CONSTRUCTION - IT CONSOLIDATION AT USGS HVO Federal contract opportunity
Solicitation number
G15PS00449
Issued by
Department of the Interior US Geological Survey

About this file

SOW summary

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCTION - IT CONSOLIDATION AT USGS HVO, newest first.
File Type Posted
Sol_G15PS00449_Amd_000001.pdf PDF
G15PS00449_Attch_3_rev1_NPS_protocols.pdf PDF
G15PS00449_Attch_4_QA1.docx DOCX document
Sol_G15PS00449.pdf PDF
G15PS00449_Attch_1_T Cs.docx DOCX document
G15PS00449_Attch_3_NPS_protocols.pdf PDF
0040212738_presol_text.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work UPS Power Distribution, AC, and Fire Suppression:

Facility Modification for IT Consolidation USGS Hawaiian Volcano Observatory

Project summary

The Hawaiian Volcano Observatory (HVO) has consolidated its computer and network infrastructure in the past few years. This consolidation has significantly reduced the space, cooling, and power needs of the IT systems that support the observatory’s volcano monitoring and research mission. In the foreseeable future, only 2 server-sized racks are needed to support the IT network and server hardware for mission-critical data acquisition, processing, and storage.

This reduction allows for a further consolidation of the IT and communication infrastructure into the UPS and communications room (B-9) located in the basement, which will reduce HVO’s energy consumption through more energy-efficient Power Distribution Unit and reduced AC requirements. The consolidation will allow for a re-purposing of the existing computer room (133) to a conference room and the existing conference room (#136) into offices.

CTA Architects Engineers prepared construction drawings and a project manual to modify rooms #133 and #B9 (electrical, fire suppression and firewall, and air conditioning and ventilation) to enable relocation of the IT data acquisition and processing servers, network routers, and a power distribution unit into B9. These documents can be accessed here: ftp://ftpext.usgs.gov/pub/wr/ca/sacramento/BAG/Caravelli/G15PS00449_projectdocs/

This statement of work, however, limits the scope of work represented by the CTA drawings. Tasks to be performed are described below with references to the drawings; tasks not to be performed are also indicated below.

Brief description of main tasks

This project includes the following main tasks:

1. Electrical

Remove existing power distribution unit in room #133, install 100-amp breaker panels in room #B9 and the storage room adjacent to room #133, and move existing circuits from the PDU and add new circuits to each panel as specified in drawings.

2. Ceiling & lighting demolition & replacement

In room #133, remove existing suspended ceiling, relocate existing light fixtures, and install new suspended ceiling grid and acoustic tiles. The suspended ceiling in room B9 will be removed by USGS.

3. Construction of 1-hour rated firewall in room #B9

A new firewall in B9 requires demolition of existing doors and part of one wall to allow installation of 2 new interior walls that extend to the ceiling and new doors and frames. A dust-abatement poly sheet wall and a continuous vacuum system during finishing of the gypsum board are required to protect the central UPS unit and telecommunications equipment.

4. Modification of fire-alarm and suppression systems in room #133 and B9

a. Remove HFC-125 clean agent fire suppression system (including control panel, piping, alarms, shut-off controls) in room #133, and properly dispose of agent and tank.

b. Move fire alarm control panel from room #133 into adjacent storage room.

c. Install new pendant sprinklers from existing pipe above ceiling in room #133.

d. In room B9, leave existing sprinkler system in place, reconfiguring heads because suspended ceiling will be removed; no clean-agent system will be installed in this room.

e. Drawings for sprinklers are conceptual only; contractor is responsible for providing certified detailed working plans and as-built drawings.

5. Modify heating, ventilation, and cooling systems in room #133.

a. Reinstall central HVAC system components in room #133, including VAV air terminal unit on premises, air supply and return ducts, hot-water piping and valves, and reconnection of thermostat to VAV terminal. The original VAV unit and vent grilles are located at the observatory.

Note: no changes will be made to the existing cooling systems in room #B9. The new air-conditioning system identified in the drawings will not be installed at this time.

Tasks to be performed, referenced to CTA drawings

Sheet A101

1.A101. First floor demo plan

1.A101.3: Clean agent equipment to be removed, but NOT relocated into B9; drawing shows location of tank, pipes, and nozzles. Clean agent and tank to be properly disposed/recycled.

2.A101. First floor remodel plan

2.A101.4: New AC equipment (DC1) located outside for cooling in B9 WILL NOT be installed.

3.A101: Basement demo plan

3.A101.4: USGS will remove existing suspended ceiling and install lighting.

4.A101: Basement remodel plan

4.A101.A: “A” represents new 1-hour-fire-rated wall to be installed floor to ceiling.

4.A101.1: Relocated equipment WILL NOT be installed (clean agent equipment).

4.A101.4: New equipment (CRAC-1) WILL NOT be installed; server racks shown to be installed by USGS.

4.A101.4: Basement dust abatement plan

All tasks identified are required.

Sheet A102

All drawings are included in this project.

Sheet F001

1.F001: Fire protection first floor demo plan

2.F001: Fire protection basement demo plan

2.F001.2: Pendant fire wet-pipe sprinkler and piping NOT TO BE REMOVED. Configuration of sprinkler heads needed because suspended ceiling will be removed.

2.F001.3: NO CAPPING of sprinkler piping

2.F001.5: Existing wet-pipe NOT TO BE REMOVED.

3.F001: Earthquake bracing details

All drawings are included in this project.

Sheet F101

1.F101: Fire protection first floor remodel plan

2.F101: Fire protection basement remodel plan

NOTE: Clean agent system WILL NOT BE INSTALLED in B9; existing sprinkler system will remain. The following note numbers do not apply to this project: 1, 2, 3, 4, 5, 6, 9, 10, 11, 12, 13, 14, and 15.

2.F101.7: Automatic closing doors WILL BE INSTALLED. Magnetic door holders WILL NOT BE INSTALLED. Signage will be acquired and installed by USGS.

2.F101.8: Task NOT REQUIRED.

3.F101: Clean agent control diagram

Clean agent system WILL NOT BE INSTALLED.

4.F101: Clean agent cylinder seismic bracing detail

Clean agent system WILL NOT BE INSTALLED.

Sheet M001

Computer room air conditioning in basement will NOT BE INSTALLED.

Sheet M101

1.M101. First floor mechanical demo plan

1.M101.1 Existing AC system to be removed by USGS.

1.M101.3 Existing AC system WILL NOT BE REMOVED.

1.M101.5.6 Alterations to concrete slab NOT REQUIRED.

2.M101. First floor mechanical remodel plan

2.M101.4 Existing AC system will be removed by USGS.

2.M101.7 New dry cooler for basement cooling WILL NOT BE INSTALLED.

2.M101.8 Piping WILL NOT BE INSTALLED.

2.M101.9 Pump WILL NOT BE INSTALLED.

3.M101. Basement mechanical demo plan

3.M101.3 This AC system WILL NOT BE REMOVED.

3.M101.7 Ceiling exhaust fan WILL NOT BE CAPPED.

4.M101. Basement mechanical remodel plan

Computer room air conditioning in basement will NOT BE INSTALLED.

Sheet E002

1.E002 One-line diagram

1.E002.9.10 CRAC breaker and wiring & surge protector will NOT BE INSTALLED.

Sheet E201

1.E201 First floor demolition lighting & system plan

2.E201 First floor lighting & systems plan

3.E201 First floor demolition power plan

3.E201.1.2.3.5.6.9.10 Remove devices and leave with USGS.

3.E201.11 Remove FACP device & wiring, INSTALL in storage room NOT ups room (See 2.E201.1).

3.E201.12 Cheetah alarm panel (part of clean agent system), remove & give to USGS.

3E201.16 Under floor smoke detectors NOT TO BE REMOVED.

4.E201 First floor power plan

4.E201.9.10.11.12 AC system WILL NOT BE INSTALLED, WIRING NOT REQUIRED.

5.E201 Basement demolition lighting & systems plan

5.E201.26 USGS will install new lighting.

5.E201.28 Exhaust fan WILL NOT BE REMOVED.

6.E201 Basement power plan

6.E201.8 USGS will install light fixtures.

6.E201.9 Point of contact NOT NEEDED.

6.E201.14 NOT NEEDED

6.E201.16 Conduit NOT NEEDED

6.E201.17 Connection NOT NEEDED

6E201.30 CRAC WILL NOT BE INSTALLED

7.E201 Basement fire plan

NOTE: Clean agent system WILL NOT BE INSTALLED in B9. The following note numbers do not apply to this project: 24, 25, 26, 27, 28, 30

8.E201 Clean agent control diagram

Clean agent system WILL NOT BE INSTALLED

Site location and contacts; general requirements

1. The location of the work site is the U.S. Geological Survey Hawaiian Volcano Observatory located within the Hawaii Volcanoes National Park, Hawaii Island. Onsite storage of equipment and materials is extremely limited; contractor shall be prepared to provide storage onsite and/or adjacent to the HVO warehouse, located about 3 miles from the observatory.

2. Work shall take place during normal business hours, 7:00 a.m. to 5:00 p.m., Monday through Friday, unless approved otherwise by the on-site representative.

3. The on-site representative, or Point of Contact, is Steven Brantley (work tel. 808-967-8827; cell 808-937-8470).

4. The contractor must abide the potential closures by Hawaii Volcanoes National Park of the Jaggar Museum to public access because of high sulfur dioxide gas concentrations exceeding 3 parts per million (ppm). The contractor must cease work and depart the work site when public access is closed. For information on the ppm levels set by Hawaii Volcanoes National Park, see http://www.nature.nps.gov/air/webcams/parks/havoso2alert/havoalert.cfm.

5. The contractor shall follow sanitation protocols for vehicles, equipment, material, and personnel to avoid introduction of invasive weeds, ants, and coqui frogs. See attached protocols.

6. The contractor shall submit “as-built” drawings at the conclusion of the project if any changes are made to the original CTA design drawings.

7. All work shall meet or exceed local building codes.

8. All electrical circuits involved with this installation shall be labeled. Panels installed as part of the installation shall be clearly labeled.

9. The contractor may use utility services and toilet facilities in the building; however, the USGS makes no representation that such services/facilities are adequate. The contractor shall be prepared to provide his own utilities and toilet facilities at no additional cost to the USGS should that prove necessary.

END OF DOCUMENT