This is a design plan set for the Grafton Drive Sidewalk project prepared by the York County Department of Public Works Engineering Division in Virginia. The project involves the construction of sidewalks, curb and gutter, pedestrian ramps, and associated infrastructure improvements along Grafton Drive in York County, Virginia. The design encompasses approximately 2,000 linear feet of work divided into three sections (Stations 10+00 to 16+75, 16+75 to 23+75, and 23+75 to 30+25). Key quantities include 155 linear feet of standard curb, 461 linear feet of curb and gutter, 970 square yards of sidewalk, 35 square yards of detectable warning surface, three sidewalk drains with riprap, two drainage structures, and curb ramp details with specific slope and transition requirements. The project includes demolition of existing pavement and concrete, earthwork with specified fill and cut slopes of 3:1, and comprehensive erosion and sediment control measures including silt fence, inlet protection, and temporary stabilization requirements.
The project is identified as a Type A, Category II project with federally-funded support through the TAP program (UPC 121106). Construction work hours are scheduled from 7:00 AM to 6:00 PM with a 35 MPH speed limit to be maintained along Grafton Drive. The design specifications require Class A-3 air-entrained concrete (3,000 PSI) for all concrete work, with expansion joints formed at ten-foot intervals using one-half inch premolded bituminous fiber joint filler. The contractor is required to notify property owners in writing a minimum of 48 hours before working on driveways and must maintain full driveway access with only one entrance worked on at a time. Temporary erosion and sediment control measures must be installed prior to demolition and earth-moving activities, with permanent stabilization required within seven days of final grading and removal of temporary measures within 30 days. The project plans include utility coordination through Miss Utility Virginia (811), tree preservation with specific protection buffers, and final restoration including topsoil, seeding, and mulch application.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDENDUM 1.pdf | ||
| SOLICITATION DOCUMENT.pdf | ||
| PRE-BID MEETING SIGN-IN SHEET.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWN BY
APPROVED BY
DESIGNED BY
DATE
SHEET NO.
I:
\P r o j e c ts \8
\8
-D -G r a f to n
D r iv e
S id e w a lk \B
IM
-C
A D \8 d S h e e ts \d d 1a .d g n
:2
P
M o n
F e b r u a r y
, 2
WMP
JMA
SIDEWALK DESIGN
GRAFTON DRIVE
E. Mertz-Guinn
ENGINEERING DIVISION
DEPARTMENT OF PUBLIC WORKS
YORK COUNTY
COUNTY PROJECT MANAGER
5/19/2025
CN
LOCATION MAP
LOCATION MAP
1A
SCALE
750' 1500'
SCALE
0.25 mi 0.50 mi
PROJECT LOCATION
G R
A F T
O N
R
IV
E
TIMBERLINE LOOP
MARTIN FARM LANE
AMORY
LANE
DESIGNED BY
DATE
SHEET NO.
I:
\P r o j e c ts \8
\8
-D -G r a f iv e
S id e w a lk \B
IM
-C
A D \8 d S h e e ts \d d 1b .d g n
:2
P
M o n
F e b r u a r y
, 2
WMP
JMA
SIDEWALK DESIGN
GRAFTON DRIVE
E. Mertz-Guinn
ENGINEERING DIVISION
DEPARTMENT OF PUBLIC WORKS
YORK COUNTY
COUNTY PROJECT MANAGER
5/19/2025
CN
TITLE SHEET1
1C
1D
1F
1G
1H
TYPICAL SECTIONS
RIGHT OF WAY DATA SHEET
REVISION DATA SHEET
SURVEY ALIGNMENT DATA SHEET
CONSTRUCTION ALIGNMENT DATA SHEET
GENERAL NOTES
DESCRIPTIONSHEET NO.
1A LOCATION MAP
1B INDEX OF SHEETS
TOTAL CROSS SECTION SHEETS ___ (SEE CROSS SECTION SHEET NUMBER 1 FOR INDEX OF SHEETS)
UNDERGROUND UTILITY TEST HOLE INFORMATION
2C
2B
INDEX OF SHEETS
(Not Included this Submittal)
INDEX OF SHEETS
1B
EXISTING CONDITIONS
3(1)
3A
3B
4B
4A
4(1)
5B
5A
5(1)
SURVEY CONTROL DATA SHEET1F(1)
1E(1) - 1E(3)
SEQUENCE OF CONSTRUCTION/MAINTENANCE OF TRAFFIC NOTES
QUANTITY SUMMARIES
EROSION AND SEDIMENT CONTROL NOTES
PLAN SHEET STA. 10+00 to 16+75
DEMOLITION PLAN SHEET STA. 10+00 to 16+75
PROFILE SHEET STA. 10+00 to 16+75
EROSION AND SEDIMENT CONTROL PLAN STA. 10+00 to 16+75
PLAN SHEET STA. 16+75 to 23+75
DEMOLITION PLAN SHEET STA. 16+75 to 23+75
PROFILE SHEET STA. 16+75 to 23+75
EROSION AND SEDIMENT CONTROL PLAN STA. 16+75 to 23+75
PLAN SHEET STA. 23+75 to 30+25
DEMOLITION PLAN SHEET STA. 23+75 to 30+25
PROFILE SHEET STA. 23+75 to 30+25
EROSION AND SEDIMENT CONTROL PLAN STA. 23+75 to 30+25
PAVEMENT MARKING AND SIGNING PLANS (SEE SHEET 6(1) FOR INDEX)
2E(1) - 2E(3)
DETAIL SHEET2D
CURB RAMP DETAILS
2A
1J(1) - 1J(2)
6(1), 6(3) - 6(5)
DESIGNED BY
DATE
SHEET NO.
I:
\P r o j e c ts \8
\8
-D -G r a f iv e
S id e w a lk \B
IM
-C
A D \8 d S h e e ts \d d 1c .d g n
:2
P
M o n
F e b r u a r y
, 2
WMP
JMA
SIDEWALK DESIGN
GRAFTON DRIVE
E. Mertz-Guinn
ENGINEERING DIVISION
DEPARTMENT OF PUBLIC WORKS
YORK COUNTY
COUNTY PROJECT MANAGER
5/19/2025
CN
1C
RIGHT OF WAY DATA SHEET
RIGHT OF WAY DATA SHEET
DESIGNED BY
DATE
SHEET NO.
I:
\P r o j e c ts \8
\8
-D -G r a f iv e
S id e w a lk \B
IM
-C
A D \8 d S h e e ts \d d 1d .d g n
:2
P
M o n
F e b r u a r y
, 2
WMP
JMA
SIDEWALK DESIGN
GRAFTON DRIVE
E. Mertz-Guinn
ENGINEERING DIVISION
DEPARTMENT OF PUBLIC WORKS
YORK COUNTY
COUNTY PROJECT MANAGER
5/19/2025
CN
1D
REVISION DATA SHEET
REVISION DATA SHEET
C o n c . W a lk
6'Wood Fence
4'Vinyl Fence
4'Vinyl Fenc e
4'Vinyl Fence
6'Wood Fence
D
D
In v
.4 im
.3
D I
C o n c
C o n c
In v
.6
(S
W
In v
.7
(N
E
1.
D I
In v
.6
.1
C D I
In v
.8
(S
W
In v
.1 (N
W
.0
C D I
In v
.3
1( S
W
In v
.3
(S
E
In v
.3
(N
E
.4
S D
M H
15" Conc.
"H
D P
"H
D P
30"C&G
30"C&G
30"C&G
Asphalt Surface
Asphalt Surface
C o n c . W a lk
S h r u b s
"C
CS
h r u b s
G r a v e l
B r ic k
S ig n
S ig n
S a p li n g
"O a k
"O a k
"O a k
Ditch
Ditch
"P in e
"P in e
"P in e
"P in e
"P in e
"P in e
S to e
W a ll
Conc. Walk
F F
E =5
.0
F r a m e
1- S ty
"O a k
2.129 ACRES PER PLAT
GPIN: S06a-0500-4384
P.B. 12 PG. 34 PLAT
D.B. 879 PG. 771
ASSOCIATION INC.
GLEN LAUREL HOMEOWNER'S
NOW OR FORMERLY
L
PIR
V
E
T V
C A T
V -P e d
T
F O
H H
T -P e d
F
W V (2
F
F F
O H
H
F O
H H
T M
H T
E M
G o u n d
L ig h t
T V
C A T
V H
H
E -P e d
H
F O
H H
T -P e d
T -C a b
1W B
S
S
P V
C
PVC
P V
C
In v
.3
(S
W
In v
.3
(S
In v
.4
(E
1.
S M
H
N o
A c c e s s
.6
S M
H
(P .B . 1
P
G . 3
-3
V A
R
IA
B L E
ID
T H
A
U R
Y
VARIABLE WIDTH R/W
GRAFTON DRIVE
PRIVATE R/W
STAGECOACH WATCH
PRIVATE R/W
STAGECOACH WATCH
R O
D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
P.B. 11 PG. 221
10' DRAINAGE & UTILITY EASEMENT
EXISTING YORK COUNTY
P .B . 1 P
G . 2
D R
A
IN
A
U
IL
IT
Y
E
A S
E M
E N
T E
X
IS
T
IN
Y
K
U N
P .B . 1
P
G . 3
-3
S
IG
S
E M
E N
T
E X
IS
T
U N
DESIGNED BY
DATE
SHEET NO.
I:
\P r o j e c ts \8
\8
-D -G r a f iv e
S id e w a lk \B
IM
-C
A D \8 d S h e e ts \d d 1e (1 d g n
:2
P
M o n
F e b r u a r y
, 2
WMP
JMA
GRAFTON DRIVE
SIDEWALK DESIGN
E. Mertz-Guinn
YORK COUNTY
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
COUNTY PROJECT MANAGER
5/19/2025
CN
SCALE
25' 50'
Exist. R/W
Exist. R/W
Exist. R/W
Exist. R/W
1E(1)
EXISTING CONDITIONS
M A
T
S
E E
T
1E
SEE SHEET 1E(2) FOR UTILITY LEGEND
NOTE:
Photo Control Point
Advertising Sign
Bench Mark
Bollard Post
Control Station
Flag Pole
Gravesite Marker
Guard Post
Mine Entrance
Node Point
Property Line Symbol
Secondary Control Point
Drainage Flow Arrow (Storm Drainage)
Filler Cap (Gas Stations)
Flow Arrow (Streams & Rivers)
Filler Pipe (Gas Stations)
Gas Vent Pipe (Gas Stations)
Gas Tank Access Manhole (Gas Stations)
PLANIMETRIC LEGEND
BM
FP
V
FC
GA
PL
PHOTO CP
Bore Hole
Mail Box
Property Monument
Metal or Wooden Post
Right of Way Monument
Iron Right of Way Pin
Railroad Mile Marker
Railroad Right of Way Monument
Railroad Telegraph Pole
Railroad Telephone Pole
Shrub
Storm Sewer Manhole
Tree
Railroad Signal Pole or Gate
P
D
Found Monumentation
Monitoring Well
Road Arrow
Reference
VDOT Commission Monument
Railroad Switch
Photogrammetric Target
Traffic Left Turn Arrow
Wetland Flag Manual
Elevation Tick Mark
Connected Plat Symbol
A
M
Z
Bridge Elevation
Plan Elevation
Water Elevation
Wetland Flag Automatic
Traffic Left-Thru-Right Arrow
Traffic Thru-Right Arrow
Traffic Springback Marker
Traffic Left-Right Arrow
Traffic Left-Thru Arrow
Traffic Right Turn Arrow
Traffic Thru Arrow
Brush Line
City Line
Curb Only
Fence Line
Guardrail
Hedge Row
State Line
Sidewalks
County Line
Curb and Gutter
Jersey Barrier
Obscure Areas
Paved Ditches
Railroad
Right of Way
Edges of Water
Wetlands
Z
Pipe Culverts *
( Variable from 12" to 120" )
* Designate size of culverts
Woods
03-17-2023
6'Wood Fence
4'Vinyl Fence
6'Wood Fence 6'Wood Fence 6'Wood Fence
4'Vinyl Fence 4'Vinyl Fence
D
D
D
D
D
In v
.8
(S
W
In v
.1 (N
W
.0
C
D I
"H
D P
"H
D P
18"HDP
In v
.3
(S
W
In v
.3
(S
E
.6
C D I
In v
.2
(S
W
In v
.2
(N
E
.1
D I
15"Conc.
"C o n c
"C o n c
In v
.9
(N
W
In v
.9
(S
.2
C D I
In v.
.0 (N
In v.
.1 1( E
R im
.9
C D I
In v.
.1 (W
In v.
.2 (S
E
R im
.9
C D I
15"Conc.
"C on c
15" Co nc
"C
&G
30"C&G30"C&G
As ph al t S ur fa ce
Asphalt Surface
B r ic k llB r ic k
C o lu m n s
S a p li n g
S a p li n gS a p li n g
S h r u b s
As ph al t
W al k
6" C C
"O a k
"O a k
"O a k
"O a k
"G u m
"P in e (2
"O a k
"G u m
"C e d a r
"P in e
"P in e
S a p li n g
"P in e
"P in e
"P in e
"O a k
"O a k
"P in e (2
"O a k
S h r u b s
C o n c . W a lk
S a p li n g
S a p li n g
"G u m (2
"P in e
"G u m
"G u m
S a p li n g
S a p li n g
"B ir c h
"B ir c h
S a p li n g
B o ll a r d s (5
"O a k
"O a k
"B ir c h
"G u m (2
S to ll
RECORD
2.08 ACRES PER TAX
GPIN: S06a-0554-3500
P.B. 12 PG. 162 PLAT
D.B. 879 PG. 771
ASSOCIATION INC.
HOMEOWNER'S
GLEN LAUREL
NOW OR FORMERLY
F
F O
H
HP
S
S
In v
.5
(S
W
In v
.6
(N
E
In v
.7
(N
W
1.
S M
H
In v
.9
(S
W
In v
.0
(N
E
.5
S M
H
0 P V
C
P V
C
PVC
P V
C
F H
T V
T T -P e d
C A
T V -P e d
C A
T V -P e d
C A
T V -P e d
T V
T V
F
F
F O
H H (2
T M
H T
F
L
P
G r o u n d
L ig h t
G V
E
E -T r a n s
G M
E E
U P
S (2
F O
H H
VARIABLE WIDTH R/W
GRAFTON DRIVE
PRIVATE R/W
THORNROSE DRIVE
P .B . 1
P
G . 1
IV
A
W
R U S
T L
T
IV
A T E
R
W
M A R T
IN
F
A R
M
R
O A D
R O D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
IN
S T
P E R
IM
E T E R
B U F F E R
E X
IS
T
IN
G
IN
S T
E A S E
M E
N T
E X
IS
T
U N T
Y
S
IG
. 1 P
G . 2
D R
A
IN
A
IL
IT
Y
E
A S
E M
E N
T
E X
IS
T
U N
T
P E
R
IM
E T
B
F
F E
R
E X
IS
T
IN
G
DRAWN BY
APPROVED BY
DESIGNED BY
DATE
SHEET NO.
I:
\P r o j e c ts \8
\8
-D -G r a f iv e
S id e w a lk \B
IM
-C
A D \8 d S h e e ts \d d 1e (2 d g n
:2
P
M o n
F e b r u a r y
, 2
WMP
JMA
GRAFTON DRIVE
SIDEWALK DESIGN
E. Mertz-Guinn
YORK COUNTY
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
COUNTY PROJECT MANAGER
5/19/2025
CN
Exist. R/W
Exist. R/W
Exist. R/W
Exist. R/W
SCALE
25' 50'
EXISTING CONDITIONS
1E(2)
M A
T
E E
T
E
M A T C
H
L
IN
E
S E E
S
H E E T
1E (3
SEE SHEET 1E(1) FOR PLANIMETRIC LEGEND
NOTE:
UTILITY LEGEND (CONTINUED)
1.76 ACRES PER PLAT
GPIN: S06a-0191-3081
INST. #170005526 PLAT
HOMEOWNERS ASSOCIATION INC.
TOWNHOMES AT MARTIN FARM
NOW OR FORMERLY
Fire Hydrant
Telephone Pedestal
Telephone Manhole
Telephone Pole
Fiber Optic Marker
Telephone Hand Hole
Traffic Control Hand Hole
Traffic Control Manhole
Traffic Signal Pole
Electric Manhole
Electric Meter
Electric Hand Hole
Gas Meter
Electric Pedestal
Electric Guy Wire
Electric Marker Post
Electric Stub
Electric Luminaire
Telephone Booth
Telephone Guy Pole
Telephone Guy Wire
Telephone Marker Post
Electric Box
Electric Guy Pole
UTILITY LEGEND
TBEB
E
E
E
TC
TC
T
T
T
Traffic Signal Pole w/Luminaire
Telephone Riser Pole
Traffic Signal Guy Pole
Test Holes (All Utilities)
Electric Ground Light
End of Information (All Utilities)
Fiber Optic Hand HoleF
Telephone Cell Tower
Traffic Camera Pole
Tower Anchor
Electric Power Pole
Electric Power Riser Pole
Electric Light Pole
Television Satellite Dish
Traffic Control Guy Wire
Traffic Control PedestalTC
Fiber Optic Manhole
Fiber Optic Pedestal
FO
FO
Water Valve
Water Meter
Water Manhole
Television Pedestal
Television Hand Hole
Gas Valve
Gas Manhole
Gas Well
Sanitary Force Main Valve
Sanitary Manhole
Sewer Clean Out
Television Manhole
Gas Marker Post
Gas Stub
Unknown Manhole
Telephone Stub
Television Stub
Water Well
Sanitary Stub
Gas Monitoring Well
S
MW
WM
G
UK
S
TV
TV
TV
W
Water Stub
Water Siamese Connection
Water Spigot
Water Marker Post
Unknown Hand Hole
Unknown Clean Out
Water Blow Off
Television Marker Post
Sewer Vent Pipe
Sanitary Marker Post
Sanitary Flow Arrow
Gas Test Station
Gas Vent
G
ST
ST
S
F
U
Water Irrigation Valve
Water Post Inspection Valve
Water Steam Manhole
Water Steam Vent Pipe
Sanitary Air Release Valve
Underground Telephone Cable
Underground Television Cable
Unknown Utility Line
Underground Fiber Optic
Underground Traffic Control
Gas Line Duct
Underground Power Cable
Underground Power Cable Duct
Underground Traffic Control Duct
Underground Telephone Cable Duct
Underground Television Cable Duct
Fiber Optic Cable Television
Underground Fiber Optic Duct
Traffic Control Fiber Optic
Telephone Fiber Optic
Chemical Line (above or below ground)
Vacuum Sewer
Fuel Line (above or below ground)
Gas Line *
Gravity Sewer *
Sanitary Force Main *
Water Line Duct
Vacuum Sewer
Water Line *
Depicted According To Utility Records **
Abandoned According To Utility Records **
** Designate type ( Unknown line is shown )
* Designate size ( Variable from 0. 75" to 54" )
According To Miss Utility Information **
D
D
D D
D
D
D In v
1.
.1
S D
M H
15"Conc.
In v
.1 (S
W
In v
.1 (E
N E
In v
.1 (N
E
.3
C D I
In v
.5
(S
W
In v
.8
(E
In v
.7
(N
.5
C D I
"C o n c
"C o n c
15"Conc.
In v
.9
(N
W
In v
.9
(S
W
In v
.9
(S
E
.6
C D I
In v
.8
(N
W
In v
.8
(S
W
In v
.8
(S
E
.6
C D I
In v
.0
(N
E
In v
.0
(S
W
.6
C D I
1"
C o n c
15"Conc.
15"Conc.
15"Conc.15 "C o n c
15"Conc.
"C on c.
In v
.2
(N
E
In v
.2
(S
.8
C
D I
In v
.6
(N
In v
.6
(S
E
.2
C
D I
In v
.3
.3
C
D I
In v
.7
1.
D I
In v
.4
(S
In v
.4
(N
E
In v
.4
(N
W
.6
C
D I
"C on c.
"C o n c . 1
5"C on
c. B r ic k 1- S ty . C r a p y r tl e
C r a r tl e (3
"S y c a m o r e
S ig n
S ig n
F la g p o le
P o s t
S ig n
B r ic k
S ig n
As ph al t S ur fa ce
C o n c r e te
S u r f a c e
"C
G
"C
C
30"C&G
6'Vinyl Fence
4'Metal Fence
"P in e
"C e d a r
"O a k (3
Di tc h
D it c h
"M a g n o li a
B r ic k
C o lu m n s
"M a g n o li a
S a p li n g
S a p li n g
S a p li n g s
S a p li n g
S a p li n g
S a p li n g
B r ll s
S h r u b s
S h r u b s
30"C&G
Asphalt Surface
Asphalt Surface
"C
C
S ig nS ig n S h r u b
H e d g e r o w
1"
C o n c . F
E S
In v
.7
1"
C o n c . F
E S
In v
.9
'M e ta l F e n c e
S ig n
O u tl e t
T V
F T
V
F O
H H
C A
T V -P e d
E
TT
T M
H (2
G r o u n d
L ig h t
G r o u n d
L ig h t(
G r o u n d
L ig h t
C A
T V
H H (2
T V
E -P e d
U
K
G r o u n d
L ig h t
VARIABLE WIDTH R/W
GRAFTON DRIVE
IN
S
T
IV
A
W
M A
R T
IN
F
A
A D
PRIVATE R/W
WINEBERRY WAY
P .B . 1
P
G . 1
IV
A
W
T
IM
B E
R L
O P
IN
S
T
D R
A
IN
A
IL
IT
Y
E
A S
E M
E N
T
V A
R
IA
B
X
IS
T
U N
. 1
P
G . 1
D R
A
IN
A
IL
IT
Y
E
A S
E M
E N
T
E X
IS
T
U N
D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
IN
S
T
P E
R
IM
E T
F
F E
R
E X
IS
T
IN
G
IN
S
T
E A S
E M
E N
T E
X
IS
T
U N
T Y
S
IG
T
W A
T E
R L
S
E M
E N
T E
X
IS
T
R
IA
B
T H
IN
S
T
D R
A
IN
A
S
E M
E N
T
E X
IS
T
IN
G
P
R
IV
A
DESIGNED BY
DATE
SHEET NO.
