://procurement.opengov.com/portal/pasadena/projects/40522?section=330574 https://procurement.opengov.com/portal/pasadena/projects/40522?section=330581 https://procurement.opengov.com/portal/pasadena/projects/40522?section=330574 https://procurement.opengov.com/portal/pasadena

6. Definitions

The words (A) "City", (B) "Department", (C) "Director", or (D) "Contractor", as used in this RFP, shall be understood to refer respectively to (A) the City of Pasadena, California; (B) the several departments therein; (C) the directors of the several City departments; or any of their properly authorized assistants; and ( D) the person, firm or corporation with whom the contract is made by said City or the agent or legal representative who may be appointed to represent such person, firm or corporation in the signing and performance of said contract.

7. Addenda

If any person contemplating submitting a proposal of the items or services listed herein is in doubt as to the true meaning of any part of this RFP, he/she may submit a question through the City's eProcurement Portal Q&A section for an interpretation or correction thereof.

Any interpretation or correction of RBOC/City specifications will be made only by addendum, duly issued by the RBOC/City representative(s) identified in Section 3, above. Addenda (if any) shall be made available to each Proposer. A proposer’s failure to address the requirements of any and all addenda may result in the proposal not being considered. If the RBOC/City determines that a time extension is required for the proposal, the RBOC/City will issue an addendum that will give the new submission date. The Proposer is responsible to register on the City's eProcurement Portal and follow the project ,Graphic Designer Request for Proposals, to insure they receive all RFP documents including addendums which are available as a download.

The RBOC/City reserves the right to change any part of these Instructions to PROPOSERS and Specifications any time prior to Deadline for Submissions. Any changes shall be in the form of addenda and will become a part of the Proposal documents and of the contract.

3. SCOPE OF WORK

1. Scope of Work

The Proposer shall be required to provide graphic design services to the RBOC, including but not limited to, the following examples:

· Design all Rose Bowl Stadium and Brookside Campus Signage

· Create Credential Design and Production for All Major Events

· Create Rose Bowl Marketing Ads, Social Graphics, Maps and Promotional Materials

· Manage and Update Operational Event Signage – Wayfinding Maps, Prohibited Items, Clear Bag Policy, Roadway Directional Signage, etc.

· Create Enterprise and Produced Event Logos and Design Materials

· Create Community Event Logos and Design Materials

· Update Rose Bowl Brand Assets

· Design Rose Bowl Stadium Annual Report

· Other Duties as Assigned

2. Qualifications

Minimum Qualifications:

· Three-Five Years of Relevant Experience in Graphic Design Preferred

· Candidate should be Self-Motivated, Organized, Professional and Detail Oriented

· Strong Verbal Communication Skills

· Available and On-Call Daily from 8:30 AM – 5:30 PM PST

· Late Night & Early Morning PST During Major Event Season

· On-Site Responsibilities during Event Week and on Event Day

· Ability to Multi-Task and Work in a Fast-Paced Environment

· Available to Work Evenings, Weekends and Holidays

3. Content of Proposals

Proposals, in order to be considered, must contain the following information and must be organized in the following manner:

A. Cover letter

This section is to include the name, address, telephone number and, if available, FAX number or email of the Proposer or the person authorized to represent the Proposing firm and with whom notifications regarding this RFP should be addressed and sent to.

B. Proposal Overview

This section should summarize the Proposer’s understanding of the RBOC’s Request for Proposals.

C. Proposer‘s Attributes & Qualifications

This section shall describe the ownership, size, organization, expertise, resources and history of the Proposer. Specifically, it shall include the name of the sole proprietor, or if a partnership or joint venture, the names of all individuals and firms that constitute the partnership or joint venture. It shall include a summary of the Proposer’s familiarity of and experience with graphic design fulfillment, including specifically, stadium and arena operations or government contracts.

Experience of three (3) years at a comparable organization to the Rose Bowl Stadium is required.

This section shall include information detailing the financial ability of the Proposer to complete the contract. To this end, a financial statement, preferably audited, is desired. The financial statement should be submitted in a separate envelope, marked “confidential”. Additionally, this section shall include a list of all pending litigation against the Proposer or its owners and all final judgments which has been entered within the last five (5) years, information on the relevant circumstances, jurisdiction, case number and current status of said legal action; a list of any defaults or terminations for cause by the firm by a client over the last five (5)-years and information on the terms and conditions and reasons for these defaults or terminations.

