Government Responses to Questions.pdf
PDF 109 KB Posted
- Attached to
- FA521524QAR01 - Generator Rental, Saipan Federal contract opportunity
- Solicitation number
- FA521524QAR01
About this file
This document is a set of questions and answers related to a federal contract opportunity for rental generators at Saipan International Airport. The U.S. Air Force requires generators in various kilowatt sizes, and the government has provided responses to 17 questions regarding acceptable equipment specifications, delivery and transportation requirements, pricing structure, and access to the airport facility.
The key details are: the government will accept generators with slightly different kilowatt ratings than the stated requirements; trailers are not mandatory but could be useful; dual containment tanks are not required; the contractor is responsible for equipment mobilization and demobilization; refueling and 24-hour maintenance should be broken out as separate line items in pricing; and the generators will be located within the airport facility, with the on-site team handling any access requirements. The solicitation number is FA521524QAR01, and the quote due date is March 22, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach 2 - Clauses and Provisions.pdf | ||
| Combo - Generator Rental.pdf | ||
| Attach 1 - Performance Work Statement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government Responses to Questions 21 Mar 2024
1. For the 40KW requirement, will you accept a generator rated at 44KW standby and 38KW
Prime?
Yes.
2. For the 50KW requirement, will you accept a generator rated at 48KW standby and 44KW Prime? If not, will you accept a generator rated at 68KW standby 60 KW Prime?
48KW standby and 44KW Prime is acceptable.
3. for the 350KW requirement will you accept a generator 2x200KW paralleled generator prime power rating?
The Government will accept 2x200KW generators, but they will not be paralleled.
4. Will generators need to be single phase or three phase? ‘
5. Are generators required to be on trailers for mobility?
Trailers would be useful but not a requirement.
6. Are generators required to have dual containment tanks?
Not required. The local or industry standard is acceptable.
7. Who is responsible for transportation to and from the airport.
The Contractor is responsible for equipment mobilization and demobilization.
8. Will the generator be located on the flight line of Saipan Airport? Are there any special requirements for tech and vehicles to access the flightline for service or fueling of generators?
The on-site team will handle any requirements to get the Contractor onto the airfield.
9. Is there a separate mobilization/ demobilization charge or does it need to be rolled up into the daily rental rate?
If there is an additional fee for mobilization and demobilization, we will create CLIN 0006, Shipping & Miscellaneous.
10. Does fuel need to be rolled up into the daily rate or is fuel a separate billable item?
Refuel will be included in CLIN 0005, Service.
See example below:
CLIN 0005 – Service $0.00
- Preventative maintenance: $0.00
- 24-Hr Maintenance: $0.00
- Refuel: $0.00
11. Is 24-hour maintenance a separate billable item or is it to be rolled up in the daily generator rental rate?
As seen above, please provide a breakdown of the items included in the service portion.
12. If generators are located in Guam, do we deliver to the air force base in Guam to transport to and from Saipan? The performance timeline does not allow for ocean shipment since service to Saipan is weekly.
No, and the delivery shall be made to Saipan International Airport.
13. Will CNMI import and duty tax apply for items mobilized from Guam and then returned to Guam?
Recommend labeling it as a shipping fee. Please reference question 9.
14. Will the generators be within the airport facility? If so, can fuel trucks enter the tarmac?
Yes, 1 generator will be within the airport facility. The onsite team will handle any requirements to get contractor onto the airfield.
15. The quantity of fuel needed is undetermined. How would you like this to be quoted?
The Government intends to keep the generators for 24 hours with no interruption. I recommend calculating using industry standards and providing the required amount to meet the Government’s requirements.
16. If entry into the airport facility with equipment and fuel trucks is required, then all employees will need a ramp pass and training before the Air Force arrival. Will this be the situation?
We are working with the local authorities to confirm. However, military personnel can operate the fuel trucks on the Contractor’s behalf if there is an issue.
17. Is a quotation with breakdown to include trucking delivery preferred?
Recommend labelling it as shipping fee.