Summary of Garner Mechanical and Wash Bay Building Specifications
This specification document outlines the comprehensive technical requirements for the Iowa Department of Transportation's Mechanical and Wash Bay (MW) Building project located at 280 Highway 18E in Garner, Iowa. The specifications, prepared by IMEG Corp., detail construction standards across all major disciplines including civil, structural, concrete, masonry, metals, plumbing, HVAC, electrical, and related systems. The project encompasses approximately 11,000 square feet and includes the construction of a new maintenance facility with integrated wash bay capabilities. The specifications establish detailed requirements for materials, products, workmanship quality, testing procedures, and coordination protocols among multiple contractors. Key submission requirements include coordination drawings prepared in CAD format, shop drawings for all mechanical and electrical equipment, testing certifications, and comprehensive operation and maintenance manuals. The document references numerous industry standards including ACI, ASTM, ASHRAE, NFPA, and NEC codes to ensure compliance with current construction practices. Contractors are required to provide seven calendar days' notice prior to covering utilities and installing ceiling systems, with final project observation contingent upon completion of all work, testing reports, training documentation, and record drawings.
The specifications establish rigorous quality assurance protocols requiring all materials and equipment to be supplied by reputable manufacturers approved by the Architect/Engineer, with material substitutions requiring written approval at least ten days prior to bid opening. The Construction Manager at Risk procurement indicates qualification-based selection with cost as a secondary consideration, with proposals due November 18, 2025. Contractors must maintain comprehensive insurance coverage, provide one-year warranties on all work and materials, and coordinate extensively across mechanical, electrical, and technology trades to ensure proper system integration and adequate maintenance access. The document stipulates that contractors bear responsibility for all costs associated with coordination drawings, field condition verification, utility location, and any required modifications to accommodate spatial conflicts. Equipment relocation is required at no additional cost, and contractors are responsible for compliance with all local, state, and federal codes, with any code-compliance modifications mandated post-award to be performed at contractor expense. The specifications establish a structured commissioning process including factory-authorized startup inspections, system testing and balancing, operator training by factory personnel, and delivery of detailed operation and maintenance documentation prior to final payment authorization.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Garner MBW Page TOC BG-2D14 (008)-80-56 1 of 3 Table of Contents
TABLE OF CONTENTS
DIVISION 03 - CONCRETE
SECTION 03 2000 - CONCRETE REINFORCEMENT
SECTION 03 3000 - CAST-IN-PLACE CONCRETE
SECTION 03 4100 - STRUCTURAL PRECAST CONCRETE
DIVISION 04 - MASONRY
SECTION 04 2200 - REINFORCED UNIT MASONRY
DIVISION 05 - METALS
SECTION 05 2100 - STEEL JOISTS
SECTION 05 3100 - STEEL DECK
DIVISION 22 - PLUMBING
SECTION 22 0500 - BASIC PLUMBING REQUIREMENTS
SECTION 22 0503 - THROUGH PENETRATION FIRESTOPPING
SECTION 22 0513 - MOTORS
SECTION 22 0529 - PLUMBING SUPPORTS AND ANCHORS
SECTION 22 0548 - PLUMBING VIBRATION ISOLATION
SECTION 22 0553 - PLUMBING IDENTIFICATION
SECTION 22 0719 - PLUMBING PIPING INSULATION
SECTION 22 0900 - INSTRUMENTATION
SECTION 22 1000 - PLUMBING PIPING
SECTION 22 1023 - NATURAL GAS PIPING
SECTION 22 1030 - PLUMBING SPECIALTIES
SECTION 22 1123 - DOMESTIC WATER PUMPS
SECTION 22 1519 - COMPRESSED AIR SYSTEMS
SECTION 22 3000 - PLUMBING EQUIPMENT
SECTION 22 4000 - PLUMBING FIXTURES
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING(HVAC)
SECTION 23 0500 - BASIC HVAC REQUIREMENTS
SECTION 23 0503 - THROUGH PENETRATION FIRESTOPPING
SECTION 23 0513 - MOTORS
SECTION 23 0553 - HVAC IDENTIFICATION
% SET
Not for
C on str uc tio n
BG-2D14 (008)-80-56 2 of 3 Table of Contents
SECTION 23 0593 - TESTING, ADJUSTING, AND BALANCING
SECTION 23 0713 - DUCTWORK INSULATION
SECTION 23 0905 - SMALL EQUIPMENT CONTROLS
SECTION 23 3100 - DUCTWORK
SECTION 23 3300 - DUCTWORK ACCESSORIES
SECTION 23 3416 - CENTRIFUGAL FANS
SECTION 23 3423 - POWER VENTILATORS
SECTION 23 3700 - AIR INLETS AND OUTLETS
SECTION 23 5100 - BREECHINGS, CHIMNEYS, AND STACKS
SECTION 23 7423.13 - GAS FIRED MAKE-UP AIR UNITS
SECTION 23 8126 - SPLIT SYSTEM AIR CONDITIONING UNITS
SECTION 23 8200 - TERMINAL HEAT TRANSFER UNITS
DIVISION 26 - ELECTRICAL
SECTION 26 0500 - BASIC ELECTRICAL REQUIREMENTS
SECTION 26 0505 - ELECTRICAL DEMOLITION FOR REMODELING
SECTION 26 0513 - WIRE AND CABLE
SECTION 26 0526 - GROUNDING AND BONDING
SECTION 26 0527 - SUPPORTING DEVICES
SECTION 26 0533 - CONDUIT AND BOXES
SECTION 26 0553 - ELECTRICAL IDENTIFICATION
SECTION 26 0933 - LIGHTING CONTROL SYSTEMS
SECTION 26 2000 - SERVICE ENTRANCE
SECTION 26 2416 - PANELBOARDS
SECTION 26 2419 - MOTOR CONTROL
SECTION 26 2726 - WIRING DEVICES
SECTION 26 2813 - FUSES
SECTION 26 2816 - DISCONNECT SWITCHES
SECTION 26 4300 - SURGE PROTECTION DEVICES
SECTION 26 5119 - LED LIGHTING
% SET
Not for
C on str uc
BG-2D14 (008)-80-56 3 of 3 Table of Contents
DIVISION 31 - EARTHWORK
SECTION 31 1000 - SITE CLEARING
SECTION 31 2200 - GRADING
SECTION 31 2300 - EXCAVATION AND BACKFILL
SECTION 31 2301 - FOUNDATION EXCAVATING AND BACKFILLING
SECTION 31 2500 - EROSION AND SEDIMENT CONTROL
SECTION 31 6613 - SHORT AGGREGATE PIER FOUNDATION SYSTEM
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 1216 - ASPHALT PAVEMENT
SECTION 32 1313 - CONCRETE PAVEMENT
SECTION 32 9110 - SURFACE RESTORATION
DIVISION 33 - UTILITIES
SECTION 33 1000 - WATER UTILITIES
SECTION 33 2000 - SANITARY SEWERAGE UTILITIES
END OF TABLE OF CONTENTS
% SET
Not for
C on str uc
Garner MBW Page 03 2000 BG-2D14 (008)-80-56 1 of 3 CONCRETE REINFORCEMENT
SECTION 03 2000
CONCRETE REINFORCEMENT
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Fabrication and placement of reinforcing steel for concrete and all related accessories.
