GFT Approved _ GHS Bid Plans Final _ 5-8-2026 (1).pdf

PDF 18 MB Posted

Attached to
Granville Health System Parking Lot Improvement Project
Solicitation number
373GHS00009
Issued by
Granville County, North Carolina

About this file

This document is a preliminary phasing plan and project specifications for a parking lot and pavement improvement project at Granville Health System in Oxford, North Carolina. The project encompasses mill and overlay work, base strengthening, and associated improvements across multiple parking lots designated as phases 1 through 4. The work scope includes hot mix asphalt (HMA) overlay with a maximum mill depth of 2 inches and maximum overlay depth of 2 inches, full depth patching estimated at approximately 250 square yards, parking stop replacement and repair, parking stripe reestablishment, and ADA accessible walkway construction in parking lots 1 and 25 during Phase 2. The contractor must submit a calendar year-specific construction schedule for review and approval by Granville Health System prior to commencing work. An optional pre-bid conference and site tour is scheduled for Friday, May 22, 2026, at 12:00 p.m. eastern standard time at the Main Hospital located at 1010 College Street, Oxford, NC 27565. Bid responses are due by Friday, June 12, 2026, no later than 2:00 p.m., with a public bid opening immediately following at the Administration Conference Room at the Main Hospital.

The project specifications require contractors to coordinate with Granville Health System to minimize material interruption to hospital operations and maintain emergency vehicle access at all times, including a minimum 20-foot width roadway for fire access per NFPA requirements. Contractors must provide detailed logistics plans for key parking lot closures (PL_02, PL_03, PL_06) and maintain traffic control measures throughout the project duration in accordance with NC DOT Division 11 of the 2024 Roadway Standard Drawings. Phase 2 remediation efforts require critical analysis for minimal construction duration due to operational impact, with the contractor required to prioritize completion of each lot within the phase and explicitly specify if overnight operations are proposed. The lump sum bid shall include parking lot expansion work in PL_26 to the southern property limit with appropriate subbase and basecourse, installation of 6 parking stops on ADA stalls in PL_29, and an optional bid allowance for 16 to 25 additional parking stops in PL_11. Contractors must provide rates for standard signage replacement, which will be determined at a later formal preconstruction meeting. The Engineer of Record is GFT Infrastructure Inc., with a 5-to-7 business day turnaround for formal responses to requests for additional information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P R

E

LI

M

IN

A R

Y P

H A

S

IN

G P

LA

N

11/26/2025

MFT

RS

JL

NOT IN PROJECT WORK SCOPE

PHASE02: MILL & OVERLAY WORK SCOPE

PHASE 02: BASE STRENGTHENING

(APPROXIMATE LIMITS ARE HIGHLIGHTED)

PHASE03: MILL & OVERLAY WORK SCOPE

PHASE 03: BASE STRENGTHENING

(APPROXIMATE LIMITS ARE HIGHLIGHTED)

PHASE04: MILL & OVERLAY WORK SCOPE

PHASE 04: BASE STRENGTHENING

(APPROXIMATE LIMITS ARE HIGHLIGHTED)

PHASE01: MILL & OVERLAY WORK SCOPE

PHASE 01: BASE STRENGTHENING

(APPROXIMATE LIMITS ARE HIGHLIGHTED)

NOT IN PROJECT WORK SCOPE

PHASE-1

PHASE-2

PHASE-3

PHASE-4

BASE STRENGTHENING (IF APPLICABLE)

(APPROXIMATE LIMITS ARE HIGHLIGHTED)

NOT IN PROJECT WORK SCOPE

PHASE01: MILL & OVERLAY WORK SCOPE

PHASE02: MILL & OVERLAY WORK SCOPE

PHASE03: MILL & OVERLAY WORK SCOPE

PHASE04: MILL & OVERLAY WORK SCOPE

BASE STRENGTHENING AREAS

(APPROXIMATE LIMITS ARE HIGHLIGHTED)

PHASING LEGEND:

PL_29

PL_26

PL_10

PL_48

PL_49

PL_08

PL_09

PL_51

PL_50

PL_26

PL_30

PL

_2

PL_04

PL_05

PL_39

PL_38

PL_21A

PL_19

PL_12PL_11

PL_40

PL_03

PL_02

PL_06

PL_01

PL_25

PL_46

GENERAL NOTES

1) CONTRACTOR SHALL SUPPLY A CALENDAR YEAR SPECIFIC

CONSTRUCTION SCHEDULE INDICATING APPROXIMATE START

AND END DATES OF PAVEMENT REMEDIATION OPERATIONS,

INCLUSIVE OF HOURS OF OPERATION AND APPLICABLE MOT

PLAN DETAIL SELECTION BY PARKING LOT (PL) FOR REVIEW

AND APPROVAL BY GRANVILLE HEALTH SYSTEMS.

2) CONTRACTOR SHALL HAVE MAINTENANCE OF TRAFFIC

MEASURES INSTALLED & INSPECTED BY THE ENGINEER OF

RECORD'S REPRESENTATIVE PRIOR TO COMMENCING WORK ON

EACH PAVEMENT REMEDIATION PHASE.

3) CONTRACTOR SHALL PLAN CONSTRUCTION PHASING

SEQUENTIALLY FROM PHASE 1 TO PHASE 4, REQUESTING

INSPECTION PAVEMENT EFFORT WITH 5 BUSINESS DAY NOTICE

UPON COMPLETION OF EACH PAVEMENT REMEDIATION PHASE.

CONTRACTOR SHALL NOT ADVANCE TO NEXT PAVEMENT

REMEDIATION PHASE UNTIL PRIOR PHASE HAS BEEN

INSPECTED, PARKING STOPS, AND ALL PAVEMENT MARKINGS

HAVE BEEN RESTORED.

4) CONTRACTOR SHALL ACKNOWLEDGE THAT PHASE 2

REMEDIATION EFFORTS SHALL BE PLANNED FOR CRITICAL

ANALYSIS OF MINIMAL CONSTRUCTION DURATION DUE TO THE

IMPACT OF THESE LOT CLOSURES UPON THE CAMPUS

OPERATIONS. IF OVERNIGHT OPERATIONS ARE PROPOSED IN

THESE AREAS TO FACILITATE A MINIMAL TIMELINE IN THESE

AREAS, CONTRACTOR SPECIFY THIS EXPLICITLY WITHIN

CONSTRUCTION SCHEDULE. CONTRACTOR SHALL PRIORITIZE

COMPLETION OF EACH LOT OF PHASE 2 WITH CRITICAL

DURATION ABOVE COMPLETION OF THE OVERALL PHASE. IN

OTHER WORDS, CONTRACTOR SHALL NOT PRIORITIZE

CONCURRENT WORK IN EACH LOT OF PHASE 2 UNLESS THIS

WILL RESULT IN THE FASTEST COMPLETION OF EACH LOT

WITHIN THIS PHASE.

5) CONTRACTOR SHALL PLAN FOR THE ACCCESIBLE WALKWAY

CONSTRUCTION IN PARKING LOT 1 & 25 DURING PHASE 2

PAVEMENT REMEDIATION. COMPLETION OF PHASE 2 SHALL

INCLUDE INSPECTION OF THE ADA ACCESSIBLE WALKWAY,

PARKING STALLS, AND ADJACENT AREAS FOR COMPLIANCE.

7) CONTRACTOR SHALL COMPLY WITH THE PHASING PLAN OF

THIS PLAN SO AS TO NOT HAVE CONSTRUCTION VEHICLES

TRACK AND TRAVERSE OVER REPAVED LOTS UNTIL THEY HAVE

BEEN INSPECTED FOR COMPLETION BY ENGINEER OF RECORD'S

REPRESENTATIVE.

8) CONTRACTOR SHALL MAINTAIN ALL MAINTENANCE OF

TRAFFIC MEASURES IN PLACE ENSURING SAFE & TRAVERSABLE

CONDITIONS FOR VEHICLES AND PEDESTRIANS AT ALL TIMES

UNTIL EACH PHASE OF PAVEMENT REMEDIATION HAS BEEN

INSPECTED FOR COMPLETION BY ENGINEER OF RECORD'S

REPRESNTATIVE.

PL_21B

PL_21C

C101

02/16/2026

GENERAL NOTES

1) CONTRACTOR SHALL SUPPLY A CALENDAR YEAR SPECIFIC

CONSTRUCTION SCHEDULE INDICATING APPROXIMATE START AND

END DATES OF PAVEMENT REMEDIATION OPERATIONS,

INCLUSIVE OF HOURS OF OPERATION AND APPLICABLE MOT

PLAN DETAIL SELECTION BY PARKING LOT (PL) FOR REVIEW

AND APPROVAL BY GRANVILLE HEALTH SYSTEMS.

2) CONTRACTOR SHALL HAVE MAINTENANCE OF TRAFFIC

MEASURES INSTALLED & INSPECTED BY THE ENGINEER OF

RECORD'S REPRESENTATIVE PRIOR TO COMMENCING WORK ON

EACH PAVEMENT REMEDIATION PHASE.

3) CONTRACTOR SHALL PLAN CONSTRUCTION PHASING

SEQUENTIALLY FROM PHASE 1 TO PHASE 4, REQUESTING

INSPECTION PAVEMENT EFFORT WITH 5 BUSINESS DAY NOTICE

UPON COMPLETION OF EACH PAVEMENT REMEDIATION PHASE.

CONTRACTOR SHALL NOT ADVANCE TO NEXT PAVEMENT

REMEDIATION PHASE UNTIL PRIOR PHASE HAS BEEN

INSPECTED, PARKING STOPS, AND ALL PAVEMENT MARKINGS

HAVE BEEN RESTORED.

4) CONTRACTOR SHALL ACKNOWLEDGE THAT PHASE 2

REMEDIATION EFFORTS SHALL BE PLANNED FOR CRITICAL

ANALYSIS OF MINIMAL CONSTRUCTION DURATION DUE TO THE

IMPACT OF THESE LOT CLOSURES UPON THE CAMPUS

OPERATIONS. IF OVERNIGHT OPERATIONS ARE PROPOSED IN

THESE AREAS TO FACILITATE A MINIMAL TIMELINE IN THESE

AREAS, CONTRACTOR SPECIFY THIS EXPLICITLY WITHIN

CONSTRUCTION SCHEDULE. CONTRACTOR SHALL PRIORITIZE

COMPLETION OF EACH LOT OF PHASE 2 WITH CRITICAL

DURATION ABOVE COMPLETION OF THE OVERALL PHASE. IN

OTHER WORDS, CONTRACTOR SHALL NOT PRIORITIZE

CONCURRENT WORK IN EACH LOT OF PHASE 2 UNLESS THIS

WILL RESULT IN THE FASTEST COMPLETION OF EACH LOT

WITHIN THIS PHASE.

5) CONTRACTOR SHALL PLAN FOR THE ACCESSIBLE WALKWAY

CONSTRUCTION IN PARKING LOT 1 & 25 DURING PHASE 2

PAVEMENT REMEDIATION. COMPLETION OF PHASE 2 SHALL

INCLUDE INSPECTION OF THE ADA ACCESSIBLE WALKWAY,

PARKING STALLS, AND ADJACENT AREAS FOR COMPLIANCE.

7) CONTRACTOR SHALL COMPLY WITH THE PHASING PLAN OF

THIS PLAN SO AS TO NOT HAVE CONSTRUCTION VEHICLES

TRACK AND TRAVERSE OVER REPAVED LOTS UNTIL THEY HAVE

BEEN INSPECTED FOR COMPLETION BY ENGINEER OF RECORD'S

REPRESENTATIVE.

8) CONTRACTOR SHALL MAINTAIN ALL MAINTENANCE OF

TRAFFIC MEASURES IN PLACE ENSURING SAFE & TRAVERSABLE

CONDITIONS FOR VEHICLES AND PEDESTRIANS AT ALL TIMES

UNTIL EACH PHASE OF PAVEMENT REMEDIATION HAS BEEN

INSPECTED FOR COMPLETION BY ENGINEER OF RECORD'S

REPRESENTATIVE.

SPECIAL CONSIDERATIONS:

1) PL 26 REPAVEMENT WORK SCOPE SHALL INCLUDE PARKING

LOT EXPANSION TO SOUTHERN PROPERTY LIMIT WHICH SHALL

INCLUDE APPROPRIATE SUBBASE, BASECOURSE AND WEARING

COURSE. LUMP SUM BID SHALL INCLUDE THIS WORK SCOPE.

2) PL 29 WORK SCOPE ONLY INCLUDES RESTRIPING, HOWEVER

CONTRACTOR SHALL INCLUDE INSTALLATION OF 6 PARKING

STOPS ON THE ADA STALLS TO LIMIT VEHICULAR

ENCROACHMENT INTO EXISTING PEDESTRIAN WALKWAY NEAR

MAIN ENTRY. LUMP SUM BID SHALL INCLUDE THIS WORK

SCOPE.

3) CONTRACTOR SHALL EXPLICITLY INDICATE AN OPTIONAL

BID ALLOWANCE FOR 16 TO 25 PARKING STOPS THAT MAY BE

INSTALLED FOR PARKING STALLS IN PL 11 (ALONG THE

RAILROAD) THAT WOULD BE IN ADDITION (NOT INCLUDED

WITHIN) THE BASE LUMP SUM BID UPON OWNER APPROVAL.

4) EXISTING CAMPUS SIGNAGE REPLACEMENT SHALL BE

DETERMINED AT THE TIME OF FORMAL PRECONSTRUCTION

MEETING AND CONTRACTOR SHOULD BE EXPLICITLY INDICATE

THEIR RATES FOR STANDARD SIGNAGE (EG. R-1 30" STOP

SIGNS, ETC.) FOR REPLACEMENT CONSIDERATION THAT WILL

BE DETERMINED AT A LATER DATE.

GENERAL NOTES

1) CONTRACTOR SHALL SUPPLY A CALENDAR YEAR SPECIFIC

CONSTRUCTION SCHEDULE INDICATING APPROXIMATE START AND

END DATES OF PAVEMENT REMEDIATION OPERATIONS,

INCLUSIVE OF HOURS OF OPERATION AND APPLICABLE MOT

PLAN DETAIL SELECTION BY PARKING LOT (PL) FOR REVIEW

AND APPROVAL BY GRANVILLE HEALTH SYSTEMS.

2) CONTRACTOR SHALL HAVE MAINTENANCE OF TRAFFIC

MEASURES INSTALLED & INSPECTED BY THE ENGINEER OF

RECORD'S REPRESENTATIVE PRIOR TO COMMENCING WORK ON

EACH PAVEMENT REMEDIATION PHASE.

3) CONTRACTOR SHALL PLAN CONSTRUCTION PHASING

SEQUENTIALLY FROM PHASE 1 TO PHASE 4, REQUESTING

INSPECTION PAVEMENT EFFORT WITH 5 BUSINESS DAY NOTICE

UPON COMPLETION OF EACH PAVEMENT REMEDIATION PHASE.

CONTRACTOR SHALL NOT ADVANCE TO NEXT PAVEMENT

REMEDIATION PHASE UNTIL PRIOR PHASE HAS BEEN

INSPECTED, PARKING STOPS, AND ALL PAVEMENT MARKINGS

HAVE BEEN RESTORED.

4) CONTRACTOR SHALL ACKNOWLEDGE THAT PHASE 2

REMEDIATION EFFORTS SHALL BE PLANNED FOR CRITICAL

ANALYSIS OF MINIMAL CONSTRUCTION DURATION DUE TO THE

IMPACT OF THESE LOT CLOSURES UPON THE CAMPUS

OPERATIONS. IF OVERNIGHT OPERATIONS ARE PROPOSED IN

THESE AREAS TO FACILITATE A MINIMAL TIMELINE IN THESE

AREAS, CONTRACTOR SPECIFY THIS EXPLICITLY WITHIN

CONSTRUCTION SCHEDULE. CONTRACTOR SHALL PRIORITIZE

COMPLETION OF EACH LOT OF PHASE 2 WITH CRITICAL

DURATION ABOVE COMPLETION OF THE OVERALL PHASE. IN

OTHER WORDS, CONTRACTOR SHALL NOT PRIORITIZE

CONCURRENT WORK IN EACH LOT OF PHASE 2 UNLESS THIS

WILL RESULT IN THE FASTEST COMPLETION OF EACH LOT

WITHIN THIS PHASE.

5) CONTRACTOR SHALL PLAN FOR THE ACCESSIBLE WALKWAY

CONSTRUCTION IN PARKING LOT 1 & 25 DURING PHASE 2

PAVEMENT REMEDIATION. COMPLETION OF PHASE 2 SHALL

INCLUDE INSPECTION OF THE ADA ACCESSIBLE WALKWAY,

PARKING STALLS, AND ADJACENT AREAS FOR COMPLIANCE.

7) CONTRACTOR SHALL COMPLY WITH THE PHASING PLAN OF

THIS PLAN SO AS TO NOT HAVE CONSTRUCTION VEHICLES

TRACK AND TRAVERSE OVER REPAVED LOTS UNTIL THEY HAVE

BEEN INSPECTED FOR COMPLETION BY ENGINEER OF RECORD'S

REPRESENTATIVE.

8) CONTRACTOR SHALL MAINTAIN ALL MAINTENANCE OF

TRAFFIC MEASURES IN PLACE ENSURING SAFE & TRAVERSABLE

CONDITIONS FOR VEHICLES AND PEDESTRIANS AT ALL TIMES

UNTIL EACH PHASE OF PAVEMENT REMEDIATION HAS BEEN

INSPECTED FOR COMPLETION BY ENGINEER OF RECORD'S

REPRESENTATIVE.

SPECIAL CONSIDERATIONS:

1) PL 26 REPAVEMENT WORK SCOPE SHALL INCLUDE PARKING

LOT EXPANSION TO SOUTHERN PROPERTY LIMIT WHICH SHALL

INCLUDE APPROPRIATE SUBBASE, BASECOURSE AND WEARING

COURSE. LUMP SUM BID SHALL INCLUDE THIS WORK SCOPE.

2) PL 29 WORK SCOPE ONLY INCLUDES RESTRIPING, HOWEVER

CONTRACTOR SHALL INCLUDE INSTALLATION OF 6 PARKING

STOPS ON THE ADA STALLS TO LIMIT VEHICULAR

ENCROACHMENT INTO EXISTING PEDESTRIAN WALKWAY NEAR

MAIN ENTRY. LUMP SUM BID SHALL INCLUDE THIS WORK

SCOPE.

3) CONTRACTOR SHALL EXPLICITLY INDICATE AN OPTIONAL

BID ALLOWANCE FOR 16 TO 25 PARKING STOPS THAT MAY BE

INSTALLED FOR PARKING STALLS IN PL 11 (ALONG THE

RAILROAD) THAT WOULD BE IN ADDITION (NOT INCLUDED

WITHIN) THE BASE LUMP SUM BID UPON OWNER APPROVAL.

4) EXISTING CAMPUS SIGNAGE REPLACEMENT SHALL BE

DETERMINED AT THE TIME OF FORMAL PRECONSTRUCTION

MEETING AND CONTRACTOR SHOULD BE EXPLICITLY INDICATE

THEIR RATES FOR STANDARD SIGNAGE (EG. R-1 30" STOP

SIGNS, ETC.) FOR REPLACEMENT CONSIDERATION THAT WILL

BE DETERMINED AT A LATER DATE.

P R

O

JE

C T

P H

A S

IN

G

P

LA

N

A0240109.302

04/24/2026

AS SHOWN

JL

RS

MFT

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

P A

R K

IN

G

LO

T

IM

P

R O

V E

M E

N T

P R

O

JE

C T

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

C101

E

LI

M

IN

A R

Y P

H A

S

IN

G P

LA

N

11/26/2025

MFT

RS

JL

GENERAL NOTES:

1) CONTRACTOR SHALL PARTICIPATE IN A PRECONSTRUCTION MEETING TO CONFIRM CONSTRUCTION SCHEDULE AND ALIGN WITH OPERATIONAL TIME RESTRICTIONS OF GRANVILLE HEALTH SYSTEMS. SPECIFIC HOURS OF CONSTRUCTION OPERATION SHALL BE AGREED TO PRIOR TO CONTRACT AWARD. MATERIAL INTERRUPTION TO GRANVILLE HEALTH SYSTEMS OPERATIONAL ABILITY TO ACCESS HOSPITAL ENTRIES SHALL BE KEPT TO A MINIMUM. CONTRACTOR SHALL SUBMIT A DETAILED LOGISTICS PLAN OF CLOSURES PLANNED FOR KEY PARKING LOTS WHERE REPAVEMENT WORK SHALL BE MINIMIZED: PL_02, PL_03, PL_06.

2) CONTRACTOR SHALL NOT FULLY CLOSE PL_46 OR PL_19 (THE MAIN CIRCULATORY ROADWAY) AT ANY TIME. CIRCULATION MUST BE ABLE TO BE MAINTAINED FOR EMERGENCY VEHICLES (EG. AMBULANCE, FIRE, POLICE) AT ALL TIMES. AT ALL TIMES A 20' WIDTH OF THE ROADWAY MUST BE MAINTAINED FOR FIRE ACCESS PER NFPA

REQUIREMENTS.

3) CONTRACTOR SHALL PROVIDE MAINTENANCE OF TRAFFIC FOR VEHICLES AND PEDESTRIANS FOR THE DURATION OF THE CONSTRUCTION PROJECT (WORK ZONE SAFETY MEASURES, REFER TO NC DOT DIVISION 11 OF THE 2024 ROADWAY STANDARD DRAWINGS AND MAINTENANCE OF TRAFFIC SHEETS "MOT" DETAILS PROVIDED WITHIN THESE

PROJECT SPECIFICATIONS).

4) CONTRACTOR SHALL MAINTAIN A CURRENT COPY OF THE APPROVED PAVEMENT PROJECT DRAWINGS, PHASING DRAWINGS, AND MAINTENANCE OF TRAFFIC DRAWINGS ONSITE

FOR THE DURATION OF THE PROJECT.

5) HOT MIX ASPHALT (HMA) OVERLAY SHALL BE S9.5B - SEE NCDOT SPECIFICATIONS WITHIN CONTRACT DOCUMENTS.

6) MILL DEPTH SHALL BE 2" MAXIMUM. OVERLAY DEPTH SHALL BE 2" MAXIMUM. EXISTING DRAINAGE PATTERNS SHALL REMAIN.

7) FULL DEPTH PATCHING SHALL BE EITHER (2) TWO 3" LIFTS OF I19.OC OR (1) ONE 6" LIFT OF B25.OC, LOCATATIONS AS CONFIRMED IN THE FIELD AND PER THE ABOVE PARKING LOT SCHEDULE. ESTIMATED TO BE APPROXIMATELY 250 SY OF FULL DEPTH PATCHING FOR THE WORK SCOPE OF THIS PROJECT.

8) CONTRACTOR SHALL INCLUDE PARKING STOP REPLACEMENT/REPAIR AS NOTED ABOVE WITHIN THEIR WORK SCOPE.

9) CONTRACTOR SHALL INCLUDE PARKING STRIPE REESTABLISHMENT WITHIN THEIR WORK SCOPE.

10) CONTRACTOR SHALL REVIEW THE PROVIDED CONTRACT DOCUMENTS AND PLANS FOR LOGISTICAL UNDERSTANDING AND NOTIFY ENGINEER OF RECORD (GFT INFRASTRUCTURE INC.) OF ANY OBSERVED DEVIATIONS FROM THE IN-SITU FIELD CONDITIONS FOR ENGINEERING REVIEW PRIOR TO COMMENCING WORK SCOPE. CONTRACTOR SHALL ALLOW 5-7 BUSINESS DAY TURNAROUND FOR FORMAL RESPONSES TO ANY FORMAL REQUESTS FOR ADDITIONAL INFORMATION (RFI) REGARDING THIS WORK SCOPE. SEE CONTRACT

DOCUMENTS FOR RFI PROTOCOL.

C102

02/16/2026

GENERAL NOTES:

1) CONTRACTOR SHALL PARTICIPATE IN A PRECONSTRUCTION MEETING TO CONFIRM CONSTRUCTION SCHEDULE AND ALIGN WITH OPERATIONAL TIME RESTRICTIONS OF GRANVILLE HEALTH SYSTEMS. SPECIFIC HOURS OF CONSTRUCTION OPERATION SHALL BE AGREED TO PRIOR TO CONTRACT AWARD. MATERIAL INTERRUPTION TO GRANVILLE HEALTH SYSTEMS OPERATIONAL ABILITY TO ACCESS HOSPITAL ENTRIES SHALL BE KEPT TO A MINIMUM. CONTRACTOR SHALL SUBMIT A DETAILED LOGISTICS PLAN OF CLOSURES PLANNED FOR KEY PARKING LOTS WHERE REPAVEMENT WORK SHALL BE MINIMIZED: PL_02, PL_03, PL_06.

2) CONTRACTOR SHALL NOT FULLY CLOSE PL_46 OR PL_19 (THE MAIN CIRCULATORY ROADWAY) AT ANY TIME. CIRCULATION MUST BE ABLE TO BE MAINTAINED FOR EMERGENCY VEHICLES (EG. AMBULANCE, FIRE, POLICE) AT ALL TIMES. AT ALL TIMES A 20' WIDTH OF THE ROADWAY MUST BE MAINTAINED FOR FIRE ACCESS PER NFPA REQUIREMENTS.

3) CONTRACTOR SHALL PROVIDE MAINTENANCE OF TRAFFIC FOR VEHICLES AND PEDESTRIANS FOR THE DURATION OF THE CONSTRUCTION PROJECT (WORK ZONE SAFETY MEASURES, REFER TO NC DOT DIVISION 11 OF THE 2024 ROADWAY STANDARD DRAWINGS AND MAINTENANCE OF TRAFFIC SHEETS "MOT" DETAILS PROVIDED WITHIN THESE PROJECT SPECIFICATIONS).

4) CONTRACTOR SHALL MAINTAIN A CURRENT COPY OF THE APPROVED PAVEMENT PROJECT DRAWINGS, PHASING DRAWINGS, AND MAINTENANCE OF TRAFFIC DRAWINGS ONSITE FOR THE DURATION OF THE PROJECT.

5) HOT MIX ASPHALT (HMA) OVERLAY SHALL BE S9.5B - SEE NCDOT SPECIFICATIONS ON SHEET C102.

6) MILL DEPTH SHALL BE 2" MAXIMUM. OVERLAY DEPTH SHALL BE 2" MAXIMUM. EXISTING DRAINAGE PATTERNS SHALL REMAIN.

7) FULL DEPTH PATCHING SHALL BE EITHER (2) TWO 3" LIFTS OF L19.0C OR (1) ONE 6" LIFT OF B25.0C, LOCATIONS AS CONFIRMED IN THE FIELD AND PER THE ABOVE PARKING LOT SCHEDULE. ESTIMATED TO BE APPROXIMATELY 250 SY OF

FULL DEPTH PATCHING FOR THE WORK SCOPE OF THIS PROJECT.

8) CONTRACTOR SHALL INCLUDE PARKING STOP REPLACEMENT/REPAIR AS NOTED ABOVE WITHIN THEIR WORK SCOPE.

9) CONTRACTOR SHALL INCLUDE PARKING STRIPE REESTABLISHMENT WITHIN THEIR WORK SCOPE.

10) CONTRACTOR SHALL REVIEW THE PROVIDED CONTRACT DOCUMENTS AND PLANS FOR LOGISTICAL UNDERSTANDING AND NOTIFY ENGINEER OF RECORD (GFT INFRASTRUCTURE, INC.) OF ANY OBSERVED DEVIATIONS FROM THE IN-SITU FIELD CONDITIONS FOR ENGINEERING REVIEW PRIOR TO COMMENCING WORK SCOPE. CONTRACTOR SHALL ALLOW 5-7 BUSINESS DAY TURNAROUND FOR FORMAL RESPONSES TO ANY FORMAL REQUESTS FOR ADDITIONAL INFORMATION (RFI) REGARDING THIS WORK

SCOPE. SEE CONTRACT DOCUMENTS FOR RFI PROTOCOL.

P A

V E

M E

N T

R E

M E

D

IA

T

IO

N

O

JE

C T

S P

E C

IF

IC

A T

IO

N

S

A0240109.302

04/24/2026

AS SHOWN

JL

RS

MFT

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

P A

R K

IN

G

LO

T

IM

P

R O

V E

M E

N T

P R

O

JE

C T

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

C102

E

LI

M

IN

A R

Y P

H A

S

IN

G P

LA

N

11/26/2025

MFT

RS

JL

GENERAL NOTES:

1) CONTRACTOR SHALL PARTICIPATE IN A PRECONSTRUCTION MEETING TO CONFIRM CONSTRUCTION SCHEDULE AND ALIGN WITH OPERATIONAL TIME RESTRICTIONS OF GRANVILLE HEALTH SYSTEMS. SPECIFIC HOURS OF CONSTRUCTION OPERATION SHALL BE AGREED TO PRIOR TO CONTRACT AWARD. MATERIAL INTERRUPTION TO GRANVILLE HEALTH SYSTEMS OPERATIONAL ABILITY TO ACCESS HOSPITAL ENTRIES SHALL BE KEPT TO A MINIMUM. CONTRACTOR SHALL SUBMIT A DETAILED LOGISTICS PLAN OF CLOSURES PLANNED FOR KEY PARKING LOTS WHERE REPAVEMENT WORK SHALL BE MINIMIZED: PL_02, PL_03, PL_06.

2) CONTRACTOR SHALL NOT FULLY CLOSE PL_46 OR PL_19 (THE MAIN CIRCULATORY ROADWAY) AT ANY TIME. CIRCULATION MUST BE ABLE TO BE MAINTAINED FOR EMERGENCY VEHICLES (EG. AMBULANCE, FIRE, POLICE) AT ALL TIMES. AT ALL TIMES A 20' WIDTH OF THE ROADWAY MUST BE MAINTAINED FOR FIRE ACCESS PER NFPA

REQUIREMENTS.

3) CONTRACTOR SHALL PROVIDE MAINTENANCE OF TRAFFIC FOR VEHICLES AND PEDESTRIANS FOR THE DURATION OF THE CONSTRUCTION PROJECT (WORK ZONE SAFETY MEASURES, REFER TO NC DOT DIVISION 11 OF THE 2024 ROADWAY STANDARD DRAWINGS AND MAINTENANCE OF TRAFFIC SHEETS "MOT" DETAILS PROVIDED WITHIN THESE

PROJECT SPECIFICATIONS).

4) CONTRACTOR SHALL MAINTAIN A CURRENT COPY OF THE APPROVED PAVEMENT PROJECT DRAWINGS, PHASING DRAWINGS, AND MAINTENANCE OF TRAFFIC DRAWINGS ONSITE

FOR THE DURATION OF THE PROJECT.

5) HOT MIX ASPHALT (HMA) OVERLAY SHALL BE S9.5B - SEE NCDOT SPECIFICATIONS WITHIN CONTRACT DOCUMENTS.

6) MILL DEPTH SHALL BE 2" MAXIMUM. OVERLAY DEPTH SHALL BE 2" MAXIMUM. EXISTING DRAINAGE PATTERNS SHALL REMAIN.

7) FULL DEPTH PATCHING SHALL BE EITHER (2) TWO 3" LIFTS OF I19.OC OR (1) ONE 6" LIFT OF B25.OC, LOCATATIONS AS CONFIRMED IN THE FIELD AND PER THE ABOVE PARKING LOT SCHEDULE. ESTIMATED TO BE APPROXIMATELY 250 SY OF FULL DEPTH PATCHING FOR THE WORK SCOPE OF THIS PROJECT.

8) CONTRACTOR SHALL INCLUDE PARKING STOP REPLACEMENT/REPAIR AS NOTED ABOVE WITHIN THEIR WORK SCOPE.

9) CONTRACTOR SHALL INCLUDE PARKING STRIPE REESTABLISHMENT WITHIN THEIR WORK SCOPE.

10) CONTRACTOR SHALL REVIEW THE PROVIDED CONTRACT DOCUMENTS AND PLANS FOR LOGISTICAL UNDERSTANDING AND NOTIFY ENGINEER OF RECORD (GFT INFRASTRUCTURE INC.) OF ANY OBSERVED DEVIATIONS FROM THE IN-SITU FIELD CONDITIONS FOR ENGINEERING REVIEW PRIOR TO COMMENCING WORK SCOPE. CONTRACTOR SHALL ALLOW 5-7 BUSINESS DAY TURNAROUND FOR FORMAL RESPONSES TO ANY FORMAL REQUESTS FOR ADDITIONAL INFORMATION (RFI) REGARDING THIS WORK SCOPE. SEE CONTRACT

DOCUMENTS FOR RFI PROTOCOL.

C102

02/16/2026

P A

V E

M E

N T

R E

M E

D

IA

T

O

JE

C T

S P

E C

IF

IC

A T

IO

N

S

C103 A0240109.302

04/24/2026

AS SHOWN

JL

RS

MFT

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

P A

R K

IN

G

LO

T

IM

P

R O

V E

M E

N T

P R

O

JE

C T

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

C103

02/16/2026

A D

A

IM

P R

O V

E M

E N

T P

LA

N

A0240109.302

04/24/2026

AS SHOWN

JL

RS

MFT

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

P A

R K

IN

G

LO

T

IM

P

R O

V E

M E

N T

P R

O

JE

C T

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

C104

C104

P A

V E

M E

N T

R E

M E

D

IA

T

O

JE

C T

S P

E C

IF

IC

A T

IO

N

S

A0240109.302

04/24/2026

AS SHOWN

JL

RS

MFT

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

P A

R K

IN

G

LO

T

IM

P

R O

V E

M E

N T

P R

O

JE

C T

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

C105

C105

P A

V E

M E

N T

R E

M E

D

IA

T

O

JE

C T

S P

E C

IF

IC

A T

IO

N

S

A0240109.302

04/24/2026

AS SHOWN

JL

RS

MFT

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

P A

R K

IN

G

LO

T

IM

P

R O

V E

M E

N T

P R

O

JE

C T

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

C106

C106

P A

V E

M E

N T

R E

M E

D

IA

T

O

JE

C T

S P

E C

IF

IC

A T

IO

N

S

A0240109.302

04/24/2026

AS SHOWN

JL

RS

MFT

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

P A

R K

IN

G

LO

T

IM

P

R O

V E

M E

N T

P R

O

JE

C T

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

C107

C107

P A

V E

M E

N T

R E

M E

D

IA

T

O

JE

C T

S P

E C

IF

IC

A T

IO

N

S

A0240109.302

04/24/2026

AS SHOWN

JL

RS

MFT

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

P A

R K

IN

G

LO

T

IM

P

R O

V E

M E

N T

P R

O

JE

C T

G R

A N

V

IL

LE

H

E A

LT

H

S Y

S T

E M

C108

2026-02-16 302240109-Phasing Preliminary Plan - 1 of x
2022026-02-16 302240109-Phasing Preliminary Plan - 2 of x
302240109 ada and mot
302240109-ADA Improvement Plan C101 02-04-2026
302240109 mot
302240109-MOT Preliminary Plan - 1 of x
302240109-MOT Preliminary Plan - 2 of x
302240109-MOT Preliminary Plan - 3 of x
302240109-MOT Preliminary Plan - 4 of x

File details come from the government source that posted it. Updated .