Geotechnical Report _ OVP Tennis Court Expans.pdf

PDF 6 MB Posted

Attached to
Design/Build - OVP Tennis Court Expansion
Solicitation number
PE-70800-NONST-2026-000000040
Issued by
Oconee County, Georgia

About this file

This is a geotechnical engineering report prepared by Geo-Hydro Engineers, Inc. for Oconee County Parks & Recreation in Watkinsville, Georgia, dated September 24, 2025. The report documents subsurface exploration and geotechnical engineering evaluation services for the Oconee Veterans Park Tennis Court Expansion project. The scope of work included eight machine-drilled soil test borings with standard penetration testing and soil sample analysis to evaluate site conditions for construction of 16 new tennis courts, a restroom/concessions building, and minor parking additions. The project site will require approximately 10 feet of cut to reach final grades, with up to 15 feet of excavation necessary for storm utility installation. The geotechnical investigation examined soil classifications, groundwater conditions, and structural capacity across the proposed development area in the Southern Piedmont Geologic Province.

The report identifies significant geotechnical considerations for project planning and budgeting, including variable fill materials extending 3 to 10 feet below grade, partially weathered rock encountered at depths of 6 to 18 feet requiring specialized excavation equipment and potential blasting, and auger refusal indicating large boulders or mass rock at depths of 12 to 14 feet. Foundation design recommendations specify an allowable bearing pressure of 3,000 psf for the restroom/concessions building on properly prepared subgrade. Pavement design recommendations include flexible asphalt sections or rigid Portland cement concrete for various traffic areas, with detailed specifications for graded aggregate base and subgrade compaction requirements. The report recommends materials testing services during construction, including density testing of subgrade and base materials, proofrolling, and pavement coring verification. For budgeting purposes, the engineer suggests contingencies for approximately 25 percent of the aggregate project area requiring ground stabilization and 20 percent of foundation excavations requiring stone replacement treatment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Report of Subsurface Exploration and Geotechnical Engineering Evaluation

Oconee Veterans Park Tennis Court Expansion Watkinsville, Georgia Geo-Hydro Project Number 251860.20

Prepared for Oconee County Parks & Recreation September 24, 2025

190 Ben Burton Road, Suite C • Bogart, Georgia 30622 o: 706.354.1800 • www.geohydro.com

Ms. Lisa Davol September 24, 2025

Oconee County Parks & Recreation

PO Box 55

Watkinsville, Georgia 30677

Report of Subsurface Exploration and

Geotechnical Engineering Evaluation

Oconee Veterans Park Tennis Court Expansion

Watkinsville, Georgia

Geo-Hydro Project Number 251860.20

Dear Ms. Davol:

Geo-Hydro Engineers, Inc. has completed the authorized geotechnical engineering services for the above referenced project. The scope of services for this project was outlined in our proposal number 251860.P1 dated September 5, 2025.

PROJECT INFORMATION

We understand that Oconee County is planning to expand the tennis facility within Oconee Veterans

Park in Watkinsville, Georgia. Figure 1 in the

Appendix shows the approximate site location.

Additions will include 16 new tennis courts, a restroom/concessions building, and minor parking additions. Based on our experience with similar projects we assume the restroom/concession building will be masonry construction with a concrete slab-on-grade. We understand that the project documents currently call for post-tensioned concrete tennis courts. You are evaluating asphalt tennis courts as an alternative section, in accordance with USTA specifications.

The project site is currently a combination of grassed and landscaped/hardscaped areas. Based on the project plans provided to us, site grading will consist of approximately 10 feet of cut to reach final grades.

Up to 15 feet of excavation will be required for installation of site storm utilities. The site plan excerpt to the right shows the planned project layout.

Oconee Veterans Park Tennis Court Expansion • Watkinsville, Georgia Project Number 251860.20

September 24, 2025 | 2

EXPLORATORY PROCEDURES

The subsurface exploration consisted of eight machine-drilled soil test borings performed at the approximate locations shown on Figure 2 in the Appendix. The test borings were located in the field using a hand-held GPS unit with pre-loaded boring coordinates. The elevations shown on the test boring records were obtained from the Overall Grading and Drainiage Plan, Sheet C301 dated July 25, 2025 by

W&A Engineering and the information is not certified as correct by this engineer. Users of this information do so at their own risk. In general, the boring locations and elevations should be considered approximate.

Standard penetration testing, as provided for in ASTM D1586, was performed at select depth intervals in the soil test borings. Soil samples obtained from the drilling operation were examined and classified in general accordance with ASTM D2488 (Visual-Manual Procedure for Description of Soils). Soil classifications include the use of the Unified Soil Classification System described in ASTM D2487

(Classification of Soils for Engineering Purposes). The soil classifications also include our evaluation of the geologic origin of the soils. Evaluations of geologic origin are based on our experience and interpretation and may be subject to some degree of error.

Descriptions of the soils encountered, groundwater conditions, standard penetration resistances, and other pertinent information are provided in the test boring records included in the Appendix.

REGIONAL GEOLOGY

The project site is located in the Southern Piedmont Geologic Province of Georgia. Soils in this area have been formed by the in-place weathering of the underlying crystalline rock, which accounts for their classification as "residual" soils. Residual soils near the ground surface, which have experienced advanced weathering, frequently consist of red brown clayey silt (ML) or silty clay (CL). The thickness of this surficial clayey zone may range up to roughly 6 feet. For various reasons, such as erosion or local variation of mineralization, the upper clayey zone is not always present.

With increased depth, the soil becomes less weathered, coarser grained, and the structural character of the underlying parent rock becomes more evident. These residual soils are typically classified as sandy micaceous silt (ML) or silty micaceous sand (SM). With a further increase in depth, the soils eventually become quite hard and take on an increasing resemblance to the underlying parent rock. When these materials have a standard penetration resistance of 100 blows per foot or greater, they are referred to as partially weathered rock. The transition from soil to partially weathered rock is usually a gradual one, and may occur at a wide range of depths. Lenses or layers of partially weathered rock are not unusual in the soil profile.

Partially weathered rock represents the zone of transition between the soil and the indurated metamorphic rocks from which the soils are derived. The subsurface profile is, in fact, a history of the weathering process which the crystalline rock has undergone. The degree of weathering is most advanced at the ground surface, where fine grained soil may be present. And the weathering process is in its early stages immediately above the surface of relatively sound rock, where partially weathered rock may be found.

September 24, 2025 | 3

The thickness of the zone of partially weathered rock and the depth to the rock surface have both been found to vary considerably over relatively short distances. The depth to the rock surface may frequently range from the ground surface to 80 feet or more. The thickness of partially weathered rock, which overlies the rock surface, may vary from only a few inches to as much as 40 feet or more.

SOIL TEST BORING SUMMARY

Starting at the ground surface, all borings encountered approximately 1 inch of topsoil. Detailed measurements necessary for quantity estimation were not performed for this project. The thickness of surface materials should be expected to vary across the site. For planning purposes, we suggest assuming a surface material thickness of 6 inches across the site. Additional surface materials will be encountered near drainage features and in low-lying or poorly draining areas of the site.

Beneath the topsoil, all borings except B-6 encountered fill materials extending to depths ranging from about 3 to greater than 10 feet. Boring B-3 was terminated at a depth of 10 feet due to an obstruction in the boring, likely an existing storm line. The fill was classified as silty sand, sandy clay, and sandy silt with standard penetration test resistances ranging from 7 to 40 blows per foot.

Beneath the topsoil or fill materials, all borings encountered residual soils typical of the Piedmont Region.

The residuum was classified as silty sand, sandy silt, and clayey sand. Standard penetration test resistances recorded in the residuum ranged from 8 to 30 blows per foot.

Partially weathered rock was encountered in borings B-4, B-5, B-6, and B-7 at depths ranging from about

6 to 18 feet. Partially weathered rock is locally defined as residual material having a standard penetration test resistance of 100 blows per foot or greater.

Materials causing auger refusal were encountered in residual material in borings B-4, B-5, and B-6 at depths ranging from 12 to 14 feet. Auger refusal is the condition that prevents further advancement of the rig using conventional soil drilling techniques. In most cases, auger refusal in residual materials is indicative of large boulders or mass rock.

Groundwater was not encountered in the test borings at the time of drilling. It is important to note that stabilized groundwater levels are typically higher than those measured at the time of drilling. It should also be noted that groundwater levels will fluctuate depending on yearly and seasonal rainfall variations and other factors and may rise in the future.

For more detailed descriptions of subsurface soil conditions, please refer to the test boring records included in the Appendix.

September 24, 2025 | 4

77Summary of Subsurface Conditions

Boring

Approx.

Current Ground

Elevation

Approx.

Planned

Elevation

Bottom of Fill)

Groundwater* Top of PWR Auger Refusal Boring

Termination

Depth (feet)

Elev.

Depth (feet)

Elev.

Depth (feet)

Elev.

Depth (feet)

Elev.

Depth (feet)

Elev.

B-1 788 773 (invert) 3 785 NE -- NE -- NE -- 20 768

B-2 792 778 (invert) 6 786 NE -- NE -- NE -- 20 772

B-3 785 774 (invert) 10 775 NE -- NE -- NE -- 10 775

B-4 788 775 (invert) 3 785 NE -- 12 776 14 774 14 774

B-5 791 781 (invert) 3 788 NE -- 6 785 13 778 13 778

B-6 792 786 (invert) NE -- NE -- 6 786 12 780 12 780

B-7 799 785 (invert) 6 793 NE -- 18 781 NE -- 20 779

B-8 801 793 (final grade) 3 798 NE -- NE -- NE -- 20 781

All Depths and Elevations in this Summary Table are Approximate NE: Not Encountered PWR: Partially weathered rock *Groundwater level measured at time of drilling Red: Partially weathered rock above or within 5 feet of invert

September 24, 2025 | 5

EVALUATIONS AND RECOMMENDATIONS

The following evaluations and recommendations are based on the information available on the proposed construction, the data obtained from the test borings, and our experience with soils and subsurface conditions similar to those encountered at this site. Because the test borings represent a very small statistical sampling of subsurface conditions, it is possible that conditions different from those indicated by the test borings could be encountered during supplemental exploration and during construction.

Geotechnical Considerations

The following geotechnical characteristics of the site should be considered for planning and design:

• Fill materials were encountered in all borings except B-6 extending to depths ranging from about 3 to

10 feet. Boring B-3 was terminated at a depth of about 10 feet due to an obstruction in the boring, likely an existing storm line. We expect any fill encountered on site during construction to be variable, and it is possible that some management of poor-quality or loose fill will be necessary during construction. Any loose, unstable fill material that cannot be readily densified in place should be removed and replaced with well compacted structural fill.

• Partially weathered rock was encountered in borings B-4, B-5, B-6, and B-7 at depths ranging from about 6 to 18 feet. Partially weathered rock was encountered above or within 5 feet of the planned invert elevation of site storm lines in borings B-4, B-5, B-6, and B-7 shown on the annotated plan excerpt below. Excavation of partially weathered rock typically requires large equipment capable of ripping. Due to the leverage required to pre-loosen partially weathered rock, it is often impractical to rip partially weathered rock in trench excavations. We expect impact hammers to be necessary to remove partially weathered rock from trench excavations. Additionally, partially weathered rock with standard penetration resistances of 50/2”, 50/1”, or 50/0” may be difficult to rip and may require blasting to remove.

• Materials causing auger refusal were encountered in borings B-4, B-5, and B-6 at depths ranging from 12 to 14 feet. Materials causing auger refusal were encountered within

5 feet of the planned invert elevation of site storm lines at borings B-4 and B-5. For planning purposes, we recommend that blasting or the use of impact hammers will be necessary to remove material below the depth of auger refusal. Based on the results of the test borings and our understanding of site grades/utility inverts, difficult excavation conditions should be expected within clouded area illustrated in the annotated plan excerpt to the right.

September 24, 2025 | 6

• Based on the results of the soil test borings, residual soils and fill materials should be reusable as structural fill. Routine adjustments of moisture content will be required. It should be noted that fill materials are inherently variable, and some fill materials on site may not be suitable for reuse as structural fill. Geo-Hydro should evaluate fill material encountered on site to evaluate its suitability for reuse as structural fill. Partially weathered rock materials will be suitable for reuse as structural fill only if they break down into a reasonably well-graded material that can be satisfactorily compacted.

However, breaking down partially weathered rock into material that can be readily reused as structural fill typically requires large equipment to may not be used for a project of this scale. For planning purposes, we recommend assuming that blast rock will not be suitable for reuse as structural fill.

• At the time of drilling, groundwater was not encountered in the test borings. Based on the results of the borings, we do not expect groundwater to be a major hindrance to design or construction. It is important to note that the groundwater levels recorded in the borings were measured at the time of drilling. Stabilized groundwater levels are typically higher than those measured at the time of drilling.

Regardless of groundwater conditions, the contractor should be prepared to manage runoff during wet weather conditions, and subsurface drainage will be necessary behind all below-grade structures including foundation walls.

• Based on the results of the borings and following the calculation procedure in the 2018 International

Building Code (Chapter 20, ASCE 7-16), the seismic Site Class for the site is D. The seismic design parameters are as follows: SS=0.199, S1=0.085, SDS=0.212, SD1=0.136.

• Based on the results of the soil test borings, it is our opinion that the planned restroom/concession building can be supported using conventional shallow foundations or a concrete slab-on-grade. For planning and design purposes, we recommend using an allowable bearing pressure of 3,000 psf for column loads no greater than 30 kips and wall loads not exceeding 3 kips per lineal foot.

• Based on the location of the project and our experience, an asphalt court section matching the

American Sports Builder

Association (ASBA) and United

States Tennis Association (USTA) guidelines for a freeze/thaw climate is most suited for this project. Provided that materials

(graded aggregate base and asphalt) are placed on properly prepared subgrade, the

“Freeze/Thaw Climate” section would provide better longevity as the topping course can be milled and overlaid in the future.

September 24, 2025 | 7

The following sections provide recommendations regarding these issues and other geotechnical aspects of the project.

Existing Fill Materials

Fill materials were encountered in all borings except B-6 extending to depths ranging from about 3 to

10 feet. Boring B-3 was terminated at a depth of about 10 feet due to an obstruction in the boring, likely an existing storm line. We expect any fill encountered on site during construction to be variable, and it is possible that some management of poor-quality or loose fill will be necessary during construction. Any loose, unstable fill material that cannot be readily densified in place should be removed and replaced with well compacted structural fill.

• The quality of existing fill materials can be highly variable, and test borings are often not able to detect all of the zones or layers of poor quality fill materials.

• Layers of poor quality fill materials that are less than about 2.5 to 5 feet thick may often remain undetected by soil test borings due to the discrete-interval sampling method used in this exploration.

• The interface between existing fill materials and the original ground surface may include a layer of organic material that was not properly stripped off during the original grading. Depending on its relationship to the foundation and floor slab bearing surfaces, an organic layer might adversely affect support of footings and floor slabs. If such organic layers are encountered during construction, it may be necessary to “chase out” the organic layer by excavating the layer along with overlying soils.

• Subsurface exploration is simply not capable of disclosing all conditions that may require remediation.

General Site Preparation

Topsoil, roots, demolition debris, and other deleterious materials should be removed from the proposed construction area. Any existing utilities should be excavated and removed from the project footprint.

Additionally, site clearing, grubbing, and stripping should be performed only during dry weather conditions.

Operation of heavy equipment on the site during wet conditions could result in excessive rutting and mixing of topsoil and debris with underlying soils. All excavations resulting from rerouting of underground utilities or demolition of below-grade structures should be backfilled in accordance with the Structural Fill section of this report.

We recommend, wherever possible, that areas to receive structural fill be proofrolled prior to placement of structural fill. Areas of proposed excavation should be proofrolled after rough finished subgrade is achieved. Proofrolling should be performed with multiple passes in at least two directions using a fully loaded tandem axle dump truck weighing at least 18 tons. Proofrolling must be avoided within 10 feet of existing structures, walls, hardscapes, and utilities that will remain. If low consistency soils are encountered that cannot be adequately densified in place, such soils should be removed and replaced with well compacted fill material placed in accordance with the Structural Fill section of this report. Proofrolling should be observed by Geo-Hydro to determine if remedial measures are necessary.

September 24, 2025 | 8

For budgeting purposes, we suggest considering that approximately 25 percent of the aggregate project area will require undercutting and recompaction or replacement extending to a depth of about 2 feet below current grades (fill areas) or planned finished grades (cut areas). The suggested stabilization approach is intended only as a tool to estimate a cost associated with ground stabilization. The need for, extent of, location, and optimal method of ground stabilization should be determined by Geo-Hydro at the time of construction based on actual site conditions. The extent and cost of ground stabilization may exceed the suggested budgetary estimate.

Items related to old homesteads which can be of concern for site development include domestic water wells and septic system tanks and drain fields. Water wells, if encountered, must be abandoned in accordance with the requirements of the Georgia Water Well Standards Act of 1985. The owner of the property is responsible for plugging the well in accordance with the requirements outlined in Circular 13, “Grouting and Plugging of Domestic Water Wells in Georgia” published by the Georgia Department of Natural

Resources, Environmental Protection Division and the Georgia Geologic Survey. A water well contractor licensed to practice in Georgia must perform the actual work of plugging the well. Additionally, any existing septic systems and drain fields must be removed, and the resulting excavation should be backfilled in accordance with the recommendations in the Structural Fill section of this report.

During site preparation, burn pits or trash pits may be encountered. All too frequently such buried material occurs in isolated areas which are not detected by the soil test borings. Any buried debris or trash found during the construction operation should be thoroughly excavated and removed from the site.

Groundwater

At the time of drilling, groundwater was not encountered in any of the borings. Based on our understanding of the planned construction, we do not expect groundwater to be a major hindrance for design or construction.

Although groundwater is not expected to be a concern for site preparation and construction, we must point out that groundwater levels vary and may rise in the future. Regardless of the groundwater conditions encountered in the borings, waterproofing and subsurface drainage is required for all retaining walls and building walls below grade.

Earth Slopes

Temporary construction slopes should be designed in strict compliance with OSHA regulations. The exploratory borings indicate that most soils at the site are Type B and Type C as defined in 29 CFR 1926

Subpart P. This dictates that temporary construction slopes in residual soils above the groundwater level for excavation depths of 20 feet or less should be no steeper than 1H:1V. Excavation slopes in fill materials, or in any soil type below the groundwater level, should be no steeper than 1.5H:1V. Temporary construction slopes should be closely observed on a daily basis by the contractor’s “competent person” for signs of mass movement: tension cracks near the crest, bulging at the toe of the slope, etc. The responsibility for excavation safety and stability of construction slopes should lie solely with the contractor.

September 24, 2025 | 9

We recommend that extreme caution be observed in trench excavations. Several cases of loss of life due to trench collapses in Georgia point out the lack of attention given to excavation safety on some projects.

We recommend that applicable local and federal regulations regarding temporary slopes, and shoring and bracing of trench excavations be closely followed.

Formal analysis of slope stability was beyond the scope of work for this project. Based on our experience, permanent cut or fill slopes should be no steeper than 2H:1V to maintain long term stability and to provide ease of maintenance. The crest or toe of cut or fill slopes should be no closer than 10 feet to any foundation or to the edge of any pavement that will support truck traffic. The crest or toe should be no closer than 5 feet to the edge of any pavements supporting cars or light truck traffic or parking. Erosion protection of slopes during construction and during establishment of vegetation should be considered an essential part of construction.

Excavation Characteristics

Based on the results of the test borings and our understanding of site grading and utility invert elevations, difficult excavation conditions should be expected in the center of the project footprint at the clouded area illustrated in the annotated plan excerpt to the right. Partially weathered rock was encountered in borings

B-4, B-5, and B-6 at depths ranging from 12 to

14 feet. Partially weathered rock was encountered above or within 5 feet of the planned invert elevation of site storm lines at boring locations B-4, B-5, B-6, and B-7. Excavation of partially weathered rock typically requires large equipment capable of ripping. Due to the leverage required to pre-loosen partially weathered rock, it is often impractical to rip partially weathered rock in trench excavations.

Materials causing auger refusal were encountered in borings B-4, B-5, and B-6 at depths ranging from 12 to 14 feet. Materials causing auger refusal were encountered within 5 feet of the planned invert elevation of site storm lines at borings B-4 and B-5. For planning purposes, we recommend that blasting or the use of impact hammers will be necessary to remove material below the depth of auger refusal. Additionally, partially weathered rock with standard penetration resistances of 50/2”, 50/1”, or 50/0” may be difficult to rip and may require blasting to remove.

September 24, 2025 | 10

It is important to note that the depth to rock or partially weathered rock can vary quite drastically over relatively short distances. It would not be unusual for rock or partially weathered rock to occur at higher elevations between or around some of the soil test borings.

For construction bidding and field verification purposes it is common to provide a verifiable definition of rock in the project specifications. The following are typical definitions of mass rock and trench rock:

• Mass Rock: Material which cannot be excavated with a single-tooth ripper drawn by a crawler tractor having a minimum draw bar pull rated at 56,000 pounds (Caterpillar D-8K or equivalent), and occupying an original volume of at least one cubic yard.

• Trench Rock: Material occupying an original volume of at least one-half cubic yard which cannot be excavated with a hydraulic excavator having a minimum flywheel power rating of 123 kW (165 hp);

such as a Caterpillar 322C L, John Deere 230C LC, or a Komatsu PC220LC-7; equipped with a short tip radius bucket not wider than 42 inches.

The foregoing definitions are based on large equipment typically utilized for mass grading. Subsequent excavations for building foundations, retaining walls, and underground utilities are often performed with smaller equipment such as rubber-tired backhoe/loaders or even mini-excavators. If difficult excavation in dense soils or partially weathered rock is encountered, contractors will often request additional payment for mobilizing larger equipment than that which was anticipated during preparation of their construction bid.

The amount of additional compensation, if any, and the minimum equipment size necessary to qualify for any additional compensation should be defined before the start of construction.

Blasting

In most cases rock excavation is performed by blasting. Standard blasting procedures include drilling through the materials to be blasted to introduce the explosives and covering up the area to be blasted to prevent flying debris. The area to be blasted is typically covered with several feet of soil or a blast mat.

Alternatively, the existing soil overburden can be left in place, which in most cases will eliminate the need for a soil cover or a blast mat.

Blasting generates ground vibrations that can be detrimental to adjacent structures. Research by the United

States Bureau of Mines and other organizations provides limits for safeguarding adjacent structures during blasting operations. A peak particle velocity of 2 inches per second is generally recognized as a conservative limit and is the maximum peak particle velocity allowed by the Georgia Blasting Standards

Act of 1978.

State and local laws require that precondition surveys of neighboring properties be performed prior to conducting blasting activities. Typical requirements are to conduct a precondition survey of structures and facilities within a 1,000-foot radius of the blast site. Vibration monitoring is also required in all four compass directions at the nearest structure not owned by the developer/owner. Some municipalities have variations of these requirements, and the local requirements should be reviewed prior to beginning blasting activities.

September 24, 2025 | 11

Reuse of Excavated Materials

Based on the results of the test borings and our observations, existing fill materials and residual soils appear to be suitable for reuse as structural fill. It is possible that some fill materials will be encountered during construction that may not be suitable for reuse. Geo-Hydro should observe the excavation of materials to evaluate their suitability for reuse. Routine adjustment of moisture content will be necessary to allow proper placement and compaction of excavated soils.

It is important to establish as part of the construction contract whether soils having elevated moisture content will be considered suitable for reuse. We often find this issue to be a point of contention and a source of delays and change orders. From a technical standpoint, soils with moisture contents wet of optimum as determined by the standard Proctor test (ASTM D698) can be reused provided that the moisture is properly adjusted to within the workable range. From a practical standpoint, wet soils can be very difficult to dry in small or congested sites and such difficulties should be considered during planning and budgeting. A clear understanding by the general contractor and grading subcontractor regarding the reuse of excavated soils will be important to avoid delays and unexpected cost overruns.

Partially weathered rock materials will be suitable for reuse as structural fill only if they break down into a reasonably well-graded material that can be satisfactorily compacted. It should be noted that breaking down partially weathered rock into a gradation that can be readily placed as structural fill may require equipment larger than would be typically mobilized for a project of this scale. The presence of cobble size or boulder size material, which does not break down under the action of compaction equipment, will limit the suitability of partially weathered rock materials. Engineering judgment will be required in the field to evaluate the acceptability of partially weathered rock materials for reuse as structural fill.

For planning purposes, we recommend assuming that blast rock will not be suitable for reuse as structural fill.

Structural Fill

Materials selected for use as structural fill should be free of organic matter, waste construction debris, and other deleterious materials. In general, the material should not contain rocks having diameters over

4 inches. It is our opinion that the following soils represented by their USCS group symbols will typically be suitable for use as structural fill and are commonly found in abundance in the Piedmont region: (CL), (SM), and (ML). The following soil types are typically suitable but are not abundant in the Piedmont region: (SW), (SP), (SC), (SP-SM), and (SP-SC). The following soil types are considered unsuitable: (MH), (CH), (OL), (OH), and (Pt).

Laboratory Proctor compaction tests should be performed on representative samples of proposed fill materials to provide data necessary to determine acceptability and for quality control. Soils having a standard Proctor maximum dry density of less than 90 pcf should be considered unsuitable unless laboratory evaluations of their stress-strain characteristics indicate that they will perform acceptably. The moisture content of suitable borrow soils should generally be no more than 3 percentage points above or below their

September 24, 2025 | 12 optimum moisture content at the time of compaction. Tighter moisture limits may be necessary with certain soils.

Suitable fill material should be placed in thin lifts. Lift thickness depends on the type of compaction equipment; but in general lifts of 8 inches loose measurement are recommended. The soil should be compacted by heavy compaction equipment such as a self-propelled sheepsfoot roller. If highly micaceous soils exist at finished subgrade elevation, a smooth-drum, steel-wheeled roller can often be used to compact loose surface soils. Within small excavations, such as those in utility trenches or around manholes, we recommend the use of “wacker packers” or “Rammax” compactors to achieve the specified compaction.

Loose lift thicknesses of 4 to 6 inches are recommended in small area fills.

We recommend that structural fill be compacted to at least 95 percent of the standard Proctor maximum dry density (ASTM D698). The upper 12 inches of floor slab subgrade soils should be compacted to at least 98 percent of the standard Proctor maximum dry density (ASTM D698). Following Georgia DOT guidelines, the upper 12 inches of pavement subgrade soils should be compacted to at least 100 percent of the standard Proctor maximum dry density. Geo-Hydro should perform density tests during fill placement.

Earth Pressure (Cast-In-Place Walls)

Three earth pressure conditions are generally considered for retaining wall design: "at rest", "active", and

"passive" stress conditions. Retaining walls which are rigidly restrained at the top and will be essentially unable to rotate under the action of earth pressure (such loading dock walls) should be designed for "at rest" conditions. Retaining walls which can move outward at the top as much as 0.5 percent of the wall height

(such as free-standing walls) should be designed for "active" conditions. For the evaluation of the resistance of soil to lateral loads the "passive" earth pressure must be calculated. It should be noted that full development of passive pressure requires deflections toward the soil mass on the order of 1.0 percent to 4.0 percent of total wall height.

Earth pressure may be evaluated using the following equation:

ph = K (DwZ + qs) + Ww(Z-d) where: ph = horizontal earth pressure at any depth below the ground surface (Z).

Ww = unit weight of water

Z = depth to any point below the ground surface d = depth to groundwater surface

Dw = wet unit weight of the soil backfill (depending on borrow sources). The wet unit weight of most residual soils may be expected to range from approximately 115 to 125 pcf.

Below the groundwater level, Dw must be the buoyant weight.

qs = uniform surcharge load (add equivalent uniform surcharge to account for construction equipment loads)

K = earth pressure coefficient as follows:

September 24, 2025 | 13

Earth Pressure Condition Coefficient

At Rest (Ko) 0.53

Active (Ka) 0.36

Passive (Kp) 2.8

The groundwater term, Ww(Z-d), should be used if no drainage system is incorporated behind retaining walls. If a drainage system is included which will not allow the development of any water pressure behind the wall, then the groundwater term may be omitted. The development of excessive water pressure is a common cause of retaining wall failures. Drainage systems should be carefully designed to ensure that long term permanent drainage is accomplished.

The above design recommendations are based on the following assumptions:

• Horizontal backfill

• 95 percent standard Proctor compactive effort on backfill (ASTM D698)

• No safety factor is included

For convenience, equivalent fluid densities are frequently used for the calculation of lateral earth pressures.

For "at rest" stress conditions, an equivalent fluid density of 66 pcf may be used. For the "active" state of stress an equivalent fluid density of 45 pcf may be used. These equivalent fluid densities are based on the assumptions that drainage behind the retaining wall will allow no development of hydrostatic pressure; that native sandy silts or silty sands will be used as backfill; that the backfill soils will be compacted to

95 percent of standard Proctor maximum dry density; that backfill will be horizontal; and that no surcharge loads will be applied.

For analysis of sliding resistance of the base of a cast-in-place concrete retaining wall, the coefficient of friction may be taken as 0.4 for the soils at the project site. This is an ultimate value, and an adequate factor of safety should be used in design. Customarily, retaining wall design includes a factor of safety which affects the global design. Using that design approach, it is not necessary to reduce the coefficient of friction as a design input. Such a reduction, coupled with the global factor of safety applied to the wall design, would place an unreasonable reduction in the calculation of the frictional resistance. The force that resists base sliding is calculated by multiplying the normal force on the base by the coefficient of friction. Full development of the frictional force could require deflection of the base of roughly 0.1 to 0.3 inches.

Foundation Design

After general site preparation and site grading have been completed in accordance with the recommendations of this report, it is our opinion that the planned restroom/concession building can be supported using conventional shallow foundations or concrete slab on grade. For planning and design purposes, we recommend using an allowable bearing pressure of 3,000 psf for column loads no greater than

30 kips and wall loads not exceeding 3 kips per lineal foot. In addition, we recommend a minimum width of 24 inches for column footings and 18 inches for continuous wall footings to prevent general bearing capacity failure. Footings should bear at a minimum depth of 18 inches below the prevailing exterior ground surface elevation to avoid potential problems due to frost heave.

September 24, 2025 | 14

The recommended allowable soil bearing pressure is based on an estimated maximum total foundation settlement no greater than approximately 1 inch, with anticipated differential settlement between adjacent columns not exceeding about ½ inch. If the architect or structural engineer determine that the estimated total or differential settlement cannot be accommodated by the proposed structure, please contact us.

Foundation bearing surface evaluations should be performed in all footing excavations prior to placement of reinforcing steel. Geo-Hydro should perform these evaluations to confirm that the design allowable soil bearing pressure is available. Foundation bearing surface evaluations should be performed using a combination of visual observation, hand augering, and portable dynamic cone penetrometer testing

(ASTM STP-399).

Remedial measures should be based on actual field conditions. However, in most cases we expect the use of the stone replacement technique to be the primary remedial measure. Stone replacement involves the removal of soft or loose soils, and replacement with well-compacted graded aggregate base (GAB) meeting

Georgia Department of Transportation specifications for gradation. Stone replacement is generally performed to depths ranging from a few inches to as much as 2 times the footing width, depending on the actual conditions. For budgeting purposes, we suggest considering a contingency to treat approximately

20 percent of the foundation excavations using stone replacement extending to a depth of 3½ feet below bearing elevation. The actual quantity of stone replacement will be different and may exceed the suggested estimate.

Seismic Design

Based on the results of borings performed for the project, and following the calculation procedure in the

2018 International Building Code (Chapter 20, ASCE 7-16), the seismic Site Class for the site is D. The seismic design parameters are as follows: SS=0.199, S1=0.085, SDS=0.212, SD1=0.136.

Based on the information obtained from the soil test borings, it is our opinion that the potential for liquefaction of the residual soils at the site due to earthquake activity is relatively low.

Floor Slab Subgrade Preparation

The soil subgrade in the area of concrete slab-on-grade support is often disturbed during foundation and superstructure construction. We recommend that the floor slab subgrade be evaluated by Geo-Hydro immediately prior to beginning floor slab construction. If low consistency soils are encountered which cannot be adequately densified in place, such soils should be removed and replaced with well-compacted fill material placed in accordance with the Structural Fill section of this report or with well-compacted graded aggregate base (GAB).

Assuming that the top 12 inches of floor slab subgrade soils are compacted to at least 98 percent of the standard Proctor maximum dry density, we recommend that a modulus of subgrade reaction of 120 pci be used for design. This value is suitable only for light floor loads (no greater than 150 psf) and transient loads, and should not be used for designing thickened slab sections or floors supporting permanent or

September 24, 2025 | 15 semi-permanent loads such as those from equipment and storage racks. For floor areas supporting permanent or semi-permanent loads from floor storage, storage racks, equipment, etc., we recommend using a modulus of subgrade reaction of 70 pci for design purposes.

Moisture Control for Concrete Slabs

To prevent the capillary rise of groundwater from adversely affecting the concrete slab-on-grade floor system, we recommend that all slab-on-grade construction in areas other than the apparatus bay be underlain by a minimum 4-inch thickness of open-graded stone. Use of #57 crushed stone meeting Georgia DOT specifications for gradation is suggested. The stone should be covered by a vapor retarder consisting of polyethylene sheeting at least 10 mils thick.

For any floor areas that may be subjected to relatively heavy wheel loads from vehicles, lift platforms, or other similar equipment, we recommend that slab-on-grade floors be underlain by a minimum 5-inch thickness of GDOT compliant graded aggregate base (GAB) compacted to at least 100 percent of the modified Proctor maximum dry density (ASTM D1557). The GAB must be covered by a vapor retarder as suggested above.

Asphalt Playing Surface

Based on the location of the project and our experience, an asphalt court section matching the American

Sports Builder Association (ASBA) and United States Tennis Association

(USTA) guidelines for a freeze/thaw climate is most suited for this project.

Provided that materials (graded aggregate base and asphalt) are placed on properly prepared subgrade, the “Freeze/Thaw

Climate” section would provide better longevity as the topping course can be milled and overlaid in the future. The excerpt to the right was taken from the ASBA/USTA Tennis

Courts Construction and

Maintenance Manual.

GAB must be compacted to at least 100 percent of the modified Proctor maximum dry density(ASTM

D1557). Soil subgrade must be compacted to at least 100% standard Proctor maximum dry density (ASTM

D698).

September 24, 2025 | 16

All playing surface pavement construction should be performed in general accordance with ASBA/USTA specifications. Proper subgrade compaction and compliance with project plans and specifications, will be critical to the performance of the constructed playing surface.

Flexible Pavement Design

Based on our experience with similar projects, assuming standard pavement design parameters, and contingent upon proper pavement subgrade preparation, we recommend the following pavement sections:

Entrance/Exit Driveways and Truck Traffic Areas

Material Thickness (inches) Asphaltic Concrete 9.5mm Superpave Type II 2

Asphaltic Concrete 19mm Superpave 2

Graded Aggregate Base (GAB) (Base Course) 8

Subgrade compacted to at least 100% standard Proctor maximum dry density (ASTM D698)

Automobile Parking and Automobile Traffic Only

Material Thickness (inches) Asphaltic Concrete 9.5mm Superpave Type II 2

Graded Aggregate Base (GAB) (Base Course) 6

Subgrade compacted to at least 100% standard Proctor maximum dry density (ASTM D-698)

A concrete thickness of 7 inches is recommended for the approach and collection zone in front of any dumpster, in loading/unloading zones, and in any designated truck turn-around areas. Please refer to the

Concrete Pavement section of this report for concrete pavement recommendations.

The top 12 inches of pavement subgrade soils should be compacted to at least 100 percent of the standard

Proctor maximum dry density (ASTM D698). Scarification and moisture adjustment will likely be required to achieve the recommended subgrade compaction level. Allowances for pavement subgrade preparation should be considered for budgeting and scheduling.

GAB must be compacted to at least 100 percent of the modified Proctor maximum dry density

(ASTM D1557).

All pavement construction should be performed in general accordance with Georgia DOT specifications.

Proper subgrade compaction, adherence to Georgia DOT specifications, and compliance with project plans and specifications, will be critical to the performance of the constructed pavement.

Concrete Pavement

A rigid Portland cement concrete pavement may be considered. Although usually more costly, a Portland cement concrete pavement is typically more durable and requires less maintenance throughout the life cycle

September 24, 2025 | 17 of the facility. Concrete thicknesses of 5 inches in automobile parking areas and 6 inches in driveways and truck traffic areas are recommended for this project. A concrete thickness of 7 inches is recommended for the approach and collection zone in front of the dumpster, in loading/unloading zones, and in any designated truck turn-around areas. A 600-psi flexural strength concrete mix with 4 to 6 percent air entrainment should be used. The concrete pavement should be underlain by no less than 5 inches of compacted graded aggregate base (GAB). GAB should be compacted to at least 100 percent of the modified Proctor maximum dry density (ASTM D1557). The top 12 inches of soil subgrade should be compacted to at least 100 percent of the standard Proctor maximum dry density (ASTM D698).

The concrete pavement may be designed as a “plain concrete pavement” with no reinforcing steel, or reinforcing steel may be used at joints. Construction joints and other design details should be in accordance with guidelines provided by the Portland Cement Association and the American Concrete Institute.

In general, all pavement construction should be in accordance with Georgia DOT specifications. Proper subgrade compaction, adherence to Georgia DOT specifications, and compliance with project plans and specifications will be critical to the performance of the constructed pavement.

Pavement Design Limitations

The pavement sections discussed above are based on our experience with similar type facilities. After traffic information has been developed, we recommend that you allow us to review the traffic data and revise our recommendations as necessary.

Pavement Materials Testing (Pavements and Playing Surface)

To aid in verifying that the pavement system is installed in general accordance with the design considerations, the following materials testing services are recommended:

• Density testing of subgrade materials.

• Proofrolling of pavement subgrade materials immediately prior to placement of graded aggregate base

(GAB). This proofrolling should be performed the same day GAB is installed.

• Density testing of GAB and verification of GAB thickness. In-place density should be verified using the sand cone (ASTM D1556) or Nuclear Density Gauge method (ASTM D6938).

• Coring of the pavement to verify thickness and density (asphalt pavement only).

• Preparation and testing of beams and cylinders for flexural and compressive strength testing (Portland cement concrete only). The total number of test specimens required will depend on the number of concrete placement events necessary to construct the pavement.

September 24, 2025 | 18

We appreciate the opportunity to serve as your geotechnical consultant for this project and are prepared to provide any additional services you may require. If you have any questions concerning this report or any of our services, please call us.

Sincerely, GEO-HYDRO ENGINEERS, INC.

John T. Redding, P.E. A. Marty Peninger, P.E.

Geotechnical Engineer Georgia Geotechnical Manager jredding@geohydro.com mpeninger@geohydro.com

JTR/AMP/251860.20 - Oconee Veterans Park Tennis Court Expansion - Watkinsville

APPENDIX

Figure 1: Site Location Plan

Approximate Scale, Miles

0 0.25 0.5 1 1.5

Oconee Veterans Park Tennis Court Expansion

Watkinsville, Georgia

Geo-Hydro Project Number 251860.20

Site

Oconee Veterans Park Tennis Court Expansion

Watkinsville, Georgia

Geo-Hydro Project Number 251860.20

LEGEND: Soil Test Boring

Approximate Scale: 1"=150'

150 300

Figure 2: Boring Location Plan

P

P

S

S

S

S

S

S

S

S

G

A

S

P

X X X X X X X X

T

X X X X X X X X

X X

P

P

SVC

SVC

P P

X X X X X X X X

X X X X X X X X

XXXXXXXX

XXXXXXXX

W

X

P

W

X X

P

X

P

XX

XXXXXXXX

XXXXXXXX

GAS

S

V

C

S

V

C

S

V

C

S

V

C

T

G

A

S

G

A

S

X

X

X

X

X

S

V

C

S

V

C

S

V

C

P

T

P

P

W

W

G

A

S

P

T

P

T

G

A

S

P

P

X

X

X

X

W

X

X

X

X

X

P

W

P

X

X

X

X

X

G

A

S

P

W

P

G

A

S

X

P

P

T

G

A

S

X

X

X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

XX

X

X X

X X

X X

X X

X X

X X

W

X

P

P

X

X X

X

X X

X X

X X

X X

X X

P

P

X

X X

X X

P

X X

X X

X X

X X

G A

S

P

X X

X X

W

W

P

G A

S

X X

X X

P

X

X

T

P

W

G

A

S

X

W

W

G

A

S

T

G

A

S

P

P

P

G

A

S

G

A

S

P

W

W

P

G

A S

W

G

A

S

P

W

W

P

P

W

T

P

T

W

W

W

P

P

P

P

B-8

B-7

B-6

B-5

B-4

B-3

B-2

B-1

I:Main/Geo/Misc/Symbols&Nomenclature

Symbols and Nomenclature

Symbols ▐ Thin-walled tube (TWT) sample recovered

Thin-walled tube (TWT) sample not recovered

● Standard penetration resistance (ASTM D1586)

50/2” Number of blows (50) to drive the split-spoon a number of inches (2)

65% Percentage of rock core recovered

RQD Rock quality designation - % of recovered core sample which is 4 or more inches long

GW Groundwater

Water level at least 24 hours after drilling

Water level one hour or less after drilling

ALLUV Alluvium

TOP Topsoil

PM Pavement Materials

CONC Concrete

FILL Fill Material

RES Residual Soil

PWR Partially Weathered Rock

SPT Standard Penetration Testing

Penetration Resistance Results Approximate Number of Blows, N Relative Density Sands 0-4 very loose

5-10 loose 11-20 firm 21-30 very firm 31-50 dense Over 50 very dense

Approximate Number of Blows, N Consistency Silts and 0-1 very soft Clays 2-4 soft 5-8 firm 9-15 stiff 16-30 very stiff 31-50 hard Over 50 very hard

Drilling Procedures Soil sampling and standard penetration testing performed in accordance with ASTM D 1586. The standard penetration resistance is the number of blows of a 140-pound hammer falling 30 inches to drive a 2-inch O.D., 1.4-inch I.D. split-spoon sampler one foot. Rock coring is performed in accordance with ASTM D 2113. Thin-walled tube sampling is performed in accordance with ASTM D 1587.

Topsoil (Approximately 1 inch) Stiff red and orange fine sandy clay (CL)

(FILL)

Firm orange clayey fine sand (SC)

(RESIDUUM)

Stiff to very stiff orange and tan fine sandy silt (ML)

Boring Terminated at 20 feet

E le v.

(F t)

0 30 40 100

S ym bo l

Test Boring Record D ep th

(F t)

G W

T

GWT at Drilling: Not Encountered

50 70

Date: 9/11/25

GWT at 24 hrs: N/A (Boring Backfilled) Logged By: AM

Method: HSA- ASTM D1586

Project No: 251860.20Project: Oconee Veterans Park Tennis Court Expansion

Location: Watkinsville, Georgia

Remarks:

Standard Penetration Test (Blows/Foot)

B-1

G.S. Elev: 788

Description

Driller: SD (Rope & Cathead)

N

T E

S T

B O

R

IN

G R

E C

O R

D L

O G

S .G

P J

G E

O H

Y D

R O

.G D

T

9/

/2

Very firm red and orange silty fine sand (SM)

(FILL)

Stiff micaceous red and orange fine sandy silt (ML) (FILL)

Very stiff micaceous red and orange fine sandy silt (ML) (RESIDUUM)

Loose to firm orange and tan silty fine sand

(SM)

Boring Terminated at 20 feet

E le v.

(F t)

0 30 40 100

S ym bo l

Test Boring Record D ep th

(F t)

G W

T

GWT at Drilling: Not Encountered

50 70

Date: 9/11/25

GWT at 24 hrs: N/A (Boring Backfilled) Logged By: AM

Method: HSA- ASTM D1586

Project No: 251860.20Project: Oconee Veterans Park Tennis Court Expansion

Location: Watkinsville, Georgia

Remarks:

Standard Penetration Test (Blows/Foot)

B-2

G.S. Elev: 792

Description

Driller: SD (Rope & Cathead)

N

T E

S T

B O

R

IN

G R

E C

O R

D L

O G

S .G

P J

G E

O H

Y D

R O

.G

Firm brown and orange silty…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .