Geotech_Report_-_Pocahontas_Drive_Lift_Station_(24-292)_10.28.24_(1).pdf
PDF 18 MB Posted
- Attached to
- POCAHONTAS LIFT STATION REPLACEMENT PROJECT
- Solicitation number
- ITB WS 52-26
- Issued by
- Okaloosa County, Florida
About this file
This is a geotechnical report prepared by Larry M. Jacobs & Associates, Inc. for Okaloosa County, Florida regarding subsurface conditions at the Pocahontas Drive Lift Station replacement project site located at the northwest corner of Bradford Drive and Pocahontas Drive in Fort Walton Beach. The report, dated October 28, 2024 and electronically signed by Keith V. Jacobs, PE (FL Reg. #66577), documents findings from one Standard Penetration Test boring drilled to a depth of 41 feet. The proposed project involves replacement of an existing lift station with a new 6-foot diameter precast wet well with a bottom depth approximately 25 feet below existing grade. The boring revealed slightly silty sand and sand in the upper 16 feet, very soft very sandy clay from 16 to 28 feet, and sand and slightly silty sand to the bottom at 41 feet. Groundwater was encountered at 3 feet below grade at the time of drilling and will vary with tidal fluctuations, rainfall, and site drainage changes.
The report provides comprehensive recommendations for construction activities including dewatering requirements, excavation safety protocols, and earthwork specifications. Dewatering using well points is required with at least two perimeter rings—one above and one below the clay layer—with groundwater maintained a minimum of 3 feet below planned excavation depth. The boring identified very soft clay unsuitable for lift station foundation support, requiring over-excavation of 2 to 4 feet to reach underlying medium dense sandy soils, with excavated clay material to be hauled offsite. Backfill material specifications require minimum 95 percent compaction using ASTM D1557 standards, with testing verification at specified frequencies. The report recommends sheet pile design by a registered Florida professional engineer for excavations exceeding 20 feet depth, pre-existing condition surveys and vibration monitoring for nearby structures due to pile driving impacts, and involvement of the geotechnical engineer during construction phases to verify recommendations implementation and address any differing subsurface conditions encountered.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pocahontas_LS_Replacement_Bid_Specs.pdf | ||
| Pocahontas_LS_Replacement_Bid_Drawings_S&S.pdf | ||
| ITB_WS_52-26_Final_050126.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This document has been electronically signed and sealed by Keith V. Jacobs (license # 66577) on October 28, 2024. Printed copies of this document are not considered signed and sealed, and the signature must be verified on any electronic copies.
Pocahontas Drive Lift Station Okaloosa County, Florida LMJ File #: 24-292 October 28, 2024
Prepared for
Mr. Blaine Beck, PE blaine.beck@jacobs.com
Prepared by
Larry M. Jacobs & Associates, Inc.
328 East Gadsden Street, Pensacola, Florida 32501 Florida Certificate of Authorization #2184
Keith V. Jacobs, PE Principal Engineer FL Reg. #66577 mailto:blaine.beck@jacobs.com
Pocahontas Drive Lift Station LMJ Project 24-292 October 28, 2024
Subsurface Conditions
▼ The boring encountered slightly silty sand and sand in the upper16 feet where very soft very sandy clay was encountered to 28 feet underlain by sand and slightly silty sand to the bottom of the boring at 41 feet.
▼ The boring was loose and medium dense in the top 13 feet, very loose/very soft to 28 feet, and medium dense to the bottom of the boring at 41 feet.
▼ Groundwater was encountered at 3½ feet below grade at the time of drilling.
▼ Groundwater levels will vary with the tide, the amount of local rainfall, and changes in site drainage characteristics and may be different at other times.
General Comments and Recommendations
▼ Dewatering will be needed to install the lift station, and well points are typically used for lift station construction in similar soils.
▼ We anticipate at least two perimeter rings of wells with one set above the clay layer and one below the clay layer to effectively dewater the sandy soils above and below the clay.
▼ We recommend that well points below the clay layer maintain groundwater a minimum depth of 3 feet below the bottom of the planned excavation, which could be up to 30+/-feet below existing grade (as needed to remove poor soils).
▼ The lift station boring encountered very soft clay at the anticipated lift station bottom depth that is not suitable for support of the lift station.
▼ We recommend over-excavating the soft clay soils beneath the lift station concrete collar down to the underlying medium dense sandy soils per this report.
▼ The clay soils are not suitable for lift station backfill and will need to be hauled offsite.
Note: The above summary is an overview of the report and should not be used by itself for planning, design, and/or construction. See the relevant sections for further details.
Summary
Project Information
The site lift station site is located at the northwest corner of the intersection of Bradford Drive and Pocahontas Drive in Fort Walton Beach, Florida. Based on Google Earth®, existing grade near the existing lift station is roughly 8 feet. At the time of drilling, the existing lift station area was fenced.
Proposed Construction
The project consists of the replacement of the existing lift station. The new lift station is planned to be 6 feet in diameter with a bottom of well depth around 25 feet below existing grade. The lift station is planned to have a concrete collar at the bottom with crushed stone below the concrete. We understand the existing well is planned to be buried in place.
Subsurface Exploration
Our exploration included one Standard Penetration Test (SPT) boring drilled for the proposed lift station to a depth of 41 feet. The boring was drilled using a truck mounted drill rig and was advanced between sampling using a “mud” jetting technique with bentonite drilling mud. The subsurface conditions encountered in the boring can be found on the boring log here.
The above project information is the basis of our recommendations. If this information changes or is incorrect, our office should be notified, and changes to our report may be needed.
Project Information
Dewatering ▼ Dewatering will be needed to install the lift station, and well points are typically used for lift station construction in similar soils.
▼ We anticipate at least two perimeter rings of wells with one set above the clay layer and one below the clay layer to effectively dewater the sandy soils above and below the clay.
▼ We recommend that well points below the clay layer maintain groundwater a minimum depth of 3 feet below the bottom of the planned excavation, which could be up to 30+/- feet below existing grade (as needed to remove poor soils).
▼ Dewatering should occur prior to excavating and should be maintained until backfill operations are complete.
▼ Dewatering pump failure could cause significant disturbance or “boiling” of the bottom of the excavation which could require extensive restoration measures like undercutting and/or replacing of disturbed/loosened soils. LMJ should be notified if any such events occur, and additional recommendations or testing may be needed.
Excavations All excavations should be made at a safe slope (1.5H:1V minimum) or sheeting, shoring, or trench boxes should be used. We expect that sheeting will be used to install the lift station.
Note that significant rainfall events and flowing groundwater (seepage forces) through excavation walls can be destabilizing, and stormwater runoff, seepage, and erosion should be controlled for all excavations. The contractor is solely responsible for designing and constructing safe excavations that maintain stability during construction. All excavations should be in accordance with the latest local, state, and federal safety regulations. We recommend that the sheet piles be designed by a registered professional engineer licensed in the state of Florida, which is also an OSHA requirement for excavations deeper than 20 feet.
▼ Estimated unit weights (γ), friction angles (φ), and cohesion (c) values are noted on the boring log if needed for sheet pile design/analysis. These estimated soil parameters are based on the SPT values, published correlations, and our experience with similar soils.
▼ Note that the unit weights provided are moist/buoyant.
▼ We recommend installing sheets that penetrate a sufficient depth into the medium dense soils encountered beneath the very soft clay layer, and a second waler (or struts) may be needed in addition to a top waler.
Vibration Discussion ▼ Driving sheet piles creates ground vibrations, and these vibrations can cause disturbance or damage to nearby existing structures.
▼ We recommend performing pre-existing conditions surveys of the nearby structures prior to any pile driving, which includes taking photos and documenting the existing conditions including obvious existing cracks or damage.
▼ We also recommend vibration monitoring during sheet pile installation and removal, and LMJ can provide the above services upon request.
Earthwork
Backfill Recommendations ▼ Backfill material should be the soil types listed in the following table.
▼ Excavated native soils can be used as backfill around the lift station except for the clay soils, which are unsuitable for use as backfill. Clay soils excavated for foundation construction should be hauled offsite.
▼ All backfill should be free of organic or deleterious materials and non-plastic.
▼ Samples of any imported fill material, if needed, should be submitted to the geotechnical engineer for testing and evaluation prior to shipment to the site.
Backfill Recommendations
Material Type
Lift Thickness (in) Hand Operated
Equipment Large Equipment
Hand Operated
Equipment Sand or Slightly Silty Sand 10-12 6 Plate Tamper
Silty/Clayey Sand 6-8 4 Jumping Jack
Compaction ▼ Backfill material should be moisture conditioned to within 2% of its optimum moisture content prior to compaction.
▼ The sand soils should be relatively easy to compact and will require ample moisture to achieve compaction. It is best to thoroughly wet dry sandy soils prior to compaction.
▼ We do not recommend using a large vibratory roller for this project because they can draw up groundwater and cause damage or disturbance to the nearby residences. A smaller, utility trench roller may be used.
▼ Compaction of backfill should be per the below table and should be verified by LMJ at the frequency in the below table.
Compaction and Testing Recommendations
Site Element Minimum
Compaction
(ASTM D1557)
Minimum Compaction Testing Frequency Per Lift
Backfill for Over-Excavation 95% 3 Minimum
Crushed Stone Under Concrete Collar 98% 3 Minimum
Backfill Around Lift Station 95% 2 per 12-inch increment of backfill
Earthwork
Lift Station Recommendations
▼ Dewatering will be needed to install the lift station, and recommendations for dewatering are provided in the earthwork section here.
▼ The lift station boring encountered very soft clay at the anticipated lift station bottom depth that is not suitable for support of the lift station.
▼ We recommend over-excavating the soft clay soils beneath the lift station concrete collar down to the underlying medium dense sandy soils.
▼ The 25-foot sample had very soft clay, and the 30-foot sample had medium dense slightly silty sand indicating that the conditions changed between samples. Based on the boring, undercut depths of roughly 2-4 feet could be needed to remove the very soft clay.
▼ The over-excavation should be widened a minimum of half the depth of the over-excavation on all sides of the concrete collar.
▼ We normally recommend placing a minimum of 12 inches of well-graded crushed stone beneath the concrete collar (such as FDOT Graded Aggregate Base or GAB).
▼ The over-excavation to remove unsuitable clay could be backfilled using compacted sandy soils or crushed stone, and backfill should be placed and compacted and compaction verified per the earthwork section of this report.
▼ If a well-graded crushed stone is used to backfill the undercut, it should be placed in 12-inch lifts compacted to a non-yielding surface up to 1 foot below the bottom of the collar.
▼ The crushed stone immediately under the concrete collar should be compacted for a minimum depth of 12 inches to a minimum of 98% of the material’s Modified Proctor density
(ASTM D1557).
▼ The bottom of the lift station over-excavation should be evaluated by LMJ to verify and document the removal of the unsuitable clay, and we recommend putting a note on the plans requiring this.
▼ To help reduce differential settlement between the well and connections such as piping, the lift station could be filled with water and allowed to settle prior to making piping connections to the well.
Lift Station
STANDARD PENETRATION TEST BORING
ALL BORING LOCATIONS ARE APPROXIMATE
N
B-1
09-04-24
DARK BROWN SILTY SAND (6")(TOPSOIL)(SM)
A
DEPTH
(FT)
PROBE
(IN)
SURFACE
0.5
1.5
2.5
HA
TAN/ORANGE LOOSE SLIGHTLY SAND (SP/SM)
TAN WITH ORANGE SEAMS LOOSE TO MEDIUM DENSE SAND (SP)
WHITE MEDIUM DENSE SAND (SP)
DARK BROWN/BLACK SLIGHTLY SILTY SAND (SP/SM)
GRAY VERY LOOSE SLIGHTLY SILTY SAND (SP/SM)
GRAY VERY SOFT VERY SANDY CLAY WITH CLAYEY
SAND POCKETS (CH)
GRAY/GREEN VERY SOFT VERY SANDY CLAY (CH)
GRAY MEDIUM DENSE SLIGHTLY SILTY SAND (SP/SM)
WHITE/LIGHT GRAY MEDIUM DENSE SAND WITH SOME
CLAYEY SAND POCKETS (SP)
w=81.5
LL=100
PL=35
PI=65
LI=0.71
w=98.3 -200=52.7 w=13.3 -200=6.2 φ
100/50 γ γ
31105/55
2485/35
90/40
31105/55 c 250 c 250 c
Boring Location Map
Boring
L
Test Results
Laboratory testing for this project included wash #200 sieve tests, natural moisture content tests, and one Atterberg Limits tests run on selected spilt spoon samples to assist in soil classification and to evaluate and document soil properties. A pocket penetrometer was used to estimate the approximate cohesion of the clay samples. The laboratory test results are shown on the boring log adjacent to the samples tested.
Lab
Basis of Recommendations
Recommendations rendered herein are based on assumed and/or design information available at the time of this report, the subsurface conditions encountered in the test boring, generally accepted geotechnical engineering principles and practices, and our experience with similar soil and groundwater conditions. Should final project information or existing conditions differ from the information used in this report, or should any soil conditions not discussed in this report be encountered during construction, our office should be notified and retained so that this report can be modified as needed. LMJ should be provided the final plans and specifications for review to determine if any changes to our report are needed based on the final design and that our recommendations have been properly interpreted.
This report and any correspondence are intended for the exclusive use of our client for the specific application to the project discussed. LMJ is not responsible for the interpretations, conclusions, or recommendations made by others based on the information in this report.
Regardless of the care exercised in performing a Geotechnical Exploration, the possibility always exists that soil and/or groundwater conditions will differ from those encountered at the specific boring locations. In addition, construction operations may alter the soil conditions.
Therefore, it is recommended that a representative from LMJ be involved during the construction phases discussed in this report.
Test Methods
Standard Penetration Test
The Standard Penetration Test (SPT) consists of driving a 2-inch diameter split spoon sampler into the ground using a 140-pound hammer dropped 30 inches. The number of blows required to drive the sampler one foot (after seating it 6 inches) is referred to as the blow count or “N” value and represents the relative density of subsurface soils. “N” values can be found on the boring logs. The SPT borings were drilled in general accordance with ASTM D1586 using a truck mounted drill rig. Each sample was removed from the sampler, classified in the field by the driller, and packaged for visual classification by our engineering staff and laboratory testing. The borings were sampled using an autohammer. FDOT converts autohammer to safety hammer using a factor of 1.24.
Other Test Methods
Wash #200 Sieve (ASTM D1140), Moisture Content (ASTM D2216), and Atterberg Limits
(ASTM D4318).
Appendix
LEGEND
SAFETY HAMMER AUTOMATIC HAMMER
GRANULAR SOILS
SPT
BLOWS/FOOT (N) RELATIVE DENSITY
0-2 VERY LOOSE
3-8 LOOSE
9-24 MEDIUM DENSE
25-40 DENSE
> 40 VERY DENSE
COHESIVE SOILS
BLOWS/FOOT (N) RELATIVE DENSITY
<1 VERY SOFT
1-3 SOFT
4-6 MEDIUM STIFF
7-12 STIFF
13-24 VERY STIFF
> 24 HARD
GRANULAR SOILS
SPT
BLOWS/FOOT (N) RELATIVE DENSITY
0-3 VERY LOOSE
4-10 LOOSE
11-30 MEDIUM DENSE
31-50 DENSE
> 50 VERY DENSE
COHESIVE SOILS
BLOWS/FOOT (N) RELATIVE DENSITY
0-1 VERY SOFT
2-4 SOFT
5-8 MEDIUM STIFF
9-15 STIFF
16-30 VERY STIFF
> 30 HARD
SAND
SILTY SAND
CLAY
PEAT
SLIGHTLY
SILTY SAND
SILT
CLAYEY
SAND
GRAVEL
GROUNDWATER NOT ENCOUNTERED
AT TIME OF DRILLING
STANDARD PENETRATION
RESISTANCE IN BLOWS PER FOOT
STANDARD PENETRATION
RESISTANCE USING AUTOHAMMER
ENCOUNTERED GROUNDWATER
LEVEL
ENCOUNTERED PERCHED WATER
LEVEL
NUMBER OF BLOWS REQUIRED (50)
TO ADVANCE SPLIT SPOON SAMPLER
A SPECIFIC DISTANCE (2) INCHES
SPLIT SPOON SAMPLE ADVANCED
UNDER WEIGHT OF ROD AND
HAMMER
HAND AUGER
SHELBY TUBE SAMPLER
NATURAL MOISTURE CONTENT (%)
FINES PASSING #200 SIEVE (%)
ORGANIC CONTENT (%)
LIQUID LIMIT
PLASTIC LIMIT
LIQUIDITY INDEX
APPROXIMATE COHESION VALUE
(PSF) BASED ON POCKET
PENETROMETER READINGS
SATURATED VERTICAL HYDRAULIC
CONDUCTIVITY (FT/DAY)
DRY UNIT WEIGHT (PCF)
ESTIMATED MOIST UNIT WEIGHT
(PCF)
ESTIMATED BUOYANT UNIT WEIGHT
(PCF)
ESTIMATED ANGLE OF INTERNAL
FRICTION (DEGREES)
w
Kv γ d
Appendix
NOTES
1) SPT BORINGS PERFORMED
IN GENERAL ACCORDANCE
WITH ASTM D1586
2) SUBSURFACE CONDITIONS
ARE AT BORING LOCATIONS
AND ACTUAL CONDITIONS
BETWEEN BORINGS MAY
VARY
3) ALL CLASSIFICATIONS ARE
BASED ON VISUAL
EXAMINATION UNLESS
ACCOMPANIED BY
LABORATORY TEST RESULTS
4) BOUNDARIES BETWEEN SOIL
