About this file

This Statement of Work outlines requirements for installing a gas line at the Federal Correctional Institution (FCI) Williamsburg, with the project managed by the Department of Justice Bureau of Prisons. The work involves installing an appropriately sized gas line spanning approximately 5,500 feet from Dominion Energy's connection point at the front entrance along Highway 521 to the facility's powerhouse. The gas line must support three existing boilers and integrate with current systems while isolating other piping to maintain the original gas line's operation.

The solicitation (15B31625Q00000004) requires interested contractors to complete an onsite evaluation between December 16, 2024, and January 10, 2025, with final bid submissions due by January 17, 2025. This is a firm-fixed price contract with work completion required by March 15, 2025. The contractor must coordinate with Dominion Energy, who will handle meter installation and connection to their main line. Award will be based on past performance and price, with the possibility of single or multiple awards. The work location is 8301 Hwy 521, Salters, SC 29590.

View the file

Other files for this federal contract opportunity

Other files attached to Install Natural Gas Line, newest first.
File Type Posted
15B31625Q000000004.pdf PDF
15B31625Q000000004.pdf PDF
004 SOL Gas Line.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) for FCI Williamsburg Gas Line Installation

1. Introduction This Statement of Work (SOW) outlines the requirements for the installation of a gas line at the Federal Correctional Institution (FCI) Williamsburg. The project involves the installation of an appropriately sized gas line from Dominion Energy's connection point at the front entrance of FCI Williamsburg's property along Highway 521, extending approximately 5,500 feet to the powerhouse.

2. Scope of Work

· Gas Line Installation:

· Install an appropriately sized gas line spanning approximately 5,500 feet from Dominion Energy's connection point at the front entrance of FCI Williamsburg along Highway 521 to the powerhouse.

· Ensure the gas line is capable of supporting the operation of three existing boilers at the powerhouse.

· Connection must be made to current boilers

· Isolate all other piping to ensure the rest of the powerhouse runs from the original gas line.

· Coordination with Dominion Energy:

· Coordinate with Dominion Energy to ensure the connection at the highway is properly established.

· Dominion Energy will install the meter and make the connection to their line.

· Compliance:

· The installation must meet all relevant codes and specifications, ensuring safety and regulatory compliance.

· Work must be completed by 15 March 2025.