This is a specification document for the Garden City Middle School Window Replacement Project, a capital construction project for Garden City Public Schools with French Associates serving as the architect. The project involves the replacement of windows at Garden City Middle School (Project No. 2019-005). The contract award is planned for May 6, 2019, with site demolition beginning June 17, 2019, after the last day of school on June 14, 2019. All project work must be completed by August 11, 2019. Electrical work may commence prior to the end of the school year but only during non-school hours. Contractors are limited to designated construction areas within the contract limits and must provide parking for six administrative vehicles and maintain building access throughout the construction period.

The document establishes operational constraints requiring contractors to maintain the building in weather-tight condition, protect building occupants, and minimize interference with owner operations. Contractors must provide not less than five calendar days' notice before activities affecting owner operations and are prohibited from interrupting utilities, including electrical service, while school is in session. Site access is restricted during school operating hours, and administrative staff will remain in the building with cleaning operations continuing through the summer. The contractor assumes responsibility for repairing any damage caused by construction operations and maintaining all existing exits and walkways. The specification format follows the 50-division CSI/CSC MasterFormat numbering system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GARDEN CITY PUBLIC SCHOOLS

GARDEN CITY MIDDLE SCHOOL WINDOW REPLACEMENT

PROJECT NO. 2019-005

FRENCH ASSOCIATES, INC.

architects planners interiors

01 1000 - 1

SUMMARY

SECTION 01 1000 - SUMMARY

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Type of the Contract.

3. Owner-furnished products.

4. Use of premises.

5. Owner's occupancy requirements.

6. Work restrictions.

7. Specification formats and conventions.

B. Related Sections include the following:

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Identification:

a. Garden City Middle School Window Replacement

B. Owner: Garden City Schools

C. Architect: French Associates

1.4 OWNER-FURNISHED PRODUCTS

A. Owner will furnish products indicated. The Work includes providing support systems to receive Owner's equipment.

1.5 USE OF PREMISES

A. General: Each Contractor shall have limited use of premises for construction operations as indicated on Drawings by the Contract limits.

A. Use of Site: Refer to Attached site diagrams. Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

01 1000 - 2

SUMMARY

C. Schedule of Work:

1. Contract award is planned for May 6, 2019.

2. At all sites, site demolition can begin on June 17, 2019.

3. The last day of school is June 14, 2019.

4. Electrical work may begin prior to the end of the school year but it must occur during non-school hours.

5. The projects must be complete by August 11, 2019.

D. Site Access: Access to the site will be limited during school operating hours.

1. Owner Occupancy: Allow for partial Owner occupancy of the building and site.

a. Administrative staff will be in the building and building cleaning will continue during the summer. Provide a location for 6 cars to park and access to the building.

E. Use of Existing Building: Maintain existing building in a weather-tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.

1.6 OWNER'S OCCUPANCY REQUIREMENTS

A. Owner Occupancy: Owner will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations. Maintain existing exits, unless otherwise indicated.

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and authorities having jurisdiction.

2. Provide not less than five (5) calendar days notice to Owner of activities that will affect Owner's operations.

1.7 WORK RESTRICTIONS

A. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Owner not less than five days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Owner's written permission.

B. Utility interruptions, including electrical service will not be allowed while school is in session.

1.8 SPECIFICATION FORMATS AND CONVENTIONS

A. Specification Format: The Specifications are organized into Divisions and Sections using the 50-division format and CSI/CSC's "MasterFormat" numbering system.

1. Section Identification: The Specifications use Section numbers and titles to help cross-referencing in the Contract Documents. Sections in the Project Manual are in numeric sequence; however, the sequence is incomplete because all available Section numbers

01 1000 - 3

SUMMARY

are not used. Consult the table of contents at the beginning of the Project Manual to determine numbers and names of Sections in the Contract Documents.

2. Division 01: Sections in Division 01 govern the execution of the Work of all Sections in the Specifications.

B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate.

Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.

2. Imperative mood and streamlined language are generally used in the Specifications.

Requirements expressed in the imperative mood are to be performed by Contractor.

Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.

a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 1000

PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Work covered by the Contract Documents.
2. Type of the Contract.
3. Owner-furnished products.
4. Use of premises.
5. Owner's occupancy requirements.
6. Work restrictions.
7. Specification formats and conventions.

B. Related Sections include the following:

1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Identification:
a. Garden City Middle School Window Replacement
B. Owner: Garden City Schools
C. Architect: French Associates
1.4 OWNER-FURNISHED PRODUCTS
A. Owner will furnish products indicated. The Work includes providing support systems to receive Owner's equipment.
1.5 USE OF PREMISES
A. General: Each Contractor shall have limited use of premises for construction operations as indicated on Drawings by the Contract limits.
A. Use of Site: Refer to Attached site diagrams. Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
C. Schedule of Work:
1. Contract award is planned for May 6, 2019.
2. At all sites, site demolition can begin on June 17, 2019.
3. The last day of school is June 14, 2019.
4. Electrical work may begin prior to the end of the school year but it must occur during non-school hours.
5. The projects must be complete by August 11, 2019.
D. Site Access: Access to the site will be limited during school operating hours.
1. Owner Occupancy: Allow for partial Owner occupancy of the building and site.
a. Administrative staff will be in the building and building cleaning will continue during the summer. Provide a location for 6 cars to park and access to the building.

E. Use of Existing Building: Maintain existing building in a weather-tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.

1.6 OWNER'S OCCUPANCY REQUIREMENTS
A. Owner Occupancy: Owner will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the ...
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and authorities having jurisd...
2. Provide not less than five (5) calendar days notice to Owner of activities that will affect Owner's operations.
1.7 WORK RESTRICTIONS
A. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements...
1. Notify Owner not less than five days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Owner's written permission.

B. Utility interruptions, including electrical service will not be allowed while school is in session.

1.8 SPECIFICATION FORMATS AND CONVENTIONS
A. Specification Format: The Specifications are organized into Divisions and Sections using the 50-division format and CSI/CSC's "MasterFormat" numbering system.
1. Section Identification: The Specifications use Section numbers and titles to help cross-referencing in the Contract Documents. Sections in the Project Manual are in numeric sequence; however, the sequence is incomplete because all available Secti...
2. Division 01: Sections in Division 01 govern the execution of the Work of all Sections in the Specifications.
B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:
1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate. Words implied, but not stated, shall be inferred as the sense requires. Singular word...
2. Imperative mood and streamlined language are generally used in the Specifications. Requirements expressed in the imperative mood are to be performed by Contractor. Occasionally, the indicative or subjunctive mood may be used in the Section Text f...
a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)