LAYERS SHOULD BE
CONSIDERED APPROXIMATE
AS THE ACTUAL TRANSITION
MAY BE GRADUAL
5) DEPTH OF BORING IS BELOW
EXISTING GRADE AT TIME OF
DRILLING
6) ELEVATIONS, IF SHOWN,
WERE ESTIMATED FROM
PROVIDED TOPOGRAPHIC
SURVEY
7) COLORS USED FOR BORING
HATCHING MAY NOT
REPRESENT THE ACTUAL
SOIL COLORS
| ▼ The boring encountered slightly silty sand and sand in the upper16 feet where very soft very sandy clay was encountered to 28 feet underlain by sand and slightly silty sand to the bottom of the boring at 41 feet. |
| ▼ The boring was loose and medium dense in the top 13 feet, very loose/very soft to 28 feet, and medium dense to the bottom of the boring at 41 feet. |
| ▼ Groundwater was encountered at 3½ feet below grade at the time of drilling. |
| ▼ Groundwater levels will vary with the tide, the amount of local rainfall, and changes in site drainage characteristics and may be different at other times. |
| General Comments and Recommendations |
| ▼ The lift station boring encountered very soft clay at the anticipated lift station bottom depth that is not suitable for support of the lift station. |
| ▼ We recommend over-excavating the soft clay soils beneath the lift station concrete collar down to the underlying medium dense sandy soils per this report. |
| ▼ The clay soils are not suitable for lift station backfill and will need to be hauled offsite. |
| ▼ Driving sheet piles creates ground vibrations, and these vibrations can cause disturbance or damage to nearby existing structures. |
| ▼ We recommend performing pre-existing conditions surveys of the nearby structures prior to any pile driving, which includes taking photos and documenting the existing conditions including obvious existing cracks or damage. |
| ▼ We also recommend vibration monitoring during sheet pile installation and removal, and LMJ can provide the above services upon request. |
| ▼ Dewatering will be needed to install the lift station, and recommendations for dewatering are provided in the earthwork section here. |
| ▼ The lift station boring encountered very soft clay at the anticipated lift station bottom depth that is not suitable for support of the lift station. |
| ▼ We recommend over-excavating the soft clay soils beneath the lift station concrete collar down to the underlying medium dense sandy soils. |
| ▼ The 25-foot sample had very soft clay, and the 30-foot sample had medium dense slightly silty sand indicating that the conditions changed between samples. Based on the boring, undercut depths of roughly 2-4 feet could be needed to remove the very so... |
| ▼ The over-excavation should be widened a minimum of half the depth of the over-excavation on all sides of the concrete collar. |
| ▼ We normally recommend placing a minimum of 12 inches of well-graded crushed stone beneath the concrete collar (such as FDOT Graded Aggregate Base or GAB). |
| ▼ The over-excavation to remove unsuitable clay could be backfilled using compacted sandy soils or crushed stone, and backfill should be placed and compacted and compaction verified per the earthwork section of this report. |
| ▼ If a well-graded crushed stone is used to backfill the undercut, it should be placed in 12-inch lifts compacted to a non-yielding surface up to 1 foot below the bottom of the collar. |
| ▼ The crushed stone immediately under the concrete collar should be compacted for a minimum depth of 12 inches to a minimum of 98% of the material’s Modified Proctor density (ASTM D1557). |
| ▼ The bottom of the lift station over-excavation should be evaluated by LMJ to verify and document the removal of the unsuitable clay, and we recommend putting a note on the plans requiring this. |
| ▼ To help reduce differential settlement between the well and connections such as piping, the lift station could be filled with water and allowed to settle prior to making piping connections to the well. |
| Summary |
| Project Information |
| Earthwork |
| Earthwork |
| Lift Station |
| Boring |
| Lab |
| Appendix |
| Appendix |
| 2024-10-28T15:00:47-0500 | |
| Keith V Jacobs |
File details come from the government source that posted it. Updated .