B. Reinforcing steel for use in bond beams, masonry columns, and lintels is specified in Division 4 and is not a part of the work in this section.
C. Structural notes indicated on the drawings regarding concrete reinforcement shall be considered a part of this specification.
1.2 RELATED WORK
A. Pertinent Sections of Division 01.
B. Section 03 3000 - Cast-in-Place Concrete.
1.3 REFERENCES
A. Codes and Standards: Comply with the provisions of the following codes, specifications, and standards, except where more stringent requirements are shown or specified. Where provisions of other pertinent codes and standards conflict with this specification, the more stringent provision shall govern.
1. ACI 117 - Specification for Tolerances for Concrete Construction and Materials.
2. ACI 301 - Specifications for Structural Concrete.
3. ACI 318 - Building Code Requirements for Structural Concrete.
4. ACI SP-066 - ACI Detailing Manual.
5. ASTM A184 - Standard Specification for Welded Deformed Steel Bar Mats for Concrete Reinforcement.
6. ASTM A615 - Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement.
7. ASTM A706 - Standard Specification for Deformed and Plain Low-Allow Steel Bars for Concrete Reinforcement.
8. ASTM A1064 - Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete.
9. AWS D1.4 - Structural Welding Code - Reinforcing Steel.
10. Concrete Reinforcing Steel Institute (CRSI) - Manual of Standard Practice.
1.4 SUBMITTALS
A. Placing Drawings: Submit placing drawings showing fabrication dimensions and locations for placement of reinforcement and reinforcement accessories. Indicate bar sizes, spacing, locations, and quantities of reinforcing steel, bending and cutting diagrams, anchors, and supporting and spacing devices. Dowels shall be shown in placing drawings for the element that is to be placed first. Reinforcing steel descriptions or shop drawings shall be inch-pound sizes.
1.5 COORDINATION
A. Coordinate reinforcement installation with the placement of formwork and other embedded items such as inserts, conduit, pipe sleeves, drains, metal supports, anchor rods, etc.
% SET
Not for
C on str uc
BG-2D14 (008)-80-56 2 of 3 CONCRETE REINFORCEMENT
1.6 DELIVERY, STORAGE AND HANDLING
A. Deliver reinforcement to the jobsite in bundles sorted and labeled with durable tags indicating bar size, length, and shop drawing mark. Bundles shall also bear testing laboratory tags indicating identified steel.
B. Store elevated clear of ground and protect at all times from contamination and deterioration.
C. Prevent bending, coating with earth, oil, or other material, or otherwise damaging the reinforcement.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Bar Deformations: Bars used for reinforcement shall be deformed except column spirals and welded wire reinforcement, which may be plain.
B. Reinforcing Steel: Reinforcing steel shall conform to the ASTM standard and grade indicated in the General Notes on the drawings.
C. Welded Wire Reinforcement: Welded wire reinforcement shall conform to the ASTM standard indicated in the General Notes on the drawings.
D. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place. Manufacture bar supports according to CRSI's "Manual of Standard Practice" from steel wire, plastic, precast concrete, or fiber-reinforced concrete of greater compressive strength than concrete, and as follows:
1. For concrete surfaces exposed to view where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected or CRSI Class 2 stainless-steel bar supports.
2. Concrete cast against earth: Bars may be supported by precast concrete bricks or approved prefabricated wire bar supports complying with CRSI recommendations with footpads large enough to support the weight of the bars and construction traffic without being pushed into underlying grade. Precast concrete blocks shall have a minimum compressive strength of 6,000 psi.
2.2 FABRICATION
A. Fabrication Tolerances: Reinforcing steel shall be shop fabricated within tolerances according to ACI 117 and other applicable codes, and shall conform in size, shape, quantity, dimensions, etc. to the construction drawings and approved shop drawings.
B. Bar Condition: Bars shall be free from mill scale, excessive rust, and other coatings, which would reduce or destroy the bond with the concrete. Wipe oil from forms before reinforcement is placed on or adjacent to so that oil will not be tracked over or in any way come into contact with the reinforcement.
C. Bars Bending: Bars shall be bent cold, and no method of fabrication shall be used which would be injurious to the material. Heating of bars for bending is not permitted.
D. Identification: After fabrication, bars shall be sorted, bundled, and tagged with metal tags bearing the bar mark before delivery to the jobsite.
E. Reinforcing for continuous footings shall extend into spread footings a minimum of 2'-0".
F. Dowels between footings and walls or columns shall be the same grade, size and spacing or number as the vertical reinforcing respectively, unless noted otherwise.
PART 3 - EXECUTION
3.1 PLACING
A. Reinforcement Relocation: When necessary to move reinforcement beyond the specified spacing to avoid interference with other reinforcement, or embedded items, submit resulting arrangement of reinforcement to Structural Engineer for approval.
B. Reinforcement Cutting: Cutting of reinforcement which conflicts with embedded objects is not acceptable.
% SET
Not for
C on str uc
BG-2D14 (008)-80-56 3 of 3 CONCRETE REINFORCEMENT
C. Welded Wire Reinforcement: Extend welded wire reinforcement to within 1 inch of the concrete edge. Lap edges and ends of fabric sheets a minimum of two full mesh squares. Lace edges with 16-gauge tie wire. Support welded wire reinforcement during placing of concrete to assure required positioning in the slab. Do not place wire reinforcement on grade or metal deck and raise into position in freshly-placed concrete.
