Gibraltar School District - Asbestos Removal RFP - Summer 2019 Projects.pdf
PDF 439 KB Posted
- Attached to
- 2019 Summer Renovation Projects.
- Solicitation number
- RFP-GIB-190000001989-2
- Issued by
- Macomb County, Galien Village, Michigan
About this file
This is a Request for Proposals (RFP) issued by Gibraltar School District in Michigan for asbestos removal services at three elementary schools: Chapman, Hunter, and Parsons. The scope includes removal of various asbestos-containing materials including floor tiles, carpet glue, door frame caulk, fire doors, transite fascia boards, and black mastic materials from specific locations within each school. The work is scheduled to begin June 14, 2019 and must be completed by June 28, 2019. Proposals are due by 4:00 PM on Monday, May 6, 2019 and should be submitted via email to the District's Finance Manager. PCM clearance testing will be required in accordance with AHERA/Michigan regulations.
Bidders must submit a bid bond or certified check for 5% of the total bid amount with their proposal. Required documentation includes completed bid proposal forms, proof of current Michigan Asbestos Contractor License, certificates of insurance including worker's compensation, and unit pricing for additional asbestos-containing materials if needed. The contractor must maintain comprehensive general liability insurance of $2 million per occurrence, automobile liability of $1 million, and umbrella coverage of $1 million. Pricing must remain firm for 60 days from bid opening. The project designer is Brumbaugh-Herrick, Inc. who can provide specifications to interested bidders.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Gibraltar Schools - Asbestos Abatement Project Addendum.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS
for
ASBESTOS REMOVAL
PROJECT:
2019 SUMMER RENOVATION PROJECTS
BUILDINGS:
CHAPMAN ELEMENTARY SCHOOL
HUNTER ELEMENTARY SCHOOL
PARSONS ELEMENTARY SCHOOL
Owner:
GIBRALTAR SCHOOL DISTRICT
19370 VREELAND RD.
WOODHAVEN, MI 48183
PROPOSALS DUE:
MONDAY, MAY 6, 2019 at 4:00 PM
ASBESTOS PROJECT DESIGNER
Brumbaugh-Herrick, Inc.
7920 N. Woodbridge Rd.
Monclova, OH 43542 419.382.9574
BHI
Brumbaugh-Herrick, Inc.
Table of Contents
Bidding Documents
Advertisement
Instructions to Bidders
Bid Proposal Form
Project Manual
General Conditions
General Requirements
Technical Specifications
Project Forms
BID ADVERTISEMENT
GIBRALTAR SCHOOL DISTRICT
Gibraltar School District will accept sealed bids for the removal of asbestos containing materials from Chapman, Hunter, and Parsons Elementary Schools. Work is expected to be conducted starting on June 14, 2019 and be completed by June 28, 2019.
The Bid Due Date is Monday, May 6, 2019 at 4:00 PM. Bids should be e-mailed to the District to the following addresses:
Shawn Stirling, Finance Manager: stirlis@gibdist.net
A Bid Bond for 5% of the Bid or a certified check in the amount of 5% of the total bid amount must accompany your bid.
Prices shall be firm for sixty (60) days from the date of opening of bids. All bids submitted must meet or exceed all project specifications.
Copies of the specifications are available from the asbestos project designer;
Brumbaugh-Herrick, Inc. Contact Brett Brumbaugh at brett@brumbaugh-herrick.com or 419.382.9574.
mailto:stirlis@gibdist.net mailto:brett@brumbaugh-herrick.com
INSTRUCTIONS TO BIDDERS
GIBRALTAR SCHOOL DISTRICT – ASBESTOS REMOVAL – SUMMER 2019
1.0 DEFINED TERMS
1.1 Terms used in these Instructions to Bidders which are defined in the Standard General Conditions of the Construction Contract, EJCDC No. 1910-8 (1996 Edition) have meanings assigned to them in the General Conditions.
1.2 A Day is defined as a twenty-four hour period of time; one seventh of a week.
Holidays and weekends are included. Unless modified elsewhere, a day shall commence and end at midnight.
1.3 The term "Bidding Documents" includes the Instructions to Bidders, the Proposal Form, and the proposed Contract Documents including any and all addenda issued prior to the receipt of the proposal.
1.4 These Instructions to Bidders supersede the General Conditions in the applicable paragraphs.
2.0 PRE-BID MEETING
There will be no formal pre-bid meeting. Contractors desiring to conduct a site visit to the schools should identify themselves at the front office.
3.0 DOCUMENTS
3.1 Plans, specifications, and other contract documents will be available from the Consultant / Project Designer, Brumbaugh-Herrick, Inc.
4.0 SCOPE OF PROJECT
The work involves the renovation project abatement of ACM materials at Chapman, Hunter, and Parsons Elementary Schools as shown in the Technical Specifications.
5.0 SCHEDULE OF WORK
5.1 Removal work is to begin immediately following the completion of the 2019 school year which ends on June 13, 2019. All abatement work is to be completed within 2 weeks of the start date.
5.2 If it becomes apparent that the proposed time schedule will not be met, CONTRACTOR shall do everything in its power to bring the project back on schedule, at no additional cost, including increasing manpower, working overtime or extra shifts and/or rescheduling other activities.
6.0
7.0
8.0
PAYMENTS
Payment to the contractor shall be in 1 final payment following the completion of the site work and submittal of all closeout documents. All payments shall note the P.O.
number from the School District.
SUBMISSION OF PROPOSALS
Proposals will be received by Monday, May 6, 2019 no later than 4:00 PM.
Proposals should be e-mailed to the District to the following addresses:
Shawn Stirling, Finance Manager: stirlis@gibdist.net
REQUIRED PROPOSAL SUBMITTALS
Bidders shall submit copies of the following as part of their proposal:
8.1 Completed Bid Proposal Form.
8.2 Proof of current Michigan Asbestos Contractor License.
8.3 Appropriate Certificate(s) of Insurance including Worker’s Compensation.
9.0 WORK COMPLETION
9.1 The Successful Bidder is to complete all removal activities within the completion date requirements stated in Section 5.0, above.
10.0 BID PROPOSAL FORM
10.1 A blank bid proposal form is included in the bidding documents. All blanks to be completed in ink, or typed.
10.2 The proposal must contain acknowledgment of receipt of any and all addenda in the space provided.
mailto:stirlis@gibdist.net
11.0 ADDENDA
Addenda may be issued to modify the bidding documents as deemed appropriate by the Consultant. Oral explanations will not be binding; only written addenda will be binding. Addenda will be issued no later than three days before proposals are due.
12.0 BID SECURITY
A Bid Bond for 5% of the Bid or a certified check in the amount of 5% of the total bid amount must accompany your bid.
13.0 SITE INVESTIGATION
It is the responsibility of each Bidder, before submitting a proposal to:
13.1 Examine the Contract Documents thoroughly and field verify all estimated quantities of materials specified for removal. All quantities, locations, and drawings are approximate.
13.2 Visit the site to become familiar with local conditions that may affect cost, progress, performance, or furnishing of the Work.
13.3 Consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work.
13.4 Study and carefully correlate Bidder's observations with the contract documents.
13.5 Notify the Consultant of any and all conflicts, errors, or discrepancies in the Contract Documents at least four (4) days prior to the due date of the proposals.
14. 0 INSURANCE
14.1 Contractor shall acquire and maintain during the term of the contract such insurance, to be provided by a company or companies lawfully authorized to do business in Michigan as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contract and for which the Contractor may be legally liable, whether such operations be by the Contractor or a Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable:
14.1.1 claims under workers compensation, disability benefit and other similar employee benefit acts that are applicable to the work to be performed;
14.1.2 claims for damages because of bodily injury, sickness, disease or death of the Contractor's employees;
14.1.3 claims for damages because of bodily injury, sickness, disease or death of any person other than Contractor's employees;
14.1.4 claims for damages insured by usual personal injury liability coverage which are sustained (1) by a person as a result of any offense directly or indirectly related to employment of such person by the Contractor, or (2) by another person.
14.1.5 claims for damages, other than to the Work itself, because of injury to or destruction of tangible property, including the loss of use resulting therefrom;
and
14.1.6 claims for damages because of bodily injury, death of a person or property damage arising out of ownership, maintenance, or use of a motor vehicle.
14.2 The insurance required by Paragraph 14.1 shall be written for not less than the following minimum limits or as required by law, whichever is greater. Coverage shall be maintained without interruption from the date of commencement of the Work until date of final payment and termination of any coverage required to be maintained after final payment:
14.2.1 Worker's Compensation:
Provide a copy of the current Certificate of Premium Payment.
14.2.2 Comprehensive General Liability, including Employer's Liability (Stop Gap):
• $2,000,000 bodily injury and property damage combined single limit, per occurrence and aggregate.
• Asbestos coverage is to be included. True occurrence basis coverage is required.
14.2.3 Comprehensive Automobile Liability, including owned, scheduled, hired and non-owned vehicles:
• $1,000,000 bodily injury and property damage per occurrence (no aggregate)
14.2.4 Umbrella/Excess Liability:
• $1,000,000 per occurrence and aggregate.
14.3 Contractor shall show evidence of all insurance required in the bid proposal package.
14.4 Insurance policies required by Paragraph 14 shall contain a provision that coverage afforded under the policies will not be canceled or allowed to expire until at least 30 days prior written notice has been given..
14.5 All insurance coverage shall cover the risks and hazards of asbestos and shall be obtained on a true occurrence basis. The insurance company providing the coverage required herein shall have a rating classification of “A-” or better as determined by A.M. Best's Key Rating Guide: Property & Casualty.
BID PROPOSAL FORM
1. The undersigned BIDDER proposes and agrees, if this proposal is accepted, to complete all work described in the specifications or as indicated in the Bidding Documents for the contract price stated. BIDDER further accepts and agrees to complete the work in a timely manner and procedure as described in the Instructions to Bidders and in the Contract Documents.