I:
\P r o j e c ts \8
\8
-D -G r a f iv e
S id e w a lk \B
IM
-C
A D \8 d S h e e ts \d d 1e (3 d g n
:2
P
M o n
F e b r u a r y
, 2
WMP
JMA
GRAFTON DRIVE
SIDEWALK DESIGN
E. Mertz-Guinn
YORK COUNTY
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
COUNTY PROJECT MANAGER
5/19/2025
CN
SCALE
25' 50'
Exist. R/W
Exist. R/W
Exist. R/W
EXISTING CONDITIONS
1E(3)
M A
T
E E
T
E
1.76 ACRES PER PLAT
GPIN: S06a-0191-3081
INST. #170005526 PLAT
HOMEOWNERS ASSOCIATION INC.
TOWNHOMES AT MARTIN FARM
NOW OR FORMERLY
RECORD
0.06 ACRE PER TAX
GPIN: S06a-0856-3313
INST. #170005526 PLAT
INST. #200001773
MERON LULSEGED
ELIAS TESSEMA &
NOW OR FORMERLY
1.64 ACRES PER TAX RECORD
GPIN: S06a-0721-2943
P.B. 13 PG. 185 PLAT
A CONDOMINIUM
RAINBROOK VILLAS,
THE UNIT OWNERS OF THE
NOW OR FORMERLY
DESIGNED BY
DATE
SHEET NO.
I:
\P r o j e c ts \8
\8
-D -G r a f iv e
S id e w a lk \B
IM
-C
A D \8 d S h e e ts \d d 1f .d g n
:2
P
M o n
F e b r u a r y
, 2
WMP
JMA
E. Mertz-Guinn
COUNTY PROJECT MANAGER
5/19/2025
CN
TO INCORPORATE THE SHEET LAYOUT PLAN.
ON TOP OF PROPOSED DESIGN AS DETERMINED NECESSARY
XREF SHEET BORDER WILL NEED TO BE RELOCATED/ ROTATED AND PLACED
SURVEY ALIGNMENT DATA SHEET
ENGINEERING DIVISION
DEPARTMENT OF PUBLIC WORKS
COUNTY OF YORK
SCALE
75' 150'
Accuracy Standards Unless Otherwise Noted.
Supervision Of Gary C. Thomas, Ls. This Plat, Map, Or Digital Geospatial Data Including Metadata Meets Minimum
The Topography And Physical Features Shown On This Map Were Obtained Under The Direct And Responsible Charge And8.
Location Of The Underground Utilities.
On This Survey. Prior To Construction Or Excavation Activities, Contact "Va811" Of Virginia At 1-800-552-7001 Or 811 To Verify The
For Quality Level B (Ql B). Pmi Can Not Guarantee The Existence Or Non-Existence Of All Underground Utilities Shown Or Not Show
Of Civil Engineers (Asce) Standards Guidelines For The Collection And Depiction Of Existing Subsurface Utility Data (9Ci/Asce 38-02)
The Underground Utilities Shown Have Been Designated And Located By Pmi. The Designation Conforms To The American Society7.
Type Of Pipes Located In Confined Or Inaccessible Spaces.
Pipe Material Types Are Determined By Field Observations To The Best Of Our Ability. Pmi Does Not Warrant The Material6.
Property Except As Shown.
This Survey Does Not Intend To Depict Any Wetlands, Hazardous Waste And Environmental Features That May Affect Said5.
This Survey Does Not Constitute A Boundary Survey Nor A Subdivision Of Land.4.
Site Conditions Which Occur Subsequent To This Date And Or To Proposed Improvements.
This Survey Was Prepared To Show Existing Features As Of March 17, 2023, And Does Not Certify To Changes To3.
Elevations Refer To North American Vertical Datum Of 1988 (Navd88).2.
North American Datum 1983(NA2011) . Coordinate Values Shown Are Expressed In U.S. Survey Feet.
The Meridian Source Is Based On The Virginia State Plane Coordinate System, South Zone, 1.
SURVEY NOTES:
SIDEWALK DESIGN
GRAFTON DRIVE
Point Inset C - Sheet 1F(1) See Survey Control
Point Inset B - Sheet 1F(1) See Survey Control
Point Inset A - Sheet 1F(1) See Survey Control
1F
R d p
N ,5
,3
.9
E =1 ,0 ,6 .9
E L E
V =5
.5
N 30°49'01" W 689.48'
Survey Baseli ne
S °5 7' " W
0.
Su rv ey B as el in e
N ,5
,7 .8
E =1 ,0 ,0 .1
E L E
V =5
.2
R p
N ,5
,8 .9
E =1 ,0 ,8 .8
E L E
V =5
.2
R p
E le v
.1
C u t S q u a r e
T B
M
"B
E le v
.3
C u t S q u a r e
T B
M
"A
E le v
.6
C u t S q u a r e
T B
M
"C
C o n c . W a lk
6'Wood Fence
4'Vi nyl F ence
4'V iny l F enc e
4'V iny l F enc e
6'Wood Fence 6'Wood Fence
4'Vinyl Fence
6'Wood Fence 6'Wood Fence 6'Wood Fence
4'Vinyl Fence 4'Vinyl Fence
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
In v
.4
.3
D I 9 15
C o n c
C o n c
In v
.6
(S
W
In v
.7 (N
E
1.
D I
In v
.6
.1
C D I
In v
.8
(S
W
In v
.1 (N
W
.0
C
D I
In v
.3
1( S
W
In v
.3
(S
E
In v
.3
(N
E
.4
S
D M
H
15" Conc
"H
D P
"H
D P
18"HDP
In v
.3
(S
W
In v
.3
(S
E
.6
C D I
In v
.2
(S
W
In v
.2
(N
E
.1
D I
In v
.3
(S
W
In v
.3
(N
E
1.
D I
15"Conc.
"C o n c
"C o n c
"C o n c
In v
.9
(N
W
In v
.9
(S
.2
C D I
In v.
.0 (N
In v.
.1 1( E
R im
.9
C D I
In v.
.1 (W
In v.
.2 (S
E
R im
.9
C D I
15"Conc.
"C on c
15" Co nc
In v.
1.8
R im
.17
S D
M H
#1
"C on c.
In v.
.13 (S
W
In v.
.15 (E
N E
In v.
.14 (N
E
R im
.3
C D I #1
In v.
.5 (S
W
In v.
.8 (E
In v.
.7 (N
R im
.5
C D I #1
"C o n c
"C o n c
"C on c.
In v.
.9 (N
W
In v.
.9 (S
W
In v.
.9 (S
E
R im
.6
C D I #1
In v.
.8 (N
W
In v.
.8 (S
W
In v.
.8 (S
E
R im
.6
C D I #1
In v.
.0 (N
E
In v.
.0 (S
W
R im
.6
C D I #1
1" C on c.
"C on c.
"C on c.
"C on c.
"C on c.
15" Con c.
15"Conc.
In v
.2
(N
E
In v
.2
(S
R im
.8
C D I
In v
.6 (N
In v
.6 (S
E
R im
.2
C D I
In v
.3
R im
.3
C D I
In v
.7
R im
1.
D I
In v
.4 (S
In v
.4 (N
E
In v
.4 (N
W
R im
.6
C D I
"C o n c
"C on c.15"Conc.
B r ic k
1- S ty
C r a r tl e
C r a yr tl e (3
"S yc a m o r e
S ig n
S ig n
F la g p o le
P o s tS ig n B r ic k
S ig n
Asphalt Surface
C o n c r e te
S u r f a c e
"C
G6 "C
C
"C
&G
6' Vi ny l F en ce
4'M eta l F en ce
"P in e
"C ed ar
"O ak (3
D it c h
D it ch
"M ag no li a
B ri ck C ol um ns
"M ag no li a
S ap li ng
S ap li ng
S ap li ng s
S ap li ng
S ap li ng
S ap li ng
B ri ck W al ls
S hr ub s
S hr ub s
"C
G
"C
&G
30"C&G 30"C&G
30"C&G
30" C&G
30" C&G
As ph al t S ur fa ce
As ph al t S ur fa ce
Asphalt Surface
Asphalt Surface
Asp halt Su rfa ce
"C
C
S ig n
S ig n
S hr ub
B r llB r ic k
C o lu m n s
S a p li n g
S a p li n gS a p li n g
S h r u b s
As ph al t
W al k
6" C C
"O a k
"O a k
"O a k
"O a k
"G u m
"P in e (2
"O a k
"G u m
"C e d a r
"P in e
"P in e
S a p li n g
"P in e
"P in e
"P in e
"O a k
"O a k
"P in e (2
"O a k
S h r u b s
C o n c . W a lk
S h r u b s
"C
C
S h r u b s
G r a v e l
B r ic k
S ig n
S ig n
S a p li n g
"O a k
"O a k
"O a k
Di tch
Dit ch
"P in e
"P in e
"P in e
"P in e
"P in e
"P in e
H e d g e r o w
1" C on c.
F
E S
In v.
.7
1" C on c.
F
E S
In v.
.9
'M et al F en ce
S ig n
S a p li n g
S a p li n g
"G u m (2
"P in e
"G u m
"G u m
S a p li n g
S a p li n g
"B ir c h
"B ir c h
S a p li n g
B o ll a r d s (5
"O a k
"O a k
"B ir c h
"G u m (2 )S to ll
S to ll
Con
c. W alk
F F
E =5
.0
F r a m e
1- S ty
"O a k
(P .B . 1
P
G . 3
-3
V A
R
IA
B
U R
Y
VARIA
BLE
WID
TH
R/W
GRAFTON D
RIV
E
VARIABLE WIDTH R/W
GRAFTON DRIVE
VARIA
BLE
WID
TH
R/
W
GRAF
TON
DRIV
E
PRIVATE R
/W
STAGECOACH WATCH
PRIVATE R/W
STAGECOACH WATCH PRIVATE R/W
THORNROSE DRIVE
.B . 1
P
G . 1
IV
A
W
R U S
T L
T
IV
A T E
R
W
M A R T
IN
F
A R
M
R
O A D
P R
IV
A T E
R
E B E R R Y
W A Y
P.
B.
P
G.
