GLSS2 Attachment List.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- FINAL RFP - Special Operations Forces (SOF) Global Logistics Support Services II (GLSS2) Contract
- Solicitation number
- H92254-25-RE-001
- Issued by
-
United States Special Operations Command
About this file
The file is an Excel spreadsheet listing attachments for the Special Operations Forces Global Logistics Support Services II (SOF GLSS2) Request for Proposal (RFP). The solicitation (H92254-25-RE-001) is a full and open competition with a maximum contract ceiling of $10.53 billion, covering a five-year base period with potential extensions up to 12 years. The contract will provide global lifecycle logistics support for Special Operations Forces across aviation, ground, and maritime platforms, with core competencies including design, prototyping, production, modification, integration, and sustainment activities.
The attachment list includes multiple technical documents such as Performance Work Statements (PWS), Statements of Objectives (SOO), Cost Worksheets, Quality Assurance Surveillance Plans (QASP), and task order attachments for specific platforms like MH-60M helicopters, FOSOV, and MQ-9 systems. Many attachments are marked as Controlled Unilateral Information (CUI) and restricted. The solicitation is issued by the United States Special Operations Command (USSOCOM), with a response deadline of 1400 EST on 21 November 2025, and involves comprehensive logistics, facility management, environmental safety, security, industrial operations, and IT management services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| H92254-25-RE-001 SOF GLSS2 RFP Cover Letter.pdf | ||
| RFP Att 12_QnA Template.xlsx | XLSX spreadsheet | |
| Section L_Attachment 00A.pdf | ||
| Solicitation - H9225425RE001.pdf | ||
| Section M_Attachment 00B.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachments
| Package | Document Type | SAM Doc Name | Date | # of Pages | CUI | Marked | Restricted? |
| 1 | Reference Document | H92254-25-RE-001 SOF GLSS2 RFP Cover Letter | 19-Sep | No | |||
| 1 | Solicitation RFP | Solicitation - H9225425RE001 | 29-Aug | 152 | No | ||
| 1 | Section L | Section L_Attachment 00A | 29-Aug | 20 | No | ||
| 1 | Section M | Section M_Attachment 00B | 29-Aug | 7 | No | ||
| 2 | PWS Appendix A | PWS App A_Enterprise Metrics | 29-Aug | 13 | Yes | ||
| 2 | PWS Appendix B | PWS App B_SOFSANet Core Services | 29-Aug | 4 | CTI | Yes | Yes |
| 2 | PWS Appendix C | PWS App C_SOFSANet Software List | 29-Aug | N/A | Yes | ||
| 2 | PWS Appendix D | PWS App D_SOFSA Network Architecture | 29-Aug | 1 | CTI | Yes | Yes |
| 2 | PWS Appendix E | PWS App E_SOFSA Stratified Inventory | 29-Aug | 1 | Yes | ||
| 2 | PWS Appendix F | PWS App F_Base Contract Property | 29-Aug | 76 | Yes | ||
| 2 | PWS Appendix G | PWS App G_GLSS2 TO Transition Schedule | 29-Aug | N/A | Yes | ||
| 2 | PWS Appendix H | PWS App H_Facilities Maintenance Requirement | 29-Aug | 25 | Yes | ||
| 2 | PWS Appendix I | PWS App I_Accountable Inventory Officer SOP | 29-Aug | 27 | Yes | ||
| 2 | RFP Attachment 01 | RFP Att 01_Performance Work Statement (PWS) | 29-Aug | 32 | Yes | ||
| 2 | RFP Attachment 02 | RFP Att 02_DD254 Sep2025 | 16-Sep | Yes | |||
| 2 | RFP Attachment 03 | RFP Att 03_CDRLs | 29-Aug | 48 | Yes | ||
| 2 | RFP Attachment 10 | RFP Att 10_Enterprise Budget Template | 29-Aug | Yes | |||
| 2 | RFP Attachment 13 | RFP Att 13_Quality Assurance Surveillance Plan (QASP) | 29-Aug | 14 | Yes | ||
| 3 | RFP Attachment 04 | RFP Att 04_TO 1 Instructions to Offerors (ITO) MH60M | 29-Aug | 2 | Yes | ||
| 3 | RFP Attachment 05 | RFP Att 05_TO 1 Statement of Objectives (SOO) MH60M | 29-Aug | 11 | Yes | ||
| 3 | RFP Attachment 11a | RFP Att 11a_TO 1 Cost Worksheet MH60M | 29-Aug | N/A | Yes | ||
| 3 | REP TO 1 Attachment 01 | TO 1 Att 01_CDRLs MH60M | 29-Aug | 4 | Yes | ||
| 3 | REP TO 1 Attachment 02 | TO 1 Att 02_QASP MH60M | 29-Aug | 10 | Yes | ||
| 3 | REP TO 1 SOO Appendix A | TO 1 SOO App A_MH-60M Basic Weight Update | 29-Aug | Yes | |||
| 3 | REP TO 1 SOO Appendix A | TO 1 SOO App A_Engine Bay Spring Clip Installation | 29-Aug | Yes | |||
| 3 | REP TO 1 SOO Appendix A | TO 1 SOO App A_Relocation of the Native Mode Switch | 29-Aug | Yes | |||
| 3 | REP TO 1 SOO Appendix A | TO 1 SOO App A_1553 Connection to Q2 SEU | 29-Aug | Yes | |||
| 3 | REP TO 1 SOO Appendix A | TO 1 SOO App A_STT System Installation | 29-Aug | Yes | |||
| 3 | REP TO 1 SOO Appendix A | TO 1 SOO App A_PLS System Demod | 29-Aug | Yes | |||
| 3 | REP TO 1 SOO Appendix A | TO 1 SOO App A_DVE Installation | 29-Aug | Yes | |||
| 3 | REP TO 1 SOO Appendix A | TO 1 SOO App A_CIRCM Installation | 29-Aug | Yes | |||
| 3 | REP TO 1 SOO Appendix A | TO 1 SOO App A_APQ-187 SKR Installation | 29-Aug | Yes | |||
| 3 | REP TO 1 SOO Appendix A | TO 1 SOO App A_STA 379 Frames | 29-Aug | Yes | |||
| 3 | REP TO 1 SOO Appendix A | TO 1 SOO App A_STA 485 Stringer Replacement | 29-Aug | Yes | |||
| 3 | REP TO 1 SOO Appendix A | TO 1 SOO App A_Cabin ICS Control Panel | 29-Aug | Yes | |||
| 3 | REP TO 1 SOO Appendix A | TO 1 SOO App A_EIBF Installation | 29-Aug | Yes | |||
| 3 | REP TO 1 SOO Appendix A | TO 1 SOO App A_USB Port Installation | 29-Aug | Yes | |||
| 4 | RFP Attachment 06 | RFP Att 06_TO 2 ITO FOSOV | 29-Aug | 2 | Yes | ||
| 4 | RFP Attachment 07 | RFP Att 07_TO 2 SOO FOSOV | 29-Aug | 25 | Yes | ||
| 4 | RFP Attachment 11b | RFP Att 11b_TO 2 Cost Worksheet FOSOV | 29-Aug | N/A | Yes | ||
| 4 | REP TO 2 Attachment 01 | TO 2 Att 01_CDRLs FOSOV | 29-Aug | 26 | Yes | ||
| 4 | REP TO 2 Attachment 02 | TO 2 Att 02_DD254 FOSOV | 29-Aug | 6 | Yes | ||
| 4 | REP TO 2 Attachment 03 | TO 2 Att 03_QASP FOSOV | 29-Aug | 9 | Yes | ||
| 4 | REP TO 2 Attachment 04 | TO 2 Att 04_GFP List FOSOV | 29-Aug | N/A | Yes | ||
| 4 | REP TO 2 Attachment 05 | TO 2 Att 05_ECR Process | 29-Aug | 17 | Yes | ||
| 4 | REP TO 2 Attachment 06 | TO 2 Att 06_FOSOV Web App Guide | 29-Aug | 46 | Yes | ||
| 4 | REP TO 2 Attachment 07 | TO 2 Att 07_ PARTS Web Overview | 29-Aug | Yes | |||
| 5 | RFP Attachment 08 | RFP Att 08_TO 3 ITO MQ9 | 29-Aug | 2 | Yes | ||
| 5 | RFP Attachment 09 | RFP Att 09_TO 3 SOO MQ9 | 29-Aug | 29 | Yes | ||
| 5 | RFP Attachment 11c | RFP Att 11c_TO 3 Cost Worksheet | 29-Aug | N/A | Yes | ||
| 5 | REP TO 3 Attachment 01 | TO 3 Att 01_CDRLs MQ-9 | 29-Aug | 14 | Yes | ||
| 5 | REP TO 3 Attachment 02 | TO 3 Att 02_DD254 MQ-9 | 29-Aug | 7 | Yes | ||
| 5 | REP TO 3 Attachment 03 | TO 3 Att 03_QASP MQ-9 | 29-Aug | 14 | Yes | ||
| 5 | REP TO 3 Attachment 04 | TO 3 Att 04_AFMAN 21-206 | 29-Aug | Yes | |||
| 5 | REP TO 3 Attachment 04 | TO 3 Att 04_Engine Removal with Required Conditions | 29-Aug | Yes | |||
| 5 | REP TO 3 Attachment 04 | TO 3 Att 04_Periodic Inspection Listing_WUC Listing | 29-Aug | Yes | |||
| 5 | REP TO 3 Attachment 04 | TO 3 Att 04_Aircraft Information Publications | 29-Aug | Yes | |||
| 5 | REP TO 3 Attachment 04 | TO 3 Att 04_Aircraft Movement | 29-Aug | Yes | |||
| 5 | REP TO 3 Attachment 04 | TO 3 Att 04_Aircraft Towing | 29-Aug | Yes | |||
| 5 | REP TO 3 Attachment 04 | TO 3 Att 04_BPO_Preflight Insp | 29-Aug | Yes | |||
| 5 | REP TO 3 Attachment 04 | TO 3 Att 04_Aircraft Launch | 29-Aug | Yes | |||
| 5 | REP TO 3 Attachment 04 | TO 3 Att 04_EOR | 29-Aug | Yes | |||
| 5 | REP TO 3 Attachment 04 | TO 3 Att 04_Thruflight | 29-Aug | Yes | |||
| 5 | REP TO 3 Attachment 04 | TO 3 Att 04_MTS Removal with Required Conditions | 29-Aug | Yes | |||
| 6 | PWS Applicable Document | 2024 SOFSA Workorder Log | 29-Aug | NA | Yes | ||
| 6 | Reference Document | CBA BGS_IAMAW | 29-Aug | 43 | Yes | ||
| 6 | Reference Document | CBA DRG_IAMAW | 29-Aug | 25 | Yes | ||
| 6 | Reference Document | CBA Tunista_IAMAW | 29-Aug | 68 | Yes | ||
| 6 | Reference Document | CBA Yulista_IAMAW | 29-Aug | 30 | Yes | ||
| 6 | Reference Document | MOA Yulista_IAMAW | 29-Aug | 3 | Yes | ||
| 6 | PWS Applicable Documents | PWS 3.0 Applicable Docs Portfolio | 29-Aug | 5524 | Yes | ||
| 6 | RFP Attachment 12 | RFP Att 12_QnA Template | 29-Aug | No | |||
| 6 | RFP Attachment 14 | RFP Att 14_Past Performance Questionnaire | 29-Aug | N/A | Yes | ||
| 6 | RFP Attachment 15 | RFP Att 15_List of Applicable CBAs and WDs | 29-Aug | N/A | Yes | ||
| 6 | Reference Document | Wage Determination PDF Portfolio (all WDs) | 29-Aug | 737 | Yes |
File details come from the government source that posted it. Updated .