2. BIDDER understands and accepts all the terms and conditions of the Bidding Documents and agrees without limitation to those dealing with the disposition of Bid Security. This Proposal will remain subject to acceptance for thirty days after the day of the Proposal opening.
3. BIDDER has familiarized their self with the Scope of Work for the project, the nature and extent of the Contract Documents, Work, site, locality, and all other local conditions and Laws and Regulations that may affect cost in any manner as well as hinder the progress, performance, or furnishing of the work.
4. BIDDER has read all documents including the following Addenda, receipt of which is acknowledged below:
Date Number
5. BIDDER acknowledges that he has had opportunity to give the CONSULTANT written notice of all conflicts, errors or discrepancies that he has discovered in the Contract Documents and the written resolution of the CONSULTANT is acceptable to the BIDDER.
6. This proposal is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited any other Bidder to submit a false or spurious bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other Bidder.
7. Having carefully examined the bid documents, the work site, and all existing conditions, we propose to complete all work covered, in a workmanlike manner, for the sum specified.
Chapman Elementary School: $____________
Hunter Elementary School: $____________
Parsons Elementary School: $____________
TOTAL ALL BUILDINGS: $____________
BID PROPOSAL FORM
UNIT PRICES for additional asbestos containing materials required to be removed as part of the project and not originally specified for removal:
ACM Pipe Insulation Mud Fittings $ __________ / each
9” Vinyl Floor Tile & Mastic $ __________ / square foot
9” Vinyl Floor Tile and carpet $ __________ / square foot
Transite cement board $ __________ / square foot
Mobilization (if not already on-site) $___________/ mobilization
All pertinent information concerning the company and officers is contained on the appropriate following blanks.
Date of Proposal Submittal: _________________________
By: _______________________________________________________ Name of Company or Corporation
STATE OF INCORPORATION: ______________________ DATE: _____________
BUSINESS ADDRESS: ________________________________________________
TELEPHONE: ________________________
E-MAIL: ___________________________________________
NAME: _______________________________ TITLE: _______________________
SIGNATURE: _______________________________________
Bidders shall submit copies of the following as part of their proposal:
• Completed Bid Proposal Form.
• Proof of current Michigan Asbestos Contractor License.
• Appropriate Certificate(s) of Insurance including Worker’s Compensation.
• Bid Bond
GENERAL REQUIREMENTS
Potential Asbestos Hazard The disturbance or dislocation of asbestos-containing materials may cause asbestos fibers to be released into the building's atmosphere, thereby creating a potential health hazard to workmen and building occupants. Apprise all workers, supervisory personnel, subcontractors and consultants who will be at the jobsite of the seriousness of the hazard and of proper work procedures which must be followed.
Where in the performance of the work, workers, supervisory personnel, subcontractors, or consultants may encounter, disturb, or otherwise function in the immediate vicinity of any identified asbestos-containing materials, take appropriate continuous measures as necessary to protect all building occupants from the potential hazard of exposure to airborne asbestos.
Such measures shall include the procedures and methods described herein, and compliance with regulations of applicable federal, state, and local agencies.
Contractor Use of Premises Gibraltar School District shall designate and provide space for the loading and unloading of equipment and project materials.
Electrical power and city water will be available to the contractor. Sewer facilities to receive properly filtered project waste water will be available.
Contractor employees are forbidden from smoking in the buildings.
The Contractor shall not go into any other area than where he is working except as necessary to gain access to the work area.
Electrical Safety The importance of electrical safety cannot be overemphasized. It is a project requirement that all electrical equipment be powered from circuits that are ground fault circuit interrupter (GFCI or GFI) protected at their source, which must be outside any negative pressure regulated area.
Ground fault circuit interrupters are to be supplied by the Contractor.
Fire Safety The contractor is to abide by the OSHA fire safety requirements as outlined in 29CFR:1910 and 1926.
Site Security During asbestos abatement activities, the Contractor is responsible for such barricades, signs and warnings such that a reasonable person would be aware that they should not enter regulated areas.
TECHNICAL SPECIFICATIONS
1.0 IDENTIFICATION OF PROJECT
Related Documents
Drawings, general provisions of the Contract, including General and Supplementary
Conditions, and other Specifications sections apply to the work of this section.
Project Identification
PROJECT OWNER: Gibraltar School District 19370 Vreeland Road Woodhaven, MI 48183
Contact: Kelly Greenhalgh - Director of Operations Gibraltar School District Phone: 734.379.6377 Office Cell: 734.735.8564
BUILDING 1: Chapman Elementary School 31500 Olmstead Rd.
Rockwood, MI 48173
BUILDING 2: Hunter Elementary School 21320 Roche Rd.
Brownstown Charter Twp., MI 48183
BUILDING 3: Parsons Elementary School 14473 Middle Gibraltar Rd.
Gibraltar, MI 48173
ASBESTOS PROJECT Brumbaugh-Herrick, Inc.
DESIGNER: 7920 N. Woodbridge Rd.
Monclova, OH 43542 Phone: 419-382-9574 Fax: 419-382-9584 Contact: Brett Brumbaugh Certification: Inspector/Project Designer #A3686 e-mail: brett@brumbaugh-herrick.com
2.0 SCOPE OF WORK
BUILDING 1: Chapman Elementary School
ASBESTOS MATERIAL BUILDING LOCATIONS
QUANTITY
OF ACM
Carpet glue (includes disposal of carpeting) Main Office storage room 128 sf
Interior door frame caulk (removal of entire door frame) Main office storage room 1 door
Fire door (to be removed with frame above) Main office storage room 1 door
9” tan floor tile (neg. mastic) Principal’s office 224 sf
BUILDING 2: Hunter Elementary School
OF ACM
12” green floor tile and mastic Main office supply closet 64 sf
Paper in round light fixture Main office supply closet 1 fixture
Exterior Transite fascia board 4’x8’ panels (ground access) and associated caulking
Upper exterior sides of building perimeter (excluding front entry)
4,576 sf (143 panels)
Exterior Transite fascia board 4’x8’ (roof access) and associated caulking between and below panels
Upper sections of Gym and Classroom Pods (accessible off of roof)
3,904 sf (122 panels)
BUILDING 3: Parsons Elementary School
OF ACM
Black mastic under wood flooring and black mastic under cork flooring on concrete (includes removal and disposal of the cork under mastic and carpeting in ¾ of the area)
Media Center, sides of stage, and stage built-out area.
3,162 sf
PROJECT NOTES:
• All asbestos removal is to be completed in accordance with the applicable OSHA work practices.
• The interior abatement areas will require PCM clearance, which will be conducted in accordance with AHERA/Michigan regulations and analyzed on-site by the Consultant.
• At the Parsons Media Center, all shelving in the work areas will be removed by the Owner prior to the start date.
• The ramp and front stage area (42’x6’) are to demolished and disposed of by the abatement contractor (along with the abatement of the wood flooring under both).
• All exterior lighting fixtures and security cameras mounted on the Transite panels are to be removed and saved for the Owner to re-install.
• The caulking between and below the Transite panels is positive for asbestos and is to be removed as part of this project.
• At Chapman Elementary, the shelves in the office storage room are to be removed by the abatement contractor to abate the floor tile under the shelving.
3.0 CODES AND REGULATIONS
Description of the Work
This section sets forth governmental regulations and industry standards which are included and incorporated herein by reference and made a part of the specification. This section also sets forth those notices and permits which are known to the Owner and which either must be applied for and received, or which must be given to governmental agencies before start of work.
Codes & Regulations
General Applicability of Codes, Regulations, and Standards: Except to the extent that more explicit or more stringent requirements are written directly into the Contract documents, all applicable codes, regulations, and standards have the same force and effect (and are made part of the contract documents by reference) as if copied directly into the contract documents, or as if published copies are bound herewith.
Contractor Responsibility: The Contractor shall assume full responsibility and liability for the compliance with all applicable Federal, State, and local regulations pertaining to work practices, hauling, disposal, and protection of workers, visitors to the site, and persons occupying areas adjacent to the site.
The Contractor is responsible for providing medical examinations and maintaining medical records of personnel as required by the applicable Federal, State, and local regulations. The Contractor shall hold the Owner and Consultant harmless for failure to comply with any applicable work, hauling, disposal, safety, health, or other regulation on the part of their self, his employees, or his subcontractors.
Federal Requirements which govern asbestos abatement work or the hauling and disposal of asbestos waste materials include but are not limited to:
Occupational Safety and Health Administration:
29 CFR 1910 General Industry Standards 29 CFR 1926 Construction Industry Standards
Especially:
29 CFR 1910.20 Access to Employee Exposure Medical Records 29 CFR 1910.134 Respiratory Protection 29 CFR 1910.145 Specifications for Accident Prevention (Signs) 29 CFR 1910.1200 Hazard Communication 29 CFR 1926.1101 Asbestos Standard for
Construction (final rules)
Environmental Protection Agency:
40 CFR 61, Subpart A National Emission Standard for Hazardous Air
Pollutants (NESHAPS)
40 CFR 61, Subpart M NESHAPS Asbestos Regulation
40 CFR 763, Subpart E Asbestos-Containing Materials in Schools
Department of Transportation:
49 CFR 107, et seq. Hazardous Material Regulations
49 CFR 171-180 Hazardous Material Regulations
State Requirements which govern asbestos abatement work or the hauling and disposal of asbestos waste materials include but are not limited to:
All work must be performed in accordance with the Michigan Basic Building Code.
State requirements which govern asbestos hazard abatement work include, but are not limited to: Michigan Dept. of Environmental Quality and the Environmental Protection Agency regulations.
Notices
US Environmental Protection Agency: at least 10 working days prior to the start date of the project (40 CFR 61, Subpart M).
State of Michigan (MDEQ and MDLEG): at least 10 working days prior to the beginning date of the project.
Licenses: Maintain current licenses as required for the removal, transporting, disposal, or other regulated activity relative to the work of this Contract.
Posting: Post certification cards of all workers and the Supervisor at the site during work hours.
4.0 AIR MONITORING / ON-SITE LABORATORY SERVICES
This section describes air monitoring carried out by the Consultant to verify that the building beyond the work area and outside environment remain uncontaminated.
Air monitoring within the work area is required of the Contractor by OSHA. It is not covered in this section and is not the purpose of the Consultant’s air monitoring.
Sampling and Analytical Methods
PCM air samples will be collected on 25 mm cassette-mounted filters at sampling rate between 4 and 16 liters per minute. The filter medium will be mixed cellulose ester having a pore size less than or equal to 1.2 micrometers. They will be analyzed according to NIOSH Method 7400A.
Final Air Clearance Testing
PCM clearance will be required in accordance with the AHERA and State of Michigan regulations. Clearance will be followed by a final visual inspection and will conducted by the Consultant with the Contractor’s Representative present. PCM air samples will be analyzed on-site.
Release Criterion
For the release criterion for PCM clearance samples, the protocol of 29 CFR 763.90 of
AHERA will be followed. If all 5 PCM sample results are below 0.01 f/cc the clearance requirements have been met and the work area can be prepared for re-occupancy by the Owner. If any PCM sample(s) exceed 0.01 f/cc the clearance requirements have not been achieved the entire work area must be recleaned and re-tested.
5.0 REQUIRED FORMS
Description of Requirements:
Pursuant to good recordkeeping, final documentation, and job management, the Consultant requires the attached forms to be utilized as necessary during the Project.
Explanation:
Waiver of Liability Form to be completed for each person entering the work area not employed by the Contractor or the Consultant.
Certification of Visual Inspection Form to be completed by the Competent Person and the Consultant to verify each cleared area.
Worker Qualification Form to be submitted for each employee working on the site.
(Environmental Contractor's Form with same information may be substituted.) The form must be accompanied by a copy of the most recent physical examination, Asbestos Worker or Asbestos Supervisor Card, AHERA approved training certificates (initial and most recent refresher), OSHA 40-hour course certificate, and most recent respirator fit test.
Contractor Personal Air Sampling Form to be submitted with final documents. (Contractor's form with same information may be substituted.)
Waste Shipment Record to be completed for each load of asbestos material.
MDEQ and MDLEG Notifications to be submitted with final documents.
6.0 PROJECT CLOSE-OUT
Description of Requirements
This section describes the submissions that will be required from the Contractor before the Work will be considered complete. Requirements for final cleanup, after work area clearance has been achieved, are described.
Prerequisites to Substantial Completion
Submit o A copy of the Contractor's project log book, including daily log form and sign in sheets.
o A record of each Contractor employee working on the project including a completed Worker Qualification Form, a copy of the most recent physical examination, Michigan o Asbestos Worker or Supervisor Certification Card, AHERA approved training certificates (initial and most recent refresher), and the most recent respirator fit test.
o A complete set of landfill receipts and EPA Waste Manifest forms for each load of asbestos containing waste.
o Copies of any and all regulatory agency notifications, inquiries, complaints, warrants, or any other communications relating to the project from governmental agencies.
o Complete set of Contractor's personal air monitoring records for the project.
Inspection Procedures: Upon receipt of Contractor's Request for Inspection, Consultant will either advise the Contractor of unfulfilled prerequisites or proceed with the inspection. Following initial inspection, Consultant will either prepare the Certificate of Substantial Completion, or will advise the Contractor of work which must be performed before the certificate will be issued (the punch list). The Consultant will repeat the inspection when requested and when assured that the Work has been substantially completed.
Prerequisites for Final Acceptance
Complete the following before requesting the Consultant's final inspection for Certification of Final Acceptance, and final payment as required by the General Conditions. List known exceptions, if any, in the request.
Submit the final payment request with final releases and supporting documentation not previously submitted and accepted.
Submit an updated final statement, accounting for final additional changes to the Contract Sum.
Submit waivers of lien from every entity (including Contractor) who could lawfully and possibly file a lien arising out of the Contract and related to work covered by the payment.
Submit a certified copy of the Consultant's final punch-list of itemized work to be completed or corrected, stating that each item has been completed or otherwise resolved for acceptance.
Reinspection Procedure: The Consultant will reinspect the Work upon receipt of the
Contractor's notice that the work, including punch-list items resulting from earlier inspections, has been completed, except for those items whose completion has been delayed because of circumstances that are acceptable to the Consultant.
Upon completion of reinspection, the Consultant will either prepare a Certificate of Final
Acceptance, or will advise the Contractor of work that is incomplete or of obligations that have not been fulfilled, but are required for final acceptance.
7.0 ASBESTOS REMOVAL PROCEDURES
Related Documents
Drawings, general provisions of the Contract, including General and Supplementary Conditions, and other Specification sections apply to the work of this section.
CLASS 2 ASBESTOS REMOVAL AREAS
This section describes the procedures that will be used for determining the acceptability of the Work as determined by:
A) Adherence to OSHA work procedures, B) Visual inspection by the Consultant C) Final PCM air clearances below 0.01 f/cc
All OSHA Class 1 and Class 2 removal work must be done in accordance with the OSHA asbestos standard 29 CFR 1926.1101.
Release Criteria - Containment Areas
There are three criteria for acceptability of removal work conducted within containment areas, they are:
a) The work procedures meet the requirements.
b) The Visual Inspection is satisfactory.
c) All PCM air samples are below 0.01 f/cc
If any of these requirements are not met the Contractor shall reclean as necessary to achieve the required results.
8.0 ISOLATION AREAS
CLASS 2 ACM MATERIALS:
The Contractor shall set up the work area isolation/decontamination facilities consisting of three areas as follows:
• The equipment room shall be an area of sufficient size so as to accommodate at least one worker (allowing enough room to remove protective clothing), a 6 mil disposal bag and container, and any equipment which the Contractor wishes to store when not in use.
• The wash room shall have two curtained doorways of opaque polyethylene film, one to the work area and one to the uncontaminated area. At least one shower with shower head supplied with hot and cold water or warm water shall be installed in this room for personnel decontamination. This room shall also be equipped with high pressure, low volume sprays to be used for the decontamination of disposal containers and equipment. The wash room shall be constructed so that all waste water is collected and pumped through a five (5) micron filter system.
• Filtrate shall be disposed of as contaminated waste. From the filter, wastewater shall be drained off in any conventional manner to a sanitary wastewater system. Careful attention shall be paid to the construction of the shower to insure that it is watertight. No leakage shall be permitted. The Contractor shall supply and maintain soap, shampoo and disposable towels at all times in the shower area.
• The clean room shall be of sufficient size to accommodate at least one worker, towels for the workers, and storage for street clothing. The clean room shall be in the uncontaminated area.
If the work area isolation structure fails to prevent air flow out of the work area during personnel or equipment movement through the isolation structure, additional air locks shall be installed until air flow is eliminated.
Construction of Work Area Isolation Structures:
The wash room shall be constructed of 6 mil polyethylene and suitable framing so as to make it as airtight as possible. Where joining separate sheets of polyethylene is necessary, taping alone shall not be sufficient. The sheets of polyethylene shall be overlapped at least 3 inches and joined with an unbroken line of adhesive in such a manner as to prohibit air movement; tape shall then be used to further seal the joint on both the inside and outside of the chamber.
Work area isolation structure shall be constructed to prohibit passers-by from casually observing activities within the work area isolation structure or dressing areas in the uncontaminated area. The clean room and equipment room shall be constructed to permit workers to privately dress and undress.
Other work area isolation systems shall be considered as long as they maintain the intended integrity of this system. Any proposed changes must be submitted in writing (with drawings) prior to commencement of work and must be approved in writing.
Maintenance of Isolation Systems and Barriers:
Ensure that barriers are effectively sealed and taped. Repair damaged barriers and remedy defects immediately upon discovery.
Visually inspect all enclosures at the beginning of each work period, and intermittently thereafter.
Smoke test methods must be used by the Contractor to test work areas daily from the time negative pressure is first established until final clearance is accomplished. The negative pressure shall be maintained 24 hours a day, 7 days per week. At no time shall the Contractor allow air to flow from the work area (including periods when asbestos hazard abatement work is not in progress) except through an AFD exhausting HEPA-filtered air outside the building.
The Contractor shall provide local exhaust and ventilation within the work area with the flow of air away from the workers.
Local Exhaust and Ventilation (LEV) means to extract contaminated air from the immediate vicinity of the workers with uncontaminated air, so as to reduce the worker's exposure to concentrations of airborne fiber during the work.
9.0 EMERGENCY PROTECTION
Prepare a contingency plan for emergencies including fire, accident, power failure, negative pressure system failure, supplied air system failure, or any other event that may require modification or abridgment of decontamination or work area isolation procedures.
Include in plan specific procedures for decontamination or work area isolation. Note that nothing in this plan should impede safe exiting or providing of adequate medical attention in the event of an emergency.
The Contractor shall establish emergency and fire entrances and exits to work areas. All emergency entrances shall be equipped with two (2) full sets of protective clothing and respirators at all times. The Contractor shall mark all exits from the work area so that they are readily visible in the event of an emergency.
The Contractor shall be prepared to administer first aid to injured personnel after decontamination. Seriously injured personnel shall be treated immediately or evacuated without delay for decontamination. When an injury occurs the Contractor shall stop work and implement fiber reduction techniques (e.g., wetting asbestos-containing materials) until the injured person has been removed from the work area.
The Contractor shall post in the clean room the numbers and locations of emergency services including but not limited to fire, ambulance, doctor, hospital, police, power company, and telephone company.
10.0 FACILITY PROTECTION
The Contractor shall comply with OSHA and EPA regulations concerning signs and labeling.
Facility Protection
All existing fire protection and alarm systems, both within and without the work area, shall be maintained in proper working order throughout the asbestos hazard abatement project.
In the event that any area of the building or any area outside the building is contaminated by Contractor activities (except the isolated work areas after asbestos hazard asbestos hazard abatement work commences and the disposal landfill), the Contractor shall bear all expenses for determination of the contamination and necessary decontamination.
11.0 DISPOSAL OF ASBESTOS-CONTAINING WASTE MATERIALS
Comply with the multiple codes and regulations which apply to this work.
Submittals
In addition to the submittals required by regulation, provide to Consultant a copy of the EPA or State asbestos landfill permit.
Removal Activities As the asbestos-containing material and contaminated waste accumulates, it must be kept wet and promptly placed in disposal containers. Actual configuration of disposal containers will comply with local EPA District and/or landfill requirements, but as a minimum disposal con-tainers shall be two 6-mil polyethylene bags (one inside the other, both separately sealed).
All polyethylene film, tape, cleaning material, and all other disposable material or items used in the work area shall be treated as contaminated waste.
As disposal containers are filled, they shall be sealed and moved to a staging area adjacent to the work area isolation structure. The Contractor shall remove waste materials from within the work area on a regular basis, and not permit accumulation of disposal containers to obstruct work progress or building exit ways.
Disposal containers may be temporarily stored at the site, outside the work area, if secured in a van-type or semi-trailer truck that is completely and securely lined with polyethylene film, including a curtained doorway at the opening. A similarly sealed, enclosed and locked container is also acceptable.
Disposal containers shall not be loaded so as to make handling unduly difficult or unsafe, or threaten the integrity of the container, polyethylene barriers or building structures.
Warning labels, having waterproof print and permanent adhesive, shall be affixed to the sides of the disposal containers (unless the containers have pre-printed labels). Warning labels shall be conspicuous and legible, and they shall be in accordance with EPA, OSHA and DOT regulations. All disposal bags or containers shall also have the Generator name, address, etc. in accordance with current NESHAP regulations.
All waste disposal containers shall be decontaminated and removed from the work area before final clean up is started and the isolation barrier is taken down.
12.0 CONTINGENCY PLAN
Plan Submittals:
Prepare a Contingency Plan for emergencies including fire, accident, power failure, negative air system failure, supplied air system failure, or any other event that may require modification or abridgment of decontamination or work area isolation procedures. Include in the plan specific procedures for decontamination or work area isolation. List the telephone numbers and locations of the emergency services, including but not limited to fire, ambulance, doctor, hospital, police, power company and telephone company. Note that nothing in this specification should impede safe exiting or providing adequate medical attention in the event of an emergency.
Post the Contingency Plan in the Clean Room or on the job site.
Notifications
Notify other entities at the Project Site of the nature of the asbestos abatement activities, location of asbestos containing materials, and requirements relative to asbestos set forth in these specifications and applicable regulations.
CERTIFICATE OF WORKER’S ACKNOWLEDGMENT
PROJECT NAME:__________________________________________ DATE: _________________
PROJECT ADDRESS:_______________________________________________________________
CONTRACTOR’S NAME:_____________________________________________________
Working with asbestos can be dangerous. Inhaling asbestos fibers has been linked with various types of cancer. If you smoke and inhale asbestos fibers, the chance that you will develop lung cancer is greater than that of the non-smoking public.
Your employer’s Contract for the above referenced project requires that:
1) You be supplied with the proper respirator and be trained in its use;
2) You be trained in safe work practices and in the use of equipment found on the job; and
3) You receive a medical examination. These things have been done at no cost to you.
RESPIRATORY PROTECTION: You must have been trained in the proper use of respirators and informed of the type of respirator to be used on the above referenced project. You must be given access to a copy of the written respiratory protection program issued by your employer. You must be equipped, at no cost, with the respirator to be used on the above project.
TRAINING COURSE: You must have been trained in the dangers inherent in handling asbestos and breathing asbestos dust, and in proper work procedures, and in personal and area protective measures. The topics covered in the course must have included the following:
Physical characteristics of asbestos Health hazards associated with asbestos Respiratory protection Use of protective equipment Pressure Differential Systems Work practices including hands-on or on-the job training Personal Decontamination procedures Air monitoring, personal and area
MEDICAL EXAMINATION: You must have had a medical examination within the past 12 months at no cost to you. This examination must have included: health history and pulmonary function tests, and may have included an evaluation of a chest X-ray.
By signing this document, you are acknowledging only that the Owner of the building you are about to work in has advised you of your rights to training and protection relative to your employer, the Contractor.
Signature ________________________________ Soc. Sec. No.____________________
Printed Name __________________________________________________________
ASBESTOS WORKER QUALIFICATION FORM
EMPLOYEE NAME:_______________________________________________________
EMPLOYEE ADDRESS:______________________________________________________________
NAMES OF PERSONS TO CONTACT IN AN EMERGENCY (2 REQUIRED)
Name_______________________________ Relationship____________Phone__________________ Name_______________________________ Relationship____________Phone__________________
MEDICAL EXAMINATION & PULMONARY FUNCTION TEST:
Latest Physical Date____________________________ Provider___________________________________________________________________________
ASBESTOS TRAINING PROGRAMS ATTENDED:
Initial Course Provider__________________________________________________ Date_________ Refresher Course Provider______________________________________________ Date_________
EXPERIENCE AND DATES OF ASBESTOS-RELATED WORK:
Project_________________________________________________________ Date_______________
Do you now have, or have you had, any respiratory problems? YES NO Have you worked in the past with asbestos or fiberglass type materials ? YES NO
This project involves the handling, removal, and disposal of asbestos from the building. Asbestos is considered a health hazard.
I certify that my statements and answers are true and that I am familiar with all applicable OSHA, EPA, and State regulations concerning the handling, removal, and disposal of friable asbestos-containing material.
EMPLOYEE SIGNATURE ___________________________________ DATE _____________
I certify that the above information is true, to the best of my knowledge, and that this worker has had the necessary medical examination and training required for asbestos abatement work.
EMPLOYER SIGNATURE ___________________________________ DATE _____________
Recommended Asbestos Medical Examination Determination
Information to the Examining Physician: Please complete this form in order to assist the employer to comply the United States Occupational Safety and Health Administration Asbestos Construction Standard 29 CFR 1926.1101.
Name of Individual Examined: ________________________________________
Employer: ________________________________________
Home Address of Individual Examined: ________________________________________
Date of Examination: ________________________________________
Based upon the results of my examination of the above named individual, I hereby declare that he or she (check and complete as necessary);
Is physically able to perform work as required by OSHA 29 CFR 1926.1101 and wear a negative pressure respirator.
Is physically able to perform work as required by OSHA 29 CFR 1926.1101 and wear a negative pressure respirator under the following limitations:
Is not physically able to perform work as required by OSHA 29 CFR
1926.1101 and wear a negative pressure respirator.
Name of Medical Facility: __________________________________________
Address of Medical Facility:__________________________________________
Telephone Number of Medical Facility: ______________________________
Printed Name of Examining Physician: __________________________________________
Signature of Examining Physician: __________________________________________
CERTIFICATE OF WORKER’S ACKNOWLEDGMENT
PROJECT NAME:__________________________________________ DATE: _________________
PROJECT ADDRESS:_______________________________________________________________
CONTRACTOR’S NAME:_____________________________________________________
Working with asbestos can be dangerous. Inhaling asbestos fibers has been linked with various types of cancer. If you smoke and inhale asbestos fibers, the chance that you will develop lung cancer is greater than that of the non-smoking public.
Your employer’s Contract with the Owner for the above referenced project requires that:
1) You be supplied with the proper respirator and be trained in its use;
2) You be trained in safe work practices and in the use of equipment found on the job; and
3) You receive a medical examination. These things have been done at no cost to you.
RESPIRATORY PROTECTION: You must have been trained in the proper use of respirators and informed of the type of respirator to be used on the above referenced project. You must be given access to a copy of the written respiratory protection program issued by your employer. You must be equipped, at no cost, with the respirator to be used on the above project.
TRAINING COURSE: You must have been trained in the dangers inherent in handling asbestos and breathing asbestos dust, and in proper work procedures, and in personal and area protective measures. The topics covered in the course must have included the following:
Physical characteristics of asbestos Health hazards associated with asbestos Respiratory protection Use of protective equipment Pressure Differential Systems Work practices including hands-on or on-the job training Personal Decontamination procedures Air monitoring, personal and area
MEDICAL EXAMINATION: You must have had a medical examination within the past 12 months at no cost to you. This examination must have included: health history and pulmonary function tests, and may have included an evaluation of a chest X-ray.
By signing this document, you are acknowledging only that the Owner of the building you are about to work in has advised you of your rights to training and protection relative to your employer, the Contractor.
Signature ________________________________
Printed Name __________________________________________________________
CERTIFICATION OF FINAL VISUAL INSPECTION
for
ASBESTOS ABATEMENT PROJECTS
CLIENT:__________________________________________________________________
BUILDING:________________________________________________________________
WORK AREA:______________________________________________________________
CONTRACTOR’S REPRESENTATIVE CERTIFICATION
In accordance with the project specifications, the Contractor’s Representative hereby certifies that they have visually inspected the entire asbestos work area including all applicable surfaces (pipes, ledges, walls, ceilings, floors, decon unit, poly, etc.) and have found no visible dust, debris, or residue.
NAME:________________________________________________ DATE:______________
SIGNATURE:____________________________________________________
COMPANY:________________________________________________________________
OWNER’S REPRESENTATIVE CERTIFICATION
The Owner’s Representative hereby certifies that they have conducted a final visual inspection of the work area at the request of the Contractor’s Representative, and verifies that this inspection has been thorough and, to the best of their knowledge and belief, the Contractor’s certification above is a true and honest one.
NAME:________________________________________________ DATE:______________
SIGNATURE:____________________________________________________
File details come from the government source that posted it. Updated .