combined amendment2.pdf
PDF 252 KB Posted
- Solicitation number
- 1066228
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment 01.docx | DOCX document | |
| GAOA_JerseydaleCG_Rehab_Phase4_Specifications_060722_Revised_FINAL.pdf | ||
| WAGE DETERMINATION.pdf | ||
| GAOA_JerseydaleCG_Rehab_Phase4_PlanDrawings_060722_Revised_FINAL.pdf | ||
| RFP -.docx | DOCX document | |
| GAOA_JerseydaleCG_Rehab_Phase4_SectionC_040622_FINAL.rtf | RTF text file | |
| GAOA_JerseydaleCG_Rehab_Phase4_Fire Plan 2013_040622_FINAL.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 1
Greg Cunningham USDA, Forest Service 3237 Peacekeeper Way Suite 101 McClellan Park, Ca. 95652
USDA Forest Service Construction Contracting 3237 Peacekeeper Way, Suite 101 McClellan, CA 95652
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)
ALL PROSPECTIVE OFFERORS
(X) 9A. AMENDMENT OF SOLICITATION NUMBER
127EAW22R0053
9B. DATED (SEE ITEM 11)
07/22/2022
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
A00002 08/16/22 1066228
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
GAOA Jerseydale CG Rehabilitation Phase 4, Sierra National Forest, California
See attached RFI responses
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of Contracting Officer)
Previous edition unusable STANDARD FORM 30 (REV. 11/2016)
Attachment to Amendment No. 2
1. RFI Clarification: Safety Network Traffic Signs and Contractor shall use the standard .080 gauge aluminum – universal standard/Caltrans standard that is used throughout the US. The ¾” indication for sign thickness is a typo.
2. RFI Questions: The tent pads and trails call for compacted native soil only.
Just confirming there is no topping required (crusher dust or aggregate) on both the tent pads and the trails throughout this project?
RESPONSE: Per details 3/G-8 Compacted Native Soil ORAR and 1/D-9 Compacted Native Soil Tent Pad, the surface is compacted native soil. There is no topping required such as dust or aggregate on both.
The hardened aggregate surface (rock dust) and/or aggregate base is specified for details 2/G-9 Aggregate Base Apron and 2/G-11 Hardened Aggregate Surface.
3. RFI Question: Is the Forest Service willing to allow the contractor to “Camp” on site during the construction period?
ANSWER: Yes.
4. RFI Statement: Spec Section 2805.2.1 calls for "Steps shall be manufactured by: Permapost Products Co., 4205 SE Witch Hazel Rd, Hillsboro, OR 97123.
Attention Jayne Bond or Bruce Lipps. 503-619-0212 or sales.permapost@gmail.com. Treatment on timber shall be .50 Pentachlorphenol (Type A) Treated material (Chocolate Brown Color), Incised, #1/Better Coastal Douglas Fir Green, Independent Inspection and BMP or approved equal by the Forest Service."
mailto:sales.permapost@gmail.com
Permapost Products Co. informed that: We may not have enough Penta to run these. Penta has been banned and we have 5 years to get rid of what we have. We have been reducing our inventory of Penta for a little while and we may have to switch the Penta treatment to Copper Naphthenate.
5. RFI QUESTION:
Attached are the specifications and information on the Copper Naphthenate products, would this be an acceptable substitution?
Answer: The following is the recommended specifications for the timber steps:
• Timber steps shall be CA (Copper Azoles) or CA-C, (Type A) and UC4A Ground Contact, 6x6 #2/Better Douglas Fir Pressure Treated S4S Green in color or approved equal by the Forest Service.
• Rebar shall be hot dip galvanized. The CA or CA-C treatment requires hot dip galvanized rebar.
| 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS |
| N/A |
| 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14. |
| GAOA Jerseydale CG Rehabilitation Phase 4, Sierra National Forest, California |
| See attached RFI responses |