D. Wire Tie Orientation: Set wire ties so ends are directed away from the concrete surface.
E. Slab on Grade Reinforcement Placement: Place shrinkage and temperature reinforcement 1/3 of the slab thickness from the top surface of the slabs on grade unless noted otherwise on the drawings.
F. Do not cut, displace, or puncture vapor retarder. Repair damage and reseal vapor retarder before placing concrete.
G. Support for Reinforcement: Unless noted otherwise, supports for reinforcement shall have Class 2 protection as defined in the CRSI Manual of Standard Practice. Submit data on supports indicating class of protection at all different locations for approval. Supports shall not be used as bases for runways for concrete-conveying equipment and similar construction loads. Do not place reinforcing bars more than 2" beyond last leg of any continuous bar support.
H. Support for Bars in Concrete Cast on Ground: Bar supports for slabs on grade, grade beams, footings, and all other concrete cast directly onto grade shall be supported at an average spacing of 4 feet or less in each direction.
I. Securing Reinforcing Bars: All bars must be placed, spaced, secured, and supported prior to casting concrete. Bars embedded in hardened or partially hardened concrete shall not be bent unless approved in writing prior to placement by the Structural Engineer.
J. Foot Traffic: Restrict foot traffic over the slab on grade reinforcing after it has been properly positioned.
K. Reinforcement at Expansion Joints: Do not continue reinforcement or other embedded metal items bonded to concrete through expansion joints. Dowels bonded on only one side of a joint and waterstops may extend through joint.
L. Pumping Concrete: When using a pump to place concrete, pump hose shall be supported directly on forms. Do not allow hose to rest on reinforcing bars if doing so could cause displacement of bars.
END OF SECTION
% SET
Not for
C on str uc
Garner MBW Page 03 3000 BG-2D14 (008)-80-56 1 of 19 CAST-IN-PLACE CONCRETE
SECTION 03 3000
CAST-IN-PLACE CONCRETE
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. All items required for executing and completing the cast-in-place concrete work and related work shown on the drawings or specified herein. Work shall include installation of items furnished in other sections of these specifications.
B. Concrete paving, walks, and curbs are specified in Division 3 or 32.
C. Structural notes indicated on the drawings regarding cast-in-place concrete shall be considered a part of this specification.
1.2 RELATED WORK
A. Pertinent Sections of Division 01.
B. Section 03 2000 - Concrete Reinforcement.
C. Section 05 3100 - Steel Deck.
1.3 REFERENCES
A. Codes and Standards: Comply with the provisions of the following codes, specifications, and standards, except where more stringent requirements are shown or specified. Where any provision of other pertinent codes and standards conflict with this specification, the more stringent provision shall govern.
1. ACI 117 - Specification for Tolerances for Concrete Construction and Materials.
2. ACI 301 - Specifications for Structural Concrete.
3. ACI 302.1R - Guide to Concrete Floor and Slab Construction.
4. ACI 302.2R - Guide for Concrete Slabs that Received Moisture-Sensitive Flooring Materials.
5. ACI 304R - Guide to Measuring, Mixing, Transporting, and Placing Concrete.
6. ACI 305.1 - Specification for Hot Weather Concreting.
7. ACI 306.1 - Guide to Cold Weather Concreting.
8. ACI 308R - Guide to External Curing of Concrete.
9. ACI 309R - Guide for Consolidation of Concrete.
10. ACI 318 - Building Code Requirements for Structural Concrete.
11. ACI 347R - Guide to Formwork for Concrete.
12. ASTM C31 - Standard Practice for Making and Curing Concrete Test Specimens in the Field.
13. ASTM C33 - Standard Specification for Concrete Aggregates.
14. ASTM C39 - Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens.
15. ASTM C42 - Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete.
16. ASTM C88 - Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate.
17. ASTM C94 - Standard Specification for Ready-Mixed Concrete.
18. ASTM C131 - Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine.
19. ASTM C138 - Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete.
% SET
Not for
C on str uc
BG-2D14 (008)-80-56 2 of 19 CAST-IN-PLACE CONCRETE
20. ASTM C143 - Standard Test Method for Slump of Hydraulic Cement Concrete.
21. ASTM C150 - Standard Specification for Portland Cement.
22. ASTM C157 - Standard Test Method for Length Change of Hardened Hydraulic-Cement Mortar and Concrete
23. ASTM C171 - Standard Specification for Sheet Materials for Curing Concrete.
24. ASTM C172 - Standard Practice for Sampling Freshly Mixed Concrete.
25. ASTM C173 - Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method.
26. ASTM C231 - Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method.
27. ASTM C260 - Standard Specification for Air-Entraining Admixtures for Concrete.
28. ASTM C309 - Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete.
29. ASTM C494 - Standard Specification for Chemical Admixtures for Concrete.
30. ASTM C618 - Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete.
31. ASTM C1017 - Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete.
32. ASTM C1064 - Standard Test Method for Temperature of Freshly Mixed Hydraulic Cement Concrete.
33. ASTM C1077 - Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation.
34. ASTM C1107 - Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink).
35. ASTM D1751 - Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types).
36. ASTM D2103 - Standard Specification for Polyethylene Film and Sheeting.
37. ASTM E154 - Standard Test Methods for Water Vapor Retarders Used in Contact with Earth Under Concrete Slabs, on Walls, or as Ground Cover.
38. ASTM E329 - Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection.
39. ASTM E1745 - Standard Specification for Plastic Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs.
40. Concrete Reinforcing Steel Institute (CRSI) - Manual of Standard Practice.
1.4 SAMPLING AND TESTING REQUIREMENTS
A. Maintain records verifying materials used are of the specified and accepted types and sizes and are in conformance with the requirements of the Contract Documents.
B. Use of testing services will not relieve the Contractor of the responsibility to furnish materials and construction in full compliance with the Contract Documents.
C. Take samples of fresh concrete at the job site for each mix design placed each day. Sampling and testing shall be done after the final addition and proper mixing of any water or admixtures that are added on site.
1. Personnel and testing equipment shall meet the requirements of ASTM E329.
% SET
Not for
C on str uc
BG-2D14 (008)-80-56 3 of 19 CAST-IN-PLACE CONCRETE
2. Testing Frequency: Obtain at least one composite sample for each 150 cu. yd. or 5,000
sq. ft. of surface area, whichever is less or fraction thereof of each concrete mixture placed each day.
a. On a given project, if the total volume of concrete is such that the frequency of testing required above would provide less than five strength tests for a given class of concrete, tests shall be made from at least five randomly selected batches or from each batch if fewer than five batches are used.
3. A strength test shall be the average of the strengths of two 6x12 inch or three 4x8 inch cylinders made from the same sample of concrete and tested at 28 days.
D. For each sample of fresh concrete, perform the following duties:
1. Measure and record slump in accordance with ASTM C143.
2. Measure and record temperature in accordance with ASTM C1064.
a. Provide one test hourly when air temperature is 40°F and below and when 80°F and above, and one test for each composite sample.
3. Measure and record air content by volume in accordance with either ASTM C231 or
ASTM C173.
a. Wet cure specimens for a period of seven (7) days (including the period of time the specimens are in the mold). Wet cure may be achieved through storage in a moist cabinet or room in accordance with ASTM C511, or through storage in lime-saturated water.
b. Slump of concrete for testing shall match job requirements and need not be limited to the restrictions as stated in ASTM C157.
c. Report results in accordance with ASTM C157 at 0, 7, 14 and 28 days of drying.
4. Mold three 6x12 inch or four 4x8 inch cylinders (laboratory cylinders) in accordance with ASTM C31 to be laboratory-cured. Protect from moisture loss and maintain at 60°F to 80°F for 24 to 48 hours before moving. Deliver cylinders to testing laboratory for curing and testing.
5. Mold one cylinder (field cylinder) in accordance with ASTM C31 to be field-cured. Field cylinder shall be placed as near as possible to the in-place concrete from which it was taken, protected, and cured in the same manner. Deliver field-cured cylinder to testing laboratory, and measure and record compressive strength in accordance with ASTM C39. Field cylinder shall be used to determine if concrete footings, walls, or piers have reached the required compressive strength for steel erection to begin.
E. Measure and record compressive strength in accordance with ASTM C39 for laboratory cylinders. Test one laboratory cylinder at 7 days and all other cylinders at 28 days. Acceptance is based on the average of the two 6x12 inch or three 4x8 inch laboratory cured 28-day tests.
Notify Architect in the event strength levels do not meet the acceptance requirements of ACI 318.
1. Any additional cylinders molded for Contractor to have a compressive strength test done before seven days shall be at the Contractor's expense.
F. Prepare and submit test reports to the Architect/Engineer/Contractor and Supplier. Reports shall be completed and furnished within 48 hours of testing. Refer to description in Submittals.
G. When strength of field-cured cylinders is less than 85 percent of companion laboratory-cured cylinders, Contractor shall evaluate operations and provide corrective procedures for protecting and curing in-place concrete.
H. Should the strength of any grade of concrete for any portion of work, as indicated by molded test cylinders, fall below the minimum 28-day compressive strength specified on the drawings, upon approval of the Structural Engineer, the concrete supplier shall adjust the concrete mix for remaining portion of construction so that the resulting concrete meets the minimum strength requirements.
% SET
Not for
C on str uc
BG-2D14 (008)-80-56 4 of 19 CAST-IN-PLACE CONCRETE
1.5 SUBMITTALS
A. Concrete Materials: Submit information on concrete materials as listed below.
1. Cementitious materials: Submit type, class, producer name, and certification not more than 90 days old of compliance with applicable ASTM standard.
2. Aggregates: Submit type, pit or quarry location, producer name, gradations, specific gravity, water content, and certification not more than 90 days old.
3. Admixtures: Submit product data sheet. Product data shall include: dosages and performance data, brand names, producers, chloride ion concentrations, and certifications of compliance with applicable ASTM standard. Certifications shall not be more than 90 days old.
4. Water: Submit name of source.
B. Product Data: Prepare and submit product and performance data for materials and accessories, including patching compounds, joint systems, curing compounds, finish materials, and other concrete related items.
C. Testing Agency Qualifications: When requested, the proposed testing agencies shall submit data on qualifications for acceptance.
D. Concrete Mix Design:
1. Concrete mix design submittals shall be submitted to the Structural Engineer for review and approval at least 14 days prior to placing concrete.
2. Obtain Structural Engineer approval for each mix design prior to use, including new mix designs required to be prepared should there be a change in materials being used.
3. Submit concrete mixture proportions and characteristics for each concrete mix. Include standard deviation analysis or trial batch data with mix design. Submit historical field test data to demonstrate the average compressive strength for approval. Concrete mix proportions, materials, and handling methods for field test data or trial batches shall be the same as used for the work. Include the following information for each mix design:
a. Water/cementitious materials ratio.
b. Slump per ASTM C143
c. Air content per ASTM C231 or ASTM C173
d. Unit weight of concrete per ASTM C138
e. Compressive strength at 28 days per ASTM C39
4. If trial batches are used, submit representative samples of each proposed ingredient to independent testing laboratory for use in preparation of mix design.
5. Include alternate mix designs when characteristics of materials, project conditions, weather, test results, or other circumstances warrant adjustments. Indicate amounts of mix water to be withheld for later addition at Project site.
6. Provide a record copy of the final mix designs and test results to the testing agency prior to commencement of the concrete work.
E. Repair Methods: When stains, rust, efflorescence, and surface deposits must be removed, submit the proposed method of removal.
F. Certificates: Submit written certification regarding the design mix from the ready-mix supplier and the admixture manufacturer stating all concrete and admixtures do not contain chloride ions in excess of concentrations specified herein.
G. Cold Weather Procedure Submittal: Refer to Cold Weather Concreting article in Part 3 for more information.
H. Record Documents: Accurately record actual locations of embedded utilities and components that are concealed from view.
% SET
Not for
C on str uc
BG-2D14 (008)-80-56 5 of 19 CAST-IN-PLACE CONCRETE
1.6 DELIVERY, STORAGE, AND HANDLING
A. Cementitious materials: Store cementitious materials in dry weather tight buildings, bins, or silos that exclude contaminants.
B. Aggregates: Store and handle aggregate in a manner that will avoid segregation and prevent contamination with other materials or other sizes of aggregates. Store aggregates so as to drain freely.
C. Admixtures: Protect stored admixtures against contamination, evaporation, or damage. Protect liquid admixtures from freezing and temperature changes, which would adversely affect their performance. Handle chemical admixtures in accordance with manufacturer's instructions.
PART 2 - PRODUCTS
2.1 CONCRETE MATERIALS
A. Portland Cement: Portland cement shall conform to ASTM C150, Type I Normal, and be a standard brand of Portland cement. Use one brand of cement throughout project, unless approved in writing by the Engineer. Cement, which conforms to ASTM C150 Type II, may be used if it also meets the requirements of ASTM C150 Type I. Cement used in concrete shall be of the same brand and type as the cement used in the concrete represented by the submitted field test data or used in the trial mixtures. Maintain consistent cement color throughout project unless directed otherwise by architectural requirements.
1. Total replacement of Portland cement by supplementary cementitious materials in design mixture shall not exceed 50% (by weight).
B. Supplementary Cementitious Materials
1. Fly Ash: Fly ash shall conform to ASTM C618, Class C or Class F. Replacement of Portland cement by fly ash shall not exceed the following (percentages are by weight):
a. Concrete Flatwork: 20 percent.
b. Mass Concrete (more than two feet thick): 50 percent.
c. All other concrete: 25 percent.
d. Concrete to be placed in cold weather as defined herein: No fly ash allowed unless the cold weather procedure submitted has compensated for the increased setting time and decreased rate of strength gain due to cold weather and fly ash.
C. Coarse Aggregate for Normal Weight Concrete: Comply with ASTM C33. Provide coarse aggregate from a single source for exposed concrete. Gradations shall be similar to that described in the following table:
COARSE AGGREGATE GRADATIONS
SIEVE SIZE - PERCENT PASSING
Grade No. 1-1/2" 1" 3/4" 1/2" 3/8" No. 4 No. 16
90-100 Note 1
20-55 0-15 --- 0-5 --- ---
57 100 95-100 --- 25-60 0-10 0-10 ---
67 --- 100 90-100 --- 20-55 0-10 ---
89 --- --- --- 100 90-100 20-55 0-10
1. Shall be 100 percent passing the 2" sieve.
% SET
Not for
C on str uc
BG-2D14 (008)-80-56 6 of 19 CAST-IN-PLACE CONCRETE
D. Do not use aggregates containing deleterious substances that could cause spalling on any exterior exposed surface. These include, but are not limited to the following:
1. Organic impurities.
2. Ferrous metals.
3. Soluble salts.
4. Coal, lignite, or other lightweight materials.
5. Soft particles.
6. Clay lumps and friable particles.
7. Cherts of less than 2.40 specific gravity.
E. Water: Mixing water for concrete shall meet the requirements of ASTM C94. Water shall be clean and free from injurious amounts of acids, alkalis, organic materials, chloride ions and oils deleterious to concrete or reinforcing steel.
F. Testing agency shall be given access to plants and stockpiles to obtain samples for testing for compliance with the Contract Documents.
2.2 ADMIXTURES
A. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with other admixtures. Calcium chloride thiocyanates or admixtures containing intentionally added chlorides are not permitted.
B. Water Reducing Admixture: Material shall comply with ASTM C494, Type A.
1. Acceptable:
a. BASF Corporation - MasterPozzolith Series or MasterPolyheed Series.
b. Chemical Company - Eucon WR Series.
c. Sika Chemical Corp. - Plastocrete 161.
d. GRT - Polychem 400 NC.
e. Grace Construction Products - WRDA 82.
C. Air Entraining Admixture: Air entraining admixture shall comply with ASTM C260, and be certified by the manufacturer to be compatible with other admixtures to be used.
1. Acceptable:
a. BASF Corporation - MasterAir Series.
b. Euclid Chemical Company - Air-Mix or AEA Series.
c. Sika Chemical Corporation - Sika-Aer.
d. GRT - Polychem VR.
e. Grace Construction Products - Darex II or Daravair 1000.
D. Admixtures used in concrete shall be the same brand, type, and dosage used in concrete represented by field test data or used in trial mixes.
2.3 CURING PRODUCTS
A. Moisture Retaining Cover
1. Plastic Film: Use 6 mil polyethylene film sheet materials that meet the requirements of
ASTM C171.
2. White burlap-polyethylene sheet meeting ASTM C171.
3. Reinforced curing paper complying with ASTM C171.
% SET
Not for
C on str uc
BG-2D14 (008)-80-56 7 of 19 CAST-IN-PLACE CONCRETE
4. Moisture Retaining Fabric: A naturally colored, non-woven, polypropylene fabric with a 4-mil, non-perforated reflective (white) polyethylene coating containing stabilizers to resist degradation from ultraviolet light. Fabric shall exhibit low permeability and high moisture retention. Acceptable manufacturers and products include:
a. PNA Construction Technologies, Inc.: Hydracure S16.
b. PNA Construction Technologies, Inc.: Hydracure M5.
c. Reef Industries Incorporated: Transguard 4000.
B. Dissipating Resin Curing Compound: Clear, waterborne, membrane-forming curing compound complying with ASTM C309, Type 1, Class B shall be composed of hydrocarbon resins and dissipating agents that begin to break down upon exposure to ultraviolet light and traffic approximately 4 to 6 weeks after application, providing a film that is removable with standard degreasing agents and mechanized scrubbing actions so as to not impair the later addition of applied finishes.
1. Curing compounds used on interior enclosed environments shall be a water-borne product and VOC compliant as required by the U.S. EPA Architectural Coating Rule.
C. Non-dissipating Curing Compound: Clear, membrane-forming curing compound complying with ASTM C309, Type 1, Class B.
1. Curing compounds used on interior enclosed environments shall be a water-borne product and VOC compliant as required by the U.S. EPA Architectural Coating Rule.
D. Curing and Sealing Compound: Clear, membrane-forming curing and sealing compound complying with ASTM C309, Type 1, and ASTM C1315, Type 1, Class A. Compound shall dry to a clear finish, resist yellowing due to ultraviolet degradation and provide a long-lasting finish that has high resistance to chemicals, oil, grease, deicing salts, and abrasion.
1. Curing and sealing compounds used on interior enclosed environments shall be a water-borne product and VOC compliant as required by the U.S. EPA Architectural Coating Rule.
2.4 MISCELLANEOUS MATERIALS
A. Patching Mortar: Non-shrink, non-slump, non-metallic, quick setting.
1. Acceptable manufacturers and products:
a. Euclid Chemical Company - Eucospeed.
b. BASF Corporation - MasterEmaco N 424.
c. Adhesive Technologies. - Hard Rok Vertipatch.
d. W.R. Meadows - Speed Crete (Red Line).
e. Dayton Superior - Re-Crete 20 minute.
f. SpecChem - Precast Patch.
B. Expansion Joint Material: Preformed, resilient, non-extruding asphalt-impregnated fiber conforming to ASTM D1751. Thickness of expansion joint material shall be 1/2" unless noted otherwise on the drawings.
C. Vapor Retarder: ASTM E 1745, Class A, not less than 10 mils thick.
1. Acceptable:
a. Stego Industries, LLC - Stego Wrap.
b. W.R. Meadows, Inc. - Perminator.
c. Raven Industries - Vapor Block
d. Insulation Solutions - Viper VaporCheck II.
D. Bonding Agent: "Weld-Crete" manufactured by the Larsen Products Corporation or "Nitobond Acrylic" manufactured by Fosroc Inc.or approved equivalent.
% SET
Not for
C on str uc
BG-2D14 (008)-80-56 8 of 19 CAST-IN-PLACE CONCRETE
E. Anti-Bonding Agent: "Thompson's Water Seal" as manufactured by A. E. Thompson, Inc., Californiaor approved equivalent.
F. Penetrating Liquid Floor Treatment: Chemically reactive, waterborne solution of inorganic silicate or siliconate materials and proprietary components; odorless; colorless; that penetrates, hardens, and densifies concrete surfaces.
1. Manufacturers and products:
a. BASF Corporation - MasterKure HD 200WB.
b. Conspec Marketing & Manufacturing Co., Inc. - Intraseal
c. Curecrete Chemical Co., Inc. - Ashford Formula
d. Dayton Superior Corporation - Day-Chem Sure Hard (J-17)
e. Euclid Chemical Company - Eucosil
f. L&M Construction Chemicals, Inc. - Seal Hard
g. Vexcon Chemicals, Inc - Vexcon Starseal PS
h. SpecChem - SpecHard
G. Control Joint Filler: Two-component, semi-rigid, 100% solid, self-leveling, polyurea joint filler with a Shore A hardness of 90 to 95 per ASTM D 2240. Apply joint filler per manufacturers written recommendations a minimum of 90 days after concrete is poured or return to repair joint separations after shrinkage has occurred utilizing methods recommended by the same manufacturer as the original filler.
1. Acceptable:
a. Metzger McGuire - SPAC-PRO RSF
b. Euclid Chemical Company - EUCO QWIKjoint 300.
c. BASF Corporation - MasterSeal CR100
2.5 STRENGTH AND PROPERTIES
A. Concrete Mix Designs: Refer to the drawings for specified compressive strength. Proportion concrete mixes according to the properties in the following table. The concrete supplier may produce a mix at a lower water-cement ratio to allow for adjustment of slump at the site by adding water. The addition of site water shall be in accordance with ASTM C94, and the total water-cement ratio shall not exceed the value specified below.
Class
Coarse Aggregate Gradation
Fine Aggregate Gradation
Range of Slump
Max.
w/c Air Content
Other Requirements
B 57 or 67 FA 1" to 4" 0.45 5% to 8%
D 57 or 67 FA 4" to 6" 0.50 n/a
Use water reducing admixture to achieve slump specified
H 89 FA 5" to 8" 0.50 n/a
B. Schedule of Concrete Classes: Provide concrete of the specified class according to the following:
1. Exterior foundations: Class B
2. Interior slabs on grade: Class D
% SET
Not for
C on str uc
BG-2D14 (008)-80-56 9 of 19 CAST-IN-PLACE CONCRETE
3. Interior slab on metal decks: Class H
4. Unless noted otherwise: Class B
C. Water Reducer: Add water reducing admixture or high range water reducing admixtures (superplasticizers) as follows:
1. All pumped concrete.
2. Fiber reinforced concrete.
3. As required for placement or workability.
4. As required by high temperatures, low humidity, or other adverse placement conditions.
5. Concrete with water-cementitious materials ratio below 0.50.
D. No other admixtures shall be used unless approved by Structural Engineer.
E. Chlorides: Admixtures or other ingredients including aggregates containing calcium chloride or more than 0.05% chloride ions by weight shall not be used.
F. Workability: Concrete shall have a workability such that it will fill the forms without voids, honeycombs, or rock pockets with proper vibration without permitting materials to separate or excess water to collect on the surface.
G. Concrete Temperatures: Minimum concrete temperature of fresh concrete varies in relation to average air temperature over a 24-hour period as follows:
1. Air temperature below 0°F Concrete temperature 70°F min.
2. Air temperature 0°F to 30°F Concrete temperature 65°F min.
3. Air temperature 30°F to 50°F Concrete temperature 50°F min.
4. Air temperature above 50°F No minimum temperature
5. The maximum temperature of concrete at the time of delivery shall be 90°F. When concrete temperature exceeds 90°F, concrete supplier shall attempt to reduce temperature by shading aggregates and cement and cooling mix water. When these methods fail to reduce the concrete temperature below 90°F, supplier shall use ice in the water to reduce the concrete temperature. Use set retarding admixtures only when approved in the mix design.
PART 3 - EXECUTION
3.1 PREPARATION
A. Verify requirements for concrete cover over reinforcement.
B. Verify anchors, seats, plates, reinforcement, and other items to be cast into concrete are accurately placed, positioned securely, and will not cause hardship in placing concrete.
C. Do not place concrete until data on materials and mix designs have been approved, Architect has been notified, and all other affected trades have coordinated their work.
D. Remove snow, ice, frost, water, mud, and other foreign material from surfaces, reinforcing bars and embedded items against which concrete will be placed.
E. Prepare previously placed concrete by cleaning with sandblasting, steel brush, or water blast to expose aggregate to minimum 1/4" amplitude.
3.2 SLABS
A. Slab on Grade:
1. All interior slabs on grade shall have a polyethylene vapor retarder conforming to ASTM E1745. Lap all joints minimum 6" and seal edges with adhesive tape. Fit vapor retarder around utilities and seal with adhesive tape as required. Place, protect, and repair vapor-retarder sheets according to ASTM E 1643 and manufacturer's written instructions.
2. Refer to drawings for required sub-grade preparation beneath slabs on grade.
% SET
Not for
C on str uc
BG-2D14 (008)-80-56 10 of 19 CAST-IN-PLACE CONCRETE
3. Where vapor retarder is not used below the slab on grade, wet sub-grade below slab prior to placing concrete. Subgrade shall be moist with no free water and no muddy or soft spots.
4. Saw cut control joints: Cut with power saws equipped with shatterproof abrasive or diamond-rimmed blades. Cut joints into concrete when cutting action will not tear, abrade, or otherwise damage surface and before concrete develops random contraction cracks.
Control joints shall be located along column lines, with intermediate joints spaced at a maximum distance indicated on the drawings, unless noted otherwise. Control joints shall be continuous, not staggered or offset. Slab panels shall have a maximum length to width ratio of 1.5 to 1. Provide additional control joints at all reentrant or isolated corners formed in the slab on grade. Refer to the drawings for typical control joint detailing.
5. Provide isolation joints along foundation walls. Form isolation joints with 1/2" expansion joint material. Extend isolation joint material full width and depth of joint, terminating flush with finished concrete surface, unless otherwise indicated.
6. Depress slabs as required for architectural finishes, and pits,. Obtain layout and locations from Architect.
7. Verify completion of all under slab work with mechanical and electrical trades before placing slabs.
8. Slope slabs as indicated on the drawings and to provide positive drainage. Slope slab keeping bottom level and varying top. Maintain minimum thickness of concrete as indicated on the drawings. Refer to floor finishes for tolerances.
B. All supported slabs, including slabs-on-steel decking and cast-in-place concrete slabs:
1. Supported slabs have deflections that may cause areas of concrete to have thicknesses greater than indicated on the drawings. Contractor is expected to provide that volume as needed to finish the floor at the specified elevation. If specified floor finish tolerances are not achieved during the concrete floor construction, after formwork removal, the Contractor shall install, at no cost to the project, a self-leveling cementitious underlayment BASF Corporation - MasterTop 110 SL to correct the floor flatness and levelness.
C. Embedded Items:
1. The outside diameter of embedded conduit or pipe shall not exceed one-third of the slab thickness in structural slabs, including at crossovers, and shall be placed between the top and bottom reinforcing with a minimum 3" clear cover. Conduit or pipe running parallel to each other shall be spaced at least 8" apart and no more than 2 runs stacked vertically in the slab. Conduit or pipe shall not be embedded in any supported slab less than 6" thick.
No embedded conduit or pipe is allowed in any concrete slab-on-steel deck.
3.3 CONSTRUCTION JOINTS
A. Vertical: Locate vertical construction joints in walls not farther than a maximum of 100 feet on center. Coordinate joint locations with architectural design.
B. Horizontal: Locate horizontal joints in walls, piers, at underside of slabs, and at the top of slabs and footings unless otherwise indicated. At least 24 hours shall elapse between placing concrete in a wall, and placing concrete in an area supported by the walls,, unless approved in writing by the Structural Engineer.
C. Reinforcing: Stop all welded wire reinforcement and/or reinforcing at construction joints in slabs on grade and provide dowel bars as detailed. Provide reinforcement at other construction joints as detailed. Roughen and thoroughly clean the surface of the concrete, remove all laitance, and wet the surface before placing new concrete against the joint. Slush vertical joints with a neat cement grout before placing new concrete.
% SET
Not for
C on str uc
BG-2D14 (008)-80-56 11 of 19 CAST-IN-PLACE CONCRETE
3.4 CONCRETE PLACEMENT
A. Place concrete as continuously as possible until placement is complete. Do not place against concrete that has attained initial set, except at authorized joints. If, for any reason, concrete pour is delayed for more than 45 minutes, bulkhead off pour at last acceptable construction joint. Immediately remove excess concrete and clean forms.
B. Do not begin to place concrete during periods of rain, sleet, or snow unless adequate protection is provided.
C. No concrete shall be cast onto or against sub-grades containing free water, frost, ice, or snow.
If earth at bottom of forms has dried out, rewet so the soil is moist, but free of standing water and mud.
D. Notify the Architect in advance if concrete is to be pumped.
E. Do not place concrete until all reinforcement is in place, forms have been thoroughly cleaned and approval has been given.
F. Do not accept concrete delivered to the job site more than 90 minutes after initial mixing.
G. Concrete from its point of release to mixers, hoppers, or conveyances, shall not be permitted to drop more than 5 feet (10 feet for concrete containing high range water reducers). Deposit concrete directly into conveyances and directly from conveyances to final points of deposit.
Sufficient transportation equipment in good working order shall be on hand before work begins.
All conveying equipment must be clean and kept clean during concreting operations. Take every possible precaution to prevent segregation or loss of ingredients.
H. Regulate rate of placement so concrete surface is kept level throughout; a minimum being permitted to flow from one area to another. Use tremie heads spaced at approximately 10-foot intervals for placing concrete in walls. Control rate of placement consistent with form design.
I. Deposit concrete in one continuous operation until section being placed has been completed.
For slab thicknesses greater than 12 inches, prevent excessive segregation of aggregate and high temperatures in accordance with ACI 304 and ACI 308. Place concrete in wall forms in layers not greater than 12 inches in depth, each layer being compacted by internal vibration before succeeding layer is placed.
J. Place concrete as near as possible to its final position to prevent segregation or loss of materials. Do not use vibrators to transport concrete within forms. Consolidate concrete in walls, columns, beams, and slabs or joist construction thicker than 8" with internal vibrators (8,000 to 12,000 VPM). Slabs less than 8" thick may be consolidated with internal vibrators (9,000 to 13,500 VPM) or vibrating screeds supported on forms, boards, or rails, approved by the Structural Engineer, supplement vibration by forking or spading by hand along surfaces adjacent to forms and construction joints. Be sure an adequate number of operating vibrator units are on hand to properly consolidate quantity of concrete to be placed, including spares for emergency use.
1. Vertically insert and remove handheld vibrators at constant intervals 18 to 30 inches apart. Vibrate concrete the maximum amount and time required for complete consolidation, without segregation, and release of entrapped air bubbles, but in no instance exceed 15 seconds per square foot of exposed surface.
K. Re-tempering of concrete shall not be permitted. Concrete that has stood more than 15 minutes after leaving the mixer shall be discarded.
L. Exercise care in placing concrete over waterproof membranes, rigid insulation, and/or protection boards to avoid damaging those materials. Report damage immediately, and do not proceed until damage is repaired.
M. Remove loose debris from hardened surfaces of previous pours, thoroughly wet and slush with a neat cement grout immediately before placing new concrete or apply bonding compound to surface and let dry before placing new concrete.
% SET
Not for
C on str uc
BG-2D14 (008)-80-56 12 of 19 CAST-IN-PLACE CONCRETE
N. Protect existing concrete work to be exposed to view and other finished materials from damage and staining resulting from concreting operations. Handle concrete carefully to avoid dripping and spillage. Remove spilled concrete from existing surfaces immediately. Covering sills, ledges, and other surfaces with protective coverings may be necessary to protect the work.
O. Filling In: Fill in holes and openings left in concrete structures, unless otherwise indicated, after work of other trades is in place. Mix, place, and cure concrete, as specified, to blend with in-place construction. Provide other miscellaneous concrete filling indicated or required to complete Work.
3.5 CONCRETE FINISHES AND TOLERANCES
A. Exposed Smooth Formed Surfaces: Remove forms and perform necessary repairs and patch to produce surface finish-3.0 as specified in ACI 301. Apply the following to smooth-formed finished concrete exposed to view in the finished work. Confirm finishes with the Architect prior to concrete placement by submitting shop drawings indicating locations of all types of finishes.
1. Smooth-Rubbed Finish: Not later than one day after form removal, moisten concrete surfaces and rub with carborundum brick or another abrasive until producing a uniform color and texture. Do not apply cement grout other than that created by the rubbing process.
2. Grout-Cleaned Finish: Wet concrete surfaces and apply grout of a consistency of thick paint to coat surfaces and fill small holes. Mix one part Portland cement to one and one-half parts fine sand with a 1:1 mixture of bonding admixture and water. Add white Portland cement in amounts determined by trial patches so color of dry grout will match adjacent surfaces. Scrub grout into voids and remove excess grout. When grout whitens, rub surface with clean burlap and keep surface damp by fog spray for at least 36 hours.
3. Cork-Floated Finish: Wet concrete surfaces and apply a stiff grout. Mix one part Portland cement and one part fine sand with a 1:1 mixture of bonding agent and water. Add white Portland cement in amounts determined by trial patches so color of dry grout will match adjacent surfaces. Compress grout into voids by grinding surface. In a swirling motion, finish surface with a cork float.
B. Related Unformed Surfaces: At tops of walls, horizontal offsets, and similar unformed surfaces adjacent to formed surfaces, strike off smooth and finish with a texture matching adjacent formed surfaces. Continue final surface treatment of formed surfaces uniformly across adjacent unformed surfaces, unless otherwise indicated.
3.6 CONCRETE SLAB FINISHES AND TOLERANCES
A. Trowel Finish:
1. Screed concrete to an even plane, float, then power trowel the surface.
2. Hand trowel the surface smooth and free of trowel marks. Continue hand troweling until a ringing sound is produced as the floor is troweled.
3. Provide trowel finish as indicated on the drawings and at the following locations:
a. Concrete floors exposed in finished work unless otherwise indicated.
b. Slabs to receive curing compounds and sealers.
c. Slabs to receive resilient flooring or carpet.
d. Slabs to receive waterproof membranes.
B. Fine Broom Finish:
1. Screed concrete to an even plane, float, then power trowel the surface. Provide fine hair broom finish perpendicular to slope, free of loose particles, ridges, projections, voids, and concrete droppings.
% SET
Not for
C on str uc
BG-2D14 (008)-80-56 13 of 19 CAST-IN-PLACE CONCRETE
2. Provide fine broom finish as indicated on the drawings and at the following locations:
a. Stoop slabs.
b. Raised curbs and walkway areas.
c. Slabs to receive thin set ceramic tile.
C. Broom Finish:
1. Screed concrete to an even plane and then float. Immediately after concrete has received a floated finish, give the concrete surface a coarse transverse scored texture by drawing a coarse broom across the surface.
2. Provide as indicated on the drawings and at the following locations:
a. ADA ramp slabs.
b. Exterior walkway slabs.
D. Float Finish:
1. Screed concrete to an even plane then float.
2. Provide as indicated on the drawings and at the following locations:
a. Slabs to directly receive concrete topping.
b. Roof slabs to receive loose laid roof insulation.
E. Floor Finish Tolerances: Floor finish tolerances shall be measured by placing a freestanding (unleveled) 10-foot straightedge anywhere on the slab and allowing it to rest upon two high spots within 72 hours after placement of slab and removal of shoring (if present). The gap at any point between the straightedge and the floor (and between the high spots) shall not exceed:
1. Slab on Grade: 3/16"
2. Suspended Slabs: 1/4"
F. Slab Drainage: Finish all concrete slabs to proper elevations to ensure that all surface moisture will drain freely to floor drains, and that no puddle areas exist. Contractor shall bear the cost of corrections to provide positive drainage.
G. Special Tolerances for Concrete Slabs: No abrupt change in vertical elevation of 1/4" or more is acceptable at the interface between slabs and within areas where pedestrian traffic is expected.
3.7 CONCRETE CURING
A. Freshly placed concrete shall be protected from premature drying and excessively hot temperatures.
B. Concrete other than high-early strength shall be maintained above 50°F and in a moist condition for at least the first 7 days after placement, except when special curing is used.
Special curing procedures shall not be used without written permission from the Structural Engineer.
C. Formed surfaces shall be cured by leaving the formwork in place during the curing period.
D. Protect concrete from excessive changes in temperature during the curing period and at the termination of the curing process.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .