GHS Div 00 Final Draft _ 5-8-2026 (1).pdf

PDF 36 MB Posted

Attached to
Granville Health System Parking Lot Improvement Project
Solicitation number
373GHS00009
Issued by
Granville County, North Carolina

About this file

This document is a comprehensive bid solicitation package issued by Granville Health System, a municipal hospital in Oxford, North Carolina, for a parking lot and pavement improvement project. The project involves the repair and repaving of streets and parking lots at the Granville Health System main campus located at 1010 College Street, Oxford, North Carolina 27565. Bids must be submitted under seal to the owner before 2:00 p.m. local time on June 12, 2026, with public opening and reading of bids immediately following. An optional pre-bid conference and site tour will be held on Friday, May 22, 2026, from 12:00 p.m. to 2:00 p.m., which bidders are strongly encouraged to attend. The contractor must commence work within the timeframe specified in the notice to proceed and complete all work within 90 consecutive calendar days from that date. Requests for information (RFIs) must be submitted no later than seven working days prior to the bid date, and written substitution requests must be received no later than ten working days prior to the scheduled bid date. The contract will be awarded to a single prime contractor on the basis of the lowest responsible and responsive bid.

Bidders must provide bid security in the form of a bid bond in an amount not less than 5 percent of the bid amount and must comply with all minority business participation requirements, including achieving or demonstrating good faith efforts to achieve a 10 percent participation goal by minority-owned business enterprises. The successful bidder will be required to furnish a performance bond and payment bond, each in an amount equal to 100 percent of the contract price. Liquidated damages will be assessed at the rate of $500.00 per day for each day the work is not completed by the specified completion date. Payment will be made on the basis of monthly estimates with a standard 5 percent retainage, though retainage may be waived after 50 percent of the work has been satisfactorily completed on schedule with owner and surety approval. Final payment is due within 30 days after completion and acceptance of work by the owner. All work must comply with the North Carolina State Building Code and applicable federal, state, and local codes and regulations. The bidding documents and project manual are available through the NC eProcurement website, and questions should be directed to Zeb Barnette, Director of Materials Management, at zbarnette@granvillemedical.com or 919-690-3412.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS TO BIDDERS AND GENERAL

CONDITIONS OF THE CONTRACT

STANDARD FORM FOR CONSTRUCTION PROJECTS

GRANVILLE HEAL TH SYSTEM

Granville Health System Parking Lot Improvement Project

GHS

Oxford, North Carolina

ADVERTISEMENT FOR BIDS

FROM:

THE OWNER (HEREINAFTER REFERRED TO AS OWNER):

Granville Health System Address:1010 College Street

Oxford, North Carolina 27565-2507

AND THE ENGINEER (HEREINAFTER REFERRED TO AS ARCHITECT OR ENGINEER):

GFT Infrastructure, Inc.

Address: 1 Glenwood Avenue

Raleigh, NC 27603

DATE: 5-8-2026

TO: POTENTIAL BIDDERS

A. Your firm is invited to submit an offer under seal to Owner for construction to the facility located at the above address before 2:00 pm local time on the 12th day of June, 2026, for:

B. Project: Granville Health System Parking Lot Improvement C. Engineers Project Number: A0240109.302 D. Project Description:

1. The project includes the repair and repaving of streets and parking lots at Granville Health System main campus as described in the project manual.

E. The Bidding Documents may be obtained only by Prime Bidders.

1. Others may examine the Bidding Documents at the following document locations:

a. NC eProcurement (NCEP): https://eprocurement.nc.gov/login.

b. Contact Granville Health System Zeb Barnette zbarnette@granvillemedical .com

F. If the Bidder is in doubt as to the true meaning of any part of the Documents, he or she shall submit a Request for Information (RFI) to the Engineer. RFIs shall be made no later than seven working days prior to the scheduled bid date in order to allow the Engineer to evaluate the RFI and to issue a formal clarification no later than four working days prior to the scheduled bid date.

G. Written requests for substitutions shall be received by the Engineer no later than ten working days prior to the scheduled bid date.

H. Bidders will be required to provide Bid security in the form of a Bid Bond of a sum no less than 5 percent of the Bid Amount.

ZEB BARNETTE

Highlight

ZEB BARNETTE

Highlight

I. Refer to other bidding requirements described in Document Instructions to Bidders and General Conditions of the Contract.

J. An optional Pre-Bid Conference and Site Tour will be held on Friday 22nd day of May 2026 from 12:00 pm to 2:00 pm.

All bidders are strongly encouraged to attend this tour.

K. Submit your offer on the Bid Form provided. Bidders may supplement this form as appropriate.

L. Submit bids addressed to Kelly Lucas, Chief Information Officer -- but delivered to Zeb Barnette, Director of Materials Management (at 1010 College Street, Oxford, North Carolina 27565-2507). Bids will be publicly opened and read aloud at the time for receipt of bids.

1. Bids received after the time named above will NOT be considered.

M. Your offer will be required to be submitted under a condition of irrevocability for a period of 60 days after submission.

N. The Owner reserves the right to accept or reject any or all offers and to waive informalities.

O. The basis of award will be a single Contract.

SIGNATURE

For: Granville Health System

By: _________________________________________________________________

Signed: ______________________________________________________________ (Authorized signing officer)

ENCL.

END OF BID SOLICITATION

ZEB BARNETTE

Highlight

INSTRUCTIONS TO BIDDERS

For a proposal to be considered it must be in accordance with the following instructions:

1. PROPOSALS

Proposals must be made in strict accordance with the Form of Proposal provided therefor, and all blank spaces for bids, alternates, and unit prices applicable to bidder's work shall be properly filled in. When requested alternates are not bid, the proposer shall so indicate by the words ''No Bid". Any blanks shall also be interpreted as ''No Bid". The bidder agrees that bid on Form of Proposal detached from specifications will be considered and will have the same force and effect as if attached thereto. Photocopied or faxed proposals will not be considered.

Numbers shall be stated both in writing and in figures for the base bids and alternates. If figures and writing differ, the written number will supersede the figures.

Any modifications to the Form of Proposal (including alternates and/or unit prices) will disqualify the bid and may cause the bid to be rejected.

The bidder shall fill in the Form of Proposal as follows:

a If the documents are executed by a sole owner, that fact shall be evidenced by the word "Owner" appearing after the name of the person executing them.

b. If the documents are executed by a partnership, that fact shall be evidenced by the word "Co-Partner" appearing after the name of the partner executing them.

c. If the documents are executed on the part of a corporation, they shall be executed by either the president or the vice president and attested by the secretary or assistant secretary in either case, and the title of the office of such persons shall appear after their signatures.

The seal of the corporation shall be impressed on each signature page of the documents.

d. If the proposal is made by a joint venture, it shall be executed by each member of the joint venture in the above form for sole owner, partnership or corporation, whichever form is applicable.

e. All signatures shall be properly witnessed.

£ If the Contractor's license of a bidder is held by a person other than an owner, partner or officer of a firm, then the licensee shall also sign and be a party to the proposal. The title "Licensee" shall appear under his/her signature.

Proposals should be addressed as indicated in the Advertisement for Bids and be delivered, enclosed in an opaque sealed envelope, marked "Proposal" and bearing the title of the work, name of the bidder, and the Contractor's license number of the bidder. Bidders should clearly mark on the outside of the bid envelope which contract(s) they are bidding.

Bidder shall identify on the bid the minority businesses that will be utilized on the project with corresponding total dollar value of the bid and affidavit listing good faith efforts or an affidavit indicating work under contract will be self-performed, as required by G. S. 14 3-128 .2( c) and

G.S. 143-128.2(£). Failure to comply with these requirements is grounds for rejection of the bid.

For projects bid in the single-prime alternative, the names and license numbers of major Subcontractors shall be listed on the proposal form.

It shall be the specific responsibility of the bidder to deliver his bid to the proper official at the selected place and prior to the announced time for the opening of bids. Later delivery of a bid for any reason, including delivery by any delivery service, shall disqualify the bid.

Unit prices quoted in the proposal shall include overhead and profit and shall be the full compensation for the Contractor's cost involved in the work. See General Conditions, Article 19c-1.

2. EXAMINATION OF CONDITIONS

It is understood and mutually agreed that by submitting a bid the bidder acknowledges that he has carefully examined all documents pertaining to the work, the location, accessibility and general character of the site of the work and all existing buildings and structures within and adjacent to the site, and has satisfied himself as to the nature of the work, the condition of existing buildings and structures, the conformation of the ground, the character, quality and quantity of the material to be encountered, the character of the equipment, machinery, plant and any other facilities needed preliminary to and during prosecution of the work, the general and local conditions, the construction hazards, and all other matters, including, but not limited to, the labor situation which can in any way affect the work under the contract, and including all safety measures required by the Occupational Safety and Health Act of 1970 and all rules and regulations issued pursuant thereto. It is further mutually agreed that by submitting a proposal the bidder acknowledges that he has satisfied himself as to the feasibility and meaning of the plans, drawings, specifications and other contract documents for the construction of the work and that he accepts all the terms, conditions and stipulations contained therein; and that he is prepared to work in cooperation with other Contractors performing work on the site.

Reference is made to contract documents for the identification of those surveys and investigation reports of subsurface or latent physical conditions at the site or otherwise affecting performance of the work which have been relied upon by the designer in preparing the documents. The owner will make copies of all such surveys and reports available to the bidder upon request.

Each bidder may, at his own expense, make such additional surveys and investigations as he may deem necessary to determine his bid price for the performance of the work. Any on-site investigation shall be done at the convenience of the owner. Any reasonable request for access to the site will be honored by the owner.

3. BULLETINS AND ADDENDA

Any addenda to specifications issued during the time of bidding are to be considered covered in the proposal and in closing a contract they will become a part thereof. It shall be the bidder's responsibility to ascertain prior to bid time the addenda issued and to see that his bid includes any changes thereby required.

Should the bidder find discrepancies in, or omission from, the drawings or documents or should he be in doubt as to their meaning, he shall at once notify the designer who will send written instructions in the form of addenda to all bidders. Notification should be no later than seven (7) days prior to the date set for receipt of bids. Neither the owner nor the designer will be responsible for any oral instructions.

All addenda should be acknowledged by the bidder(s) on the Form of Proposal.

However, even if not acknowledged, by submitting a bid, the bidder has certified that he has reviewed all issued addenda and has included all costs associated within his bid.

4. BID SECURITY

Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company insured by the Federal Deposit Insurance Corporation, or a bid bond in an amount equal to not less than five percent (5%) of the proposal, said deposit to be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten (10) days after the award or to give satisfactory surety as required by law (G.S. 143-129).

Bid bond shall be conditioned that the surety will, upon demand, forthwith make payment to the obligee upon said bond if the bidder fails to execute the contract. The owner may retain bid securities of any bidder( s) who may have a reasonable chance of award of contract for the full duration of time stated in the Notice to Bidders. Other bid securities may be released sooner, at the discretion of the owner. All bid securities (cash or certified checks) shall be returned to the bidders promptly after award of contracts, and no later than seven (7) days after expiration of the holding period stated in the Notice to Bidders. Standard Form of Bid Bond is included in these specifications and shall be used.

5. RECEIPT OF BIDS

Bids shall be received in strict accordance with requirements of the General Statutes of North Carolina. Bid security shall be required as prescribed by statute. Prior to the closing of the bid, the bidder will be permitted to change or withdraw his bid. Guidelines for opening of public construction bids entitled "Guidelines for Opening of Public Construction Bids" are available from the State Construction Office and are available online at https://files.nc.gov/ncdoa/documents/files/sbcbids l .pdf.

6. OPENING OF BIDS

All bids shall be opened in public and read aloud at the time and place advertised in the notice. Once bidding is closed, there shall not be any withdrawal of bids by any bidder and no bids may be returned by the designer to any bidder. After the opening of bids, no bid may be withdrawn, except under the provisions of General Statute 143-129.1, for a period of sixty (60) otherwise specified. Should the successful bidder default and fail to execute a contract, the contract may be awarded to the next lowest and responsible bidder. The owner reserves the unqualified right to reject any and all bids. Reasons for rejection may include, but shall not be limited to, the following:

a If the Form of Proposal furnished to the bidder is not used or is altered.

b. If the bidder fails to insert a price for all bid items, alternate and unit prices requested.

c. If the bidder adds any provisions reserving the right to accept or reject any award.

d. If there are unauthorized additions or conditional bids, or irregularities of any kind which tend to make the proposal incomplete, indefinite or ambiguous as to its meaning.

e. If the bidder fails to complete the proposal form where information is requested so the bid may be properly evaluated by the owner.

£ If the unit prices contained in the bid schedule are unacceptable to the owner.

g. If the bidder fails to comply with other instructions stated herein.

7. BID EVALUATION

The award of the contract will be made to the lowest responsible bidder as soon as practical. The owner may award on the basis of the base bid and any alternates the owner chooses.

Before awarding a contract, the owner may require the apparent low bidder to qualify himself to be a responsible bidder by furnishing any or all of the following data:

a The latest financial statement showing assets and liabilities of the company or other information satisfactory to the owner.

b. A listing of completed projects of similar size.

c. Permanent name and address of place of business.

d. The number of regular employees of the organization and length of time the organization has been in business under present name.

e. The name and home office address of the surety proposed and the name and address of the responsible local claim agent.

£ The names of members of the firms who hold appropriate trade licenses, together with license numbers.

g. If prequalified, Contractor info will be reviewed and evaluated comparatively to submitted prequalification package.

Failure or refusal to furnish any of the above information, if requested, shall constitute a basis for disqualification of any bidder.

In determining the lowest responsible, responsive bidder, the owner shall take into consideration the bidder's compliance with the requirements of G.S. 143-128.2(c), the past performance of the bidder on construction contracts with particular concern given to completion times, quality of work, cooperation with other Contractors, and cooperation with the designer and owner. Failure of the low bidder to furnish affidavit and/or documentation as required by G.S. 143-128.2(c) shall constitute a basis for disqualification of the bid.

Should the owner adjudge that the apparent low bidder is not the lowest responsible, responsive bidder by virtue of the above information, said apparent low bidder will be so notified and his bid security shall be returned to him.

8. PERFORMANCE BOND

The successful bidder, upon award of contract, shall furnish a performance bond in an amount equal to 100 percent of the contract price. See Article 35, General Conditions.

9. PAYMENTBOND

The successful bidder, upon award of contract, shall furnish a payment bond in an amount equal to 100 percent of the contract price. See Article 35, General Conditions.

10. PAYMENTS

Payments to the successful bidders (Contractors) will be made on the basis of monthly estimates. See Article 31, General Conditions.

11. PRE-BID CONFERENCE

Bidders are requested to attend a Pre Bid Conference at the time and place stipulated in the Bidding Documents.

12. SUBSTITUTIONS

In accordance with the provisions of G.S. 133-3, material, product, or equipment substitutions proposed by the bidders to those specified herein can only be considered during the bidding phase until ten (10) days prior to the receipt of bids when submitted to the Designer with sufficient data to confirm material, product, or equipment equality. Proposed substitutions submitted after this time will be considered only as potential change order.

Submittals for proposed substitutions shall include the following information:

a Name, address, and telephone number of manufacturer and supplier as appropriate.

b. Trade name, model or catalog designation.

c. Product data including performance and test data, reference standards, and technical descriptions of material, product, or equipment. Include color samples and samples of available finishes as appropriate.

d. Detailed comparison with specified products including performance capabilities, warranties, and test results.

e. Other pertinent data including data requested by the Designer to confirm product equality.

If a proposed material, product, or equipment substitution is deemed equal by the Designer to those specified, all bidders of record will be notified by Addendum

ARTICLE

GENERAL CONDITIONS OF THE CONTRACT

TABLE OF CONTENTS

TITLE PAGE

1 Definition 2 Intent and Execution of Documents 3 Clarifications and Detail Drawings 4 Copies of Drawings and Specifications 5 Shop Drawings, Submittals, Samples, Data 6 Working Drawings and Specifications at the Job Site 7 Ownership of Drawings and Specifications 8 Materials, Equipment, Employees 9 Royalties, Licenses and Patent .................................................................................... 1 7

10 Permits, Inspections, Fees, Regulations 11 Protection of Work, Property and the Public ................................................................ 1 7 12 Sedimentation Pollution Control Act of 1973 13 Inspection of the Work 14 Construction Supervision and Schedule 15 Separate Contracts and Contractor Relationships 16 Subcontracts and Subcontractors 17 Contractor and Subcontractor Relationships 18 Designer's Status 19 Changes in the Work 20 Claims for Extra Cost 21 Minor Changes in the Work 22 Uncorrected Faulty Work 23 Time of Completion, Delays, Extension of Time ............................................................ 3 0 24 Partial Utilization: Beneficial Occupancy 25 Final Inspection, Acceptance, and Project Closeout 26 Correction of Work Before Final Payment 27 Correction of Work After Final Payment 28 Owner's Right to Do Work 29 Annulment of Contract 30 Contractor's Right to Stop Work or Terminate the Contract 31 Requests for Payments ................................................................................................... 3 5 32 Certificates of Payment and Final Payment 33 Payments Withheld 34 Minimum Insurance Requirements ............................................................................. 3 8 35 Performance Bond and Payment Bond 36 Contractor's Affidavit 37 Assignments 38 Use of Premises 39 Cutting, Patching and Digging 40 Utilities, Structures, Signs 41 Cleaning Up 42 Guarantee

43 Codes and Standards 44 lndemnification 45 Taxes 46 Equal Opportunity Clause 47 Employment of the Handicapped 48 A~bes~os-Co~taining ~a!eri~ls (ACM) 49 Mmonty Busmess Part1c1pat1on 50 [Intentionally Deleted] 51 Gifts 52 Auditing Access to Persons and Records 53 North Carolina False Claims Act 54 Termination for Convenience 55 Dispute Resolution

ARTICLE 1 - DEFINITIONS

a The contract documents consist of the Notice to Bidders; Instructions to Bidders; General Conditions of the Contract; special conditions if applicable; Supplementary General Conditions; the drawing and specifications, including all bulletins, addenda or other modifications of the drawings and specifications incorporated into the documents prior to their execution; the proposal; the contract; the performance bond; the payment bond; and insurance certificates. All of these items together form the contract.

b. The owner for purposes of this contract is Granville Health System, a municipal hospital organized pursuant to N.C. Gen. Stat. §131E-9(a). Granville County, a body politic and corporate of the State of North Carolina, holds title to the underlying real property pursuant to resolution duly adopted by the Granville County Board of Commissioners dated April 6, 2009.

c. The designer(s) are those referred to within this contract, or their authorized representatives. The Designer(s ), as referred to herein, shall mean architect and/or engineer.

They will be referred to hereinafter as if each were of the singular number, masculine gender.

d The Contractor, as referred to hereinafter, shall be deemed to be either of the several contracting parties called the "Party of the First Part" in either of the several contracts in connection with the total project. Where, in special instances hereinafter, a particular Contractor is intended, an adjective precedes the word "Contractor," as "general," "heating," etc. For the purposes of a single prime contract, the term Contractor shall be deemed to be the single contracting entity identified as the "Party of the First Part" in the single Construction Contract. Any references or adjectives that name or infer multiple prime Contractors shall be interpreted to mean the single prime Contractor.

e. A Subcontractor, as the term is used herein, shall be understood to be one who has entered into a direct contract with a Contractor, and includes one who furnishes materials worked to a special design in accordance with plans and specifications covered by the contract, but does not include one who only sells or furnishes materials not requiring work so described or detailed.

f Written notice shall be defined as notice in writing delivered in person to the Contractor, or to a partner of the firm in the case of a partnership, or to a member of the contracting organization, or to an officer of the organization in the case of a corporation, or sent to the last known business address of the contracting organization by registered mail.

g Work, as used herein as a noun, is intended to include materials, labor, and workmanship of the appropriate Contractor.

h The project is the total construction work to be performed under the contract documents by the several Contractors.

1 Project Expediter, as used herein, is an entity stated in the contract documents, designated to effectively facilitate scheduling and coordination of work activities. See Article 14(f) for responsibilities of a Project Expediter. For the purposes of a single prime contract, the single prime Contractor shall be designated as the Project Expediter

J. Change order, as used herein, shall mean a written order to the Contractor subsequent to the signing of the contract authorizing a change in the contract. The change order shall be signed by the Contractor, designer and the owner, in that order (Article 19).

k Field Order, as used herein, shall mean a written approval for the Contractor to proceed with the work requested by owner prior to issuance of a formal Change Order. The field order shall be signed by the Contractor, designer, and owner.

1 Time of completion, as stated in the contract documents, is to be interpreted as consecutive calendar days measured from the date established in the written Notice to Proceed, or such other date as may be established herein (Article 23).

m Liquidated damages, as stated in the contract documents, is an amount reasonably estimated in advance to cover the consequential damages associated with the Owner's economic loss in not being able to use the Project for its intended purposes at the end of the contract's completion date as amended by change order, if any, by reason of failure of the Contractor( s) to complete the work within the time specified. Liquidated damages does not include the Owner's extended contract administration costs (including but not limited to additional fees for architectural and engineering services, testing services, inspection services, commissioning services, etc.), such other damages directly resulting from delays caused solely by the Contractor, or consequential damages that the Owner identified in the bid documents that may be impacted by any delay caused solely by the Contractor (e.g., if a multi-phased project-subsequent phases, delays in start other projects that are dependent on the completion of this Project, extension ofleases and/or maintenance agreements for other facilities).

n Surety, as used herein, shall mean the bonding company or corporate body which is bound with and for the Contractor, and which engages to be responsible for the Contractor and his acceptable performance of the work.

u Routine written communications between the Designer and the Contractor are any communication other than a "request for information" provided in letter, memo, or transmittal format, sent by mail, courier, electronic mail, or facsimile. Such communications cannot be identified as "request for information".

p Clarification or Request for information (RFI) is a request from the Contractor seeking an interpretation or clarification by the Designer relative to the contract documents. The RFI, which shall be labeled (RFI), shall clearly and concisely set forth the issue or item requiring clarification or interpretation and why the response is needed. The RFI must set forth the Contractor's interpretation or understanding of the contract documents requirements in question, along with reasons for such an understanding.

q Approval means written or imprinted acknowledgement that materials, equipment or methods of construction are acceptable for use in the work

r. Inspection shall mean observation of work completed or in progress to determine its compliance with contract documents.

s. "Equal to" or "approved equal" shall mean materials, products, equipment, assemblies, or installation methods considered equal by the bidder in all characteristics (physical, functional, and aesthetic) to those specified in the contract documents. Acceptance of equal is subject to approval of Designer and owner.

t "Substitution" or "substitute" shall mean materials, products, equipment, assemblies, or installation methods deviating in at least one characteristic (physical, functional, or aesthetic) from those specified, but which in the opinion of the bidder would improve competition and/or enhance the finished installation. Acceptance of substitution is subject to the approval of the Designer and owner.

u Provide shall mean furnish and install complete in place, new, clean, operational, and ready for use.

v. Indicated and shown shall mean provide as detailed, or called for, and reasonably implied in the contract documents.

w. Special inspector is one who inspects materials, installation, fabrication, erection or placement of components and connections requiring special expertise to ensure compliance with the approved construction documents and referenced standards.

x Commissioning is a quality assurance process that verifies and documents that building components and systems operate in accordance to the owner's project requirements and the project design documents.

y. Designer Final Inspection is the inspection performed by the design team to determine the completeness of the project in accordance with approved plans and specifications. This inspection occurs prior to final inspection.

z Final Inspection is the inspection performed by Granville County Inspections Division to determine the completeness of the project in accordance with NC Building Codes and approved plans and specifications.

aa. Beneficial Occupancy is requested by the owner and is occupancy or partial occupancy of the building after all life safety items have been completed as determined by the Granville County Inspections Division. Life safety items include but not limited to fire alarm, sprinkler, egress and exit lighting, fire rated walls, egress paths and security.

bb. Final Acceptance is the date in which the Granville County Inspections Division and the Owner accept the construction as totally complete. This includes the Granville County Inspections Division Final Inspection and certification by the designer that all punch lists are completed.

ARTICLE 2 - INTENT AND EXECUTION OF DOCUMENTS

a The drawings and specifications are complementary, one to the other, and that which is shown on the drawings or called for in the specifications shall be as binding as if it were both called for and shown. The intent of the drawings and specifications is to establish the scope of all labor, materials, transportation, equipment, and any and all other things necessary to provide a bid for a complete job. In case of discrepancy or disagreement in the contract documents, the order of precedence shall be: Form of Contract, specifications, large-scale detail drawings, small-scale drawings.

h The wording of the specifications shall be interpreted in accordance with common usage of the language except that words having a commonly used technical or trade meaning shall be so interpreted in preference to other meanings.

c. The Contractor shall execute each copy of the proposal, contract, performance bond and payment bond as follows:

1. If the documents are executed by a sole owner, that fact shall be evidenced by the word "Owner" appearing after the name of the person executing them.

2 If the documents are executed by a partnership, that fact shall be evidenced by the word "Co-Partner" appearing after the name of the partner executing them.

3. If the documents are executed on the part of a corporation, they shall be executed by either the president or the vice president and attested by the secretary or assistant secretary in either case, and the title of the office of such persons shall appear after their signatures. The seal of the corporation shall be impressed on each signature page of the documents.

4. If the documents are made by a joint venture, they shall be executed by each member of the joint venture in the above form for sole owner, partnership or corporation, whichever form is applicable to each particular member.

5. All signatures shall be properly witnessed.

6. If the Contractor's license is held by a person other than an owner, partner or officer of a firm, then the licensee shall also sign and be a party to the contract. The title "Licensee" shall appear under his/her signature.

7. The bonds shall be executed by an attorney-in-fact. There shall be attached to each copy of the bond a certified copy of power of attorney properly executed and dated.

8. Each copy of the bonds shall be countersigned by an authorized individual agent of the bonding company licensed to do business in North Carolina. The title "Licensed Resident Agent" shall appear after the signature.

9. The seal of the bonding company shall be impressed on each signature page of the bonds.

s.

10. The Contractor's signature on the performance bond and the payment bond shall correspond with that on the contract. The date of performance and payment bond shall not be prior to the date of the contract.

AR TI CLE 3 - CLARIFICATIONS AND DETAIL DRAWINGS

a In such cases where the nature of the work requires clarification by the designer, such clarification shall be furnished by the designer with reasonable promptness by means of written instructions or detail drawings, or both. Clarifications and drawings shall be consistent with the intent of contract documents and shall become a part thereof.

h The Contractor( s) and the designer shall prepare, if deemed necessary, a schedule fixing dates upon which foreseeable clarifications will be required. The schedule will be subject to addition or change in accordance with progress of the work. The designer shall furnish drawings or clarifications in accordance with that schedule. The Contractor shall not proceed with the work without such detail drawings and/or written clarifications.

ARTICLE 4 - COPIES OF DRAWINGS AND SPECIFICATIONS

The designer or Owner shall furnish free of charge to the Contractors electronic copies of plans and specifications.

ARTICLE 5 - SHOP DRAWINGS, SUBMITTALS, SAMPLES, DATA

a Within 15 consecutive calendar days after the notice to proceed, each prime Contractor shall submit a schedule for submission of all shop drawings, product data, samples, and similar submittals through the Project Expediter to the Designer. This schedule shall indicate the items, relevant specification sections, other related submittal, data, and the date when these items will be furnished to the designer.

h The Contractor(s) shall review, approve and submit to the Designer all Shop Drawings, Coordination Drawings, Product Data, Samples, Color Charts, and similar submittal data required or reasonably implied by the Contract Documents. Required Submittals shall bear the Contractor's stamp of approval, any exceptions to the Contract Documents shall be noted on the submittals, and copies of all submittals shall be of sufficient quantity for the Designer to retain up to three (3) copies of each submittal for his own use plus additional copies as may be required by the Contractor. Submittals shall be presented to the Designer in accordance with the schedule submitted in paragraph (a). so as to cause no delay in the activities of the Owner or of separate Contractors.

c. The Designer shall review required submittals promptly, noting desired corrections if any, and retaining three (3) copies (1 for the Designer, 1 for the owner and 1 for Granville County Inspections Division) for his use. The remaining copies of each submittal shall be returned to the Contractor not later than twenty (20) days from the date of receipt by the Designer, for the Contractor's use or for corrections and resubmittal as noted by the Designer. When resubmittals are required, the submittal procedure shall be the same as for the original submittal d Approval of shop drawings/submittals by the Designer shall not be construed as relieving the Contractor from responsibility for compliance with the design or terms of the contract documents nor from responsibility of errors of any sort in the shop drawings, unless such lack of compliance or errors first have been called in writing to the attention of the Designer by the Contractor.

ARTICLE 6 - WORKING DRAWINGS AND SPECIFICATIONS AT THE JOB SITE

a The Contractor shall maintain, in readable condition at his job office, one complete set of working drawings and specifications for his work including all shop drawings. Such drawings and specifications shall be available for use by the designer, his authorized representative, owner or Granville County Inspections Division.

b. The Contractor shall maintain at the job office, a day-to-day record of work-in-place that is at variance with the contract documents. Such variations shall be fully noted on project drawings by the Contractor and submitted to the designer upon project completion and no later than 30 days after final acceptance of the project.

c. The Contractor shall maintain at the job office a record of all required tests that have been performed, clearly indicating the scope of work inspected and the date of approval or rejection.

ARTICLE 7-OWNERSHIP OF DRAWINGS AND SPECIFICATIONS

All drawings and specifications are instruments of service and remain the property of the owner.

The use of these instruments on work other than this contract without permission of the owner is prohibited. All copies of drawings and specifications other than contract copies shall be returned to the owner upon request after completion of the work.

ARTICLE 8-MATERIALS, EQUIPMENT, EMPLOYEES

a The Contractor shall, unless otherwise specified, supply and pay for all labor, transportation, materials, tools, apparatus, lights, power, heat, sanitary facilities, water, scaffolding and incidentals necessary for the completion of his work, and shall install, maintain and remove all equipment of the construction, other utensils or things, and be responsible for the safe, proper and lawful construction, maintenance and use of same, and shall construct in the best and most workmanlike manner, a complete job and everything incidental thereto, as shown on the plans, stated in the specifications, or reasonably implied therefrom, all in accordance with the contract documents.

b. All materials shall be new and of quality specified, except where reclaimed material is authorized herein and approved for use. Workmanship shall at all times be of a grade accepted as the best practice of the particular trade involved, and as stipulated in written standards of recognized organizations or institutes of the respective trades except as exceeded or qualified by the specifications.

c. Upon notice, the Contractor shall furnish evidence as to quality of materials.

d Products are generally specified by ASTM or other reference standard and/or by manufacturer's name and model number or trade name. When specified only by reference standard, the Contractor may select any product meeting this standard, by any manufacturer. When several products or manufacturers are specified as being equally acceptable, the Contractor has the option of using any product and manufacturer combination listed. However, the Contractor shall be aware that the cited examples are used only to denote the quality standard of product desired and that they do not restrict bidders to a specific brand, make, manufacturer or specific name; that they are used only to set forth and convey to bidders the general style, type, character and quality of product desired; and that equivalent products will be acceptable. Request for substitution of materials, items, or equipment shall be submitted to the designer for approval or disapproval; such approval or disapproval shall be made by the designer prior to the opening of bids. Alternate materials may be requested after the award if it can clearly be demonstrated that it is an added benefit to the owner and the designer and owner approves.

e. The designer is the judge of equality for proposed substitution of products, materials or equipment.

f If at any time during the construction and completion of the work covered by these contract documents, the language, conduct, or attire of any workman of the various crafts be adjudged a nuisance to the owner or designer, or if any workman be considered detrimental to the work, the Contractor shall order such parties removed immediately from grounds.

ARTICLE 9-ROYALTIES, LICENSES AND PATENTS

It is the intention of the contract documents that the work covered herein will not constitute in any way infringement of any patent whatsoever unless the fact of such patent is clearly evidenced herein. The Contractor shall protect and save harmless the owner against suit on account of alleged or actual infringement. The Contractor shall pay all royalties and/or license fees required on account of patented articles or processes, whether the patent rights are evidenced hereinafter.

ARTICLE IO-PERMITS, INSPECTIONS, FEES, REGULATIONS

a The Contractor shall give all notices and comply with all laws, ordinances, codes, rules and regulations bearing on the conduct of the work under this contract. If the Contractor observes that the drawings and specifications are at variance therewith, he shall promptly notify the designer in writing. See Instructions to Bidders, Paragraph 3, Bulletins and Addenda. Any necessary changes required after contract award shall be made by change order in accordance with Article 19. If the Contractor performs any work knowing it to be contrary to such laws, ordinances, codes, rules and regulations, and without such notice to the designer, he shall bear all cost arising therefrom. Additional requirements implemented after bidding will be subject to equitable negotiations.

b. All work under this contract shall conform to the North Carolina State Building Code and other State, local and national codes as are applicable. The cost of all required inspections and permits shall be the responsibility of the Contractor and included within the bid proposal.

All water taps, meter barrels, vaults and impact fees shall be paid by the Contractor unless otherwise noted.

ARTICLE 11 - PROTECTION OF WORK, PROPERTY AND THE PUBLIC

a The Contractors shall be jointly responsible for the entire site and the building or construction of the same and provide all the necessary protections, as required by the owner or designer, and by laws or ordinances governing such conditions. They shall be responsible for any damage to the owner's property, or of that of others on the job, by them, their personnel, or their Subcontractors, and shall make good such damages. They shall be

Accident Prevention Manual in Construction

Federal Register responsible for and pay for any damages caused to the owner. All Contractors shall have access to the project at all times.

h The Contractor shall provide cover and protect all portions of the structure when the work is not in progress, provide and set all temporary roofs, covers for doorways, sash and windows, and all other materials necessary to protect all the work on the building, whether set by him, or any of the Subcontractors. Any work damaged through the lack of proper protection or from any other cause, shall be repaired or replaced without extra cost to the owner.

c. No fires of any kind will be allowed inside or around the operations during the course of construction without special permission from the designer and owner.

d The Contractor shall protect all trees and shrubs designated to remain in the vicinity of the operations by building substantial boxes around same. He shall barricade all walks, roads, etc., as directed by the designer to keep the public away from the construction. All trenches, excavations or other hazards in the vicinity of the work shall be well barricaded and properly lighted at night.

e. The Contractor shall provide all necessary safety measures for the protection of all persons on the job, including the requirements of the A.G.C.

, as amended, and shall fully comply with all state laws or regulations and North Carolina State Building Code requirements to prevent accident or injury to persons on or about the location of the work. He shall clearly mark or post signs warning of hazards existing, and shall barricade excavations, elevator shafts, stairwells and similar hazards. He shall protect against damage or injury resulting from falling materials and he shall maintain all protective devices and signs throughout the progress of the work.

f The Contractor shall adhere to the rules, regulations and interpretations of the North Carolina Department of Labor relating to Occupational Safety and Health Standards for the Construction Industry (Title 29, Code of Federal Regulations, Part 1926, published in Volume 39, Number 122, Part II, June 24, 1974, ), and revisions thereto as adopted by General Statutes ofNorth Carolina 95-126 through 155.

g The Contractor shall designate a responsible person of his organization as safety officer/inspector to inspect the project site for unsafe health and safety hazards, to report these hazards to the Contractor for correction, and whose duties also include accident prevention on the project, and to provide other safety and health measures on the project site as required by the terms and conditions of the contract. The name of the safety inspector shall be made known to the designer and owner at the time of the preconstruction conference and in all cases prior to any work starting on the project.

h In the event of emergency affecting the safety of life, the protection of work, or the safety of adjoining properties, the Contractor is hereby authorized to act at his own discretion, without further authorization from anyone, to prevent such threatened injury or damage.

Any compensation claimed by the Contractor on account of such action shall be determined as provided for under Article 19(b ).

1 Any and all costs associated with correcting damage caused to adjacent properties of the construction site or staging area shall be borne by the Contractor. These costs shall include but not be limited to flooding, mud, sand, stone, debris, and discharging of waste products.

ARTICLE 12- SEDIMENTATION POLLUTION CONTROL ACT OF 1973

a Any land-disturbing activity performed by the Contractor(s) in connection with the project shall comply with all erosion control measures set forth in the contract documents and any additional measures which may be required in order to ensure that the project is in full compliance with the Sedimentation Pollution Control Act of 1973, as implemented by Title 15, North Carolina Administrative Code, Chapter 4, Sedimentation Control, Subchapters 4A, 4B and 4C, as amended (15 N.C.A.C. 4A, 4B and 4C).

b. Upon receipt of notice that a land-disturbing activity is in violation of said act, the Contractor(s) shall be responsible for ensuring that all steps or actions necessary to bring the project in compliance with said act are promptly taken.

c. The Contractor(s) shall be responsible for defending any legal actions instituted pursuant to N.C.G.S. 113A-64 against any party or persons described in this article.

d To the fullest extent permitted by law, the Contractor(s) shall indemnify and hold harmless the owner, the designer and the agents, consultants and employees of the owner and designer, from and against all claims, damages, civil penalties, losses and expenses, including, but not limited to, attorneys' fees, arising out of or resulting from the performance of work or failure of performance of work, provided that any such claim, damage, civil penalty, loss or expense is attributable to a violation of the Sedimentation Pollution Control Act. Such obligation shall not be construed to negate, abridge or otherwise reduced any other right or obligation of indemnity which would otherwise exist as to any party or persons described in this article.

ARTICLE 13 - INSPECTION OF THE WORK

a It is a condition of this contract that the work shall be subject to inspection during normal working hours and during any time work is in preparation and progress by the designer, designated official representatives of the owner, Granville County Inspections Division and those persons required by state law to test special work for official approval. The Contractor shall therefore provide safe access to the work at all times for such inspections.

b. All instructions to the Contractor will be made only by or through the designer or his designated project representative. Observations made by official representatives of the owner shall be conveyed to the designer for review and coordination prior to issuance to the Contractor.

c. All work shall be inspected by designer, special inspector and/or Granville County Inspections Division prior to being covered by the Contractor. Contractor shall give a minimum two weeks' notice unless otherwise agreed to by all parties. If inspection fails, after the first reinspection all costs associated with additional re-inspections shall be borne by the Contractor.

d All laboratory tests shall be paid by the owner unless provided otherwise in the contract documents except the general Contractor shall pay for laboratory tests to establish design mix for concrete, and for additional tests to prove compliance with contract documents where materials have tested deficient except when the testing laboratory did not follow the appropriate ASTM testing procedures.

e. Should any work be covered up or concealed prior to inspection and approval by the designer, special inspector, and/or Granville County Inspections Division such work shall be uncovered or exposed for inspection, if so requested by the designer in writing. Inspection of the work will be made upon notice from the Contractor. All cost involved in uncovering, repairing, replacing, recovering and restoring to design condition, the work that has been covered or concealed will be paid by the Contractor involved.

ARTICLE 14-CONSTRUCTION SUPERVISION AND SCHEDULE

a Throughout the progress of the work, each Contractor shall keep at the job site a competent superintendent and supervisory staff satisfactory to the designer and the owner. The superintendent and supervisory staff shall not be changed without the consent of the designer and owner unless said superintendent ceases to be employed by the Contractor or ceases to be competent as determined by the Contractor, designer or owner. The superintendent and other staff designated by the Contractor in writing shall have authority to act on behalf of the Contractor, and instructions, directions or notices given to him shall be as binding as if given to the Contractor. However, directions, instructions, and notices shall be confirmed in writing.

h The Contractor shall examine and study the drawings and specifications and fully understand the project design, and shall provide constant and efficient supervision to the work. Should he discover any discrepancies of any sort in the drawings or specifications, he shall report them to the designer without delay. He will not be held responsible for discrepancies in the drawings and/or specifications, but shall be held responsible to report them should they become known to him.

c. All Contractors shall be required to cooperate and consult with each other during the construction ofthis project. Prior to installation of work, all Contractors shall jointly prepare coordination drawings, showing locations of various ductworks, piping, motors, pumps, and other mechanical or electrical equipment, in relation to the structure, walls and ceilings.

These drawings shall be submitted to the designer through the Project Expediter for information only Each Contractor shall lay out and execute his work to cause the least delay to other Contractors. Each Contractor shall be financially responsible for any damage to other Contractor's work and for undue delay caused to other Contractors on the project.

d The Contractor is required to attend job site progress conferences as called by the designer.

The Contractor shall be represented at these job progress conferences by both home office and project personnel.

This is the start of the file's text. The full file is on GovTribe.