D. Work Program and Management

This section shall include a detailed description of the type and level of services offered by the Proposer. It shall include specific information on personnel selection, training and monitoring, task assignments and responsibilities. This section shall identify and provide background information (e.g. education, expertise and experience) of the personnel who will be involved with the administration of the RBOC’s contract, including the specific dedicated personnel to the Rose Bowl Stadium account.

E. Portfolio

This section shall provide a variety of examples of the Proposer's work, with examples comparable to the items listed in the scope of work above. Specifically, Proposer should submit work product examples of the following:

· Signage

· Original Logo(s) Design(s)

· Flyers / Posters

· PowerPoint templates, Presentation Decks, Brochures

· Brand Books

· Social Media Graphics and Assets

Proposers may be required to participate in an interview process and provide additional examples of work specifically requested to be developed in advance of the interview.

F. Pricing

Pricing should be based on a monthly basis and shall include all services provided for the following:

• Up to 25 Major Events (defined as events with an attendance of over 20,000 including but not limited to soccer matches and concerts)

• Up to five (5) Produced Events per year (i.e. Craftoberfest, Rose Bowl Wine Festival, etc.)

• Three (3) Community Events per year (Egg Bowl, July 4th Americafest, Cinco de Mayo)

4. Evaluation Process

Evaluation of proposals shall be based upon a competitive selection process and based on the content of the written proposals and, if any, interviews. The RBOC will evaluate each proposal on the basis of the Proposer’s attributes, work program and management, price, Small & Micro- Business Certification (if any), physical business location and commitment to hiring local residents. The RBOC will evaluate the responses based upon the information supplied by the Proposer. The criteria for the evaluations are as follows:

Category/Maximum Points:

Prior Experience and Qualifications/References 15

Ability to provide scope of services as defined 10

Ability to meet or exceed performance standards 25

Individuals to be assigned to the contract 15

Local Pasadena Business 5

Small and Micro Business 5

Cost Proposal 25

Total 100

In addition, the RBOC may consider evidence of untimely and unsatisfactory performance on prior similar projects or litigation by the Proposer on previous contracts to disqualify any Proposer.

Screening, evaluation and selection of proposals will be conducted by committee. The committee shall consist of the Rose Bowl General Manager and/or designee(s), RBOC staff and others as deemed necessary and appropriate by the Rose Bowl General Manager.

The RBOC reserves the right to contact and interview one or more proposers to clarify or obtain additional information.

5. Compensation

Fees and rates negotiated and made part of the contract document are to remain firm for the original performance period. For any renewal year, fees and rates may be adjusted to reflect changes in the Consumer Price Index (Urban Consumers Index for the Los Angeles — Anaheim;

Riverside Area or any successor index issued by the Federal Government) for the six (6) months immediately preceding the renewal year, in comparison to the previous year, but shall not exceed 3% annually.

I. Invoices and Payment

A. Invoices are to be submitted no later than 30 days after services have been rendered.

B. All charges are to be identified by assignment, areas, hours, and reimbursable expenses itemized and listed separately.

C. Payment for the RBOC approved invoice will be paid within 30 days of receipt.

4. SAMPLE PRICE PROPOSAL

Each Proposer must submit a Price Proposal containing all costs associated with the technical proposal. The cost proposal shall describe both the total and the detailed price for which the consultant will commit to complete the total scope of work and end products. The table(s) below is intended to be a sample. Proposers may add necessary line items provided they are in compliance with instructions in this RFP for "Cost Proposals." The cost proposal detail shall describe costs for each professional’s time, for the completion of each proposed task, and for materials and supplies.

INSTRUCTIONS:

Each Proposer must submit a Price Proposal containing all costs associated with the technical proposal. Using the attached Price Proposal in this RFP, provide Proposer’s lump-sum price and/or unit price for performing all services and work called for in the SCOPE OF WORK. The Proposer’s price shall include, without limitation:

A. all designs, equipment, materials, labor, insurance and bond premiums, home office, jobsite, and other overhead, profit and services relating to the Proposer’s performance of its obligations under the Contract (including all work, equipment, materials, labor, and services provided by subcontractors and intellectual property rights necessary to perform the work);

B. performance of each and every portion of the work

C. all costs of obtaining Government approvals other than Government approvals that are the responsibility of the City of Pasadena;

D. all costs of compliance with Government rules, except to the extent such compliance is the responsibility of the City of Pasadena;

E. all taxes, duties, permits, and other fees or royalties incident to the performance of the

SCOPE OF WORK;

F. payment of all salaries, wages, benefits, and expenses of the Proposer’s employees;

G. compensation for all risks, liabilities, and contingencies assigned to the Proposer; and

H. all other costs needed or incurred to complete the Project.

Line Item Description Quantity Unit of Measure

Unit Cost Total

1 Monthly retainer pricing 12 Monthly

TOTAL

5. EVALUATION CRITERIA

Evaluation of the proposals will be based on a competitive selection process, in which the evaluation of proposals will not be limited to price alone. The capability of the proposer to satisfy the City requirements identified in the Scope of Services, and the experience of the proposer in providing services of this type, size and scope will also be considered in the selection. A minimum of five (5) years of experience providing similar services is required.

This RFP has been structured to provide specific requirements which function as a standardized framework for the evaluation of a prospective consultant’s qualifications.

The City, in consultation with the selection panel, reserves the right to reject any and all proposals. The selection panel will grade and score responsive proposals with the following criteria and weights: The competitive selection evaluation criteria are as follows:

No. Evaluation Criteria Scoring Method Weight (Points)

1. Prior Experience and Qualifications/References Points will be assigned for “Experience with Projects of this Size and Scope in an Agency of Similar Size” based on a vendor’s previous experience with municipal agencies, as delineated in the SCOPE OF WORK, and CLIENT REFERENCES. Relevant experience, and technical expertise of the Consultant and sub- Consultants (if allowed) to perform the work.

Points Based 15 (15% of Total)

2. Individuals to be Assigned to the Project Points will be assigned for staffing assigned to this project/contract; and staff accessibility and availability to the project. Education and experience of key personnel. Consideration will be given based on the professional, technical, and educational qualifications of personnel that will be assigned to the project based on the resumes provided. Proposer should demonstrate that all key personnel have been successfully involved with projects of similar scope and magnitude.

Points Based 15 (15% of Total)

3. Ability to Provide Scope of Services as Defined Points will be assigned based on Proposer's work plan, management understanding of the RFP requirements and ability to meet those requirements. This section shall include a detailed description of the type and level of services offered by the proposing firm. It shall include specific information on staffing levels, response to emergency requests, personnel selection, training and monitoring, task assignments and responsibilities, report types and schedules, uniforms and equipment.

Points Based 10 (10% of Total)

4. Ability to Meet or Exceed Performance Standards Points will be assigned based on the Quality of Proposed Product or Service and on it's ability to met or exceed the Scope of Work. Nature and quality of completed work for other governmental agencies. This shall include evaluation of the Propoer's Portfolio work quality.

Points Based 25 (25% of Total)

5. Cost Proposal Points will be assigned based on a “Ratio Method.” The proposer’s cost must include the delivery of the proposed solutions, as well as any recurring costs (if any) as delineated in the Scope of Work and the PRICE PROPOSAL.

With this method, the proposal with the lowest cost receives the maximum points allowed. All other proposals receive a percentage of the points available based on their cost relationship to the lowest price. This is determined by applying the following formula:

Lowest Price / Evaluated Price X maximum points available = Awarded Points

Example: The cost for the lowest proposal is $100,000. The next lowest proposal has a cost of $125,000. The total points available for cost = 30 points.

( $100,000 / $125,000 ) X 30 = 24 points

Reward Low Cost 25 (25% of Total)

6. Local Pasadena Business To be awarded a 5 point preference for this category, the proposer must have an official business address within the City of Pasadena at the time that this RFP is posted on the City’s Website.

Pass / Fail 5 (5% of Total)

7. Small or Micro-Business To be awarded a 5 point preference for this category, the proposer must be certified by the State of California as a small or micro-business.

Refer to the State of California Department of General Services Division for further information.

https://caleprocure.ca.gov/pages/sbdvbe-index.aspx

Pass / Fail 5 (5% of Total) https://caleprocure.ca.gov/pages/sbdvbe-index.aspx

6. REVIEW AND AWARD RECOMMENDATION PROCESS

1. Review and Award

A screening committee will determine which proposals are responsive to RBOC requirements and needs. The technical portions of responsive proposals will be evaluated by a selection panel consisting of personnel from the RBOC. The selection may be based solely on the written proposals submitted.

PROPOSERS may be invited to a meeting to provide additional clarification of the content of their proposal. The RBOC reserves the right to invite all of the PROPOSERS for an oral clarification OR only the top three (3) ranked firms based on the initial written proposal review. The meeting will not alter the selection criteria but will be used to clarify content of the proposal. The final scoring and ranking will be made after the meetings. Proposals shall consist of the sections named in the “Contents of Proposal” outlined below.

Once an agreement is reached with a Proposer, staff will recommend award of a contract. The RBOC reserves the right to select the firm which, in its sole judgment, best meets the needs of the RBOC.

Any contract resulting from this RFP, if $75,000 or more, shall not be effective until approved by the RBOC Board of Directors.

2. Separate Review of Technical, and Price Proposals

The Technical Proposal and the Price Proposal will be evaluated separately. First will be all non-price qualifications including but not limited approach, experience, all Required Forms, litigation history, responsiveness, and all elements related to the non-price evaluation factors in the Evaluation Criteria (#Evaluation Criteria). The RBOC may utilize separate evaluation committees to review the Technical and Price elements.

https://procurement.opengov.com/portal/pasadena/projects/40522?section=330573

7. PUBLIC CONTRACT CLAIMS PROCEDURE

PUBLIC CONTRACT CODE SEC. 9204 PUBLIC WORKS CLAIMS PROCEDURE

AB 626, approved by the Governor on September 29, 2016, created a new Public Contract Code Section 9204, which specifies new procedural requirements for claims submitted by a contractor on any public works project. These new requirements contain burdens for both private contractors and public entities and are specifically made applicable to charter cities.

For this legislation, a “public works project” is defined as “the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.” This definition is not as broad as in the Prevailing Wage Law.

A “claim” is defined as “a separate demand by a contractor sent by registered mail or certified mail with return receipt requested…” and is limited to three types of contract disputes:

1. “A time extension…for relief from damages or penalties for delay assessed by a public entity….”

2. “Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled”, and/or

3. “Payment of an amount that is disputed by the public entity.”

Upon receipt of a claim, a public entity must "conduct a reasonable review" and provide a written statement to the contractor within 45 days of receipt of the claim. Failure of a public entity to respond to a claim within the time periods described in Section 9204 "shall result in the claim being deemed rejected in its entirety."

For any undisputed portion of a claim, a public entity must make payment within 60 days of the public entity's issuance of the written statement.

If the contractor disputes the public entity's written statement, or if the public entity fails to respond, the contractor may demand "an informal conference to meet and confer for settlement of the issues in dispute." The public entity must schedule the meet and confer conference within 30 days of the demand.

Within 10 business days following the meet and confer conference, the public entity must provide a written statement identifying the portion of the claim that remains in dispute.

Any payment due on an undisputed portion of the claim must be made within 60 days of the meet and confer conference. Amounts not paid in a timely manner shall bear interest at 7 percent per year.

After the meet and confer conference, any disputed portion of the claim "shall be submitted to non-binding mediation." If mediation fails to resolve the dispute, the parts of the claim that remain in dispute shall be subject to applicable procedures outside Section 9204 (statutory and contractual).

The full text of this new legislation is set forth below:

THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS:

SECTION 1.

Section 9204 is added to the Public Contract Code, to read:

9204.

(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner.

(b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project.

(c) For purposes of this section:

(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:

(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project.

(B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled.

(C) Payment of an amount that is disputed by the public entity.

(2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project.

(3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency.

(B) “Public entity” shall not include the following:

The Department of Water Resources as to any project under the jurisdiction of that department.

The Department of Transportation as to any project under the jurisdiction of that department.

The Department of Parks and Recreation as to any project under the jurisdiction of that department.

The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.

The Military Department as to any project under the jurisdiction of that department.

The Department of General Services as to all other projects.

The High-Speed Rail Authority.

(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.

(5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor.

(d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision.

(B) The claimant shall furnish reasonable documentation to support the claim.

(C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion.

(D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.

(2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.

(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.

(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.

(D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.

(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.

(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.

(4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.

(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim.

Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.

(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section.

(f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.

(g) This section applies to contracts entered into on or after January 1, 2017.

(h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.

(i) This section shall remain in effect only until January 1, 2027, and as of that date is repealed, unless a later enacted statute that is enacted before January 1, 2027, deletes or extends that date.

(Amended by Stats. 2019, Ch. 489, Sec. 1. (AB 456) Effective January 1, 2020. Repealed as of January 1, 2027, by its own provisions.)

SEC. 2.

The Legislature finds and declares that it is of statewide concern to require a charter city, charter county, or charter city and county to follow a prescribed claims resolution process to ensure there are uniform and equitable procurement practices.

SEC. 3.

If the Commission on State Mandates determines that this act contains costs mandated by the state, reimbursement to local agencies and school districts for those costs shall be made pursuant to Part 7 (commencing with Section 17500) of Division 4 of Title 2 of the Government Code.

8. CITY REQUIREMENTS

There are of forms included in the section named Submittal/Checklist of these specifications which a bidder must complete to establish compliance with a number of City Requirements, including, but not limited to, equal employment opportunity and affidavit of non-collusion. These forms and their instructions should be considered an integral part of the specifications and failure to complete them may be grounds, in the sole discretion of the city, for rejection of any bidder.

1. Equal Employment Opportunity in Contracting

Policy - The City of Pasadena is committed to a policy of Equal Employment:

• Contracting. Contractors expressly agree to comply with the City’s ordinances and regulations regarding Equal Opportunity Employment as well as regulations that may be mandated by the source of the funds supporting this contract.

Compliance – To the extent permitted by law, Contractor expressly agrees to establish compliance with the Equal Employment Opportunity Practices Provisions of Chapter 4.08 of the Pasadena Municipal Code, and the Rules and Regulations adopted pursuant to said ordinance.

The successful bidder may be required to submit documentation during the term of the contract to evidence on going compliance with the City’s Equal Opportunity Practices Provisions. Such documentation may include, but not be limited to certified payroll records and Current Permanent Workforce Utilization reports.

Required Forms – Each bidder must submit a completed Form AA-1. Failure to submit this form will result in automatic disqualification with no exceptions unless bidder has an approved Form on file with the City.

Questions regarding Chapter 4.08 of the Pasadena Municipal Code and regulations adopted pursuant thereto should be directed to the Department of Finance, Purchasing Division 626.744.6755.

2. Declaration of Non-Collusion by Contractor

The City requires that each bidder executes and submits to the City with the Bid, the attached Declaration of Non Collusion in the #Bidder's Submittals/Checklist.

3. System for Award Management (SAM.Gov) https://procurement.opengov.com/portal/pasadena/projects/40522?section=undefined

Prior to contract award, the winning contractor must provide an active registration with "Sam.Gov." Vendors seeking to register can register for free at the following link:

https://sam.gov/content/entity-registration

4. CHANGE ORDER MANAGEMENTCHANGE ORDER MANAGEMENT

Any additional work identified during the course of the project that is deemed necessary, but outside the original Scope of Services, must be recorded as a Change Order and approved by the City in writing before work is started.

5. Local Preferences

The City of Pasadena is committed to promoting the economic health and well being of its residents. To this end, contractor agrees to recruit Pasadena residents initially and to give them preference, if all other factors are equal, for any new positions that result from the performance of this contract and which are performed within the City.

6. Protest Procedure

This procedure specifies the process to be utilized by the City of Pasadena in resolving protests regarding this solicitation. In order for a protest to be considered by the City of Pasadena, it must be submitted in accordance with the procedures outlined in the FORMAL SOLICATION PROTEST PROCURE found at the following link: (https://ww5.cityofpasadena.net/finance/doing-business-with-the-city/). A protest submitted that is not in accordance with this procedure, may be returned to the submitting party without any further action by the City of Pasadena.

7. Pasadena Business License

Awarded bidder(s) may be required to obtain and pay for any required business license under Title 5 of the Pasadena Municipal Code.

• If the business will not come into the City for the purpose of providing services for this contract they are not required to obtain a business license.

• If the business will only be coming into the city no more than 10 times to work on projects, they are charged 33% of the annual tax (5.04.130C)

• If they come into the City more than 10 times they are required to pay the annual fee.

• Any subcontractors used by the awarded bidder will be required to obtain a license if they will be coming into the City to perform services.

For further information contact Municipal Services Department at (626) 744-4166, Monday- Friday between 7:15 am and 5:15 pm. Additional Information regarding business license fees can be found here: https://www.cityofpasadena.net/finance/licenses/business-licenses/

8. Invoice Submission Portal

Invoice Submission Portal https://sam.gov/content/entity-registration https://ww5.cityofpasadena.net/finance/doing-business-with-the-city/ https://ww5.cityofpasadena.net/finance/doing-business-with-the-city/ https://www.cityofpasadena.net/finance/licenses/business-licenses/

The invoice submission process is activated when an invoice is submitted through the Vendor Invoice Portal. Invoices submitted are automatically sent to the department being invoiced for review. Once the city department verifies its accuracy, the department will submit the invoice to Accounts Payable for payment processing. One final review and approval by the department who was invoiced is needed in order for a check to be issued. Checks are issued on Tuesday and Thursday.

How to submit invoices to the City of Pasadena?

Create an account: Visit the City’s Invoice Submission website:

https://invoice.cityofpasadena.net/ and select “Create Account”

Refer to the "Invoice Submission Portal - Vendor User Guide" for detailed instructions.

9. Pasadena Living Wage Ordinance

This project is subject to the City of Pasadena's Living Wage Ordinance, Pasadena Municipal Code Chapter 4.11. The ordinance requires that contractors providing labor or services to the City under contracts in excess of $25,000 pay no less than the City’s Living Wage to all employees who spend any of their time providing labor or delivering services to the City.

The selected contractor will be required to evidence compliance with the Living Wage Ordinance by submitting payroll records as requested by the City. Each record shall include the full name of each employee performing labor or providing services under the contract; job classification; rate of pay and benefit rate.

Failure to comply with the provisions of the Pasadena Living Wage Ordinance is grounds for termination of the contract and a basis for penalties as stated in Pasadena Municipal Code Chapter 4.11. Questions concerning the Pasadena Living Wage Ordinance should be directed to:

Finance Department Purchasing Division 626-744-6755 - phone 626-744-6757 – fax

Please visit https://ww5.cityofpasadena.net/finance/doing-business-with-the-city/ for the current calendar year Pasadena Living Wage rate.

10. Errors and Omissions

Bidders shall not be allowed to take advantage of any errors or omissions in the Instructions to Bidders or Specifications. Full instructions will be given if such error or omission is discovered and timely called to the attention of the City.

11. Patent Fees; Patent, Copyright, Trade Secret, and Trademark Fees

Each bidder shall include in the price bid any patent fees, royalties and charges on any patented article or process to be furnished or used in the prosecution of the Work.

12. Taxes https://invoice.cityofpasadena.net/PortalGuide.pdf https://ww5.cityofpasadena.net/finance/doing-business-with-the-city/

Price bid shall include all federal, state, local and other taxes.

13. Certificate of Insurance

Proof of insurance is not required to be submitted with your bid, but will be required prior to the City's award of the contract. Refer to the Insurance requirements in the "Insurance Requirements" section of this document.

14. REQUEST FOR TAXPAYER IDENTIFICATION NUMBER AND CERTIFICATION (IRS Form W-9)

The winning proposal may be required to submit a completed and signed IRS Form W-9. Failure to submit this form may result in the response being deemed non-responsive.

Link: https://www.irs.gov/pub/irs-pdf/fw9.pdf

15. Technical Questionnaire Form

This form is only required for the purchases of technology. The City of Pasadena Department of Information Technology (DoIT) is tasked with reviewing all IT solutions proposed for use by the City. DoIT uses this questionnaire to assess various business, security, and/or operational impacts of vendor proposed technology solutions, SaaS offerings, software or hardware that will reside on the City’s servers and/or network, that will integrate to the City’s existing applications, servers and/or network, or that may have an impact on the City’s ability to conduct business.

This questionnaire is also used to identify and distinguish at an early stage in the evaluation process the potential roles and responsibilities of the City and the proposer.

If selected, proposers are required to complete the Pasadena Department of Information Technology Technical Questionnaire. The questionnaire is included in the section named "Sumittal/Checlist." When completing the questionnaire, please note:

• Section 4.0 must be completed for externally hosted/SAAS applications; and

• Section 5.0 must be completed for City hosted/on-premises software https://www.irs.gov/pub/irs-pdf/fw9.pdf https://www.irs.gov/pub/irs-pdf/fw9.pdf

9. GENERAL REQUIREMENTS

1. Local Preference

The City of Pasadena is committed to promoting the economic health and well-being of its residents. To this end, Contractor agrees to recruit Pasadena residents initially and to give them preference, if all other factors are equal, for any new positions which result from the performance of this Contract and which are performed within the City.

• The Contractor will be required to make good-faith effort to hire Pasadena residents for all new hires, including subcontractor new hires.

• A good-faith effort will include requests to unions or community organizations designated by City to provide a list of qualified Pasadena residents. If qualified candidates available, Contractor will conduct interviews with assistance of City and union/community organizations.

• Residents are individuals who are, and have been one year prior to the effective date of the contract, residents of the City of Pasadena.

• Submission to the City of documentation of requests and interviews will constitute proof of a good-faith effort.

• Interviews of Pasadena residents, if conducted, shall be completed and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .