GLSS2 Attachment List.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
FINAL RFP - Special Operations Forces (SOF) Global Logistics Support Services II (GLSS2) Contract
Solicitation number
H92254-25-RE-001
Issued by

About this file

The file is an Excel spreadsheet listing attachments for the Special Operations Forces Global Logistics Support Services II (SOF GLSS2) Request for Proposal (RFP). The solicitation (H92254-25-RE-001) is a full and open competition with a maximum contract ceiling of $10.53 billion, covering a five-year base period with potential extensions up to 12 years. The contract will provide global lifecycle logistics support for Special Operations Forces across aviation, ground, and maritime platforms, with core competencies including design, prototyping, production, modification, integration, and sustainment activities.

The attachment list includes multiple technical documents such as Performance Work Statements (PWS), Statements of Objectives (SOO), Cost Worksheets, Quality Assurance Surveillance Plans (QASP), and task order attachments for specific platforms like MH-60M helicopters, FOSOV, and MQ-9 systems. Many attachments are marked as Controlled Unilateral Information (CUI) and restricted. The solicitation is issued by the United States Special Operations Command (USSOCOM), with a response deadline of 1400 EST on 21 November 2025, and involves comprehensive logistics, facility management, environmental safety, security, industrial operations, and IT management services.

View the file

Other files

File Type Posted
H92254-25-RE-001 SOF GLSS2 RFP Cover Letter.pdf PDF
RFP Att 12_QnA Template.xlsx XLSX spreadsheet
Section L_Attachment 00A.pdf PDF
Solicitation - H9225425RE001.pdf PDF
Section M_Attachment 00B.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachments

PackageDocument TypeSAM Doc NameDate# of PagesCUIMarkedRestricted?
1Reference DocumentH92254-25-RE-001 SOF GLSS2 RFP Cover Letter19-SepNo
1Solicitation RFPSolicitation - H9225425RE00129-Aug152No
1Section LSection L_Attachment 00A29-Aug20No
1Section MSection M_Attachment 00B29-Aug7No
2PWS Appendix APWS App A_Enterprise Metrics29-Aug13Yes
2PWS Appendix BPWS App B_SOFSANet Core Services29-Aug4CTIYesYes
2PWS Appendix CPWS App C_SOFSANet Software List29-AugN/AYes
2PWS Appendix DPWS App D_SOFSA Network Architecture29-Aug1CTIYesYes
2PWS Appendix EPWS App E_SOFSA Stratified Inventory29-Aug1Yes
2PWS Appendix FPWS App F_Base Contract Property29-Aug76Yes
2PWS Appendix GPWS App G_GLSS2 TO Transition Schedule29-AugN/AYes
2PWS Appendix HPWS App H_Facilities Maintenance Requirement29-Aug25Yes
2PWS Appendix IPWS App I_Accountable Inventory Officer SOP29-Aug27Yes
2RFP Attachment 01RFP Att 01_Performance Work Statement (PWS)29-Aug32Yes
2RFP Attachment 02RFP Att 02_DD254 Sep202516-SepYes
2RFP Attachment 03RFP Att 03_CDRLs29-Aug48Yes
2RFP Attachment 10RFP Att 10_Enterprise Budget Template29-AugYes
2RFP Attachment 13RFP Att 13_Quality Assurance Surveillance Plan (QASP)29-Aug14Yes
3RFP Attachment 04RFP Att 04_TO 1 Instructions to Offerors (ITO) MH60M29-Aug2Yes
3RFP Attachment 05RFP Att 05_TO 1 Statement of Objectives (SOO) MH60M29-Aug11Yes
3RFP Attachment 11aRFP Att 11a_TO 1 Cost Worksheet MH60M29-AugN/AYes
3REP TO 1 Attachment 01TO 1 Att 01_CDRLs MH60M29-Aug4Yes
3REP TO 1 Attachment 02TO 1 Att 02_QASP MH60M29-Aug10Yes
3REP TO 1 SOO Appendix ATO 1 SOO App A_MH-60M Basic Weight Update29-AugYes
3REP TO 1 SOO Appendix ATO 1 SOO App A_Engine Bay Spring Clip Installation29-AugYes
3REP TO 1 SOO Appendix ATO 1 SOO App A_Relocation of the Native Mode Switch29-AugYes
3REP TO 1 SOO Appendix ATO 1 SOO App A_1553 Connection to Q2 SEU29-AugYes
3REP TO 1 SOO Appendix ATO 1 SOO App A_STT System Installation29-AugYes
3REP TO 1 SOO Appendix ATO 1 SOO App A_PLS System Demod29-AugYes
3REP TO 1 SOO Appendix ATO 1 SOO App A_DVE Installation29-AugYes
3REP TO 1 SOO Appendix ATO 1 SOO App A_CIRCM Installation29-AugYes
3REP TO 1 SOO Appendix ATO 1 SOO App A_APQ-187 SKR Installation29-AugYes
3REP TO 1 SOO Appendix ATO 1 SOO App A_STA 379 Frames29-AugYes
3REP TO 1 SOO Appendix ATO 1 SOO App A_STA 485 Stringer Replacement29-AugYes
3REP TO 1 SOO Appendix ATO 1 SOO App A_Cabin ICS Control Panel29-AugYes
3REP TO 1 SOO Appendix ATO 1 SOO App A_EIBF Installation29-AugYes
3REP TO 1 SOO Appendix ATO 1 SOO App A_USB Port Installation29-AugYes
4RFP Attachment 06RFP Att 06_TO 2 ITO FOSOV29-Aug2Yes
4RFP Attachment 07RFP Att 07_TO 2 SOO FOSOV29-Aug25Yes
4RFP Attachment 11bRFP Att 11b_TO 2 Cost Worksheet FOSOV29-AugN/AYes
4REP TO 2 Attachment 01TO 2 Att 01_CDRLs FOSOV29-Aug26Yes
4REP TO 2 Attachment 02TO 2 Att 02_DD254 FOSOV29-Aug6Yes
4REP TO 2 Attachment 03TO 2 Att 03_QASP FOSOV29-Aug9Yes
4REP TO 2 Attachment 04TO 2 Att 04_GFP List FOSOV29-AugN/AYes
4REP TO 2 Attachment 05TO 2 Att 05_ECR Process29-Aug17Yes
4REP TO 2 Attachment 06TO 2 Att 06_FOSOV Web App Guide29-Aug46Yes
4REP TO 2 Attachment 07TO 2 Att 07_ PARTS Web Overview29-AugYes
5RFP Attachment 08RFP Att 08_TO 3 ITO MQ929-Aug2Yes
5RFP Attachment 09RFP Att 09_TO 3 SOO MQ929-Aug29Yes
5RFP Attachment 11cRFP Att 11c_TO 3 Cost Worksheet29-AugN/AYes
5REP TO 3 Attachment 01TO 3 Att 01_CDRLs MQ-929-Aug14Yes
5REP TO 3 Attachment 02TO 3 Att 02_DD254 MQ-929-Aug7Yes
5REP TO 3 Attachment 03TO 3 Att 03_QASP MQ-929-Aug14Yes
5REP TO 3 Attachment 04TO 3 Att 04_AFMAN 21-20629-AugYes
5REP TO 3 Attachment 04TO 3 Att 04_Engine Removal with Required Conditions29-AugYes
5REP TO 3 Attachment 04TO 3 Att 04_Periodic Inspection Listing_WUC Listing29-AugYes
5REP TO 3 Attachment 04TO 3 Att 04_Aircraft Information Publications29-AugYes
5REP TO 3 Attachment 04TO 3 Att 04_Aircraft Movement29-AugYes
5REP TO 3 Attachment 04TO 3 Att 04_Aircraft Towing29-AugYes
5REP TO 3 Attachment 04TO 3 Att 04_BPO_Preflight Insp29-AugYes
5REP TO 3 Attachment 04TO 3 Att 04_Aircraft Launch29-AugYes
5REP TO 3 Attachment 04TO 3 Att 04_EOR29-AugYes
5REP TO 3 Attachment 04TO 3 Att 04_Thruflight29-AugYes
5REP TO 3 Attachment 04TO 3 Att 04_MTS Removal with Required Conditions29-AugYes
6PWS Applicable Document2024 SOFSA Workorder Log29-AugNAYes
6Reference DocumentCBA BGS_IAMAW29-Aug43Yes
6Reference DocumentCBA DRG_IAMAW29-Aug25Yes
6Reference DocumentCBA Tunista_IAMAW29-Aug68Yes
6Reference DocumentCBA Yulista_IAMAW29-Aug30Yes
6Reference DocumentMOA Yulista_IAMAW29-Aug3Yes
6PWS Applicable DocumentsPWS 3.0 Applicable Docs Portfolio29-Aug5524Yes
6RFP Attachment 12RFP Att 12_QnA Template29-AugNo
6RFP Attachment 14RFP Att 14_Past Performance Questionnaire29-AugN/AYes
6RFP Attachment 15RFP Att 15_List of Applicable CBAs and WDs29-AugN/AYes
6Reference DocumentWage Determination PDF Portfolio (all WDs)29-Aug737Yes

File details come from the government source that posted it. Updated .