About this file

This Scope of Work document is prepared by the Department of Military Affairs for Fort Pickett, Blackstone, Virginia, and outlines the excavation, removal, and replacement of a failed culvert on Trimble Road near the Range Control Range Gate entry within the Fort Pickett Training Area. The project involves removing approximately 60 linear feet of damaged 48-inch Corrugated Metal Pipe (CMP) and replacing it with a 48-inch span, 16-gauge polymer-coated arched/elongated pipe. The work scope includes removal and reinstallation of grouted rip rap inlet/outlet protection, placement of geotextile fabric for slope stabilization, removal and reinstallation of existing wood guardrail systems on both sides of the road (approximately 83 inches on the East side and 87 inches on the West side), road restoration including trench compaction, stone base spreading, and grading to drain. An optional site visit is scheduled for September 8, 2026, at 2:00 PM at building 229 at the corner of Rives and 9th Street, with attendance to be confirmed via email to allison.s.maddox.nfg@army.mil. The project is classified as non-capital construction with a project number of 133908 and is dated 05 August 2026.

The contractor must provide road closure signs, barriers, and flagging personnel; coordinate bypass routes with Fort Pickett Range Operations and Department of Public Works; and complete the work as quickly as possible following project commencement. Critical requirements include attendance at a mandatory one-hour UXO (Unexploded Ordnance) training session prior to work start, valid photo identification (Real ID) for all personnel, valid vehicle registration and inspection, coordination with Miss Utility at least seven days prior to digging, and delivery of all removed CMP to the Fort Pickett Recycling Center. The contractor is responsible for workplace safety including trench and confined space compliance with OSHA 1926 standards, and must not damage or remove any trees not designated for removal. Materials specifications include 16-gauge polymer-coated CMP with 10/10 grade coating, VDOT Class II riprap, nonwoven geotextile GTX-2019-01-296 US 160NW, #57 washed stone or VDOT #26 or #27 stone for bedding, pressure-treated lumber Grade 1 or better, and A325 galvanized steel bolts. The contract will be governed by Virginia's CO-7 General Conditions of the Construction Contract and references VDOT Road and Bridge Standards 2016 Edition and VDOT Road and Bridges Specifications 2022 Edition.

View the file

Other files

File Type Posted
Bid Submission Information.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Trimble Road Culvert Failure Replacement Ft. PICKETT, Blackstone VA.

Project # 133908 05 August 2026

Page 1of 3

TO: Department of Military Affairs ATTN: VAFP-FP (Billy Cole)

TEL: 434/292-6221

CELL: 804-814-6510

SCOPE OF SERVICES

I. GENERAL:

The work can be generally described as the excavation, removal, and replacement of damaged culverton Trimble Road just North of Range Control Range Gate entry within the Fort Pickett Training Area. Culvert is crushed from the top, invert has completely rusted out, and slope protection has washed away. All existing pipe is Corrugated Metal Pipe (CMP) and will be replaced with Polymer Coated arched/elongated pipe. Length is approx. 60 feet with a 48” span. The roads will be restored to pre-excavation conditions to include trench compaction, guardrail replacement/removal, spreading stone base and grading to drain. The work is considered to be non-capital construction.

II. SUMMARY OF WORK

a. The failed culvert on Trimble Road near the Range Entry gate is 48” CMP. This pipe is 2’ below the road surface. Remove pipe, reinstall approx. 60LF of 48” span, 16 GA Polymer Coated arched/elongated Pipe.

b. Remove grouted rip rap inlet/outlet protection and store on site for re-use. Place geotextile fabric to assist with slope stabilization prior to VDOT rip rap type II placement per VDOT Spec.

c. There is a wood guardrail system (approx. 83” East Side and 87” West side’) on both sides of the road. Remove only what is necessary to replace culvert, store and then reinstall at completion of project ensuring proper run-on/run-off flair. The contractor is responsible for the secure storage of all the components to this system, to include horizontal timber, wood post, steel backer plates and bolts, nuts and washers. Shortages will be the contractor's responsibility to replenish. Contractor to quote for an allowance for any sections found that will need to be replaced due to deterioration.

d. The pipe shall be bedded as required by Section 302 of the Virginia Roads and Bridges Specifications (2022 Edition). See attached.

III. CONSTRUCTION REQUIREMENTS:

a. These roads will have to be 100% bypass until the work within this project is completed. The work must be completed as quickly as possible once it has been started.

b. The contractor must coordinate directly with Fort Pickett Range Operations to “OCCUPY” and “DEPART” the work site daily.

c. Road closure signs, barriers and flagging personnel (if needed) are to be provided by the contractor.

d. Coordinate bypass routes with Ft Pickett Range Operations and Department of Public Works (DWP).

e. Even though this area has not been used as a range in recent history (last 25 years) it may have residual munitions or remnants of such from activities from as far back as World War II. Range Operations, Fort Pickett, provides a one-hour training session on how to recognize UXO (Unexploded Ordnance) as well as other items that may be encountered while digging on Fort Pickett. The training will provide immediate actions required upon encountering UXO and crucial contact numbers for eradication.

Contractors (all personnel working on this project) will be required to schedule and attend this training prior to starting this work.

f. All the CMP to be removed will be delivered to the Fort Pickett Recycling Center.

g. The Contractor is responsible for calling Miss Utility at least 7 days prior to digging.

h. Entry to Fort Pickett requires a valid photo identification [Real ID] card for every person in the vehicle.

i. All vehicles must have valid registration and inspection.

j. There will be an opportunity (not mandatory) site visit on September 8, 2026 at 2:00 PM. Meet at building 229 at the corner of Rives and 9th Street. Please email allison.s.maddox.nfg@army.mil to confirm attendance.

IV. Materials:

a. Pipe bedding shall be #57 washed stone (if required) and/or VDOT #26 or #27 stone.

b. Inlet and outlet protection (Riprap) shall be VDOT Class II

c. Nonwoven Geotextile GTX-2019-01-296. US 160NW is a nonwoven needle punched geotextile made of 100% polypropylene staple filaments or equal for RIPRAP bedding.

d. Culvert shall be 16-gauge, polymer coated CMP (Corrugated Metal Pipe) with 10/10 grade coating.

e. CMP connector bands, straps, brackets and bolts shall be polymer coated from same manufacturer as the pipe.

f. Road bedding, backfill and surface treatment shall be VDOT #21A, 21B or #33 Select (match existing).

g. Pressure Treated (PT) lumber shall be Grade 1 or better with not less than .40/lbs chemicals per cubic foot.

h. Steel bolts shall be A325 galvanized

i. Do not damage, kill or remove any trees, that are not designated to be removed, during execution of this contract.

V. Excavation

a. The contractor will be responsible for workplace safety. All trenches and confined spaces shall conform to pertinent requirements OSHA 1926 to include:

1. Either trench boxes or benched excavation or sloped excavation (not to exceed

1.5:1 %)

2. Ladders or other means of egress.

3. No stockpiling of materials near trench edge

b. Excavation shall be planned and proceed in such a way that the hauling assets are able to safely enter and exit the work site without slipping, spinning, rutting or turning over.

c. Stored spoils shall be spread and compacted so that water does not stand or seep into the pile.

d. Additional fill materials are available for use (no costs) within 5 miles of Range 14 work site. Less than a mile from the other 2 culvert sites. Requests to open the site must be approved by Ft Pickett Environmental. They will inspect the site before and after use. Contractor to perform required actions to close the site (grade to drain, seed, mulching). The contractor is responsible for loading and hauling the material to worksite.

mailto:allison.s.maddox.nfg@army.mil

VI. Planting Soil and Seed

a. Existing, on-site soil.

b. Seed and Other Packaged Materials: Deliver packaged materials in original, unopened containers.

c. Quality: Seed of grass species as listed below for solar exposure, with not less than 85 percent germination, not less than 95 percent pure seed, and not more than 0.5 percent weed seed.

1. Kentucky 31 or Turf Type Tall Fescue 95-100%

2. Kentucky Blue Grass 0-5%

VII. Fertilizers and Mulch

a. Commercial-grade complete fertilizer of neutral character, consisting of fast- and slow-release nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous, and potassium in the following composition:

b. Distribution: 1 lb/1000 sq. ft. of actual nitrogen, 4 percent phosphorous, and 2 percent potassium, by weight.

c. Composition: Nitrogen, phosphorous, and potassium

d. Straw mulch shall be air-dry, clean, mildew- and seed-free, salt hay or threshed straw of wheat, rye, oats, or barley.

VIII. REFERENCES:

a. VDOT Road and Bridge Standards 2016 Edition

b. VDOT Road and Bridges Specifications 2022

c. Fort Pickett 1:50,000 map

d. Fort Pickett 350-1

e. US Army Corps of Engineers Unexploded Ordnance (UXO) Safety

IX. The CO-7, General Conditions of the Construction Contract, has been created specifically for the use of agencies of the Commonwealth of Virginia and will be adhered to in its entirety for this project. Complete forms can be found at:

https://dgs.virginia.gov/search/documents-and-forms/?filter=DEB https://dgs.virginia.gov/search/documents-and-forms/?filter=DEB

TO: Department of Military Affairs
SCOPE OF SERVICES

File details come from the government source that posted it. Updated .