FY26 YRT5 1084th POST Yellow Ribbon - QASP.pdf
PDF 288 KB Posted
- Attached to
- 1084th TC Post Deployment Yellow Ribbon
- Solicitation number
- W912NR26QA017
- Issued by
-
Department of the Army National Guard
About this file
This is a Quality Assurance Surveillance Plan (QASP) template issued by the Louisiana Army National Guard (LAARNG) for the FY26 YRT5 1084th TC Post Deployment Yellow Ribbon Reintegration Training event scheduled for August 15-16, 2026. The document establishes systematic methods and procedures for monitoring contractor performance and ensuring compliance with required service levels and quality standards.
The QASP outlines specific performance requirements for venue services including meeting space availability (95% compliance), dining capacity for 240 people in rounds of ten with specified equipment (95% compliance), an awards presentation space theater setup for 200 people (95% compliance), an exhibitor area with 30 tables (75% accuracy), general session audiovisual equipment including dual projector screens and PA systems (95% compliance), five breakout rooms with 50-person minimum capacity and AV equipment (95% compliance), three operational support meeting spaces (95% compliance), catering for hot buffet lunch with minimum two proteins, two starches, and two vegetable options plus beverages (100% meal compliance, 75% delivery accuracy), and 40 lodging rooms with single and double occupancy (95% compliance). Surveillance methods include random monitoring and 100% inspection conducted by the Contracting Officer's Representative (COR) and Yellow Ribbon staff. The document establishes roles for the Contracting Officer and COR in performance monitoring, reporting, and resolution of deficiencies. Monthly written reports documenting overall quality assurance surveillance results become part of the QA documentation file. Failure to meet acceptable quality levels may result in payment deductions from the monthly contract amount.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FY26 YRT5 1084 TC POST_PWS.pdf | ||
| SOLICITATION QUOTATION WORKSHEET 1084 TC YELLOW RIBBON.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAARNG Template (Ver May 2018)
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
LANG Reintegration Office
For
FY26 YRT5 1084th TC Post Deployment Yellow Ribbon
Issued 02 June 2026
TABLE OF CONTENTS
1 INTRODUCTION
1.1 Purpose
1.2 Performance Management Approach
1.3 Performance Management Strategy
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
2.2 The Contracting Officer’s Representative
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
4.2 Customer Feedback
4.3 Acceptable Quality Levels
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
5.2 Monitoring Forms
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.2 Reporting
6.3 Reviews and Resolution
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
ATTACHMENT 2: QUALITY ASSURANCE MONITORING FORM
1 INTRODUCTION
This QASP is pursuant to the requirements listed in the performance work statement (PWS) entitled
“FY26 YRT5 1084th TC Post Deployment Yellow Ribbon Reintegration Training”. This plan sets forth the procedures and guidelines the Yellow Ribbon Reintegration Program will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team
(IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to
“how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by Yellow Ribbon Reintegration Program to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
1.2.2 Performance management represents a significant shift from the more traditional quality assurance
(QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.
1.3.2 The Contracting Officer Representative (COR) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
The Contracting Officer (KO) is responsible for monitoring contract compliance, contract administration, cost control and for resolving any differences between the observations documented by the COR and the contractor. The KO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the KO.
2.2 The COR
The COR is designated in writing by the KO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The
COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and in Attachment 1, Performance Requirements Summary. If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. Failure to meet the required service or performance level will result in a deduction from the monthly amount.
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:
➢ Random monitoring, which shall be performed by the COR designated inspector.
4.2 Customer Feedback
4.2.1 The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction.
Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
4.2.2 Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the COR as opposed to the contractor.
4.2.3 Customer complaints, to be considered valid, must set forth clearly and in writing. The detailed nature of the complaint must be stated, document signed and forwarded to the COR. Upon receipt of a complaint, the COR will investigate and document the findings on the monitoring form, Attachment 2 and in the COR file.
4.2.4 Customer feedback may also be obtained from the results of formal customer satisfaction surveys or random customer complaints.
4.3 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements
Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving meals and lodging, the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance.
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1, Performance Requirements Summary.
5.2 Monitoring Forms
The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring form in Attachment 2. The form, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required quality levels are being achieved.
5.2.1 The COR will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.1.1 The Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels. Failure to meet the AQL may result in a deduction from the monthly payment.
6.2 Reporting
6.2.1 At the end of each month, the COR will prepare a written report for the KO summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes [Include if applicable - the contractor’s submitted monthly report and] the completed quality assurance monitoring form (Attachment 2), will become part of the QA documentation and COR file. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
6.3 Reviews and Resolution
6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with the
KO, COR and other government IPT personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:
➢ Monthly performance assessment data and trend analysis
➢ Issues and concerns of both parties
➢ Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
➢ Recommendations for improved efficiency and/or effectiveness
➢ Issues arising from the performance monitoring processes
6.3.2 The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action.
Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented.
Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the KO.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY (PRS)
Performance
Objective Performance Standard Acceptable Quality
Levels (AQL) Surveillance Method / By
Whom
5.1.2 Meeting Space
availability
5.1.2 All requested meeting
spaces shall be available beginning 0900-1800 CST on Saturday, 15 August 2026 through 0630-1800 CST Sunday, 16 August 2026.
Event staff will be on site 0900 CST, 15 August 2026, to begin setting up event.
95% compliance Proposal/quote provided by in the bid process
COR/ YR Staff
5.1.5-5.1.6 Dining Space & General Session to hold 240 people in rounds of ten
Require dining area space to hold 24 rounds of ten with tablecloths and hold a total of 240 people for Yellow Ribbon
Reintegration Training
(YRRT).
Stated seating must be met with 95% compliance
Site visit, scaled layout drawing, and on the spot assessment on the day of the event
COR/YR Staff
5.1.7 Meeting space
for awards presentation
Require one (1) large separate meeting space to be set theater, with stage, pipe and drape backdrop, podium with goose neck microphone, wireless microphone, and audio visual for approximately 200 people in an awards presentation set up.
95% compliance Site visit, scaled layout drawing, and on the spot the event
5.1.8 Exhibitor Area to
hold 30 tables
Require a lobby area or meeting room that can hold a minimum 30 exhibitor tables.
75% accuracy and not result in major event schedule change
Site visit, scaled layout drawing, and on the spot the event.
5.1.10 General session meeting space
audiovisual equipment
Require general session meeting space to have a minimum of audiovisual (AV) equipment and internet support. AV equipment to include two (2) 15-20’
Diagonal Projector screens, two (2) projectors and overheard sound Public Address (PA) system, to include podium with wired microphone for the YRRT event in the General Session Area.
95% compliance
Site visit scaled layout drawing, and on the spot
5.1.11
(5) Breakout rooms capable of various seating
Require five (5) separate meeting spaces to be used as training breakouts. Space must be able to hold a minimum of 50 people in
95% compliance Site visit, scaled layout drawing, and on the spot theatre, banquet or classroom style seating.
5.1.12 Separate
meeting space audiovisual equipment
Require the five (5) separate meeting spaces to have available, AV equipment and internet support. AV equipment will include one (1) 8x8’ projector screen, and one
(1) projector with appropriate connection cables for personal computers.
95% compliance Site visit scaled layout drawing, and on the spot
5.1.13
(3) Meeting spaces to support event operations
Require three (3) meeting spaces to be used in support of event operations.
95% compliance Site visit, scaled layout drawing, and on the spot
5.2-5.2.2 Catering
Catering: Capability of catering for approximately 240 adults for a hot buffet lunch from approximately 1030-1300 in the general session area to allow for working lunch/access to vendor tables.
95% compliance 100% Inspection
5.2.1 Food &
Beverage Requirements
Adult buffet will include a hot buffet meal with a minimum of 2 proteins, 2 starches, 2 vegetable options at a minimum. Must include tea, water, lemonade, caffeinated and decaffeinated coffee, and hot tea. Adult buffet will not serve ‘fast food’ items (i.e., hot dogs, chicken nuggets, hamburgers, etc.) nor will it serve ‘cold items’ (i.e. cold cuts, subs, sandwiches.)
Meals must be in 100% compliance with menu specifications and delivered on schedule with 75% accuracy and not result in major event schedule change.
100% Inspection
5.3-5.4.14 40 Lodging
Rooms
A total of 40 sleeping rooms with single and double occupancy Saturday, 2 August 2025.
95% compliance with rooming list provided by
YR Staff
Site visit, rooming list with confirmation numbers
ATTACHMENT 2: QUALITY ASSURANCE MONITORING FORM
PERFORMANCE OBJECTIVE or STANDARD:
SURVEY PERIOD: 15-16 August 2026
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
Service Provider’s Performance (Check): Meets Standards
Does Not Meet Standards
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: _______________________
File details come from the government source that posted it. Updated .