PRI
VAT
E R/
W
TI
MBERLI
NE
LO
OP
V A R
IA
LE
T H
R
W
S T A T E
R
O U T E
M A R T
IN
F
A R
M
R
O A D
IN
S
T
D R
A
IN
A
IL
IT
Y
E
A S
E M
E N
T
V A
R
IA
B
X
IS
T
U N
. 1
P
G . 1
D R
A
IN
A
IL
IT
Y
E
A S
E M
E N
T
E X
IS
T
U N
D (F
R O
D (F
R O D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
R O D (F
R O D (F
R O D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
R O
D (F
IN
S
T
P E
R
IM
E T
F
F E
R
E X
IS
T
IN
G
IN
S T
E A S E
M E
N T
E X
IS
T
U N T
Y
S
IG
T
P E R
IM
E T E R
B U F F E R
E X
IS
T
IN
G
IN
S T
W A T E
R
LI
N E
E
A S E
M E
N T
E X
IS
T
IN
G
V A R
IA
LE
T H
IN
S T
E A S E
M E
N T
E X
IS
T
U N T
Y
S
IG
. 1 P
G . 2
D R
A
IN
A
IL
IT
Y
E
A S
E M
E N
T
E X
IS
T
U N
P.B . 11
PG. 2
10'
DRAIN
AGE
UTIL
ITY
EAS
EMENT
EXIS
TIN
G
YORK
COUNTY
P .B . 1 P
G . 2
D R
A
IN
A
IL
IT
Y
E
A S
E M
E N
T
E X
IS
T
U N
. 1
P
G . 3
-3
S
IG
S
E M
E N
T E
X
IS
T
U N
T
D R
A
IN
A
S E
M E
N T
E X
IS
T
IN
G
P
R
IV
A
T
P E
R
IM
E T
F
F E
R
E X
IS
T
IN
G
DESIGNED BY
DATE
SHEET NO.
I:
\P r o j e c ts \8
\8
-D -G r a f iv e
S id e w a lk \B
IM
-C
A D \8 d S h e e ts \d d 1f (1 d g n
:2
P
M o n
F e b r u a r y
, 2
WMP
JMA
GRAFTON DRIVE
SIDEWALK DESIGN
E. Mertz-Guinn
YORK COUNTY
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
COUNTY PROJECT MANAGER
5/19/2025
CN
1F(1)
SURVEY CONTROL DATA SHEET
E 12075885.85 N 3587868.97
E 12076018.14 N 3588708.81
E 12075664.92 N 3589300.94
SURVEY CONTROL POINT - INSET A SURVEY CONTROL POINT - INSET B SURVEY CONTROL POINT - INSET C
SCALE
25' 50'
N= 3,587,868.97 E=12,075,885.85
ELEV=53.25
Rod & Cap #300
Elev = 53.30
Cut Square
TBM "A"
N= 3,588,708.81 E=12,076,018.14
ELEV=55.20
Rod & Cap #301
Elev = 56.19
Cut Square
TBM "B"
Rod & Cap #302 N= 3,589,300.94 E=12,075,664.92
ELEV=56.55
DESIGNED BY
DATE
SHEET NO.
I:
\P r o j e c ts \8
\8
-D -G r a f iv e
S id e w a lk \B
IM
-C
A D \8 d S h e e ts \d d 1g .d g n
:2
P
M o n
F e b r u a r y
, 2
WMP
JMA
GRAFTON DRIVE
SIDEWALK DESIGN
E. Mertz-Guinn
YORK COUNTY
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
COUNTY PROJECT MANAGER
5/19/2025
CN
26.5 0'
19.27'
4.7 2'
126.94'
30.10'
36.05'
66.75' 227.69'
CONSTRUCTION ALIGNMENT DATA SHEET
DATA SHEET
CONSTRUCTION ALIGNMENT
1G
66.62'
19.74'
.2
21.3 0'
3.0
1'
P O T
+0 .0
P C
+0 .4
P T
+1 .2
152.56'
Curve Data Curve C5 P.I. Station 15+38.02 N 3,589,204.8060 E 12,075,678.5332 Delta = 11° 15' 09.51" (LT) Degree = 114° 35' 29.61" Tangent = 4.9257 Length = 9.8198 Radius = 50.0000 External = 0.2420 Long Chord = 9.8040 Mid. Ord. = 0.2409 P.C. Station 15+33.10 N 3,589,208.8776 E 12,075,675.7609 P.T. Station 15+42.92 N 3,589,201.3537 E 12,075,682.0466 C.C. N 3,589,237.0180 E 12,075,717.0903 Back = S 34° 15' 00.57" E Ahead = S 45° 30' 10.08" E Chord Bear = S 39° 52' 35.32" E
Course from PT C5 to PC C6 S 45° 30' 10.10" E Dist 4.7247
Curve Data Curve C6 P.I. Station 15+52.76 N 3,589,194.4529 E 12,075,689.0696 Delta = 12° 59' 07.86" (RT) Degree = 127° 19' 26.24" Tangent = 5.1213 Length = 10.1988 Radius = 45.0000 External = 0.2905 Long Chord = 10.1770 Mid. Ord. = 0.2886 P.C. Station 15+47.64 N 3,589,198.0423 E 12,075,685.4167 P.T. Station 15+57.84 N 3,589,190.1344 E 12,075,691.8226 C.C. N 3,589,165.9445 E 12,075,653.8773 Back = S 45° 30' 10.07" E Ahead = S 32° 31' 02.21" E Chord Bear = S 39° 00' 36.14" E
Course from PT C6 to P20 S 32° 31' 02.20" E Dist 126.9393
Point P20 N 3,589,083.0955 E 12,075,760.0594 Sta 16+84.78
Course from P20 to PC C7 S 24° 02' 54.50" E Dist 30.1029
Curve Data Curve C7 P.I. Station 17+24.47 N 3,589,048.1163 E 12,075,778.3049 Delta = 3° 45' 33.42" (RT) Degree = 19° 37' 18.63" Tangent = 9.5828 Length = 19.1587 Radius = 292.0000 External = 0.1572 Long Chord = 19.1552 Mid. Ord. = 0.1571 P.C. Station 17+14.88 N 3,589,055.6055 E 12,075,772.3266 P.T. Station 17+34.04 N 3,589,040.2512 E 12,075,783.7794 C.C. N 3,588,873.4362 E 12,075,544.1198 Back = S 38° 35' 56.84" E Ahead = S 34° 50' 23.42" E Chord Bear = S 36° 43' 10.13" E
Course from PT C7 to PC C8 S 34° 50' 23.42" E Dist 36.0486
Curve Data Curve C8 P.I. Station 17+82.34 N 3,589,000.6074 E 12,075,811.3735 Delta = 7° 00' 42.38" (RT) Degree = 28° 38' 52.40" Tangent = 12.2531 Length = 24.4757 Radius = 200.0000 External = 0.3750 Long Chord = 24.4604 Mid. Ord. = 0.3743 P.C. Station 17+70.09 N 3,589,010.6642 E 12,075,804.3734 P.T. Station 17+94.57 N 3,588,989.7713 E 12,075,817.0935 C.C. N 3,588,896.4074 E 12,075,640.2230 Back = S 34° 50' 23.41" E Ahead = S 27° 49' 41.03" E Chord Bear = S 31° 20' 02.22" E
Course from PT C8 to PC C9 S 27° 49' 41.02" E Dist 66.7483
Curve Data Curve C9 P.I. Station 18+67.25 N 3,588,925.4915 E 12,075,851.0246 Delta = 0° 27' 18.37" (RT) Degree = 3° 49' 56.98" Tangent = 5.9374 Length = 11.8748 Radius = 1,495.0000 External = 0.0118 Long Chord = 11.8748 Mid. Ord. = 0.0118 P.C. Station 18+61.32 N 3,588,930.7423 E 12,075,848.2529 P.T. Station 18+73.19 N 3,588,920.2188 E 12,075,853.7546 C.C. N 3,588,232.8465 E 12,074,526.1461 Back = S 27° 49' 41.05" E Ahead = S 27° 22' 22.68" E Chord Bear = S 27° 36' 01.86" E
Course from PT C9 to PC C10 S 27° 22' 22.69" E Dist 227.6912
Chain MAINLINE contains:
P1 CUR C1 CUR C2 CUR C3 CUR C4 CUR C5 CUR C6 P20
CUR C7 CUR C8 CUR C9 CUR C10 CUR C11 CUR C12
CUR C13 CUR C14 P45
Beginning chain MAINLINE description
Point P1 N 3,589,591.7057 E 12,075,306.6356 Sta 10+00.00
Course from P1 to PC C1 S 46° 50' 00.26" E Dist 44.4143
Curve Data Curve C1 P.I. Station 10+49.09 N 3,589,558.1233 E 12,075,342.4390 Delta = 3° 57' 56.68" (RT) Degree = 42° 26' 28.75" Tangent = 4.6739 Length = 9.3441 Radius = 135.0000 External = 0.0809 Long Chord = 9.3422 Mid. Ord. = 0.0808 P.C. Station 10+44.41 N 3,589,561.3209 E 12,075,339.0300 P.T. Station 10+53.76 N 3,589,554.6977 E 12,075,345.6187 C.C. N 3,589,462.8562 E 12,075,246.6735 Back = S 46° 50' 00.25" E Ahead = S 42° 52' 03.57" E Chord Bear = S 44° 51' 01.91" E
Course from PT C1 to PC C2 S 42° 52' 03.58" E Dist 21.3025
Curve Data Curve C2 P.I. Station 10+79.91 N 3,589,535.5320 E 12,075,363.4084 Delta = 3° 57' 56.69" (LT) Degree = 40° 55' 32.00" Tangent = 4.8470 Length = 9.6901 Radius = 140.0000 External = 0.0839 Long Chord = 9.6882 Mid. Ord. = 0.0838 P.C. Station 10+75.06 N 3,589,539.0845 E 12,075,360.1109 P.T. Station 10+84.75 N 3,589,532.2161 E 12,075,366.9436 C.C. N 3,589,634.3275 E 12,075,462.7207 Back = S 42° 52' 03.56" E Ahead = S 46° 50' 00.25" E Chord Bear = S 44° 51' 01.90" E
Course from PT C2 to PC C3 S 46° 50' 00.26" E Dist 243.0069
Curve Data Curve C3 P.I. Station 13+63.44 N 3,589,341.5566 E 12,075,570.2127 Delta = 5° 47' 43.34" (RT) Degree = 8° 07' 37.42" Tangent = 35.6852 Length = 71.3096 Radius = 705.0000 External = 0.9026 Long Chord = 71.2792 Mid. Ord. = 0.9014 P.C. Station 13+27.76 N 3,589,365.9697 E 12,075,544.1850 P.T. Station 13+99.07 N 3,589,314.6402 E 12,075,593.6421 C.C. N 3,588,851.7655 E 12,075,061.8790 Back = S 46° 50' 00.26" E Ahead = S 41° 02' 16.91" E Chord Bear = S 43° 56' 08.58" E
Course from PT C3 to PC C4 S 41° 02' 16.92" E Dist 26.5024
Curve Data Curve C4 P.I. Station 14+69.75 N 3,589,261.3248 E 12,075,640.0507 Delta = 6° 47' 16.34" (RT) Degree = 7° 41' 26.55" Tangent = 44.1820 Length = 88.2607 Radius = 745.0000 External = 1.3090 Long Chord = 88.2091 Mid. Ord. = 1.3067 P.C. Station 14+25.57 N 3,589,294.6501 E 12,075,611.0426 P.T. Station 15+13.83 N 3,589,224.8044 E 12,075,664.9167 C.C. N 3,588,805.5130 E 12,075,049.1085 Back = S 41° 02' 16.91" E Ahead = S 34° 15' 00.57" E Chord Bear = S 37° 38' 38.74" E
Course from PT C4 to PC C5 S 34° 15' 00.57" E Dist 19.2681
Curve C10 P.I. Station 22+23.25 N 3,588,609.3544 E 12,076,014.7054 Delta = 45° 03' 29.48" (RT) Degree = 19° 25' 20.27" Tangent = 122.3685 Length = 231.9921 Radius = 295.0000 External = 24.3729 Long Chord = 226.0600 Mid. Ord. = 22.5129 P.C. Station 21+00.88 N 3,588,718.0217 E 12,075,958.4426 P.T. Station 23+32.87 N 3,588,492.7690 E 12,075,977.5313 C.C. N 3,588,582.3863 E 12,075,696.4731 Back = S 27° 22' 22.69" E Ahead = S 17° 41' 06.79" W Chord Bear = S 4° 50' 37.95" E
Course from PT C10 to PC C11 S 17° 41' 06.79" W Dist 108.2160
Curve Data Curve C11 P.I. Station 24+45.60 N 3,588,385.3692 E 12,075,943.2862 Delta = 12° 52' 10.45" (LT) Degree = 143° 14' 22.02" Tangent = 4.5113 Length = 8.9847 Radius = 40.0000 External = 0.2536 Long Chord = 8.9658 Mid. Ord. = 0.2520 P.C. Station 24+41.09 N 3,588,389.6673 E 12,075,944.6567 P.T. Station 24+50.07 N 3,588,380.8738 E 12,075,942.9075 C.C. N 3,588,377.5158 E 12,075,982.7663 Back = S 17° 41' 06.81" W Ahead = S 4° 48' 56.37" W Chord Bear = S 11° 15' 01.59" W
Course from PT C11 to PC C12 S 4° 48' 56.39" W Dist 19.7440
Curve Data Curve C12 P.I. Station 24+84.92 N 3,588,346.1552 E 12,075,939.9825 Delta = 9° 51' 42.04" (RT) Degree = 32° 44' 25.60" Tangent = 15.0977 Length = 30.1208 Radius = 175.0000 External = 0.6500 Long Chord = 30.0836 Mid. Ord. = 0.6476 P.C. Station 24+69.82 N 3,588,361.1996 E 12,075,941.2500 P.T. Station 24+99.94 N 3,588,331.5502 E 12,075,936.1571 C.C. N 3,588,375.8908 E 12,075,766.8677 Back = S 4° 48' 56.39" W Ahead = S 14° 40' 38.42" W Chord Bear = S 9° 44' 47.40" W
Course from PT C12 to PC C13 S 14° 40' 38.42" W Dist 253.9929
Curve Data Curve C13 P.I. Station 27+69.78 N 3,588,070.5123 E 12,075,867.7855 Delta = 10° 03' 53.17" (LT) Degree = 31° 49' 51.56" Tangent = 15.8505 Length = 31.6194 Radius = 180.0000 External = 0.6965 Long Chord = 31.5788 Mid. Ord. = 0.6939 P.C. Station 27+53.93 N 3,588,085.8455 E 12,075,871.8016 P.T. Station 27+85.55 N 3,588,054.7131 E 12,075,866.5108 C.C. N 3,588,040.2379 E 12,076,045.9278 Back = S 14° 40' 38.42" W Ahead = S 4° 36' 45.26" W Chord Bear = S 9° 38' 41.84" W
Course from PT C13 to PC C14 S 4° 36' 45.27" W Dist 66.6200
44.
41'
P O T +2
.0
P T
+7
.4
P C
+5
.1
P C
+4 .4
1 P T
+5 .7
P C
+7 .0
P T
+8 .7
P C
+2 .7
P T
+9 .0
P C
+2 .5
P T
+1 .8
P T
+5 .8
P C
+4 .6
P I +8
.7
P C
+1 .8
P T
+3 .0
P C
+7 .0
P T
+9 .5
P C
+6 1.
P T
+7 .1
P C
1+ .8
P T
+3 .8
P C
+4 1.0
P T
+5 .0
P C
+6
.8
P T
+9 .9
.99'
P C
+5 .9
P T
+8
.5
C1 C2
C3
C4 C5
C6 C7
C8 C9
C14
C10
C11
C12
C13
CONSTRUCTION B/L
GRAFTON DRIVE
Curve C14 P.I. Station 28+62.38 N 3,587,978.1358 E 12,075,860.3326 Delta = 16° 35' 26.77" (LT) Degree = 81° 51' 04.01" Tangent = 10.2061 Length = 20.2695 Radius = 70.0000 External = 0.7401 Long Chord = 20.1987 Mid. Ord. = 0.7324 P.C. Station 28+52.17 N 3,587,988.3089 E 12,075,861.1534 P.T. Station 28+72.44 N 3,587,968.1519 E 12,075,862.4508 C.C. N 3,587,982.6796 E 12,075,930.9267 Back = S 4° 36' 45.27" W Ahead = S 11° 58' 41.50" E Chord Bear = S 3° 40' 58.12" E
Course from PT C14 to P45 S 11° 58' 41.32" E Dist 152.5623
Point P45 N 3,587,818.9113 E 12,075,894.1134 Sta 30+25.00
Ending chain MAINLINE description
SCALE
60' 120'
SEQUENCE OF CONSTRUCTION TRAFFIC MANAGEMENT PLAN (TMP) GENERAL NOTES
MAINTENANCE OF TRAFFIC NOTES
SEQUENCE OF CONSTRUCTION /
1J(1)
COMMUTER TRAFFIC.
THE TRAFFIC IN THIS AREA CONSISTS OF LOCAL AND 8.
DURING ALL PHASES OF CONSTRUCTION.
AND THE CONNECTING SIDESTEETS IS TO BE MAINTAINED
THE SPEED LIMIT OF 35 MPH ALONG GRAFTON DRIVE 7.
5:00 PM, UNLESS OTHERWISE APPROVED BY THE ENGINEER.
THE WORK ZONE ACTIVE HOURS WILL BE 7:00 AM TO 6.
PROPOSED RIGHT-OF-WAY.
WITHIN THE LIMITS OF THE EXISTING RIGHT-OF-WAY AND
PROVIDED OUTSIDE OF THE PROPOSED TRAVEL LANES AND
THE CONSTRUCTION MATERIAL LAYDOWN AREAS WILL BE 5.
THE SHOULDER/CURB AND GUTTER ALONG ALL SEGMENTS.
CONSTRUCTION WILL INCLUDE WORK WITHIN AND BEYOND 4.
10 FEET, AND ASSOCIATED GRADING AND APPROACH WORK.
FEET. THE WIDTH OF THE WORK ZONE IS APPROXIMATELY
THE LENGTH OF THE WORK ZONE IS APPROXIMATELY 2,000 3.
INCLUDES THE CONSTRUCTION OF SIDEWALKS.
VIRGINIA ON GRAFTON DRIVE. THE PROJECT SCOPE
THIS PROJECT IS LOCATED IN THE COUNTY OF YORK, 2.
THIS IS A TYPE A, CATEGORY II PROJECT.1.
RELATED CONSTRUCTION FACILITIES.
COMMENCE DEMOBILIZATION INCLUDING REMOVAL OF ALL OTHER 10.
SEDIMENT CONTROL MEASURES.
STABILIZATION MUST OCCUR PRIOR TO REMOVAL OF EROSION AND
AND EROSION AND SEDIMENT CONTROL MEASURES. VEGETATIVE
WHEN CONSTRUCTION IS COMPLETE, REMOVE CONSTRUCTION SIGNS 9.
DRIVEWAY ENTRANCES.
SUPPLEMENTAL FLAGGERS TO BE USED AT INTERSECTIONS AND 8.
FIGURES 1.1, 5.2, 23.2, 28.2 and 67.1.
MARKINGS IN ACCORDANCE WITH THE 2011 VAWAPM REV. 2.1 TTC
CONSTRUCT SIDEWALK, PEDESTRIAN RAMPS, SIGNING AND PAVEMENT7.
COMMENCE CLEARING AND GRUBBING AND DEMOLITION OPERATIONS.6.
AND PRIOR TO THE CONTRACTOR LEAVING THE SITE.
RESTORED AT THE END OF EACH DAY ON WHICH WORK OCCURS
TRAFFIC TO THE PROPERTY. FULL DRIVEWAY ACCESS SHALL BE
ENTRANCE WORKED ON AT A TIME SO AS NOT TO RESTRICT
PROPERTIES WITH MULTIPLE ENTRANCES SHALL HAVE ONLY ONE
WITH PROPERTY OWNERS A MINIMUM OF 48 HOURS IN ADVANCE.
CONTRACTOR SHALL COORDINATE CONSTRUCTION AT DRIVEWAYS 5.
ESTABLISH EROSION AND SEDIMENT CONTROL.4.
MANUAL REVISION 2.1.
ACCORDANCE WITH THE 2011 VIRGINIA WORK AREA PROTECTION
ESTABLISH ALL TEMPORARY TRAFFIC CONTROL DEVICES IN 3.
MINIMUM OF 7 DAYS PRIOR TO ENTERING PROPERTY.
CONTRACTOR SHALL NOTIFY PROPERTY OWNERS IN WRITING A 2.
DIRECTED BY THE OWNER.
COMMENCE MOBILIZATION AND SETTING UP STAGING AREA AS 1.
DRAWN BY
APPROVED BY
DESIGNED BY
DATE
SHEET NO.
I:
\P r o j e c ts \8
\8
-D -G r a f iv e
S id e w a lk \B
IM
-C
A D \8 d S h e e ts \d d 1j (1 d g n
:2
P
M o n
F e b r u a r y
, 2
WMP
JMA
GRAFTON DRIVE
SIDEWALK DESIGN
E. Mertz-Guinn
YORK COUNTY
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
COUNTY PROJECT MANAGER
5/19/2025
CN
MAINTENANCE OF TRAFFIC NOTES
SEQUENCE OF CONSTRUCTION /
1J(2)
DRAWN BY
APPROVED BY
DESIGNED BY
DATE
SHEET NO.
I:
\P r o j e c ts \8
\8
-D -G r a f iv e
S id e w a lk \B
IM
-C
A D \8 d S h e e ts \d d 1j (2 d g n
:2
P
M o n
F e b r u a r y
, 2
WMP
JMA
GRAFTON DRIVE
SIDEWALK DESIGN
E. Mertz-Guinn
YORK COUNTY
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
COUNTY PROJECT MANAGER
DESIGNED BY
DATE
SHEET NO.
I:
\P r o j e c ts \8
\8
-D -G r a f iv e
S id e w a lk \B
IM
-C
A D \8 d S h e e ts \d d .d g n
:2
P
M o n
F e b r u a r y
, 2
WMP
JMA
GRAFTON DRIVE
SIDEWALK DESIGN
E. Mertz-Guinn
YORK COUNTY
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
COUNTY PROJECT MANAGER
5/19/2025
CN
GENERAL NOTES
GENERAL NOTES
2. ALL DRAINAGE SWALES SHALL HAVE SIDESLOPES 3:1 OR FLATTER.
DIRECTED BY THE OWNER.
CONTRACTOR TO RELIEVE AREAS THAT MAY CAUSE DAMAGE TO ROADWAYS, AS
1. TEMPORARY DRAINAGE DURING CONSTRUCTION SHALL BE PROVIDED BY THE
INCIDENTAL DRAINAGE:
OWNER.
3. ALL CONCRETE WORK PERFORMED IN THE RIGHT-OF-WAY AND EASEMENTS SHALL BE INSPECTED BY THE
3) TEN (10) FOOT WIDE: 50'
2) FIVE (5) FOOT WIDE SIDEWALK: 50'
1) CURB & GUTTER: 100'
ARE REQUIRED AS FOLLOWS:
INTERVALS OF 100 FEET USING 1/2 INCH PREMOLDED BITUMINOUS FIBER JOINT FILLER. CONSTRUCTION JOINTS
TEN (10) FEET (NO SECTIONS SHALL BE LESS THAN SIX (6) FEET). EXPANSION JOINTS SHALL BE FORMED AT
2. BOTH CURB AND GUTTER SHALL BE CONSTRUCTED IN SECTIONS OF UNIFORM LENGTHS, APPROXIMATELY
UNLESS OTHERWISE SPECIFIED.
THE VIRGINIA DEPARTMENT OF TRANSPORTATION ROAD AND BRIDGE SPECIFICATIONS ,(CURRENT EDITION)
1. ALL CONCRETE SHALL BE CLASS "A-3" AIR ENTRAINED (3,000 PSI) IN ACCORDANCE TO SECTION 219 OF
INCIDENTAL CONCRETE:GENERAL:
20.
SURVEYING.
REQUIRED, SHALL BE INCIDENTAL TO COST OF CONSTRUCTION
PROFESSIONAL AND OCCUPATIONAL REGULATION- RULES AND REGULATIONS. THESE ACTIVITIES, WHERE
LICENSED IN THE COMMONWEALTH OF VIRGINIA, AS REQUIRED BY THE VIRGINIA DEPARTMENT OF
DISTURBED DURING CONSTRUCTION MUST BE REPLACED AFTER CONSTRUCTION BY A LAND SURVEYOR, EXISTING MONUMENTS INCLUDING BOUNDARY CORNERS AND RIGHT-OF-WAY CONTROL THAT ARE 19.
CONDITIONS. POSITIVE DRAINAGE MUST BE MAINTAINED AT ALL TIMES.
18. PROPOSED GRADES CONVEY DRAINAGE INTENT AND MAY VARY SLIGHTLY BASED ON FIELD
17. ALL TREES, SIGNS, POLES, ETC. SHALL BE A MINIMUM OF 1.5' FROM THE FACE OF CURB.
TO GRADE.
16. ALL VALVES, WATER METERS, AND CLEANOUTS IMPACTED BY THIS PROJECT SHALL BE ADJUSTED
PROPOSED PAVEMENT, NEED TO BE RATED FOR TRAFFIC.
SPECIFICATIONS LATEST EDITION. ALL STRUCTURES THAT ARE ADJUSTED TO GRADE AND ARE IN
ACCORDINGLY. MANHOLES TO BE ADJUSTED ACCORDING TO YORK COUNTY SEWER STANDARDS AND
TO GRADE WITH RISER RINGS. VALVE BOXES SHALL BE EXCAVATED AND ELEVATION ADJUSTED
15. ALL VALVE BOXES AND MANHOLES WITHIN THE LIMITS OF CONSTRUCTION SHALL NOT BE ADJUSTED
UTILITY LINES AND OTHER APPURTENANCES, UNLESS OTHERWISE NOTED ON THE PLANS OR REQUIRED.
14. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF FOUR FOOT HORIZONTAL CLEARANCE BETWEEN
CONSTRUCTION AT HIS EXPENSE.
13. THE CONTRACTOR SHALL REPLACE ANY VALVE BOXES, RISERS, OR LIDS LOST OR DAMAGED DURING
ON SHEET 2C.
OTHERWISE DIRECTED BY THE OWNER OR NOTED BY THE PLANS. USE THE SEEDING SCHEDULE SHOWN
12. THE CONTRACTOR SHALL FINE GRADE, FERTILIZE, MULCH AND SEED ALL DISTURBED AREAS, UNLESS
AREAS.
11. THE CONTRACTOR SHALL PLACE A MINIMUM OF TWO INCHES OF TOPSOIL ON ALL DISTURBED
SLOPES 3:1 (H:V).
OTHERWISE DIRECTED BY THE OWNER OR NOTED BY THE PLANS: CUT SLOPES, 3:1 (H:V);AND FILL
10. THE CONTRACTOR SHALL GRADE DISTURBED AREAS TO THE FOLLOWING SLOPES, UNLESS
APPROVED MATERIALS. THE EXTENT OF UNDERCUT AND BACKFILL IS DETERMINED BY THE OWNER.
THE GRADE SHOWN ON THE PLANS AND SHALL PLACE BACKFILL IN THOSE EXCAVATED AREAS WITH
WITHIN THE LIMITS OF CONSTRUCTION, THE CONTRACTOR SHALL EXCAVATE SUCH MATERIAL BELOW
9. WHEN MATERIALS UNSUITABLE FOR FOUNDATIONS, SUBGRADE OR THE SIDEWALK PURPOSE OCCUR
TRASH.
8. THE CONTRACTOR SHALL KEEP THE PROJECT AREA IN A CLEAN CONDITION, FREE OF DEBRIS AND
PROPERTY
HAVE ONLY ONE ENTRANCE WORKED ON AT A TIME SO AS NOT TO RESTRICT TRAFFIC TO THE
THE CONTRACTOR SHALL MATCH EXISTING MATERIALS. PROPERTIES WITH MULTIPLE ENTRANCES SHALL
LIMITS, THE OWNER SHALL DIRECT HOW THE CONTRACTOR SHALL TIE-INTO THE EXISTING DRIVEWAYS.
7. WHEN IT IS NECESSARY TO DISTURB EXISTING DRIVEWAYS BEYOND THE PROPOSED CONSTRUCTION
6. THE CONTRACTOR SHALL MAINTAIN FULL ACCESS TO VALVES AND HYDRANTS.
OF EXISTING UTILITIES PRIOR TO STARTING CONSTRUCTION.
5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND IDENTIFYING ALL VALVES AND AIR VENTS
RELOCATION OF UTILITIES MUST BE COMPLETED PRIOR TO PLACEMENT OF ANY SIDEWALK MATERIAL.
4. UNLESS OTHERWISE NOTED, UTILITIES ARE ADJUSTED OR RELOCATED BY THE RESPECTIVE OWNER.
AVAILABLE AT THE TIME OF DESIGN.
3. THE LOCATION AND EXTENT OF EXISTING UTILITY FACILITIES ARE SHOWN BASED UPON INFORMATION
CONSTRUCTION.
EXISTING UTILITIES, PAVEMENT, CONCRETE ITEMS, PIPES, ETC., THAT ARE DAMAGED DURING
CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING OR REPLACING, AT HIS OWN EXPENSE, ANY
OF VIRGINIA" 72 HOURS PRIOR TO ANY EXCAVATION WITHIN THE PROXIMITY OF THEIR UTILITIES. THE
UTILITIES WITHIN THE PROJECT LIMITS. UTILITY COMPANIES SHALL BE NOTIFIED THROUGH "MISS UTILITY
BEGINNING WORK, IN ORDER TO DETERMINE THE EXTENT AND LOCATION OF ALL UNDERGROUND
2. THE CONTRACTOR SHALL CONTACT "MISS UTILITY OF VIRGINIA" (811 OR 1-800-552-7001) PRIOR TO
ORDINANCES, CODES, AND LAWS PRIOR TO CONSTRUCTION.
VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS, AND ANY OTHER APPLICABLE CITY OR STATE
SPECIFICATIONS, 2016 VIRGINIA DEPARTMENT OF TRANSPORTATION ROAD AND BRIDGE STANDARDS, SPECIFICATIONS AND DETAILS, 2020 VIRGINIA DEPARTMENT OF TRANSPORTATION ROAD AND BRIDGE
CODES AND ORDINANCES, THE CURRENT DEPARTMENT OF PUBLIC UTILITIES SEWER AND WATER
1. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO THE CURRENT YORK COUNTY
PRIOR TO CONSTRUCTION.
INSTALL 4" OF MULCH IN DISTURBED AREAS. IRRIGATION SYSTEM WILL BE RELOCATED BY OWNER
INSTALL SIDEWALK AND RAMPS. SALVAGE REMOVED LANDSCAPING AS DIRECTED BY THE OWNER.
CONTRACTOR TO CUTBACK AND/OR REMOVE LANDSCAPING AS DIRECTED BY THE OWNER TO
DESIGNED BY
DATE
SHEET NO.
I:
\P r o j e c ts \8
\8
-D -G r a f iv e
S id e w a lk \B
IM
-C
A D \8 d S h e e ts \d d a .d g n
:2
P
M o n
F e b r u a r y
, 2
WMP
JMA
GRAFTON DRIVE
SIDEWALK DESIGN
E. Mertz-Guinn
YORK COUNTY
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
COUNTY PROJECT MANAGER
5/19/2025
CN
2A
TYPICAL SECTIONS
TYPICAL SECTIONS
LB
GRAFTON DR
CONSTRUCTION
CONSTRUCTION
GRAFTON DR
1.5%
LB
1.5%1.5% or flatter
3 : 1
3' 1'
STA 10+00 - STA 10+75, STA 13+20 - STA 13+30, STA 14+45 - STA 14+55
1.5%
PROP
1'5'
VARIES
AND
3' MIN
Finished Grade Point of
Exist Pvmt
Exist Pvmt
Finished Grade Point of
R/W
EXIST
EXISTR/W
EASEMENT
or flatter
* 3 : 1
* STA 18+75 to STA 19+00 SIDE SLOPE IS 2:1 TO AVOID BOLLARDS
SIDEWALK TO AVOID FIRE HYDRANT
* STA 20+10 SIDE SLOPE IS 2:1 AND STARTS 6" BEHIND
5'
Hydraulic Cement Concrete Sidewalk 4"
Hydraulic Cement Concrete Sidewalk 4"
2" Topsoil Class A/B and Seed
2" Topsoil Class A/B and Seed
EASEMENT
PERM
2" Topsoil Class A/B and Seed
2" Topsoil Class A/B and Seed
EASEMENT
PROP
STA 14+55 - STA 29+89.34
STA 10+75 - STA 13+20, STA 13+30 - STA 14 +45,
and Gutter Curb and Gutter Curb
QUANTITY SUMMARIES
o b il iz a ti o n
LS
C o n s tr u c ti o n
S u r v e y in g
LS
C le a r in g a u b b in g
LS
It m s c r ip ti o n
ITEM NO.
UNIT
INCIDENTAL SUMMARY
PROJECT TOTAL
A g g r . B a s tl . T y . I N o . 2
1B
TON
S ta n d a u r b
C
G -2
LF
R a d ia l
C u r b
C
G -2
LF
S ta n d a b tt e r
C
G -6
LF
R a d ia l
C u tt e r
C
G -6
LF
C G -1 te c ta le r n in g
S u r f a c e
SY
S id e w a lk
H y d r a u li c
C e m e n t
C o n c r e te
SY
A ll a y in g s t
HR
1 1 1 62 55 2414155 155 970
It s c r ip ti o n
ITEM NO.
UNIT
MARKING SUMMARY
SIGNING AND PAVEMENT
C o n c . F o u n d a ti o n
S
T P -1 , T y p e
A
EA
PROJECT TOTAL
EA EA
S ig n
P o s t
S T
P -1
1/ u g e
LF
C o n c . F o u n d a ti o n
S
T P -1 , T y p e
B
EA
S ig n
P o s t
S T
P -1
1/ u g e
LF LF
461230 241
It s c r ip ti o n
ITEM NO.
UNIT
PROJECT TOTAL
ROADSIDE DEVELOPMENT SUMMARY
T o p s o il C la
AC
T o p s o il C la s s
B
AC
R e g u la r
S e e d
LBS
O v e r s e e d in g
LBS
L im e
TON
F e r ti li z e r
N it r o g e n
N
LBS
F e r ti li z e r
P o ta s s iu m
K
LBS
F e r ti li z e r
P h o s p h o r o u s
P
LBS
T e m p o r a r y
S e e d
LBS
130.14 0.14 54.26 43.41 1.14 24.65 32.00
It s c r ip ti o n
ITEM NO.
UNIT
PROJECT TOTAL
R e m o v e
C o m b in a ti o n
C u tt e r
LF
R e m o v e
E x is ti r b
LF
DEMOLITION
R e g u la r
E x c a v a ti o n
CY
EARTHWORK
EARTHWORK SUMMARY
DEMOLITION AND
C o n c r e te
It e m s
S w t
H y d r a u li c
C e m e n t
LF
D e m o li ti o n o f
P a v e m e n t (F le x ib le
SY
422461 50325
It s c r ip ti o n
ITEM NO.
UNIT
PROJECT TOTAL
G r o u h a n n e li z v ic e s
DAY
TRAFFIC SUMMARY
MAINTENANCE OF
SF
E le c tr o r a r d
SF
900 240120
It s c r ip ti o n
ITEM NO.
UNIT
PROJECT TOTAL
CONTROL SUMMARY
EROSION AND SEDIMENT
In le t
P r o te c ti o n
T y p e
A
EA
In le t
P r o te c ti o n
T y p e
B
EA
T e m p . S il t
F e n c e
T y p e
A
LF
113 1860
S il ta ti o n
C o n tr o l E x c a v a ti o n
CY
316.20 500
T r e e
F e n c e
LF
B o r r x c a v a ti o n
CY
It s c r ip ti o n
ITEM NO.
UNIT
PROJECT TOTAL
DRAINAGE SUMMARY
11827 3
S to w e r
P ip e
LF
1" S to w e r
P ip e
LF
E n d
S e c ti o n
E
S -1
EA
1" E n d
S e c ti o n
E
S -1
EA
id e w lk a in a n d
F lu m e
EA
2B
F la g g e r
S e r v ic e
HR
-0001
513SD20
-0012
308SD20
-0001
301SD20
-0001
517SD20
-0011
502SD20
-0012
502SD20
-0022
502SD20
-0023
502SD20
-0002
504SD20
-0003
504SD20
-0001
511SD20
LF
S ig n
P o s t
S T
P -1 u g e
S ig n
P o s t
S T
P -1 u g e
-0037
700SD20
-0034
700SD20
-0036
700SD20
-0035
700SD20
-0038
700SD20
-0039
700SD20
-0003
700SD20
-0012
700SD20
P o s t
S ig n
S tr u c tu r e
R e m o v e
E x is ti n g
G r o u u n t
S Ig n
P a n e l
R e lo c a te
E x is ti n g
P o s t
-0024
512SD20
-0026
512SD20
-0014
512SD20
T e m p o r a r y
S ig n
-0027
512SD20
-0001
303SD20
-0007
303SD20
-0004
508SD20
-0002
510SX20
-0001
602SD20
-0003
602SD20
-0003
603SD20
-0004
603SD20
-0002
603SD20
-0017
603SD20
-0014
603SD20
-0015
603SD20
-0016
603SD20
-0030
303SD20
-0031
303SD20
-0029
303SD20
-0034
303SD20
-0027
302SD20
-0036
302SD20
-0199
302SD20
-0203
302SD20
LF
-0012
704SD20
LF
-0015
704SD20
LF
-0042
512SD20
P v m t
L k g
T y p la s s
II
P v m t
L k g
T y p la s s
II
E r a d ic a te
L in e a r
P v m t
M r k g
-0001
701SD20
SF
S ig n
P a n e l
18170
SY
-0001
510SX20
R e m o v e
S id e w a lk a n d
E n tr a n c e
EA
-0237
302SD20
D r o p
In le t
D I-
16.0035
LF
EA
R e m o v e
E x is ti n c r e te
P ip e
D r a in a g e
S tr u c tu r e
R e m o v e
E x is ti n g
DRAWN BY
APPROVED BY
DESIGNED BY
DATE
SHEET NO.
I:
\P r o j e c ts \8
\8
-D -G r a f iv e
S id e w a lk \B
IM
-C
A D \8 d S h e e ts \d d b .d g n
:2
P
M o n
F e b r u a r y
, 2
WMP
JMA
GRAFTON DRIVE
SIDEWALK DESIGN
E. Mertz-Guinn
YORK COUNTY
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
COUNTY PROJECT MANAGER
EROSION AND SEDIMENT CONTROL NARRITIVEEROSION CONTROL NOTES
DISPOSE OF SEDIMENTS WITHIN 30 DAYS.
TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES AND
AREA IS STABILIZED, THE CONTRACTOR SHALL REMOVE
CONSTRUCTION IS SUBSTANTIALLY COMPLETE AND THE WORK
DETERMINED BY THE OWNER. ONCE THE OWNER DETERMINES
NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS
ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES
COMPLETED. THE CONTRACTOR SHALL INSTALL AND MAINTAIN
DIRECTED BY THE OWNER AFTER FINAL GRADING IS
INSTALL PERMANENT STABILIZATION WITHIN 7 DAYS OR AS
DISTURBED LONGER THAN 30 DAYS. THE CONTRACTOR SHALL
AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN
MEASURES SHALL BE APPLIED TO ALL DENUDED OR DISTURBED
BEGINNING CONSTRUCTION. APPROVED SOIL STABILIZATION
COMPLETE MAJOR GRADING AS SOON AS POSSIBLE AFTER
CONSTRUCTION SITE TRAFFIC. THE CONTRACTOR SHALL
BY THE OWNER. THE CONTRACTOR SHALL CONTROL
CHEMICAL DUST ADHESIVES OR OTHER MEASURES AS DIRECTED
SHALL MONITOR AND CONTAIN DUST USING WATER, MULCH,
TRANSPORTED FROM THE PROJECT SITE. THE CONTRACTOR
STOCKPILES LOCATED WITHIN THE PROJECT SITE OR THOSE
TEMPORARY AND PERMANENT STABILIZATION MEASURES FOR
TRAPPING MEASURES. THE CONTRACTOR IS RESPONSIBLE FOR
MATERIALS AND STABILIZE OR PROTECT WITH SEDIMENT
THE CONTRACTOR SHALL STOCKPILE SOIL AND OTHER CREDIBLE
TREE PROTECTION.
MANUAL, LATEST EDITION. THE SILT FENCE WILL ALSO ACT AS
IN ACCORDANCE WITH THE VIRGINIA WORK AREA PROTECTION
ACTIVITY. SITE ACCESS BY CONSTRUCTION VEHICLES SHALL BE
SITE BEFORE ANY SITE DEMOLITION OR EARTH-MOVING
CONTRACTOR SHALL INSTALL SILT FENCE ON THE PROJECT
MANAGEMENT STRATEGIES / SEQUENCE OF CONSTRUCTION THE
OBTAIN A VSMP CONSTRUCTION PERMIT.
CONSERVATION AND RECREATION AT (804) 786-3957 TO
PRESERVATION AREA, CONTACT THE VIRGINIA DEPARTMENT OF
GREATER THAN 2500 SQUARE FEET IN THE CHESAPEAKE BAY
ACTIVITIES. FOR ALL SITES ONE ACRE OF GREATER, OR
BE INSTALLED PRIOR TO DEMOLITION AND EARTH-MOVING
CONTROL. EROSION AND SEDIMENT CONTROL MEASURES SHALL
SEEDING, TREE PRESERVATION AND PROTECTION, AND DUST
MEASURES INCLUDE SILT FENCE, RIPRAP, TOPSOILING, PERMANENT
EROSION AND SEDIMENT CONTROL HANDBOOK (VESCH).
SPECIFICATIONS OF THE CURRENT EDITION OF THE VIRGINIA
MAINTAINED ACCORDING TO THE MINIMUM STANDARDS AND
SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND
OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL
EROSION AND SEDIMENT CONTROL MEASURES UNLESS
AREAS ASSOCIATED WITH MOST OF THIS PROJECT.
IS GENERALLY FLAT, RESULTING IN NO CRITICAL EROSION
CRITICAL EROSION AREAS THE TOPOGRAPHY OF THE PROJECT
NOTES
EROSION AND SEDIMENT CONTROL
PERMANENT SEEDING MIXTURE
2C
RIGHT OF WAY.
19.ALL EROSION CONTROL MEASURES SHALL BE PLACED IN THE
OF IN A LAWFUL MANNER.
18.ALL MATERIAL REMOVED FROM THE SITE SHALL BE DISPOSED
CONTROLLED DISPOSAL AREA.
OR SWEEPING AND BE TRANSPORTED TO A SEDIMENT
17.SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING
AT THE END OF EACH DAY.
OR PRIVATE ROAD SURFACE WILL BE CLEANED THOROUGHLY
ANY AND ALL MATERIAL OR DEBRIS TRACKED ONTO A PUBLIC
EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK.
REPLACEMENT TREES SHALL CONFORM TO THE LATEST
SPECIES OF LIKE QUALITY AS SPECIFIED BY THE OWNER.
REPLACED BY TREES OF AT LEAST 2" CALIPER OF THE SAME
MEANS ARE KILLED DURING CONSTRUCTION, THEY SHALL BE
CONSTRUCTION: IF DESIRED TREES PROTECTED BY THE ABOVE
16.CRITERIA FOR REPLACING TREES KILLED DURING
OR COUNTY PROJECT MANAGER.
INJURY SHOULD BE PRESCRIBED BY THE COUNTY INSPECTOR
PARENT STEM AT THE BRANCH COLLAR. CARE FOR SERIOUS
SHALL BE CUT BACK TO THE NEXT LATERAL BRANCH OR
WITH ARBORICULTURAL STANDARDS. DAMAGED TREE LIMBS
EQUIPMENT OPERATIONS SHALL BE TREATED IN ACCORDANCE
15.TREE TRUNKS AND EXPOSED ROOTS DAMAGED DURING
FEASIBLE.
THIS SHOULD APPLY TO DITCHING FOR UTILITY SERVICES, IF
"NO CUT" ZONE OF 20' IN ALL DIRECTIONS FROM THE TREE).
IN FEET (EXAMPLE: CIRCUMFERENCE OF 10" WOULD HAVE A
(MEASURED 4 1/2" ABOVE GROUND LINE IN INCHES) EXPRESSED
CUT IN AN AREA EQUAL TO TWICE THE TREE CIRCUMFERENCE
LAND LEVELING OPERATIONS. FEEDER ROOTS SHOULD NOT BE
AVOID DAMAGE TO EXISTING TREE TRUNKS AND ROOTS DURING
14.HEAVY EQUIPMENT OPERATORS ARE TO BE CAUTIONED TO
BE NAILED OR ATTACHED TO TREES DURING CONSTRUCTION.
13.BOARDS OR WIRES OF A NON-PROTECTIVE NATURE SHALL NOT
SPECIFICATIONS.
SPECIFICALLY ALLOWED BY THESE STANDARDS AND
EXCEPTION TO THIS REQUIREMENT WILL BE THOSE
BE OPERATED TO AVOID SOIL COMPACTION. THE ONLY
DEFINED AREA AND VEHICLES AND OTHER EQUIPMENT SHALL
GREATER. MATERIALS SHALL NOT BE STOCKPILED WITHIN THIS
WHERE THE DRIP LINE IS LESS THAN 5', OR WHICHEVER IS
EQUAL TO THE DRIP LINE OF THE TREE OR A MINIMUM OF 5'
A CIRCULAR PATTERN AROUND THE TREE A MINIMUM DISTANCE
PRESERVATION AND PROTECTION) AND SHOULD BE LOCATED IN
(1992), STANDARD AND SPECIFICATION 3.38 (TREE
EROSION AND SEDIMENT CONTROL HANDBOOK, THIRD EDITION,
PROTECTION SHALL BE IN ACCORDANCE WITH THE VIRGINIA
DESTRUCTION OR DAMAGE OF THE TREES. THE TREE
TO BE RETAINED ON THE SITE PLAN TO PREVENT THE
PROTECTION BARRIERS SHALL BE PLACED AROUND ALL TREES
12.PRIOR TO ANY CLEARING, GRADING OR CONSTRUCTION,
PLANS AND SHALL BE CLEARLY MARKED IN THE FIELD.
11.TREES SELECTED FOR PRESERVATION ARE SHOWN ON THE
SHALL BE SPREAD AND SEEDED.
SHALL BE REMOVED WITHIN 30 DAYS. TRAPPED SEDIMENT
STABILIZED. AFTER STABILIZATION IS COMPLETE, ALL MEASURES
NOT TO BE REMOVED UNTIL ALL DISTURBED AREAS ARE
10.TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE
DETERMINED NECESSARY BY THE PLAN APPROVING AUTHORITY.
NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS
MAINTENANCE OF ANY ADDITIONAL CONTROL MEASURES
9.THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION AND
WATERWAYS OR THE STORM DRAINAGE SYSTEM.
NOT ADVERSELY AFFECT ADJACENT PROPERTIES, WETLANDS,
DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES
OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING
8.EFFLUENT FROM DE-WATERING OPERATIONS SHALL BE FILTERED
OF CONSTRUCTION SITE TRAFFIC.
WATER, MULCH, OR CHEMICAL DUST ADHESIVES AND CONTROL
CONTROL DUST, INCLUDING (BUT NOT LIMITED TO) USE OF
7.THE CONTRACTOR SHALL MONITOR AND TAKE PRECAUTIONS TO
TRANSPORTED FROM THE PROJECT SITE.
STOCKPILES ON SITE AS WELL AS FOR MATERIALS
TEMPORARY PROTECTION AND PERMANENT STABILIZATION FOR
MEASURES. THE CONTRACTOR IS RESPONSIBLE FOR THE
BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING
6.STOCKPILES OF SOIL AND OTHER ERODIBLE MATERIALS SHALL
BE REMOVED FROM PAVED AREAS ON A DAILY BASIS.
VEHICLES TO EXISTING GRAVEL ENTRANCES. SEDIMENT SHALL
5.THE CONTRACTOR SHALL LIMIT SITE ACCESS BY CONSTRUCTION
CONTRACTOR AND SHALL BE MADE IMMEDIATELY.
CLEANUP OF SEDIMENTATION ARE THE RESPONSIBILITY OF THE
EFFECTIVENESS OF THE EROSION CONTROL DEVICES AND
RAINFALL EVENT. ANY NECESSARY REPAIRS TO MAINTAIN THE
MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING
4.THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL
THE FIRST STEP IN LAND DISTURBANCE.
PROTECTION DEVICES ARE TO BE PLACED PRIOR TO OR AS
3.ALL EROSION AND SEDIMENT CONTROL MEASURES AND TREE
BE PAVED.
EARLY APPLICATION OF GRAVEL BASE MATERIAL ON AREAS TO
INCLUDE VEGETATIVE ESTABLISHMENT, MULCHING, AND THE
FOR LONGER THAN 30 DAYS. SOIL STABILIZATION MEASURES
BE AT FINAL GRADE BUT WHICH WILL REMAIN UNDISTURBED
APPLIED TO DENUDED OR DISTURBED AREAS WHICH MAY NOT
PORTION OF THE SITE. SOIL STABILIZATION MUST ALSO BE
WITHIN 7 DAYS AFTER FINAL GRADE IS REACHED ON ANY
SOIL STABILIZATION TO ALL DENUDED OR DISTURBED AREAS
2.THE CONTRACTOR SHALL APPLY PERMANENT OR TEMPORARY
EDITION).
EROSION AND SEDIMENT CONTROL HANDBOOK (LATEST
MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA
WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO
STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES
1.UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND
FOR ALL CALCULATIONS SEE DESIGN REPORT.
CALCULATIONS
VEGETATED DITCHES.
THE CONCRETE SIDEWALK SHALL DRAIN TOWARD THE EXISTING
STORMWATER RUNOFF CONSIDERATIONS
ACTIVITIES SHALL BE USED DURING CONSTRUCTION.
GRADING AND ALL OTHER POTENTIAL LAND DISTURBING
CONTROL DUST DURING DEMOLITION, EXCAVATION, PAVING,
HARMFUL AIRBORNE SUBSTANCE. MEASURES TO PREVENT AND
SOIL LOSS AND REDUCE THE PRESENCE OF POTENTIALLY
AREAS SUBJECT TO DUST PROBLEMS IN ORDER TO PREVENT
DISTURBANCE, DEMOLITION, OR CONSTRUCTION ACTIVITIES IN
REDUCING SURFACE AND AIR MOVEMENT OF DUST DURING LAND
DUST CONTROL - 3.39
COMPACTION.
VEGETATION FROM CONSTRUCTION EQUIPMENT AND SOIL
DISTURBANCE WILL PROTECT THE TREES AND OTHER
SILT FENCE BARRIER PLACED ALONG THE LIMITS OF
PROVIDE OTHER ENVIRONMENTAL AND AESTHETIC BENEFITS. THE
WILL BE EFFECTIVE FOR EROSION AND SEDIMENT CONTROL AND
TO ENSURE THE SURVIVAL OF DESIRABLE TREES WHERE THEY
INJURY DURING LAND-DISTURBING AND CONSTRUCTION ACTIVITY
PROTECTING EXISTING TREES FROM MECHANICAL AND OTHER
TREE PRESERVATION AND PROTECTION - 3.38
VEGETATIVE COVER IS NEEDED ON FINE-GRADED AREAS.
YEAR OR MORE OR WHERE PERMANENT, LONG-LIVED
AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A
VEGETATIVE COVER BY PLANTING SEED ON ROUGH-GRADED
PERMANENT SEEDING - 3.32 ESTABLISHMENT OF PERENNIAL
ARE TAKEN TO PREVENT SLOUGHING AND EROSION.
FOR SLOPES STEEPER THAN 2:1 UNLESS ADDITIONAL MEASURES
OF PROVIDING A SUITABLE GROWTH MEDIUM; NOT RECOMMENDED
IMPORTATION OF TOPSOIL IS MOST COST-EFFECTIVE METHOD
DISTURBED AREAS. APPLICABLE WHERE PRESERVATION OR
GROWTH MEDIUM FOR VEGETATION USED TO STABILIZE
PRESERVING AND USING TOPSOIL TO PROVIDE A SUITABLE
TOPSOILING - 3.30
HANDBOOK NUMBER.
RESPECTIVE VIRGINIA EROSION AND SEDIMENT CONTROL
ARE DISCUSSED BELOW AND ARE REFERENCED TO THE
THE VEGETATIVE PRACTICES TO BE USED ON THIS PROJECT
VEGETATIVE PRACTICES
UNDER DESIGN FLOW CONDITIONS.
VEGETATIVE COVER, ETC. ARE SUCH THAT SOIL MAY ERODE
CONDITIONS, WATER TURBULENCE AND VELOCITY, EXPECTED
LOOSE, ANGULAR STONE INSTALLED WHEREVER SOIL
A PERMANENT, EROSION-RESISTANT GROUND COVER OF LARGE,
RIPRAP - 3.19
PERMANENT STABILIZATION OF A DISTURBED PROJECT AREA.
CULVERT AND ASSOCIATED DRAINAGE SYSTEM PRIOR TO
ENTERING, ACCUMULATING IN AND BEING TRANSFERRED BY A
STORM SEWER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .