GAOA_JerseydaleCG_Rehab_Phase4_PlanDrawings_060722_Revised_FINAL.pdf
PDF 3 MB Posted
- Solicitation number
- 1066228
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| combined amendment2.pdf | ||
| amendment 01.docx | DOCX document | |
| GAOA_JerseydaleCG_Rehab_Phase4_Specifications_060722_Revised_FINAL.pdf | ||
| WAGE DETERMINATION.pdf | ||
| RFP -.docx | DOCX document | |
| GAOA_JerseydaleCG_Rehab_Phase4_SectionC_040622_FINAL.rtf | RTF text file | |
| GAOA_JerseydaleCG_Rehab_Phase4_Fire Plan 2013_040622_FINAL.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
PROJECT SITE
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture
Forest Service
INDEX OF SHEETS
SHEET SHEET TITLE DATE
i COVER SHEET 4/6/2022
G-1 INDEX SHEET 4/6/2022
G-2 SITE PLAN 1 4/6/2022
G-3 SITE PLAN 2 4/6/2022
G-4 SIGN AND WHEEL STOP DETAILS 4/6/2022
G-5 SINGLE VAULT TOILET BUILDING DETAILS 4/6/2022
G-6 GATE DETAILS 4/6/2022
G-7 TRASH ENCLOSURE DETAILS 4/6/2022
G-8 ORAR AND TENT PAD DETAILS 4/6/2022
G-9 TENT PAD AND AGGREGATE BASE APRON DETAILS 4/6/2022
G-10 DOUBLE VAULT TOILET BUILDING DETAILS 4/6/2022
G-11 STEP AND DRAINAGE DITCH DETAILS 4/6/2022
G-12 CONSTRUCTION SIGNS 4/6/2022
GAOA JERSEYDALE CAMPGROUND REHABILITATION
FROM THE BASS LAKE RANGER DISTRICT OFFICE, HEAD EAST TOWARDS RD 8017/GRIZZLY RD AND
TURN RIGHT ONTO RD 8017/GRIZZLY RD FOR .3 MILES. TURN LEFT ON RD 225/MINARETS RD FOR .3
MILES. TURN LEFT ONTO RD 274/MALUM RIDGE RD FOR 10.8 MILES. CONTINUE ONTO RD 222/BASS
LAKE RD FOR 3.4 MILES. TURN LEFT ONTO CA-41 S FOR 3.5 MILES. TURN RIGHT ONTO CA-49 N FOR 14.9
MILES. TURN RIGHT ONTO TRIANGLE RD FOR 3.1 MILES. TURN LEFT TO STAY ON TRIANGLE RD FOR 1.9
MILES. TURN RIGHT ONTO JERSEYDALE RD FOR 2.2 MILES TO REACH JERSEYDALE CAMPGROUND.
PHASE 4 PROJECT
DISTRICT RANGER
RECOMMENDED BY:
DIRECTOR OF ENGINEERING
APPROVED:
FOREST ENGINEER
DATE
DATE
RO FACILITIES PROGRAM MANAGER
DATE
DATE
FOREST SUPERVISOR
DATE
4/8 /22
:3
1 C
ES
AR
SA
NC
HE
Z F:
\5.
S
IT
ED
ES
IG
N\
JE
RS
EY
DA
LE
CG
\C
ON
ST
RU
CT
IO
NP
AC
KA
GE
_P
HA
SE
4_
\G
AO
A_
JE
RS
EY
DA
LE
CG
_R
EH
AB
_P
HA
SE
4_
CO
VE
RS
HE
ET
_0
2_
FI
NA
L.
DW
G;
REGION 5
SIERRA NATIONAL FOREST
MARIPOSA COUNTY
CALIFORNIA
S I T
E
S
I
T
E
I
S
I
S
I
S
I
S
I
S
I
I
I
I
I
I
I
J
E
R
S
E
Y
D
A
L
R
O
A
D
PROJECT AREA
SHEET G-3
PROJECT AREA
SHEET G-2
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
(R05)
PACIFIC SOUTHWEST REGION
GAOA
JERSEYDALE
CAMPGROUND
REHABILITATION
PHASE 4
PROJECT
SIERRA NATIONAL
FOREST
BASS LAKE
RANGER DISTRICT
INDEX SHEET
4/6/2022
CESAR S.
CESAR S.
SANDRA T.
G-1 2 13
AutoCAD SHX Text 25'
AutoCAD SHX Text 50'
AutoCAD SHX Text 10'
AutoCAD SHX Text 0'
AutoCAD SHX Text 5'
AutoCAD SHX Text
NORTH
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text
I T
E
S
I
GENERAL NOTES:
1. DURING THE PRE-CONSTRUCTION MEETING, THE CONTRACTOR AND FOREST SERVICE
WILL IDENTIFY IN THE FIELD THE EXISTING TREES AND ROCK FEATURES TO BE
PROTECTED DURING CONSTRUCTION.
2. THE CONTRACTOR SHALL PROTECT FROM DAMAGE ALL EXISTING STRUCTURES,
IMPROVEMENTS, AND UTILITIES. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO
THOSE FACILITIES.
3. THE FOREST ARCHEOLOGIST SHALL BE ONSITE TO MONITOR THE CONSTRUCTION
ACTIVITIES NEAR THE BOUNDARIES OF THE CULTURAL SITE TO ENSURE AVOIDANCE. THE
CONTRACTOR TO PROVIDE ADEQUATE NOTICE PRIOR TO WORK NEAR THE CULTURAL
SITE.
CONSTRUCT 5' WIDE X 10' LONG
EXPOSED AGGREGATE CONCRETE
ORAR (TOTAL 50 SQFT),
SEE GRADING NOTES
G-8
S
I
CONSTRUCT 30'X30' COMPACTED NATIVE
SOIL TENT PAD (TOTAL 900 SQ.FT.)
CONSTRUCT 5' WIDE X 32' LONG
EXPOSED AGGREGATE CONCRETE
ORAR (TOTAL 160 SQ.FT.),
SEE GRADING NOTES
G-8
S
I
I
I
I
I
I
INSTALL SINGLE VAULT TOILET
BUILDING (TOTAL 1 EA)
INSTALL EQUESTRIAN STAGING
SIGN (TOTAL 1 EA)
G-4
INSTALL EQUESTRIAN
SITES SIGN
G-4
G-5
CONSTRUCT TRASH ENCLOSURE
(TOTAL 1 EA)
CONSTRUCT 4' WIDE X 40' LONG COMPACTED
NATIVE SOIL ORAR (TOTAL 160 SQ FT)
REMOVE AND DISPOSE EXISTING STUMPS
(TYP.) (TOTAL 5 EA)
G-8
G-9
G-7
G-9
G-9
CONSTRUCT 4' WIDE X 310' LONG
COMPACTED NATIVE SOIL ORAR
(TOTAL 1240 SQ FT)
G-8
CONSTRUCT (3) 12.5'X16' COMPACTED
NATIVE SOIL TENT PADS 15' APART FROM
EACH OTHER (TOTAL 600 SQ.FT.)
G-9
CONSTRUCT TRASH ENCLOSURE
(TOTAL 1 EA)
G-7
G-9
G-10
CONSTRUCT A DRAINAGE DITCH AS
PART OF THE EARTHWORK/GRADING
AROUND THE TOILET BUILDING FOR
PROPER DRAINAGE
CONSTRUCT TRASH
ENCLOSURE
(TOTAL 1 EA)
G-7
G-9
G-11
GRADING NOTES:
1. SINGLE TOILET BUILDING:
2. DOUBLE TOILET BUILDING:
EDGE OF ROAD
CULTURAL SITE,
SEE GENERAL NOTE 3
31' APPROX.
FROM EDGE OF ROAD
TO CULTURAL SITE
INSTALL DOUBLE VAULT TOILET BUILDING
(TOTAL 1 EA)
CONSTRUCT THIS SECTION OF THE CONCRETE
ORAR AT 2% AND UP TO 8.33% MAX. RUNNING
SLOPE AND 2% CROSS SLOPE. THE CONCRETE
ORAR SHALL BE FLUSH WITH TOP OF THE
TOILET BUILDING FINISH FLOOR. ALL SLOPES
SHALL DRAIN AWAY FROM BUILDING. SEE
DETAIL 2/G-8.
CONSTRUCT THIS SECTION OF THE CONCRETE ORAR
AT 2% SLOPE IN ANY DIRECTION TO MATCH GRADES OF
THE EX. FAUCET SLAB. THE CONCRETE ORAR SHALL BE
FLUSH WITH THE EX. FAUCET SLAB. ALL SLOPES SHALL
DRAIN AWAY FROM BUILDING. SEE DETAIL 2/G-8.
7'
5'
CONSTRUCT THIS SECTION OF THE CONCRETE ORAR AT 2%
AND UP TO 8.33% MAX. RUNNING SLOPE AND 2% CROSS
SLOPE. ALL SLOPES SHALL DRAIN AWAY FROM BUILDING
AND INTO DRAINAGE DITCH. SEE DETAIL 2/G-8.
CONSTRUCT THIS SECTION OF THE CONCRETE ORAR AT 2%
SLOPE IN ANY DIRECTION TO MATCH GRADES OF THE EX.
FAUCET SLAB. THE CONCRETE ORAR SHALL BE FLUSH WITH
THE EX. FAUCET SLAB AND FLUSH WITH TOP OF THE TOILET
BUILDING FINISH FLOOR. ALL SLOPES SHALL DRAIN AWAY
FROM BUILDING AND INTO DRAINAGE DITCH. SEE DETAIL 2/-G-8.
EDGE OF ROAD
R=3'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
(R05)
PACIFIC SOUTHWEST REGION
GAOA
JERSEYDALE
CAMPGROUND
REHABILITATION
PHASE 4
PROJECT
SIERRA NATIONAL
FOREST
BASS LAKE
RANGER DISTRICT
SITE PLAN 1
4/6/2022
CESAR S.
CESAR S.
SANDRA T.
G-2 3 13
AutoCAD SHX Text 30'
AutoCAD SHX Text 60'
AutoCAD SHX Text 15'
AutoCAD SHX Text 0'
AutoCAD SHX Text 5'
AutoCAD SHX Text
NORTH
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
REMOVE AND DISPOSE EXISTING GATE AND
INSTALL SINGLE GATE (TOTAL 1 EA)
NOTES:
1. DURING THE PRE-CONSTRUCTION MEETING, THE CONTRACTOR AND FOREST SERVICE WILL IDENTIFY IN
THE FIELD THE EXISTING TREES AND ROCK FEATURES TO BE PROTECTED DURING CONSTRUCTION.
2. THE CONTRACTOR SHALL PROTECT FROM DAMAGE ALL EXISTING STRUCTURES, IMPROVEMENTS, AND
UTILITIES. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO THOSE FACILITIES.
J
E
R
S
E
Y
D
A
A
D
S
I
S
I
S
I
S
I
S
I
CONSTRUCT TRASH ENCLOSURE
(TOTAL 1 EA)
PROTECT EX. TREES (TYP.)
INSTALL STOP SIGN
(TOTAL 1 EA)
G-4
G-6
G-7
INSTALL KEEP RIGHT SIGN
(TOTAL 1 EA)
G-4
G-9
INSTALL STEPS (TOTAL 6 EA)
G-11
G-11
INSTALL STEPS (TOTAL 8 EA)
G-11
INSTALL STEPS (TOTAL 8 EA)
INSTALL STEPS (TOTAL 9 EA)
G-11
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
(R05)
PACIFIC SOUTHWEST REGION
GAOA
JERSEYDALE
CAMPGROUND
REHABILITATION
PHASE 4
PROJECT
SIERRA NATIONAL
FOREST
BASS LAKE
RANGER DISTRICT
SITE PLAN 2
4/6/2022
CESAR S.
CESAR S.
SANDRA T.
G-3 4 13
AutoCAD SHX Text 30'
AutoCAD SHX Text 60'
AutoCAD SHX Text 15'
AutoCAD SHX Text 0'
AutoCAD SHX Text 5'
AutoCAD SHX Text
NORTH
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
G-4
NTS
STOP
4"
30"
30"
7'-10"
4'-0"
11'-10"
6"
6"
1'-6"
STOP SIGN (R1-1)
NOTE 1
NOTE 3
NOTE 4
ROAD
5' MIN
STOP SIGN
NOTE 2
2'
MIN
EQUESTRIAN SIGN
G-4
NTS
EQUESTRIAN
SITES
19"
19"
4"
3'-0"
4'-11"
6"
6"
8'-11"
1'-6"
SIGNS SHALL BE 19"X19"X3/4" REFLECTIVE
ALUMINUM SIGN W/ 3" LETTERS AND ARROWS IN
'WHITE COLOR' ON 'BROWN' BACKGROUND WITH
3/8" 'WHITE' BORDER,
SEE BELOW
NOTES:
1. THE FINAL CONTENT, ARROW
DIRECTION, AND SIGN LAYOUT
AND SIZE TO BE APPROVED
BY THE FOREST SERVICE
DURING THE SUBMITTAL
PROCESS.
2. REFERENCE SIGN AND POST
INSTALLATION NOTES, DETAIL
4/G-4.
2'
MIN
ROAD
4'-0"
4"
18"
BREAKAWAY HOLES
2" SIZE. (TYP.)
NOTES:
1. REFERENCE SIGN AND
POST INSTALLATION
NOTES, DETAIL 4/G-4.
4"
18"
BREAKAWAY HOLES
2" SIZE. (TYP.)
EQUESTRIAN
STAGING
CONCRETE SLAB
TRASH BIN
ENCLOSURE
WALL
6"
ANCHOR
1.5"
3"
24" STAKES. (MODEL #ANC12-3;
3 PER CAR STOP)
NOTES:
1. WHEEL STOPS, ANCHOR STAKES, AND WASHERS/SPACERS SHALL BE MANUFACTURED
BY PILOT ROCK: A REGISTERED TRADEMARK OF R.J. THOMAS MFG. CO., INC., P.O. BOX
946 CHEROKEE, IOWA 51012. (712) 225-5115. www.pilotrock.com.
· RECYCLED PLASTIC BROWN CAR STOPS, MODEL#: CSL-8PW OR APPROVED EQUAL BY
THE FOREST SERVICE. INSTALLATION SHALL BE ACCORDING TO MANUFACTURER'S
RECOMMENDATIONS.
· THE WHEEL STOPS SHALL BE ANCHORED WITH THREE (3) 24" ANCHOR STAKES,
MODEL#: ANC12-3 STEEL ANCHOR STAKE SET FOR CAR STOPS OR APPROVED EQUAL
BY THE FOREST SERVICE. THE THREE (3) 24" ANCHOR STAKE SET IS NOT INCLUDED
WITH THE CAR STOPS AND IS ORDERED SEPARATELY.
· THREE (3) PCS. OF 3-1/2" DIAMETER X 3/16" THICK STEEL WASHER SHIMS/GROUND
SPACERS TO GO BELOW THE THREE ANCHOR HOLES (PART NO. 800-032) OR
APPROVED EQUAL BY THE FOREST SERVICE.
2. DRILL 5/8" DIA. HOLE THROUGH THE CONCRETE PAD AT EACH HOLE LOCATION TO
AVOID FRACTURING THE CONCRETE WHEN DRIVING IN THE STAKE. USE A HEAVY
HAMMER TO POUND THE STAKES INTO THE ASPHALT UNTIL THE HEAD OF THE STAKE IS
LEVELED WITH THE TOP OF THE CAR STOP. THE ANCHOR HOLES IN THE CAR STOPS
ARE PREDRILLED.
OVAL THRU HOLES
RECYCLED PLASTIC BROWN WHEEL STOP
PILOT ROCK MODEL CSL-8PW OR APPROVED
EQUAL BY THE FOREST SERVICE.
Ø3
" GROUND SPACERS
(PART NO. 800-032)
24" STAKES
(MODEL #ANC12-3)
WHEEL STOP - INSTALL
AT CENTER OF TRASH
ENCLOSURE
SIGN INSTALLATION
1) CARRIAGE BOLT (3/8") - TAMPER PROOF
2) GALV. WASHER
3) SIGN
4) POST (6"X6" OR 4"X4")
5) METAL WASHERS
6) NUT
7) RECESS (OPTIONAL)
NOTES:
1. ALL SIGN POSTS SHALL HAVE 1" 45° CHAMFER ON TOP END OF POST,
UNLESS NOTED OTHERWISE.
2. ALL CARRIAGE BOLTS SHALL BE 3/8"; ROUND HEAD, TAMPER PROOF AND
INSTALLED PER THE SIGN INSTALLATION DETAIL.
3. ALL POSTS SHALL BE 6"X6" DOUGLAS FIR ROUGH CUT PRESSURE TREATED
AND STAINED IN ACCORDANCE WITH SECTION 09900, UNLESS NOTED
OTHERWISE. COLOR SHALL BE "DARK CHOCOLATE" OR APPROVED EQUAL
BY THE FOREST SERVICE.
4. ALL POSTS SHALL BE SECURED BY COMPACTING NATIVE SOIL AROUND THE
BASE OF THE POST.
5. ALUMINUM SIGNS SHALL BE MANUFACTURED BY:
SAFETY NETWORK TRAFFIC SIGNS, INC., CONTACT PERSON IS ALYS
DAY, ACCOUNT MANAGER NORTHERN CALIFORNIA. 530-906-5854.
alys@snsigns.net. OR APPROVED EQUAL BY THE FOREST SERVICE.
6. ALL ALUMINUM SIGNS SHALL BE COVERED WITH 3M ANTI-GRAFFITI FILM
OR EQUIVALENT FOR SNOW PROTECTION - COVER THE ENTIRE FACE OF
THE SIGN AND FOLD 2" TO COVER THE BACK OF THE SIGN.
7. THE FINAL LOCATION OF THE SIGNS SHALL BE DETERMINED IN THE FIELD
BY THE FOREST SERVICE IN COORDINATION WITH THE CONTRACTOR.
8. BREAKAWAY HOLES SHALL BE PERPENDICULAR TO THE DIRECTION OF
VEHICLE TRAVEL. TREAT BREAKAWAY HOLES WITH PRESERVATIVE.
SIGN AND POST INSTALLATION NOTES
G-4
NTS
KEEP RIGHT SIGN
G-4
NTS
7'-4"
4'-0"
11'-4"
6"
6"
1'-6"
KEEP RIGHT SIGN
(R4-7A)
NOTE 1
NOTE 3
NOTE 4
5' MIN
NOTE 2
2'
MIN
24"
4"
18"
KEEP
RIGHT
ROAD
NOTES:
1. REFERENCE SIGN AND
POST INSTALLATION
NOTES, DETAIL 4/G-4.
4"
18"
BREAKAWAY HOLES
2" SIZE. (TYP.)
WHEEL STOP
G-4
NTS
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
(R05)
PACIFIC SOUTHWEST REGION
GAOA
JERSEYDALE
CAMPGROUND
REHABILITATION
PHASE 4
PROJECT
SIERRA NATIONAL
FOREST
BASS LAKE
RANGER DISTRICT
SIGN AND WHEEL STOP
DETAILS
4/6/2022
CESAR S.
CESAR S.
SANDRA T.
G-4 5 13
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Scale 1/4"=1'-0"
SIDE ELEVATION
Scale 1/4"=1'-0"
SIDE ELEVATION
Scale 1/4"=1'-0"
FRONT ELEVATION
Scale 1/4"=1'-0"
REAR ELEVATION
1'- 1"
8' -0
1'- 1"
5" 4'
-5
13'-0"
4' -1
7 16
5"
4' -5
9" 2'-01 2"
2" 2"
1'- 1"1'- 1"
8' -0
4'
-5
5"
13'-0"
2" 61
2" 5'-101 4"
4' -1
7 16
5"
4' -5
2"2"
9"2'-01 2"
Toilet Holding Tank Access Opening
Toilet Holding Tank Access Opening
Toilet Holding Tank Access Opening
1'-0"∅ Vent Pipe 1'-0"∅ Vent
Pipe
1'-0"∅ Vent Pipe
5'-101 4" 41
2"
7'-9 1 2 "7'-9
2"
3' -0
5" 5"
7'-9 2"
7'-9 1 2 "
1'-0"∅ Vent Pipe
3' -0
2" 5'-101
4"5'-101 4"41
2" 41 2"
Concrete Finish Shown is 6" Lap Siding. The Owner has other exterior finish options to choose from.
Concrete Finish Shown is Wood Grain. The Owner has other exterior finish options to choose from. Concrete Finish
Shown is Wood Grain. The Owner has other exterior finish options to choose from.
Concrete Roof Finish Shown is Cedar Shakes which is Standard. The Owner has other Roof finish options to choose from.
Concrete Finish Shown is 6" Lap Siding. The Owner has other exterior finish options to choose from.
Concrete Finish Shown is Wood Grain. The Owner has other exterior finish options to choose from.
Concrete Finish Shown is Wood Grain. The Owner has other exterior finish options to choose from.
Concrete Roof Finish Shown is Cedar Shakes which is Standard. The Owner has other Roof finish options to choose from.
3"3"
3"3"
7' -5
3 8"
7'-3"
7' -5
3 8"
7'-3"
SINGLE VAULT TOILET BUILDING 1
G-5
NTS
NOTES:
1. TOILET BUILDING SHALL BE INSTALLED BY
BOOM CONCRETE, INC., AN APPROVED
MANUFACTURER OR EQUIVALENT.
2. CONTRACTOR SHALL COORDINATE WITH
MANUFACTURER FOR ALL CONSTRUCTION
REQUIREMENTS, FOUNDATION/SUBGRADE
PREPARATION, AND ADDITIONAL BUILDING
FIXTURES/MATERIALS REQUIRED.
3. CONTRACTOR SHALL COORDINATE WITH
THE FOREST SERVICE FOR BUILDING
LAYOUT, STAKING, GRADES, DRAINAGE,
AND INITIAL SITE PREPARATION.
4. THE FINAL LOCATION OF THE TOILET
BUILDING SHALL BE DETERMINED IN THE
FIELD BY THE FOREST SERVICE IN
COORDINATION WITH THE CONTRACTOR.
5. SINGLE VAULT TOILET BUILDING SHALL BE
MANUFACTURED BY BOOM CONCRETE,
INC., PO BOX 437, NEWELL, SD 57760.
605-456-2600. MODEL: BOOM CLOVERMIST
SINGLE PLUS RIGHT HAND VAULT TOILET
BUILDING WITH CEDAR SHAKE ROOF IN
RAVEN BLACK COLOR; HORIZONTAL LAP
SIDING WALLS ON GABLE AND EXTERIOR
WALLS IN AUTUMN BROWN COLOR;
TEAKWOOD BROWN COLOR FOR DOORS,
DOOR FRAMES, AND WINDOW TRIMS;
RAPTOR VENT SCREENS, VAULT LINER,
HOLDING TANK CAPACITY 165.2 C.F.
(1235.7 GALLONS), AND HAZE GRAY
COLOR FOR THE FLOORS OR APPROVED
EQUAL BY THE FOREST SERVICE.
6. SEE THE TECHNICAL SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
7. THIS SHEET IS FOR REFERENCE ONLY.
CONTRACTOR TO SUBMIT THE SUBMITTAL
PACKAGE/DRAWINGS TO THE FOREST
SERVICE FOR REVIEW AND APPROVAL OF
THE ACTUAL DIMENSIONS, WALL VENT
LOCATIONS, AND SPECIFIC INFORMATION
REGARDING THIS TOILET BUILDING.
8. CONTRACTOR SHALL INSTALL BACK OF
THE BUILDING SLIGHTLY HIGHER TO
ALLOW WATER TO FREELY DRAIN OUT OF
THE TOILET ROOMS AT 1% SLOPE UNLESS
OTHERWISE APPROVED BY THE FOREST
SERVICE.
9. THE DRAINAGE DIRECTION, GRADES, AND
SLOPES SHALL BE COORDINATED IN THE
FIELD BETWEEN THE CONTRACTOR AND
THE FOREST SERVICE. THE FINAL GRADES
AND SLOPES SHALL BE APPROVED BY THE
FOREST SERVICE.
FOR
REFERENCE
ONLY
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
(R05)
PACIFIC SOUTHWEST REGION
GAOA
JERSEYDALE
CAMPGROUND
REHABILITATION
PHASE 4
PROJECT
SIERRA NATIONAL
FOREST
BASS LAKE
RANGER DISTRICT
SINGLE VAULT TOILET
BUILDING DETAILS
4/6/2022
BOOM CONCRETE
BOOM CONCRETE
SANDRA T.
G-5 6 13
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
SIDES
WELD BOTH
STEEL SLEEVE
5"Ø X 4"
4"Ø PIPE
(STEEL)
1/2" RING TYP.
WELD ALL AROUND
3/4"
TYP.
G
OFF SIDES
EXTEND 1/2"
STEEL PLATE
1/2" x 5"Ø
B
G
TUBING
2 1/2" x 2 1/2" x 3/16"
6"
1"
1/2" CHAMFER
4" X 10" X 1/4" PLATE
2" x 6" x 1/4" PLATE
3/4"Ø HOLE
CONTINUOUS WELD TO PIPE
CONTINUOUS WELD TO PLATE
4"Ø X 6' BLACK
4" X 10" X1 /4" PLATE
6"
2"3"
1"
1/2" CHAMFER
2"x6" x 1/2" PLATE
CONTINUOUS WELD TO TUBING
2 1/2" TUBING
W/ LATCH PLATE
4"Ø X 6' BLACK IRON PIPE
A
K
CUT 3" x 1/2" NOTCH
B
A
A
A
J
2" x 6" x 1/4" PLATEJ
2" x 6" x 1/4" PLATE
L
L
GATE TO GATE POST CONNECTION (2)
NTS
SLEEVE CONNECTION (1)
ISOMETRIC VIEW
LATCH PLATE (J)
IRON PIPE
2" x 6" x 1/2" PLATE K
F
E
EMBED 4"Ø PIPE
INTO CONCRETE
A
C
TYP.
24"
1'-3"
6"
D
20'-0" O.C.
A
INTERIOR SIDE
GATE LOCKED CLOSED
G
A
T
E
L
O
C
K
E
D
O
P
E
N
H
H
G
B2
PLAN VIEW
O
C
2" x 6" x 1/2" PLATE
2" x 6" x 1/4" PLATE
5" X 3' BLACK IRON PIPE
2 1/2" x 2 1/2" x 3/16" x 14' SQ. TUBING
PORTLAND CEMENT CONCRETE
1/2" x 5"Ø PLATE
1/2" STEEL RINGS
5"Ø x 4" SLEEVE
J
K
I
H
G
F
E
D
C
B
A
ARM GATE
NOTES
KEYED
DESCRIPTION
20 CF
L 4" x 10" x 1/4" PLATE
4"Ø X 6' BLACK IRON PIPE
QUANTITIES
SINGLE
2 1/2" x 2 1/2" x 3/16" x 11' SQ. TUBING
2 1/2" x 2 1/2" x 3/16" x 2' SQ. TUBING
SINGLE ARM GATE
G-6
NTS
2 FT LONG, RED & WHITE,
(1) TYPE 1 BARRICADE
M
(2) TYPE 2 OBJECT MARKER
YELLOW, BOTH SIDES OF POST,
N
N
(2)
M TYPE 1 BARRICADE
N TYPE 2 OBJECT MARKER
O HOLE PLUG
A2 1
4"Ø BLACK IRON PIPE TIE BACK POST
A2
LENGTH VARIES, MAINTAIN 3 FT BURIED
B2
2 1/2" x 2 1/2" x 3/16" x 20' SQ. TUBING1
C A
M P
G R
O U
N D
R O
A D
NOTES:
1. PAINTING: ALL STEEL AND IRON SHALL HAVE ONE COAT OF TYPE I OR II RED PAINT
(AASHTO M-72) AND ONE SHOP COAT OF "DARK CHOCOLATE" COLOR PAINT
(AASHTO M-67). REFERENCE SPECIFICATIONS SECTION 09900 FOR MORE
INFORMATION ON PAINT.
2. WELDING: ALL WELDING SHALL CONFORM TO A.W.S SPECIFICATIONS.
3. INSTALLATION: GATE SHALL BE INSTALLED SO THAT TYPE 1 BARRICADES WILL
APPEAR ON OPEN SIDE OF ROAD FACING PUBLIC. FILL INSIDE OF 4" POSTS WITH
PORTLAND CEMENT CONCRETE TO TOP OF POSTS. INSTALL POST SO GATE IS
LEVEL.
4. TIE BACK POST: TIE BACK POST LENGTH MAY VARY DEPENDING ON SLOPE OF ROAD
AND TO KEEP 3 FT BURIED MIN.
5. LOCATION AND LENGTH OF ARM GATE: THE FINAL LOCATION OF THE GATE AND THE
LENGTH OF THE ARM GATE SHALL BE FIELD VERIFIED BY THE CONTRACTOR AND
APPROVED BY THE FOREST SERVICE.
TIE BACK POST
EDGE OF ROAD
(1) TYPE 2 OBJECT MARKER
YELLOW, THIS SIDE OF POST
N
ONLY, ATTACH WITH TAMPER PROOF
PLAN VIEW ELEVATION
ATTACH WITH TAMPER PROOF
SCREWS
ATTACH WITH TAMPER PROOF
SCREWS (TYP.)
SCREWS
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
(R05)
PACIFIC SOUTHWEST REGION
GAOA
JERSEYDALE
CAMPGROUND
REHABILITATION
PHASE 4
PROJECT
SIERRA NATIONAL
FOREST
BASS LAKE
RANGER DISTRICT
GATE DETAILS
4/6/2022
FOREST SERVICE
FOREST SERVICE
SANDRA T.
G-6 7 13
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
CONCRETE SLAB
POST BASE
6"X6" TREATED POSTS
EDGE OF CONCRETE SLAB
2" MIN. (PB66) AND 3" MIN. (CB66) CLEAR TYP. FROM
GREATER STRENGTH
EMBOSSED FOR
TO RESIST TEARING
STRESS RELIEF HOLES
A
G
G
R
E
G
A
B
A
P
R
O
N
S
L
O
F
C
O
N
C
R
E
A
B
O
C
TREATED D.F. POST
6"x 6"x 5' PRESSURE
4"x 1"x 4'-6" CONSTRUCTION GRADE D.F.
JOIST HANGER PRIMED & PAINTED
ATTACHED TO POST W/JOIST HANGER
2" x 6" CONSTRUCTION GRADE D.F.
5'-0"
1'-1"
O
C
C
SLAB
D.F. @ 3'-10"Ø ABOVE
CONSTRUCTION GRADE
2"x 6" BUMPER RAIL
A
3'-10"
1" 45° CHAMFERED EDGES ON POSTS
CONCRETE SLAB
SEE DETAIL
G-8
TRASH ENCLOSURE
G-7
NTS
TYPICAL POST BASE INSTALLATION (A)
NTS
R=2'
E
D
G
C
M
P
G
R
O
U
N
D
A
D
L
E
N
G
H
V
R
I
E
S
INSTALL (1) WHEEL STOP PER TRASH ENCLOSURE,
NOTES:
1. ALL POSTS AND SLATS SHALL BE STAINED IN ACCORDANCE WITH THE
TECHNICAL SPECIFICATIONS. COLOR SHALL BE "DARK CHOCOLATE" OR
APPROVED EQUAL BY THE FOREST SERVICE.
2. ALL EXPOSED BOLTS AND METAL FRAMES SHALL BE PAINTED IN
ACCORDANCE WITH THE TECHNICAL SPECIFICATIONS. COLOR SHALL BE
SAME AS POSTS.
3. FOR TRASH ENCLOSURES LOCATED ON UPHILL SIDE OF ROAD, SLOPE
PAD AND APRON TOWARDS ROAD TO ALLOW FOR PROPER DRAINAGE.
5. THE CONTRACTOR SHALL FURNISH THE DUMPSTER. THE DUMPSTER
SHALL BE MANUFACTURED BY:
HANA CARRASCO
McLAUGHLIN WASTE EQUIPMENT, INC.
11900 E. Locke Rd
LOCKEFORD, CA 95237
Ph. 209-663-0858 hana@mwecans.com
Web Site: www.wastequip.com OR APPROVED EQUAL BY THE
FOREST SERVICE.
MODEL#: CPT4YD, 4 YARD PITCH TOP FRONT LOAD CONTAINER
WITH BEAR-RESISTANT APT METAL LIDS (SLT) LOCKING BAR,
CHAIN, AND SNATCH HOOK IN FOREST SERVICE BROWN COLOR
OR APPROVED EQUAL BY THE FOREST SERVICE.
6. THE FINAL LOCATION OF THE TRASH ENCLOSURES SHALL BE
DETERMINED IN THE FIELD BY THE FOREST SERVICE IN COORDINATION
WITH THE CONTRACTOR.
SEE DETAIL
MODEL#: CPT4YD, 4 YARD PITCH TOP FRONT LOAD CONTAINER WITH
BEAR-RESISTANT APT METAL LIDS (SLT) LOCKING BAR, CHAIN, AND SNATCH
HOOK IN FOREST SERVICE BROWN COLOR
G-4
AGGREGATE BASE APRON
SEE DETAIL
G-9
SIMPSON PB66 POST BASE SHOWN.
SEE BELOW
SIMPSON PB66 POST BASE SHOWN.
CONSULT THE FOREST SERVICE
DURING THE SUBMITTAL PROCESS FOR
FINAL POST BASE TYPE. THE FOREST
SERVICE TO SPECIFY PB66 OR CB66 OR
EQUAL THROUGH SUBMITTAL PROCESS.
M
X
R
U
N
N
I
O
P
E
O
O
P
E
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
(R05)
PACIFIC SOUTHWEST REGION
GAOA
JERSEYDALE
CAMPGROUND
REHABILITATION
PHASE 4
PROJECT
SIERRA NATIONAL
FOREST
BASS LAKE
RANGER DISTRICT
TRASH ENCLOSURE
DETAILS
4/6/2022
FOREST SERVICE
FOREST SERVICE
SANDRA T.
G-7 8 13
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
2% SLOPE IN ANY DIRECTION
1'
Y
P
DIMENSIONS AS SHOWN ON PLANS
EXISTING SLOPE
EXISTING SLOPE
C L
E A
R I N
G
H E
I G
EXPOSED AGGREGATE CONCRETE ORAR/SLAB
G-8
NTS
4" COMPACTED AGGREGATE BASE COURSE,
GRADING B, MIN. OF 95% COMPACTION,
AASHTO T-99, METHOD C OR D
COMPACTED NATIVE
SOIL SHOULDER
BACKFILL FLUSH W/
CONCRETE SURFACE
COMPACTED NATIVE SOIL SUBGRADE,
MIN. OF 95% COMPACTION, AASHTO T-99,
METHOD C OR D
4" DEPTH EXPOSED AGGREGATE CONCRETE
W/ #3 REBAR @ 12" O.C.
NOTES:
1. THE FINAL LENGTH AND LOCATION OF THE EXPOSED AGGREGATE CONCRETE ORARS SHALL BE
DETERMINED IN THE FIELD BY THE FOREST SERVICE IN COORDINATION WITH THE CONTRACTOR.
2. A CONCRETE MIX DESIGN FOR CONCRETE SLABS SHALL BE SUBMITTED BY THE CONTRACTOR 14 DAYS
PRIOR TO SCHEDULED PLACEMENT, TO ALLOW FOR REVIEW AND APPROVAL BY THE FOREST SERVICE.
3. CONCRETE SHALL HAVE A 3/8" GRADED EXPOSED AGGREGATE FINISH (SEE SPECIFICATIONS).
4. SEE SECTIONS 03100, 03200, 03300, 03351 FOR SAMPLING AND SUBMITTAL REQUIREMENTS.
5. REFERENCE GRADING NOTES ON SHEET G-2 FOR MORE INFORMATION.
6. THE DRAINAGE DIRECTION, GRADES, AND SLOPES SHALL BE COORDINATED IN THE FIELD BETWEEN
THE CONTRACTOR AND THE FOREST SERVICE. THE FINAL GRADES AND SLOPES SHALL BE APPROVED
BY THE FOREST SERVICE.
7. REFERENCE DETAIL 1/G-8 FOR MORE INFORMATION.
COMPACTED NATIVE SOIL ORAR
G-8
NTS
1.
EXISTING SLOPE
EXISTING SLOPE
AS SHOWN ON PLANS
P
P
SLOPE % - SEE NOTE 2
NOTES:
1. THE FINAL LENGTH AND LOCATION OF THE COMPACTED NATIVE SOIL ORARS SHALL BE
DETERMINED IN THE FIELD BY THE FOREST SERVICE IN COORDINATION WITH THE
CONTRACTOR.
2. THE DRAINAGE DIRECTION, GRADES, AND SLOPES FOR THE COMPACTED NATIVE SOIL ORAR
SHALL BE COORDINATED IN THE FIELD BETWEEN THE CONTRACTOR AND THE FOREST
SERVICE. THE FINAL GRADES AND SLOPES SHALL BE APPROVED BY THE FOREST SERVICE.
3. REFERENCE DETAIL 1/G-8 FOR MORE INFORMATION.
COMPACTED NATIVE SOIL
SHOULDER BACKFILL FLUSH W/
ORAR
3" COMPACTED NATIVE SOIL, MIN. OF 95%
COMPACTION, AASHTO T-99, METHOD C OR D
USING A VIBRATION PLATE COMPACTOR OR
COMPACTION METHOD APPROVED BY THE
FOREST SERVICE
MAXIMUM FINISHED SUBGRADE WIDTHS:
4' ORARS - 6'
ORAR AND TENT PAD
G-8
NTS
EXISTING GROUND
EXPOSED AGGREGATE
CONCRETE ORAR/SLAB,
COMPACTED NATIVE SOIL
ORAR OR TENT PAD,
SEE DETAIL
G-9
AS SHOWN ON THE PLANS 2'
SAW BRANCHES FLUSH
WITH TRUCK TO AVOID
STUBS (TYP.)
CLEARING LIMITS
CLEARING HEIGHT 10'
FULL BENCH
BALANCED BENCH
NOTES:
1. REMOVE ALL VEGETATION IN THE ORAR AND TENT PAD.
2. FOR SIDE SLOPES OF 5% TO 10%, BALANCE CUT AND FILL, SEE
BALANCED BENCH.
3. FOR SIDE SLOPES GREATER THAN 10%, ORAR AND TENT PAD TO BE
ALL CUT, SEE FULL BENCH.
4. FOR SIDE SLOPES LESS THAN 5%, ORAR AND TENT PAD TO MATCH
GRADE OR BE ALL FILL TO HELP DRAINAGE, SEE NO BENCH.
5. LONGITUDINAL SLOPE (RUNNING GRADE) SHOULD BE LESS THAN
HALF OF THE SIDE SLOPE OF THE HILLSIDE.
6. DO NOT REMOVE TREES OVER 6" IF THEY ARE OVER 3' FROM THE
CENTERLINE OF ORAR AND TENT PAD.
7. REMOVE TREES 6" OR LESS IN DIAMETER IF THEY ARE WITHIN 3' OF
CENTERLINE OF ORAR OR TENT PAD.
8. SAW BRANCHES FLUSH WITH TRUNK ANY TREE BRANCHES
EXTENDING INTO THE CLEARING LIMITS OF THE ORAR AND TENT
PAD.
9. BRUSH EXTENDING INTO CLEARING LIMITS THAT IS OVER 12
INCHES IN HEIGHT AND 1/2 INCH IN DIAMETER SHALL BE CUT FLUSH
WITH THE MAIN STEM AT A BRANCH FOR OR AT GROUND LEVEL IF A
FORK MAIN STEM IS NONEXISTENT.
10. CUT ALL LOGS IN ORAR OR TENT PAD 4 FEET UPHILL AND
DOWNHILL OF CENTERLINE OF ORAR AND TENT PAD.
ORAR/TENT
PAD BED
ORAR/TENT PAD BED
EXISTING GRADE
EXISTING GRADE
1'
NO BENCH
ORAR/TENT PAD
BED
EXISTING GRADE
ORAR/TENT PA FG
MATCH EG
ORAR/TENT PAD FG
MATCH EG
ORAR/TENT PAD FG
MATCH EG
NATIVE SHOULDER
BACKFILL FLUSH WITH
ORAR/TENT PAD
2'
CUT
CUT
2% SLOPE
G-8
G-8
COMPACTED NATIVE SOIL SUBGRADE,
MIN. OF 95% COMPACTION, AASHTO T-99,
METHOD C OR D
A
G
G
R
E
G
A
B
S
E
C
O
N
C
R
E
A
B
R=2'
E
D
M
P
G
R
O
U
A
D
L
E
N
G
V
R
I
E
S
AGGREGATE BASE APRON
SEE DETAIL
G-9
A
P
R
O
N
E
X
P
O
S
G
R
E
G
A
T
E
THE FOREST SERVICE IN COORDINATION WITH
THE CONTRACTOR SHALL DETERMINE IN THE
FIELD WHETHER OR NOT AGGREGATE BASE
APRONS ARE NEEDED AT THE CONCRETE ORARS.
M
X
R
U
N
N
I
O
P
E
UNLESS SPECIFIED OTHERWISE
O
S
S
S
L
O
P
E
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
(R05)
PACIFIC SOUTHWEST REGION
GAOA
JERSEYDALE
CAMPGROUND
REHABILITATION
PHASE 4
PROJECT
SIERRA NATIONAL
FOREST
BASS LAKE
RANGER DISTRICT
ORAR AND TENT PAD
DETAILS
4/6/2022
CESAR S.
CESAR S.
SANDRA T.
G-8 9 13
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
NOTES:
1. WITHIN THE 2' CLEARING, ONLY REMOVE VEGETATION
DESIGNATED FOR REMOVAL ON THE PLANS OR THAT MAY BE A
HAZARD TO VEHICULAR TRAFFIC.
2. THE AGGREGATE BASE APRONS SHALL BE FLUSH WITH THE
TOP OF THE CONCRETE SLABS AND CONCRETE ORARS AND
SHALL BE FLUSH WITH THE AGGREGATE BASE ROAD.
3. THE AGGREGATE BASE APRONS SHALL MATCH THE SLOPES OF
THE ROAD AND SHALL HAVE A 2% TO A MAXIMUM OF 8.33%
RUNNING SLOPE AND 2% CROSS SLOPE TO CONNECT TO THE
TOP OF THE CONCRETE SLABS AND CONCRETE ORARS.
4. THE DRAINAGE DIRECTION, GRADES, AND SLOPES SHALL BE
COORDINATED IN THE FIELD BETWEEN THE CONTRACTOR AND
THE FOREST SERVICE. THE FINAL GRADES AND SLOPES SHALL
BE APPROVED BY THE FOREST SERVICE.
G-8
2% CROSS SLOPE
2'
EXISTING SLOPE
PROPOSED GRADING TO
MEET EXISTING SLOPE
2:1 MAX
PROPOSED GRADING TO
MEET EXISTING SLOPE
2:1 MAX
EXISTING SLOPE
4" COMPACTED AGGREGATE
BASE COURSE, GRADING B, MIN. OF
95% COMPACTION, AASHTO T-99,
METHOD C OR D
1' COMPACTED
AGGREGATE
BASE
SHOULDER
BACKFILL
(2' AT CULVERT
CROSSING)
CLEARING WIDTH
C
L E
A R
I N
G
H
E I G
H T
SEE PLAN FOR WIDTHS
1' COMPACTED AGGREGATE BASE
SHOULDER BACKFILL AT 5% SLOPE
(2' AT CULVERT CROSSING).
COMPACTED NATIVE SOIL/UNDISTURBED NATIVE
OR STRUCTURAL FILL (ACCEPTED NATIVE), MIN.
95% COMPACTION, AASHTO T-99, METHOD C OR D
PLUS 1' EACH SIDE
2'
G-9
AGGREGATE BASE APRON
NTS
COMPACTED NATIVE SOIL TENT PAD
G-9
NTS
16'
OR
30'
12.5' OR 30'
TENT PAD
SEE PLANS FOR
LOCATION
COMPACTED NATIVE SOIL,
SCARIFY 3", REMOVE ROCKS,
LEVEL AND RE-COMPACT
PROTECT EX. TREES
(TYP.)
1.
PROTECT EX. NATURAL OBJECTS
SUCH AS ROCKS AND STUMPS
(TYP.)
REMOVE AND DISPOSE EXISTING
STUMPS WITHIN THE TENT PAD (TYP.)
SEE PLANS FOR TOTAL QTY.
EXISTING SLOPE
EXISTING SLOPE
12.5'X16' OR 30'X30'
P
P
2% SLOPE IN ANY DIRECTION
NOTES:
1. THE FINAL LOCATION OF THE TENT PADS SHALL BE DETERMINED IN THE FIELD BY THE FOREST SERVICE
IN COORDINATION WITH THE CONTRACTOR.
2. THE EXISTING NATURAL OBJECTS SUCH AS ROCKS, TREES, AND STUMPS MAY BE INCORPORATED INTO
THE EDGES OF THE TENT PAD AS LONG AS THE SQ.FT. IS MAINTAINED.
3. TENT PADS SHALL BE GRADED WITH SLOPE TO DRAIN WITH NATURAL TOPOGRAPHY, BUT NOT TO
EXCEED 2% IN ANY DIRECTION.
4. THE DRAINAGE DIRECTION, GRADES, AND SLOPES SHALL BE COORDINATED IN THE FIELD BETWEEN THE
CONTRACTOR AND THE FOREST SERVICE. THE FINAL GRADES AND SLOPES SHALL BE APPROVED BY
THE FOREST SERVICE.
5. REFERENCE DETAIL 1/G-8 FOR MORE INFORMATION.
COMPACTED NATIVE SOIL
SHOULDER BACKFILL FLUSH W/
TENT PAD
SECTION VIEW
PLAN VIEW
FOR RUNNING SLOPE SEE NOTES 3 AND 4
CONCRETE ORAR/CONCRETE SLAB
3" COMPACTED NATIVE SOIL, MIN. OF 95%
COMPACTION, AASHTO T-99, METHOD C OR D
USING A VIBRATION PLATE COMPACTOR OR
COMPACTION METHOD APPROVED BY THE
FOREST SERVICE
COMPACTED NATIVE SOIL SUBGRADE,
MIN. OF 95% COMPACTION, AASHTO T-99,
METHOD C OR D
CONSTRUCT THE AGGREGATE
BASE APRON FLUSH WITH THE
TOP OF THE CONCRETE ORAR
AND CONCRETE SLAB
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
(R05)
PACIFIC SOUTHWEST REGION
GAOA
JERSEYDALE
CAMPGROUND
REHABILITATION
PHASE 4
PROJECT
SIERRA NATIONAL
FOREST
BASS LAKE
RANGER DISTRICT
TENT PAD AND
AGGREGATE BASE
APRON DETAILS
4/6/2022
CESAR S.
CESAR S.
SANDRA T.
G-9 10 13
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Scale 1/4"=1'-0"
SIDE ELEVATION
Scale 1/4"=1'-0"
REAR ELEVATION
1'- 1"1'- 1"
'-1
1 16
6' -1
7 16
5"
18'-0 3 16"
4" 61
2" 8'-13 8"
6' -8
15 16
5" 6'
-1 7 16
2"2"
9"2'-915 16"
Toilet Holding Tank Access Opening
Toilet Holding Tank Access Opening
1'-0"∅ Vent Pipe
1'-0"∅ Vent Pipe
8'-13 8" 41
2"
7'-9 1 2 "7'-9
2"
4' -1
7 8"
5"
'-1
1 16
5" 6'
-1 7 16
18'-0 3 16"
5"
1'-0"∅ Vent Pipe
4' -1
7 8" 2" 8'-13
8"8'-13 8"61
4" 41 2"
1'-8" x 3'-0" windows with hollow metal frames
Scale 1/4"=1'-0"
FRONT ELEVATION
Scale 1/4"=1'-0"
SIDE ELEVATION
6' -8
15 16
5" 6'
-1 7 16
9" 2'-915 16"
2" 2"
Toilet Holding Tank Access Opening
1'-0"∅ Vent Pipe
3'-0" x 6'-8" metal doors with hollow metal frames
Concrete Finish Shown is Wood Grain. The Owner has other exterior finish options to choose from.
Concrete Finish Shown is 6" Lap Siding. The Owner has other exterior finish options to choose from.
Concrete Finish Shown is Wood Grain. The Owner has other exterior finish options to choose from.
Concrete Finish Shown is Wood Grain. The Owner has other exterior finish options to choose from.
Concrete Finish Shown is 6" Lap Siding. The Owner has other exterior finish options to choose from.
Concrete Finish Shown is Wood Grain. The Owner has other exterior finish options to choose from.
3"3"
7'-9 2"
1'- 1"
3"
7'-9 1 2 "
3"
1'- 1"
'-3
7 8"
10'-0 9 16"
'-3
7 8"
10'-0 9 16"
FOR
REFERENCE
ONLY
NOTES:
1. TOILET BUILDING SHALL BE INSTALLED BY
BOOM CONCRETE, INC., AN APPROVED
MANUFACTURER OR EQUIVALENT.
2. CONTRACTOR SHALL COORDINATE WITH
MANUFACTURER FOR ALL CONSTRUCTION
REQUIREMENTS, FOUNDATION/SUBGRADE
PREPARATION, AND ADDITIONAL BUILDING
FIXTURES/MATERIALS REQUIRED.
3. CONTRACTOR SHALL COORDINATE WITH THE
FOREST SERVICE FOR BUILDING LAYOUT,
STAKING, GRADES, AND INITIAL SITE
PREPARATION.
4. THE FINAL LOCATION OF THE TOILET
BUILDING SHALL BE DETERMINED IN THE
FIELD BY THE FOREST SERVICE IN
COORDINATION WITH THE CONTRACTOR.
5. DOUBLE VAULT TOILET BUILDING SHALL BE
MANUFACTURED BY BOOM CONCRETE, INC.,
PO BOX 437, NEWELL, SD 57760. 605-456-2600.
MODEL: BOOM CLOVERMIST DOUBLE VAULT
TOILET BUILDING WITH CEDAR SHAKE ROOF
IN RAVEN BLACK COLOR; HORIZONTAL LAP
SIDING WALLS ON GABLE AND EXTERIOR
WALLS IN AUTUMN BROWN COLOR;
TEAKWOOD BROWN COLOR FOR DOORS,
DOOR FRAMES, AND WINDOW TRIMS;
RAPTOR VENT SCREENS, VAULT LINER,
HOLDING TANK CAPACITY 165.2 C.F. (1235.7
GALLONS), AND HAZE GRAY COLOR FOR THE
FLOORS OR APPROVED EQUAL BY THE
FOREST SERVICE.
6. SEE THE TECHNICAL SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
7. THIS SHEET IS FOR REFERENCE ONLY.
CONTRACTOR TO SUBMIT THE SUBMITTAL
PACKAGE/DRAWINGS TO THE FOREST
SERVICE FOR REVIEW AND APPROVAL OF
THE ACTUAL DIMENSIONS, WALL VENT
LOCATIONS, AND SPECIFIC INFORMATION
REGARDING THIS TOILET BUILDING.
8. CONTRACTOR SHALL INSTALL BACK OF THE
BUILDING SLIGHTLY HIGHER TO ALLOW
WATER TO FREELY DRAIN OUT OF THE
TOILET ROOMS AT 1% SLOPE UNLESS
OTHERWISE APPROVED BY THE FOREST
SERVICE.
9. THE DRAINAGE DIRECTION, GRADES, AND
SLOPES SHALL BE COORDINATED IN THE
FIELD BETWEEN THE CONTRACTOR AND THE
FOREST SERVICE. THE FINAL GRADES AND
SLOPES SHALL BE APPROVED BY THE
FOREST SERVICE.
DOUBLE VAULT TOILET BUILDING 1
G-10
NTS
CONSTRUCT THE AGGREGATE
BASE APRON FLUSH WITH THE
TOP OF THE CONCRETE ORAR
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
(R05)
PACIFIC SOUTHWEST REGION
GAOA
JERSEYDALE
CAMPGROUND
REHABILITATION
PHASE 4
PROJECT
SIERRA NATIONAL
FOREST
BASS LAKE
RANGER DISTRICT
DOUBLE VAULT TOILET
BUILDING DETAILS
4/6/2022
BOOM CONCRETE
BOOM CONCRETE
SANDRA T.
G-10 11 13
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
STEPS
G-11
NTS
4'-0"
6" TYP
UP TO 1%
SLOPE
S
L
O
P
E
O
P E
2% SLOPE
EXISTING GROUND
COMPACTED
NATIVE MATERIAL
WOOD STEPS
DAYLIGHT FILL
15" TYP
5' LANDING BETWEEN
SETS OF 3 to 5 STEPS TYP. UNLESS
APPROVED OTHERWISE BY THE
FOREST SERVICE TO FIELD FIT
AND CONNECT TO THE CAMPSITES.
15"
18" #4 REBAR ANCHOR
DRIVEN THROUGH DRILLED
HOLES IN TIMBERS (TYP)
WOOD STEP TREAD 6" X 6" X 5' SRS PTDF WITH HALF LAP
JOINT AT BOTH ENDS TO CONNECT WITH STAIR FRAME
6" X 6" X 4' SRS PTDF TIMBER STAIR
FRAME. CUT HALF LAP JOINT ON
EXPOSED END FOR STEP JOINERY
4'
NOTES:
1. STEPS SHALL BE MANUFACTURED BY:
PERMAPOST PRODUCTS CO., 4205 SE WITCH HAZEL RD, HILLSBORO,
OREGON 97123. ATTENTION JAYNE BOND OR BRUCE LIPPS. 503-619-0212 OR
SALES.PERMAPOST@GMAIL.COM. TREATMENT ON TIMBER SHALL BE .50
PENTACHLOROPHENOL (TYPE A) TREATED MATERIAL (CHOCOLATE BROWN
COLOR), INCISED, #1/BETTER COASTAL DOUGLAS FIR GREEN, INDEPENDENT
INSPECTION AND BMP OR APPROVED EQUAL BY THE FOREST SERVICE.
2. REBAR SHALL BE DRIVEN DOWN 1" BELOW STEP AND THEN CAULKED WITH
ELASTOMERIC SEALANT: ONE PART NON-ACID-CURING SILICONE TYPES; GRADE NS;
CLASS 25 AND SHALL BE BROWN IN COLOR.
3. SAW CUT ENDS SHALL BE RETREATED.
4. STEPS SHALL BE CONSTRUCTED ALONG ALIGNMENT AS SHOWN ON THE PLANS,
HOWEVER FIELD FIT TO INCORPORATE EXISTING NATURAL FEATURES SUCH AS
TREES AND ROCKS.
5. STEPS SHALL TYPICALLY BE 15" ON CENTER, INCLUDING WHEN STEPS ARE ON A
CURVE.
6. PROTECT EXISTING VEGETATION TO THE EXTENT POSSIBLE.
7. STEPS SHALL BE CONSTRUCTED WHEN RUNNING SLOPE OF AN ORAR EXCEEDS 10%.
8. THE FINAL LOCATION OF THE STEPS SHALL BE DETERMINED IN THE FIELD BY THE
FOREST SERVICE IN COORDINATION WITH THE CONTRACTOR.
TREAD
6" X 6" X 4' SRS PTDF
TIMBER BASE FRAME
FOR WOOD STEPS
3" 15"
LANDING
OR
ORAR
LANDING
OR
ORAR
S
L
O
P
E
O
P E
4'-0"
# 4 REBAR ANCHOR
HARDENED AGGREGATE
SURFACE TRAIL
G-11
SECTION 2
SECTION 1
PLAN
EXISTING SLOPE
EXISTING SLOPE
AS SHOWN ON PLANS
P
P
2% SLOPE
NOTES:
1. ALL HARDENED AGGREGATE SURFACES SHALL BE CONSTRUCTED AS
SHOWN ON THE PLANS AND AS APPROVED IN THE FIELD BY THE FOREST
SERVICE.
2. SEE SECTION 02340 FOR REQUIREMENTS FOR HARDENED AGGREGATE
SURFACES.
3. HARDENED AGGREGATE AREAS SHALL BE GRADED WITH SLOPE TO
DRAIN WITH NATURAL TOPOGRAPHY, BUT NOT TO EXCEED 2% IN ANY
DIRECTION.
HARDENED AGGREGATE SURFACE SECTION
G-11
NTS
COMPACTED NATIVE SOIL SUBGRADE,
MIN. OF 95% COMPACTION, AASHTO T-99,
METHOD C OR D
NATIVE SHOULDER BACKFILL
FLUSH W/ AGGREGATE SURFACE
2" COMPACTED AGGREGATE, SURFACE COURSE,
GRADING C, MIN. OF 95% COMPACTION, AASHTO
T-99, METHOD C OR D USING A VIBRATION PLATE
COMPACTOR OR COMPACTION METHOD
APPROVED BY THE FOREST SERVICE
4" COMPACTED AGGREGATE BASE
COURSE, GRADING B, MIN. OF 95%
COMPACTION, AASHTO T-99,
METHOD C OR D
1' TYP.
2' TYP.
1' TYP.
F
L
NOTES:
1. THE TYPICAL DITCH SHALL BE 1 FT DEEP UNLESS DIRECTED
OTHERWISE BY THE FOREST SERVICE.
2. WHEN DITCH IS DEEPER THAN 1' STEEPEN SLOPES TO 1:1
MAX OR AS DIRECTED BY THE FOREST SERVICE.
3. FIELD FIT FLOWLINE TO DAYLIGHT AND DIRECT RUNOFF
AWAY FROM ORAR, FAUCETS, AND TOILET BUILDINGS.
4. SLOPE DITCH TO AVOID PONDING.
5. THE FINAL LOCATION OF THE DITCH SHALL BE DETERMINED
IN THE FIELD BY THE FOREST SERVICE IN COORDINATION
WITH THE CONTRACTOR.
EXISTING GRADE
FOREST SERVICE TO PLACE CLASS II
RIPRAP IN DITCH, MIN. OF 1 FT THICK
(NOT PART OF THIS CONTRACT)
DRAINAGE DITCH
G-11
NTS
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
(R05)
PACIFIC SOUTHWEST REGION
GAOA
JERSEYDALE
CAMPGROUND
REHABILITATION
PHASE 4
PROJECT
SIERRA NATIONAL
FOREST
BASS LAKE
RANGER DISTRICT
STEP AND DRAINAGE
DITCH DETAILS
4/6/2022
CESAR S.
CESAR S.
SANDRA T.
G-11 12 13
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
1. DESIGNS FOR SIGNS AND BARRICADES SHOWN ABOVE ARE IN ACCORDANCE WITH MINIMUM STANDARDS IN THE
"MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS" LATEST EDITION.
2. SIGNS SHALL BE MADE FROM SUITABLE MATERIALS WHICH ARE IN ACCORDANCE WITH ALL STATE AND FEDERAL
SPECIFICATIONS.
3. SIGNS MAY BE MADE OF WOOD OR METAL. WOOD SIGNS-5/8" PLYWOOD MANUFACTURED WITH SPECIAL
WATERPROOF GLUE. METAL SIGNS-16 GAUGE SHEET STOCK WITH EMBOSSED OR VITRIFIED FINISH. WHEN
EMBOSSED THE DETAILS OF THE DESIGN ARE RAISED FROM THE BACKGROUND NOT LESS THAN .100" NOR MORE
THAN .125".
4. REGULATORY SIGNS SHALL BE RECTANGULAR IN SHAPE WITH THE LARGER DIMENSION VERTICAL AND HAVE BLACK
AND WHITE LEGEND OR BACKGROUND. ALL REGULATORY SIGNS UNLESS DEFINITELY EXCEPTED IN THE
SPECIFICATIONS, SHALL BE REFLECTORIZED OR ILLUMINATED.
5. ALL SIGNS, UNLESS DEFINITELY EXCEPTED IN THE SPECIFICATIONS, SHALL BE DIAMOND SHAPED (SQUARE WITH ON
DIAGONAL VERTICAL) AND SHALL HAVE A HIGHWAY ORANGE BACKGROUND WITH BLACK LEGEND. ALL WARNING
SIGNS HAVING SIGNIFICANCE DURING THE HOURS OF DARK SHALL BE REFLECTORIZED OR ILLUMINATED.
6. SIGNS SHALL BE LOCATED WHERE THEY WILL BE CONSPICUOUSLY VISIBLE DAY AND NIGHT ON THE RIGHT HAND
SIDE OF APPROACHING TRAFFIC. THEY SHALL BE FACING TRAFFIC AND LOCATED WHERE THEY CAN BE SEEN AT
ALL TIMES BY APPROACHING DRIVERS WITH A MINIMUM OF EFFORT.
7. WHEN A SIGN IS REQUIRED FOR AN EXTENDED PERIOD, IT SHALL BE FASTENED TO 4 X 4 POSTS WITH 2 3/8"
CARRIAGE BOLTS. PORTABLE SUPPORTS ARE PERMITTED FOR SHORT PERIODS PROVIDED THE CONSTRUCTION IS
SUCH THAT WIND OR OTHER AGENTS CANNOT READILY UPSET THE SIGN.
8. SIGN M4-10R SHALL BE ERECTED AT THE BEGINNING OF DETOURS, ALONG DETOURS AT 1/4 MILE INTERVALS AND AT
ROAD JUNCTIONS ALONG DETOURS IN A GREATLY ENLARGED SIZE IF THIS SIGN IS PRESCRIBED FOR USE ON
BARRICADES IN THE ROADWAY WHERE A ROAD IS CLOSED FOR CONSTRUCTION OR MAJOR MAINTENANCE
OPERATIONS.
9. SIGN W20-1 SHALL BE ERECTED 1500' FROM EACH END OF CONSTRUCTION OPERATIONS.
10. SIGN W21-3 AND W11-1 SHALL BE ERECTED AT EACH END OF AREAS WHERE HEAVY EQUIPMENT IS IN OPERATION
AND SHALL BE REPEATED EVERY 1/2 MILE IF THE OPERATION EXTENDS OVER ONE MILE.
11. OTHER SIGNS SHOWN ABOVE SHALL BE USED AS INDICATED BY THEIR DESIGN.
12. IF OTHER SIGNS NOT SHOWN ABOVE ARE REQUIRED THEY SHALL ALSO CONFORM IN DESIGN TO THOSE SHOWN IN
THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
13. SELECTION AND PLACEMENT OF ALL SIGNS SHALL BE SUBJECT TO APPROVAL OF THE ENGINEER.
14. LIGHTING DEVICES SUCH AS FLASHERS, TORCHES, LANTERNS, AND ELECTRIC LIGHTS SHALL BE PLACED AND
MAINTAINED FROM SUNSET TO SUNRISE AT ALL POINTS OF HAZARD AND AT ALL SIGNS INDICATING CAUTION.
GENERAL NOTES
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
(R05)
PACIFIC SOUTHWEST REGION
GAOA
JERSEYDALE
CAMPGROUND
REHABILITATION
PHASE 4
PROJECT
SIERRA NATIONAL
FOREST
BASS LAKE
RANGER DISTRICT
CONSTRUCTION SIGNS
4/6/2022
FOREST SERVICE
FOREST SERVICE
SANDRA T.
G-12 13 13
AutoCAD SHX Text
5' TO 12'
AutoCAD SHX Text
PERMANENT
AutoCAD SHX Text
ESSENTIALLY
AutoCAD SHX Text
PORTABLE
AutoCAD SHX Text
MOVABLE
AutoCAD SHX Text
ESSENTIALLY
AutoCAD SHX Text
FLEXIBILITY
AutoCAD SHX Text
POST OR SKIDS
AutoCAD SHX Text
LIGHT "A" FRAME
AutoCAD SHX Text
HEAVY "A" FRAME
AutoCAD SHX Text
DEMOUNTABLE OR
AutoCAD SHX Text
TYPE OF FRAME
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text
3 FT. MIN.
AutoCAD SHX Text
3'MIN.-3- MAX.
AutoCAD SHX Text
3 FT. MIN.
AutoCAD SHX Text
HEIGHT
AutoCAD SHX Text
6 IN.
AutoCAD SHX Text
6 IN.
AutoCAD SHX Text
6 IN.
AutoCAD SHX Text
MAX.
AutoCAD SHX Text
3' MIN.-VARIAB;E
AutoCAD SHX Text
3' MIN.- 4' MAX.
AutoCAD SHX Text 6'-8'
AutoCAD SHX Text
WIDTH OF STRIPES
AutoCAD SHX Text
LENGTH OF RAIL
AutoCAD SHX Text
8" MIN.-12"MAX.
AutoCAD SHX Text
8" MIN.-12"MAX.
AutoCAD SHX Text
8" MIN.-12"MAX.
AutoCAD SHX Text
WIDTH OF RAIL
AutoCAD SHX Text
III
AutoCAD SHX Text
II
AutoCAD SHX Text I
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
3' MINIMUM
AutoCAD SHX Text
SEE TABLE
AutoCAD SHX Text
D LETTERING
AutoCAD SHX Text
6" SERIES
AutoCAD SHX Text 48"X18"
AutoCAD SHX Text M5-7
AutoCAD SHX Text
D LETTERING
AutoCAD SHX Text
8" SERIES
AutoCAD SHX Text 48"X30"
AutoCAD SHX Text R11-2
AutoCAD SHX Text
SEE TABLE
AutoCAD SHX Text
FOR DIMENSIONS
AutoCAD SHX Text
NOTE:
AutoCAD SHX Text
VARIES
AutoCAD SHX Text
SUPPORT
AutoCAD SHX Text
TYPE OF
AutoCAD SHX Text
TYPE III BARRICADE
AutoCAD SHX Text
TYPE I BARRICADE
AutoCAD SHX Text
TYPE II BARRICADE
AutoCAD SHX Text
8" SERIES D LETTERING
AutoCAD SHX Text 30"X30"
AutoCAD SHX Text W8-1
AutoCAD SHX Text W20-2d
AutoCAD SHX Text
5" SERIES D LETTERING
AutoCAD SHX Text 24"X24"
AutoCAD SHX Text
5" SERIES D LETTERING
AutoCAD SHX Text 30"X30"
AutoCAD SHX Text
5" SERIES C LETTERING
AutoCAD SHX Text 30"X30"
AutoCAD SHX Text
5" SERIES D LETTERING
AutoCAD SHX Text 30"X30"
AutoCAD SHX Text
5" SERIES D LETTERING
AutoCAD SHX Text 30"X30"
AutoCAD SHX Text
5" SERIES D LETTERING
AutoCAD SHX Text 36"X36"
AutoCAD SHX Text
6" SERIES D LETTERING
AutoCAD SHX Text 30"X30"
AutoCAD SHX Text
5" SERIES D LETTERING
AutoCAD SHX Text 36"X36"
AutoCAD SHX Text
8" SERIES C LETTERING
AutoCAD SHX Text 48"X48"
AutoCAD SHX Text
8" SERIES C LETTERING
AutoCAD SHX Text 48"X48"
AutoCAD SHX Text
7" SERIES C LETTERING
AutoCAD SHX Text 48"X48"
AutoCAD SHX Text
RIGHT OR LEFT
AutoCAD SHX Text
BLACK ARROW
AutoCAD SHX Text 48"X24"
AutoCAD SHX Text
3" SERIES D LETTERING
AutoCAD SHX Text
RIGHT OR LEFT
AutoCAD SHX Text 24"X9"
AutoCAD SHX Text
5" SERIES B LETTERING
AutoCAD SHX Text 24"X12"
AutoCAD SHX Text W21-2
AutoCAD SHX Text W11-1
AutoCAD SHX Text W21-1
AutoCAD SHX Text W8-7
AutoCAD SHX Text W8-6
AutoCAD SHX Text W5-2
AutoCAD SHX Text W3-1
AutoCAD SHX Text W21-3
AutoCAD SHX Text W20-2c
AutoCAD SHX Text W20-2d
AutoCAD SHX Text W20-1
AutoCAD SHX Text W1-6
AutoCAD SHX Text M4-10R
AutoCAD SHX Text M4-B
AutoCAD SHX Text
3' MINIMUM
AutoCAD SHX Text 20"
AutoCAD SHX Text 20"
AutoCAD SHX Text
AutoCAD SHX Text 1'
AutoCAD SHX Text
3' TO 3
AutoCAD SHX Text 45%%127
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 45%%127
AutoCAD SHX Text
5' TO 12'
AutoCAD SHX Text 5'
AutoCAD SHX Text 5'
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text 5"
AutoCAD SHX Text 5"
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text 5"
AutoCAD SHX Text 5"
AutoCAD SHX Text 5"
AutoCAD SHX Text 5"
AutoCAD SHX Text 3"
AutoCAD SHX Text 5"
AutoCAD SHX Text 5"
AutoCAD SHX Text
AutoCAD SHX Text 11"
AutoCAD SHX Text
AutoCAD SHX Text 5"
AutoCAD SHX Text 5"
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 5"
AutoCAD SHX Text 5"
AutoCAD SHX Text 5"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 5"
AutoCAD SHX Text 5"
AutoCAD SHX Text 5"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 13"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 13"
AutoCAD SHX Text
AutoCAD SHX Text 7"
AutoCAD SHX Text 7"
AutoCAD SHX Text 7"
AutoCAD SHX Text 48"
AutoCAD SHX Text 24"
AutoCAD SHX Text 9"
AutoCAD SHX Text 24"
AutoCAD SHX Text 12"
AutoCAD SHX Text 24"
AutoCAD SHX Text
OIL
AutoCAD SHX Text
FRESH
AutoCAD SHX Text
CROSSING
AutoCAD SHX Text
TRUCK
AutoCAD SHX Text
WORKING
AutoCAD SHX Text
MEN
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
LOOSE
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
ROUGH
AutoCAD SHX Text
AHEAD
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
BRIDGE
AutoCAD SHX Text
LANE
AutoCAD SHX Text
ONE
AutoCAD SHX Text
AHEAD
AutoCAD SHX Text
STOP
AutoCAD SHX Text
AHEAD
AutoCAD SHX Text
MACHINERY
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
500 FT
AutoCAD SHX Text
DETOUR
AutoCAD SHX Text
AHEAD
AutoCAD SHX Text
DETOUR
AutoCAD SHX Text
DETOUR
AutoCAD SHX Text
DETOUR
AutoCAD SHX Text
BUMP
AutoCAD SHX Text
AHEAD
AutoCAD SHX Text
DETOUR
AutoCAD SHX Text
DETOUR
AutoCAD SHX Text
CLOSED
AutoCAD SHX Text
ROAD
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| GAOA_JerseydaleCG_Rehab_Phase4_CoverSheet_040622_FINAL |
| Sheets and Views |
| GAOA_JerseydaleCG_Rehab_Phase4_CoverSheet_040622_FINAL-34x22 EXPANDED |
| GAOA_JerseydaleCG_Rehab_Phase4_PlanDrawings_060722_Revised_FINAL |
| Sheets and Views |
| GAOA_JerseydaleCG_Rehab_Phase4_PlanDrawings_060722_Revised_FINAL-INDEX PLAN_G1 |
| OLE1 |
| GAOA_JerseydaleCG_Rehab_Phase4_PlanDrawings_060722_Revised_FINAL-SITE PLAN 1_G2 |
| OLE1 |
| GAOA_JerseydaleCG_Rehab_Phase4_PlanDrawings_060722_Revised_FINAL-SITE PLAN 2_G3 |
| OLE1 |
| GAOA_JerseydaleCG_Rehab_Phase4_PlanDrawings_060722_Revised_FINAL-SIGN_WHEELSTOP_DETAILS_G4 |
| OLE1 |
| GAOA_JerseydaleCG_Rehab_Phase4_PlanDrawings_060722_Revised_FINAL-SINGLE_TOILETBLDG_DETAILS_G5 |
| OLE1 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .