FY27_DCA_3DEP-B_-_Instructions_for_Creating_3DEP_Defined_Project_Area_and_Tile_Delivery_Scheme_1.pdf
PDF 423 KB Posted
- Attached to
- Broad Agency Announcement (BAA) 3DNTM
- Solicitation number
- DOIDSAM27G002
About this file
This document is an instructional guide from the U.S. Geological Survey (USGS) for the 3D Elevation Program (3DEP) Data Collaboration Announcement (DCA) in Fiscal Year 2027, specifically addressing the creation of Defined Project Areas (DPA) and tile delivery schemes for lidar data collection projects.
The document establishes seven core collection requirements: the DPA must consist of the Area of Interest (AOI) plus a 100-meter buffer; data collection is required for the full DPA extent; all products must be produced to 3DEP and Task Order requirements up to the DPA edge only; project deliverables will be delivered in the applicant's chosen coordinate reference system (CRS) and tiling scheme; the CRS must be registered with the European Petroleum Survey Group (EPSG); projects covering multiple CRS zones must be split into appropriate subareas; and all tile indices must be clipped to the DPA. The geoprocessing workflow involves three primary steps: creating the AOI using an EPSG-recognized CRS in the same coordinate system as final delivery; buffering the AOI by 100 meters to establish the DPA; and creating a single non-overlapping project tiling scheme clipped to the DPA, with tiles overlapping by one column or row where multiple CRS subareas join. For projects adjacent to existing lidar surveys meeting 3DEP specifications, the project boundary should align with adjacent data before the buffer is applied, resulting in 100 meters of overlap with existing neighboring surveys to eliminate slivers and gaps; the USGS data acquisition team will review and adjust project boundaries as needed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Geological Survey 3D National Topography Model Data Collaboration Announcement (DCA) for 3D Elevation Program
(3DEP)
FY27 3DEP-B: Instructions for Creating 3DEP Defined Project Area and Tile Delivery Scheme Page 1
3DEP-B: Instructions for Creating 3DEP Defined Project Area and Tile Delivery Scheme
For background information on the Defined Project Area (DPA) see the “Collection” and “Tiles” sections of the 3D Elevation Program (3DEP) Lidar Base Specification available at:
https://www.usgs.gov/3dep/lidarspec
3DEP lidar data must follow a set of collection requirements to achieve a consistent national dataset.
These requirements include:
1. The DPA must be the Area of Interest (AOI) plus a 100-meter buffer.
2. Data collection is required for the full extent of the DPA.
3. All products must be produced to 3DEP and Task Order requirements up to the edge of the DPA and no further.
4. Project deliverables will be delivered in the coordinate reference system(s) (CRS) and tiling scheme of the applicant’s choosing.
5. The CRS used must be registered with the European Petroleum Survey Group (EPSG).
6. Where a project area covers multiple CRS zones, USGS requires that projects be split into subareas appropriate for each zone.
7. All tile indices must be clipped to the DPA.
I. Select Tiling Scheme and Coordinate Reference System
3DEP Data Collaboration Announcement (DCA) project deliverables will be delivered in the coordinate reference system(s) (CRS) and tiling scheme of the applicant’s choosing. The CRS must be registered with the European Petroleum Survey Group (EPSG). Where a project area covers multiple CRS zones, USGS requires that projects be split into subareas appropriate for each zone.
II. Geoprocessing Steps
Step 1. Create the AOI using a CRS recognized and published by the EPSG. The boundary must be created in the same CRS it will be delivered in.
Each project must be processed and delivered in a single CRS, except in cases where a project area covers multiple CRSs such that processing in a single CRS would introduce unacceptable distortions in part of the project area. In such cases, the project area is to be split into subareas appropriate for each
CRS.
https://www.usgs.gov/3dep/lidarspec
FY27 3DEP-B: Instructions for Creating 3DEP Defined Project Area and Tile Delivery Scheme Page 2
Step 2. Buffer the AOI by 100-meters to create the DPA. The 3DEP data processing workflow requires that all project boundaries include this buffer.
Step 3. Choose or create a single non-overlapping project tiling scheme. The tiling index must be created in the same CRS as the DPA. If the DPA does not completely fill full tiles, the tiling index must be clipped to the DPA. If the project is split into more than one sub-area to accommodate multiple CRS, tiles must overlap by one column or row where the two CRS join.
FY27 3DEP-B: Instructions for Creating 3DEP Defined Project Area and Tile Delivery Scheme Page 3
III. Alignment with Existing 3DEP Data
For project areas that are adjacent to existing lidar surveys that meet 3DEP specifications, the project boundary should align with the adjacent data before the 100-meter buffer is applied. The final DPA should have 100-meters of overlap with the existing neighboring lidar survey. The small amount of repeat coverage is required for 3DEP data processing workflows and eliminates any slivers and gaps between projects. The 3DEP data acquisition team will review the DPA to identify adjacent existing lidar surveys and will adjust the project boundary as needed.
File details come from the government source that posted it. Updated .