Government_Response_to_Industry_Questions_W58RGZ22R0073_Design_ES_23_MAY_2022.pdf

PDF 94 KB Posted

Attached to
RFP for SOLDIER UNMANNED AIRCRAFT SYSTEMS (SUAS) DESIGN AND DEVELOPMENT ENGINEERING SERVICES CONTRACT
Solicitation number
R-0073
Issued by

About this file

This document provides responses to industry questions regarding solicitation number R-0073 for SOLDIER UNMANNED AIRCRAFT SYSTEMS (SUAS) DESIGN AND DEVELOPMENT ENGINEERING SERVICES. The Department of the Army Materiel Command Contracting Command is seeking proposals to provide SUAS design and engineering services. The solicitation requests both the prime contractor's purchasing and accounting systems meet adequacy requirements. Contractors without approved systems can still propose, but must disclose their compliance status. Administrative changes were made to Sections L and M of the solicitation for consistency and clarity, and to update proposal submission instructions. No changes were made affecting the June 28, 2022 proposal due date or substance of other attachments.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section Question Government Response

Attachment 7

Section L / Pg. 14 /

Para (2)

The first sentence of this paragraph states compliance status will need to be determined for the following business systems: Purchasing and Accounting System. All subsequent sentences in this section only address

Accounting System Adequacy. Can the Government please clarify if adequacy status is required for both Purchasing and Accounting Systems?

The first line of Paragraph 2 is in reference to the prime contractor. The following sentences are for subcontractors of the prime contractor. Adequacy STATUS for both the

Prime's Purchasing and Accounting Systems are required.

Attachment 7

Section

L/Pg.14/para(2)

Please confirm that an approved Purchasing or Accounting

System is not required to be considered for award. If required, will the Government accept the capabilities of a subcontractor to meet this requirement?

The STATUS of the Purchasing and Accounting System are required. Please provide an answer as to whether or not you have an approved Puchasing and Accounting System or not, i.e., never been reviewed or found unacceptable.

Contractors without an approved system are not precluded from proposing.

File details come from the government source that posted it. Updated .