Attach 1 - Performance Work Statement.pdf
PDF 151 KB Posted
- Attached to
- FA521524QAR01 - Generator Rental, Saipan Federal contract opportunity
- Solicitation number
- FA521524QAR01
About this file
The document is a Performance Work Statement (PWS) for a federal contract opportunity to provide generators and related services at Saipan International Airport. The Contractor shall supply various sizes of generators, including 350 kW, 50 kW, 40 kW, and 20 kW units, along with necessary cables. The Contractor is responsible for preventive maintenance, 24-hour maintenance support, and ensuring uninterrupted fuel supply (diesel or gasoline) to keep the generators operational at all times. The contract period of performance is 3-15 April 2024. The related federal contract opportunity, Solicitation Number FA521524QAR01, seeks quotes for this requirement, with a due date of 22 March 2024 and a question due date of 21 March 2024. The solicitation is issued by the Department of the Air Force Pacific Air Forces.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Government Responses to Questions.pdf | ||
| Attach 2 - Clauses and Provisions.pdf | ||
| Combo - Generator Rental.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
AR24 Generator Rental and Services, Saipan International Airport
1.0 SCOPE OF WORK
In accordance with the schedule of supplies and services, the Contractor shall support the U.S.
Air Force members who require generators at Saipan International Airport. The Contractor shall provide the generators outlined in this PWS to include maintenance and fuel services.
2.0 DESCRIPTION OF SERVICES
The Contractor is responsible for supplying the generators as outlined. The Contractor shall provide preventive maintenance and 24-hour maintenance support in case of mechanical or serviceability issues. Additionally, the Contractor must ensure that the Government's operations are not interrupted by providing fuel (Diesel or Gasoline) to all generators and keeping them operational at all times.
Qty UoM Description 13 Days 350 kw Silent Generator (1 each) – Voltage 208 13 Days 50 kw Silent Generator (1 each) – Voltage 208/120 13 Days 40 kw Silent Generator (1 each) – Voltage 208/120 13 Days 20 kw Silent Generator (1 each) – Voltage 208/120 13 Days Service (Preventative & 24-Hr Maintenance and Refuel) – Para. 3.0 & 4.0
The Contractor shall provide compatible cables for the generators. The cables shall be in accordance with the salient characteristics below.
2.1 200 Amp Cable (4 each) Length – 25’ feet Cross-Sectional Shape Style - Round Temp Rating – 90 Degrees Celsius Conductor Quantity – 4 Accessory Wire Type & Quantity – 4 Ground Strand Quantity per Conductor – 259 All Conductors Round Conductor Size – 0 AWG All Conductors Strand AWG Size Per Conductor – 28 All Conductors
2.2 60 Amp Cable (2 each) Length – 50’ feet Cross-Sectional Shape Style - Round Temp Rating – 90 Degrees Celsius Conductor Quantity – 4 Accessory Wire Type & Quantity – 4 Ground Strand Quantity per Conductor – 133 All Conductors Round Conductor Size – 6 AWG All Conductors Strand AWG Size Per Conductor – 27 All Conductors
3.0 MAINTENNACE
Contractor shall provide preventive maintenance and 24-hr maintenance to support for mechanical or serviceability issue. i.e. oil changes,
4.0 FUEL
The Contractor must ensure that the Government's operations are not interrupted by providing fuel (Diesel or Gasoline) to all generators and keeping them operational at all times. Additionally, the Contractor shall provide fuel on demand to service the Government operations (Diesel or Gasoline).
5.0 LOCATION
Saipan International Airport 4P9H+V8R, I Fadang, Saipan 96950, CNMI
6.0 CONTRACTOR COORDINATION
The Contracting Officer and appointed Contractor Coordination Representative will be responsible for ensuring the Contractor to provide the requested services, overseeing initial installation, and reporting service interruptions.
Contracting Officer:
SSgt Eric Oh, eric.oh.1@us.af.mil
Contract Specialist:
SSgt Jessica Kinser, jessica.kinser.1@us.af.mil
Contractor Coordination Representative:
MSgt Robert Taron, robert.taron@us.af.mil
7.0 PERIOD OF PERFORMANCE
3 – 15 April 2024
8.0 POINTS OF CONTACTS AND AUTHORITIES
The Contracting Officer is the sole individual authorized to approve any changes to the requirements of this contract and provisions contained elsewhere in this contract; the authority remains solely with the Contracting Officer. In the event the Contractor affects any change in the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority, and no adjustment will be made in the contract price as a result of the change.
9.0 CONTRACTUAL RELATIONSHIPS
Contractor personnel shall always be under the supervision of the Contractor and not under the supervision of the Government or any of its employees. The Contracting Officer will bring discrepancies or noncompliance with the contract clauses, specifications, or PWS to the Contractor’s supervisor or foreman for necessary corrective action.
10.0 LIABILITY
The U.S. Government accepts no liability for the actions of the Contractor or their employees.