This is NAVSEA Form 4340/2 (Rev. Mar 2018), a Government Furnished Information (GFI) form template used to document and track GFI items provided to contractors. The form contains fields to record the attachment number, PR number, program title, contract number, date, and program office code, followed by a table with columns for sequential item numbers, document titles, document numbers, document dates, and GFI due dates.
The second page provides detailed instructions for completing each field of the form, including specific formatting requirements for dates and acceptable non-calendar methods for specifying GFI due dates (such as DAC - Days after contract award, MAC - Months after contract award, MACM - Months after contract modification, etc.). The form is associated with a Naval Surface Warfare Center Carderock Division solicitation for Flow Straighteners/Honeycomb Cleanout services in the Large Cavitational Channel, though the template itself is blank and contains no specific project information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVSEA 4340/2 (Rev. Mar 2018) Page 1 of 2
GOVERNMENT FURNISHED INFORMATION
ATTACHMENT # PR#
PROGRAM TITLE: CONTRACT NUMBER: DATE:
CODE:
(1) NUMBER (5) GFI DUE DATE(4) DOCUMENT DATE(3) DOCUMENT NUMBER(2) DOCUMENT TITLE
NAVSEA 4340/2 (Rev. Mar 2018) Page 2 of 2
NAVSEA Form 4340/2 - Government Furnished Information Instructions
ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.
PR #: Enter Purchase Request (PR) number.
PROGRAM TITLE: Enter the title of the program.
CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.
DATE: Enter the calendar date that this form was prepared.
CODE: Enter the Program Office / Requiring Activity's office code.
NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.
DOCUMENT TITLE, Column (2): Enter Document Title for each item.
DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.
DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).
GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:
DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test
PAGE __ OF __: Assign page numbers sequentially.
NAVSEA 4340/2 (Rev. Mar 2018) Page of NAVSEA 4340/2 (Rev. Mar 2018) Page of
GOVERNMENT FURNISHED INFORMATION
(1) NUMBER
(5) GFI DUE DATE
(4) DOCUMENT DATE
(3) DOCUMENT NUMBER
(2) DOCUMENT TITLE
NAVSEA Form 4340/2 - Government Furnished Information Instructions
ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.
PR #: Enter Purchase Request (PR) number.
PROGRAM TITLE: Enter the title of the program.
CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.
DATE: Enter the calendar date that this form was prepared.
CODE: Enter the Program Office / Requiring Activity's office code.
NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.
DOCUMENT TITLE, Column (2): Enter Document Title for each item.
DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.
DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).
GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:
DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test
PAGE __ OF __: Assign page numbers sequentially.
11.0.1.20130826.2.901444.899636
| CurrentPage: |
| PageCount: |
| TextField1: 1 |
| TextField2: 1301206156 |
| TextField7: Honeycomb cleanout |
| TextField8: TBD |
| DateField1: 10/29/24 |
| TextField3: |
| DateField3: 1DAC |
| DateField3: 1DAC |
| DateField2: N/A |
| DateField2: N/A |
| TextField6: N/A |
| TextField6: N/A |
| TextField5: FLOW STRAIGHTNERS AND HONEYCOMB DIAGRAM |
| TextField5: FLOW STRAIGHTNERS AND HONEYCOMB PHOTOS |
| TextField4: 1 |
| TextField4: 2 |
File details come from the government source that posted it. Updated .