GMNF Rochester Fleet Garage_OPTIONAL BID SOI.pdf

PDF 121 KB Posted

Attached to
GMF Rochester Ranger District Office Fleet Garage
Solicitation number
12445526Q0035
Issued by

About this file

This is an Independent Government Estimate for construction of a Rochester District Office Fleet Garage located at the Green Mountain National Forest, Rochester Ranger District in Windsor County, Vermont. The estimate is structured as an optional bid with five work divisions priced on a lump sum basis: General Requirements (Division 01), Concrete (Division 03), Special Construction (Division 13), Electrical (Division 26), and Earthwork (Division 31). Each division has an estimated quantity of one lump sum unit, with blank fields provided for contractors to enter unit prices and calculate total prices for each division. An optional bid total line is included at the conclusion of the pricing table.

The document serves as the government's cost baseline for this construction project but does not contain detailed specifications, project schedules, award timelines, or other contract terms. Unit prices and total prices are not populated in this estimate document, indicating it is a template or preliminary pricing structure awaiting contractor bids or further cost development.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEPENDENT GOVERNMENT ESTIMATE

Rochester District Office Fleet Garage

Green Mountain National Forest Rochester Ranger District Windsor County, Vermont

DIVISION DESCRIPTION UNITS ESTIMATED

QUANTITY UNIT PRICE TOTAL PRICE

01 General Requirements Lump Sum 1

03 Concrete Lump Sum 1

13 Special Construction Lump Sum 1

26 Electrical Lump Sum 1

31 Earthwork Lump Sum 1

OPTIONAL BID

OPTIONAL BID TOTAL

SOI