FY25 ORG Wheeler Memorial Library RFP for Bidding and Construction Oversight.pdf
PDF 5 MB Posted
- Solicitation number
- BD-26-1311-TH000-TH001-125960
- Issued by
- Franklin County, Massachusetts
About this file
This Request for Proposals is issued by the Town of Orange, Massachusetts, in partnership with the Franklin County Regional Housing & Redevelopment Authority (HRA), seeking qualified consultants to provide bidding and construction oversight services for the Wheeler Memorial Library Roof Replacement Project. The project encompasses the removal and replacement of the roof system on a 2-story brick masonry structure constructed circa 1912, located at 49 East Main Street in Orange, Massachusetts. Work includes removal of asbestos-containing materials, replacement of deteriorated wood decking, installation of new single-ply membrane on the low-sloped upper roof, asphalt shingles on sloped roof sections, masonry repointing, chimney restoration, gutter and downspout replacement, and associated flashing and waterproofing improvements. The estimated construction cost is $258,600. Proposals must be received by 3:00 p.m. on Wednesday, March 18, 2026, at the Orange Town Hall, Selectboard Office, 6 Prospect Street, Orange, Massachusetts 01364. Five copies of the sealed technical proposal and one sealed fixed price proposal are required. The project timeline extends from April 2026 through October 2026, with the bidding phase (Task I) scheduled for May 2026 and construction oversight (Task II) from June through October 2026. No pre-bid meeting date is specified in the document, though the scope indicates one will be conducted during the bidding phase.
The fixed fee for bidding and construction oversight services is $54,390.00, with no price competition; award will be based on qualifications and experience. Funding is provided through an FY 2025 Community Development Block Grant (CDBG) awarded by the Executive Office of Housing and Livable Communities (EOHLC), funded by the U.S. Department of Housing and Urban Development (HUD). The consultant must comply with all applicable federal, state, and local regulations, including HUD Title I requirements, Massachusetts General Law Chapter 149, Davis-Bacon and Related Acts, and Build America, Buy America Act (BABA) requirements. Minimum qualifications include at least five years of construction bidding and administration experience, a Massachusetts-registered architect on staff, experience with municipal roof replacement projects, examples of past municipal projects with budgets and timely completion records, experience with state or federally funded programs, and three professional references for similar projects. The firm must maintain Errors and Omissions Insurance with coverage equal to 10% of construction costs (minimum $250,000) and provide documentation of tax compliance and non-collusion. The Town reserves the right to reject all proposals and encourages submissions from qualified minority and women-owned businesses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOWN OF ORANGE
Request for Proposals
Bidding and Construction Oversight Services for
WHEELER MEMORIAL LIBRARY
Roof Replacement Project
ORANGE, MA
Contents
Scope of Services Project Description and Construction Plans
Evaluation Criteria Certificate of Non-Collusion and Tax Compliance
Price Form Library Roof Photos
Professional Services Draft Contract
The Town of ORANGE (“Town”), will accept and open all proposals received at the ORANGE Town Hall, Selectboard Office, 6 Prospect Street, Orange, Massachusetts 01364 by 3:00 p.m. March 18, 2026. Postmarks will not be considered. Proposals submitted by fax will not be considered. The Town has received an FY 2025 Massachusetts Executive Office of Housing and Livable Communities (EOHLC) Community Development Block Grant (CDBG) funded by the U. S. Department of Housing & Urban Development (HUD) for the Wheeler Memorial Library Roof Replacement Project.
Contact: Brian P. McHugh, Director of Community Development Franklin County Regional Housing & Redevelopment Authority (HRA) 241 Millers Falls Road Turners Falls, MA 01376 Phone: 413.223.5224; Email: bmchugh@fcrhra.org
A. INVITATION
BIDDING & CONSTRUCTION OVERSIGHT SERVICES FOR THE
WHEELER MEMORIAL LIBRARY ROOF REPLACEMENT PROJECT
SCOPE OF SERVICES
The following outlines a Scope of the Services the consultant will perform for the Wheeler Memorial Library Roof Replacement Project component of the Town’s FY 2025 Community Development Block Grant Program funded by
EOHLC. The Consultant will be responsible for bidding and construction oversight of the project. The fixed fee amount for the scope of services as outlined below is $54,390.00.
Towards this goal, the consultant will be responsible for the following scope of services in accordance with all Federal/State/Local laws and regulations, including but not limited to HUD regulations under Title I of the Housing and Community Development Act of 1974, as amended, applicable M.G.L. Chapter 149 requirements, as well as related Federal and State Labor Standards Provisions HUD form 4010; HUD Handbook 1344.1 Federal Labor Standards Compliance; Massachusetts General Laws Chapter 149, Section 27; and Massachusetts Department of Labor and Industries (Labor Laws); Davis-Bacon and Related Acts; the Contract Work Hours and Safety Standards Act, Copeland "Anti-Kickback Act” and compliance with all applicable Federal/State/Local ADA requirements:
Scope of Services - Tasks
Task I – BID PHASE:
Based on the approved Final Construction Plans prepared by Gale Associates, Inc. (see Part B. Project Description), the consultant will:
In conjunction with the Town and HRA, prepare final bid documents for public bidding in accordance with MGL Ch. 149 and CDBG/Federal Regulations. Prepare advertising notice for public bidding.
In conjunction with the Town and HRA:
o Develop a project Schedule and bid advertisement.
o Submit final Project construction documents to BidDocsOnline, who will disseminate the documents to bidders.
o Conduct Pre-bid meeting, respond to bidder’s questions, and issue addenda as required during the bidding process.
o Conduct bid opening. Prepare a bid tabulation, review and make recommendations concerning the qualifications of the bidders. Make a recommendation to the Town for Contract award.
Task II – CONSTRUCTION OVERSIGHT
Assist the Town and HRA in conducting the preconstruction conference Participate in the construction process, respond to RFIs, review shop drawings/submittals and pay requisitions, issue revised drawings and specifications as needed, prepare change orders, and ensure all necessary permits have been applied for and obtained by the General Contractor.
Conduct project meetings every week during construction with General Contractor, Town and HRA to discuss progress/quality of work
Review the quality and progress of the work and furnish written field reports with photographs over course of construction
Assist the Town and HRA to review contractor’s monthly request for payment, including final payment, and make recommendations to the Town and HRA for payments to be made to the contractor
Prepare a punch list for substantial completion and issue the Certificate of Substantial Completion.
Obtain from the Contractor the information needed to produce record drawings, additional materials, all permits/approvals/discharges, guarantees, affidavit of Release of Liens and Submit to the Town and HRA.
Project Completion: Upon acceptance of the Certificate of Substantial Completion, assist the Town and HRA to administer the construction contract until expiration of the construction warranty period.
Prepare as-built record drawings and product manuals. Provide two sets of blueprints and one electronic copy of Plans and an original Project Manual.
Assist in preparing the Certificate of Final Completion; attend meetings and dispute conferences as necessary. Issue the Certificate of Final Completion.
ASSUMPTIONS:
It is assumed that the Town/HRA will provide the “front end” of the Project Manual (administrative and contractual requirements) and that the Consultant will provide the technical specifications.
Proposals should include the firm's qualifications and relevant work experience, particular reference should be made to state and/or federally funded projects, including Build America, Buy America Act (BABA) requirements, with the above mentioned type of project, a listing of all personnel who will be working on this project and their responsibilities and qualifications, a timetable for completion of the scope of services, documentation that the firm meets insurance requirements (Errors and Omissions Insurance, coverage to be equal to 10% of the construction costs with a minimum of $250,000 and if the firm has a deductible to their policy, this deductible will be subject to approval by the Town.
Five (5) copies of the sealed technical proposal and one (1) sealed copy of a separate fixed price proposal for
BIDDING & CONSTRUCTION OVERSIGHT SERVICES FOR THE WHEELER MEMORIAL LIBRARY
ROOF REPLACEMENT PROJECT should be submitted in writing by 3:00 p.m. Wednesday, March 18, 2026, to the Town of ORANGE, Selectboard Office, 6 Prospect Street, Orange, Massachusetts 01364. The envelope containing the non-price proposals shall be marked “BIDDING & CONSTRUCTION OVERSIGHT SERVICES
FOR THE WHEELER MEMORIAL LIBRARY ROOF REPLACEMENT PROJECT NON-PRICE
PROPOSAL", and the fixed price proposal shall be marked “WHEELER MEMORIAL LIBRARY ROOF REPLACEMENT PROJECT PRICE PROPOSAL" and include the Fixed Fee Form attached on Page 9.
For additional information, please contact Brian McHugh by phone at (413) 223-5224 or by email at bmchugh@fcrhra.org, or at the above address.
The Town of ORANGE reserves the right to reject all proposals in the interest of sound business practices. The Town of ORANGE are Affirmative Action/Equal Opportunity Employers and encourage proposals from qualified minority and women owned businesses.
B. PROJECT DESCRIPTION:
The proposed project will repair and replace the roof of the Wheeler Memorial Library located in the heart of Orange, MA at 49 East Main Street.
The library is a 2-story solid brick masonry structure with steel framing that was constructed circa 1912. The upper roof system is a low-sloped roof with a rubber membrane. The asphalt-shingled sloped roof sections begin at the outer edges of the low-sloped, upper roof and terminate at the eaves and balustrade at the top of the second floor. All layers of the low-sloped roof system will be removed down to sound decking and be replaced with in-kind materials. The sloped roof sections will also be stripped down to sound decking and replaced with an asphalt shingle roof system. Due to extensive water infiltration, it is expected that the wood-plank decking will require replacement in conjunction with the roof replacement. In addition, repointing chimneys and restoration of the cementitious features and brickwork of the balustrades are included in the scope of work.
This proposed project has an estimated cost of $258,600 and will include the following (see Final Construction Plans prepared by Gale Associates, Inc. beginning on page 10 for additional details):
Removal and legal disposal of asbestos-containing asphaltic coatings.
Removal and legal disposal of all existing roof materials, including EPDM rubber membrane, asphalt shingles, deteriorated wood sheathing, rigid insulation on upper roof, and tarps.
On the low-sloped roof, installation of tapered insulation, roof cover board, new single-ply membrane, and sheet-metal perimeter edge flashings system.
On sloped roofs, installation of new felt underlayment, asphalt shingles, sheet-metal flashings and step flashings around the chimneys.
Reparation of masonry components to improve the appearance and performance of the building following damage from water infiltration.
On cornice returns to the sloped roof, installation of flashing to reduce the potential of water infiltration in the attic and main floor below.
Stabilization and installation of membrane cladding or flashing at the back side of the pediment.
Installation of sheet-metal reglet flashing between the limestone and masonry of the pediment to counter flash the wall cladding system.
Re-flashing of the bottom chord of the balustrade railings with membrane that extends up to the interior edge of the bottom chord.
Liquid flashing applied at the base of each baluster.
Re-pointing of chimneys to help reduce the potential for water infiltration inside the building.
Installation of new sheet-metal flashings at the chimney bases to counter flash the replacement roof-system flashings.
Removal and replacement of the gutter assembly.
D. CONTRACT PERIOD: April 2026 through October 2026
E. DESIGN FEE
A separate fee proposal must be submitted. All fees will include all expenses both direct and indirect.
A Fixed Fee has been established for this project:
Per Scope of Services $ 54,390.00
This is not a price competition; the Committee’s decision will be based upon qualifications and experience with similar projects. The Committee will review and score proposals. After scoring the proposals and checking references the committee MAY interview and score the interview of the three (3) highest scoring firms. After the interview, the committee will then open fee proposals. The committee intends to offer the project to the firm that receives the highest combined score including the comparative criterion and the interview scores. The Town will offer the project to the highest combined scoring firm for a fixed fee.
RULE OF AWARD: This project will be awarded to the highest ranked firm based on the following proposal requirements and evaluation criteria. This fee is a fixed fee.
F. PROPOSAL REQUIREMENTS
The following items must be included in all proposals:
o General design experience of the consultant o Acceptance of the scope of services as outlined in the RFP o Outline similar experience in municipal roof replacement projects in Massachusetts o Examples of the firm’s similar projects funded by state or federal programs in Massachusetts o Familiarity with HUD regulations under Title I of the Housing and Community Development Act of 1974, as amended o Familiarity with BABA requirements for public construction projects o Certificate of compliance with local, state, and federal tax laws (forms attached) o Certificate of Non-collusion (forms attached) o Fixed Price Form o MBE/WBE eligibility certification, if applicable
G. EVALUATION CRITERIA
All proposals will be evaluated based upon minimum and comparative criteria. The Town will award a contract for this project to the consultant or individual who submits the most advantageous proposal based on consideration of specified evaluation and selection criteria. The Town will then evaluate the proposals using the comparative evaluation criteria. The Town may at its own discretion schedule interviews and score them.
1. Minimum criteria: Each proposal must meet all of the following criteria to be considered for further evaluation:
o Firm must have at least five (5) years of construction bidding and administration experience o Firm must have MA registered architect on staff o Firm must have experience bidding and overseeing municipal roof replacement projects o Firm must provide examples of past projects that they have designed, managed and the outcome. Include budget, change orders and timely completion of the project o Firm must have experience with projects funded by local, state and/or federal programs o Firm must have experience involving renovations to municipal property o Firm must provide three (3) written professional references for similar projects, including names, addresses, projects you worked on, their costs, funding sources, and phone number o List of municipal projects completed in the past two years including names, addresses, their costs, funding sources, and phone number for reference purposes.
2. Comparative Criteria: The following rating will be used to evaluate those firms that meet the minimum evaluation criteria listed above. Those proposals that do not meet the minimum criteria may be reviewed at the town’s discretion. If a proposal scores Not Advantageous/Does Not Meet on any of the following comparative criteria the Town may consider the proposal unacceptable and not review it any further. The Town will consider the following comparative criterion for award:
Highly advantageous Proposal excels on the specific criterion Advantageous Proposal meets evaluation standard for the criterion Not Advantageous/Does Not Meet Proposal does not fully meet the evaluation criteria, leaves a question or issue not fully addressed, or does not address the element
The criteria that will be used for comparative purposes are the following:
H. EVALUATION OF PUBLIC CONSTRUCTION OVERSIGHT EXPERIENCE
A firm’s work examples and approach to the problem will be evaluated in conjunction with examples submitted of similar projects for municipal improvements and the firm’s references.
Standard Criterion: A Consultant that clearly demonstrate their experience working on similar municipal projects including roof repair and replacement projects using CDBG funding, that understand the community’s needs and the Wheeler Memorial Library Roof Replacement Project, that articulate understanding of the project based upon experience, background, and examples. Direct experience working with state or federally funded projects will be considered highly advantageous.
Highly advantageous Proposal excels on the specific criterion Advantageous Proposal meets evaluation standard for the criterion Not Advantageous/Does Not Meet Proposal does not fully meet the evaluation criteria, leaves a question or issue not fully addressed, or does not address the element
I. QUALIFICATION OF PROJECT PERSONNEL – PROJECT TEAM
A key consideration for the Town is the ability of the team to begin work immediately.
Standard Criteria: A Consultant that demonstrates experience with municipal projects. A project team that has seen its work translated into actual construction. The project team has completed projects in a timely fashion, work has adequately considered community concerns and have a history of cost controls during construction.
Highly advantageous Proposal excels on the specific criterion Advantageous Proposal meets evaluation standard for the criterion Not Advantageous/Does Not Meet Proposal does not fully meet the evaluation criteria, leaves a question or issue not fully addressed, or does not address the element
J. RESPONSIVENESS TO REQUEST FOR QUALIFICATIONS
The Town is interested in how well the consultant understands the project requirements, their approach to the project in meeting the specific needs of the Town, their level of interest and demonstrated commitment to the project timetable, project scope of services and the overall quality of the consultant’s proposal.
Highly advantageous Proposal excels on the specific criterion Advantageous Proposal meets evaluation standard for the criterion Not Advantageous/Does Not Meet Proposal does not fully meet the evaluation criteria, leaves a question or issue not fully addressed, or does not address the element
K. FINANCIAL STRENGTH
Highly Advantageous Consultant, or Lead Consultant if a team, has revenues greater than $750,000 per year.
Advantageous Consultant, or Lead Consultant if a team, has revenues greater than $500,000 per year
Not Advantageous/Does Not Meet Consultant, or Lead Consultant if a team, has revenues less than $500,000 per year.
L. INTERVIEW
The Town, after reviewing proposals and at its sole discretion, may interview firms that meet the minimum and comparative criteria (finalists).
The interview will be held to determine the most highly advantageous firm based on the following:
The professional experience of the consulting team with bidding and construction oversight on publicly funded projects The specific details of the work plan presented by the team and questions asked of interviewers.
The experience of personnel assigned to the project
M. PROJECT TIMETABLE
April 2026 Award Contract May 2026 Task I
June – October 2026 Task II
N. MISCELLANEOUS ARTICLES
The Consultant shall maintain worker’s compensation for all employees in accordance with Massachusetts General Law.
The Consultant shall deposit evidence of such insurance prior to the commencement of the project.
The Consultant shall be solely responsible for all claims of whatever nature arising out of the rendering of services by the Consultant during the term of this proposal and the Consultant shall indemnify and hold harmless against the same to the extent permitted by law.
The selection of the successful proposer shall be made without regard to race, color, sex, age, religion, political affiliation, or national origin.
CERTIFICATE OF NON-COLLUSION
The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word “person” shall mean natural person, business, firm, corporation, union, committee, club, or other organization, entity, or group of individuals.
Signature:________________________________________________
Typed Name/Title
Name of Consultant
CERTIFICATE OF TAX COMPLIANCE
Pursuant to Chapter 62C of the Massachusetts General Laws, Section 49A(b), I, ____________________________authorized signatory for_____________________________________________________________________ Name of individual or Name of Consultant do hereby certify under the pains and penalties of perjury that said contractor has complied with all laws of the Commonwealth of Massachusetts, and the Town of ORANGE and is current with all local, state, and federal taxes and other assessments, including child support payments.
Consultant: ____________________________________
By: ___________________________________________
Signature of authorized representative
Title: __________________________________________
Date: _________________
WHEELER MEMORIAL LIBRARY ROOF REPLACEMENT PROJECT
FIXED FEE FORM
Prices must be submitted on this form and submitted in a sealed envelope separate from the non-price technical proposal. Prices submitted on any other form will not be considered valid.
Request for proposals and price proposals must be received by 3:00 p.m. Wednesday, March 18, 2026, to the Town of ORANGE, 6 Prospect Street, Orange, Massachusetts 01364. Postmarks will not be considered. All non-price proposals will be publicly opened and recorded at the above address, date and time.
FIXED FEE: $__________________
FIRM: __________________________________
AUTHORIZED SIGNATURE
Print name and title
PHONE: __________________________________
EMAIL: __________________________________
FED TAX ID NUMBER: ______________________
C
1 2
A
B
3 4 5 6
D
E
This drawing and the design and construction features disclosed are proprietary to Gale Associates, Inc. and shall not be altered or reused in whole or part without the express written permission of Gale Associates, Inc.
Copyright©2024
PR
OJ
EC
T
OW
NE
R
DATENO. DESCRIPTION BY
SHEET TITLE
DRAWING SCALE
GRAPHIC SCALE
CHECKED BY
PROJECT NO.
DESIGNED BY
DRAWN BY
CADD FILE
DRAWING NO.
DATE
Gale Associates, Inc.
Engineers and Planners
300 LEDGEWOOD PL | ROCKLAND, MA 02073
P 781.335.6465 F 781.335.6467 www.gainc.com
Boston Baltimore Orlando Hartford Manchester Portland
RO
OF
R
EP
LA
CE
ME
NT
A
ND
A
SS
OC
IA
TE
D
W
OR
K W
HE
EL
ER
M
EM
OR
IA
L L
IB
RA
RY
E M
AI
N
ST
RE
ET
OR
AN
GE
, M A
TO
W
N
OF
O
RA
NG
E
6 P
RO
SP
EC
T
ST
RE
ET
, S
UI
TE
OR
AN
GE
, M
A
842830
AJM/JMM
CM/BHN
1/31/2025
100% SUBMISSION
842830 G100
CM
NOT TO SCALE
COVER SHEET
G100
LOCATION MAP
NOT TO SCALE
PREPARED FOR
WHEELER MEMORIAL LIBRARY
ROOF REPLACEMENT AND ASSOCIATED WORK
TITLEDRAWING NO
TOWN OF ORANGE
6 PROSPECT STREET, SUITE 4
ORANGE, MA 01364
49 E MAIN STREET
ORANGE, MA 01364
SITE MAP
NOT TO SCALE
G100 G101 G102 A101 A501 A502 A503 A504 A505
COVER SHEET
SITE PLAN AND ATTACHMENT LAYOUT PLAN
PHOTOGRAPHIC DOCUMENTATION
ROOF AREA PLAN
DETAILS
DETAILS
DETAILS
DETAILS
DETAILS
- WHEELER MEMORIAL LIBRARY
SITE PLAN NOTES
1. CONTRACTOR SHALL BASE STAGING REQUIREMENTS ON THE INFORMATION SHOWN. THE
LOCATIONS ARE APPROXIMATE AND MAY BE SUBJECT TO CHANGE.
2. CONTRACTOR WILL BE REQUIRED TO PROVIDE A DETAILED STAGING/LAYOUT PLAN FOR
THE OWNER'S REVIEW AND APPROVAL.
3. CONTRACTOR SHALL PROVIDE OVERHEAD PROTECTION AT BUILDING ENTRANCE WAYS IN
ACCORDANCE WITH OSHA, LOCAL, STATE, AND FEDERAL GUIDELINES.
4. OVERHEAD PROTECTION SHALL EXTEND A MINIMUM OF 8'-0" BEYOND THE BUILDING'S
ENTRANCES.
5. CONTRACTOR SHALL PROVIDE TEMPORARY BARRICADES TO PREVENT PEDESTRIANS
FROM ACCESSING THE WORK AREA, FROM WALKING UNDER WORK LOCATIONS, AND
FROM WALKING UNDER THE CRANE AND LOADING AREAS.
6. CONTRACTOR MAY PROVIDE TEMPORARY BARRICADES AT PEDESTRIAN WALKWAYS IN
LIEU OF OVERHEAD PROTECTION SHOULD THE ROOF AREAS ABOVE SAID WALKWAYS BE
REMOVED AND REPLACED IN THE SAME DAY. CONTRACTOR WILL BE REQUIRED TO
PROVIDE A MONITOR AT GROUND LEVEL TO WARN PEDESTRIAN TRAFFIC OF THE
ABOVE-ROOFLINE WORK.
7. CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION FOR THE PAVED AREAS, CURBS,
SIDEWALKS, AND LANDSCAPED AREAS TO PREVENT DAMAGE FROM THE WORK,
MATERIALS, OR EQUIPMENT. THE CONTRACTOR WILL BE RESPONSIBLE TO
REPAIR/REPLACE ANY DAMAGED LOCATIONS AT NO ADDITIONAL COST TO THE OWNER.
SITE PLAN
SITE PLAN LEGEND
BUILDING IN CONTRACT
BUILDING NOT IN CONTRACT
PAVEMENT/SIDEWALK
GRASS/LANDSCAPED AREA
APPROXIMATE CONTRACTOR
STAGING LOCATION
ALL ITEMS ARE EXISTING
BUILDING ENTRANCE; DO NOT
OBSTRUCT
CROSSWALK
TREE; SIZE VARIES
TELEPHONE AND ELECTRICAL
LINES ON TELEPHONE POLES
SCALE: NOT TO SCALE
ROOF AREA A
ROOF AREA B
E MAIN STREET
GR
OV
E
ST
RE
ET
PLAN
NORTH
8"
SHEET METAL FLASHING
EPDM STRIPPING
2"X6" WOOD BLOCKING
EPDM MEMBRANE;
ADHERED
3" MINIMUM TAPERED
INSULATION;
MECHANICALLY
ATTACHED TOWARDS
ROOF EDGE
2" INSULATION; LOOSE
LAID
3/4"X9" T+G WOOD
PLANK DECK
BUILT-UP ROOF FLASHING
ASPHALT SHINGLES
ASPHALT SHINGLES
BUILT-UP ROOF FLASHING
EPDM FLASHING
EPDM MEMBRANE; ADHERED
1-1/2" TAPERED INSULATION;
MECHANICALLY ATTACHED
2" INSULATION; LOOSE LAID
BUILT-UP ROOF
3/4"X9" T+G WOOD
PLANK DECK
18" TO
ASPHALT
SHINGLES
EXISTING ROOF CROSS SECTION
ALL ITEMS ARE EXISTING
SCALE: 3"=1'-0"0 3" 6" 9"
SCALE:
PROPERLY DRIVEN OVERDRIVEN UNDERDRIVEN CROOKED
(STRAIGHT, GOOD
PENETRATION AND
FLUSH WITH
SHINGLE SURFACE)
(TOO DEEP, CUTS
INTO SHINGLE)
(INADEQUATE
PENETRATION)
(INADEQUATE
ANCHORAGE)
NAIL LOCATIONS FOR
SHINGLE INSTALLATION,
TYPICAL
UPPER COURSE OF
SHINGLES
LOWER COURSE OF
SHINGLES
FASTENER HEADS AND CENTER
OF SHINGLE TABS SHALL HAVE
A 1" DIAMETER BEAD OF ROOF
CEMENT APPLIED
LIMITS OF LOWER
COURSE OF
SHINGLES
SHINGLE MANUFACTURER'S SELF-SEALING ADHESIVE;
REMOVE ALL RELEASE TAPES PRIOR TO INSTALLING
SHINGLE
1" DIAMETER PLASTIC ROOF CEMENT
UNDER EACH SHINGLE TAB, OR AS
REQUIRED BY MANUFACTURER
6"±
12"
5"
36"±
SCALE:
WOOD PLANK DECK;
SHOWN SCHEMATICALLY
DECK UNDERLAYMENT
SELF-ADHERING HIGH
TEMPERATURE MODIFIED
BITUMEN UNDERLAYMENT;
INSTALL AT DESIGNATED
LOCATIONS AS DETAILED
SIDE LAP
SLOPE
EXPOSURE
4" MIN.
END LAP
NOTE:
THE UNDERLAYMENT CONFIGURATION SHOWN HERE IS FOR SCHEMATIC PURPOSES ONLY. THE ACTUAL INSTALLATION METHOD / ORIENTATION MAY VARY DEPENDING ON UNDERLAYMENT TYPE AND THE MANUFACTURER'S RECOMMENDATIONS. PROVIDE THE UNDERLAYMENT MANUFACTURER'S SEAM TAPES, FASTENERS, ADHESIVES, ETC. AS REQUIRED.
EXPOSURE =
OVERLAPS
WIDTH OF UNDERLAYMENT
- 3"
SIDE LAP =
WIDTH OF UNDERLAYMENT
+ 3"
TYPICAL UNDERLAYMENT CONFIGURATION
NOT TO SCALE
(ALL ITEMS ARE NEW UNLESS DESIGNATED AS EXISTING)
TYPICAL 3-TAB ASPHALT SHINGLE FASTENING AND WIND SEALANT
NOT TO SCALE
(ALL ITEMS ARE NEW UNLESS DESIGNATED AS EXISTING)
C
1 2
A
B
3 4 5 6
D
E
This drawing and the design and construction features disclosed are proprietary to Gale Associates, Inc. and shall not be altered or reused in whole or part without the express written permission of Gale Associates, Inc.
Copyright©2024
PR
OJ
EC
T
OW
NE
R
DATENO. DESCRIPTION BY
SHEET TITLE
DRAWING SCALE
GRAPHIC SCALE
CHECKED BY
PROJECT NO.
DESIGNED BY
DRAWN BY
CADD FILE
DRAWING NO.
DATE
Gale Associates, Inc.
Engineers and Planners
300 LEDGEWOOD PL | ROCKLAND, MA 02073
P 781.335.6465 F 781.335.6467 www.gainc.com
Boston Baltimore Orlando Hartford Manchester Portland
RO
OF
R
EP
LA
CE
ME
NT
A
ND
A
SS
OC
IA
TE
D
W
OR
K W
HE
EL
ER
M
EM
OR
IA
L L
IB
RA
RY
E M
AI
N
ST
RE
ET
OR
AN
GE
, M A
TO
W
N
OF
O
RA
NG
E
6 P
RO
SP
EC
T
ST
RE
ET
, S
UI
TE
OR
AN
GE
, M
A
842830
AJM/JMM
CM/BHN
1/31/2025
100% SUBMISSION
842830 G100's
CM
AS NOTED
SITE PLAN
AND ATTACHMENT
LAYOUT PLAN
G101
REMOVE AND REPLACE SHINGLE ROOF; TYPICAL.
REMOVE AND REPLACE LOW SLOPE ROOF; TYPICAL.
REMOVE AND DISPOSE OF TEMPORARY TARPAULIN COVERS AND BATTENS; TYPICAL.
EXISTING CANOPY NOT IN CONTRACT.
TELEPHONE AND ELECTRICAL WIRES; USE CAUTION.
EXISTING ICE DAM TO BE DISPOSED OF.
TYPICAL LIMESTONE WATERTABLE; REMOVE ASPHALTIC COATING AND APPLY LEAD T'S,
TYPICAL.
EXISTING CHIMNEY; REPOINT 100%.
EXISTING HEAT TRACE CABLE. REMOVE AND REPLACE; TYPICAL.
EXISTING DRAIN BOWL; REMOVE AND REPLACE; TYPICAL.
PHOTO 1 - OVERALL ROOF AREA PHOTO 2 - MAIN ENTRANCE PHOTO 3 - WEST ENTRANCE PHOTO 4 - REAR PARKING LOT
PHOTOGRAPHIC INDICATORS
APPROXIMATE PHOTOGRAPH LOCATIONS
PHOTOGRAPHIC DOCUMENTATION NOTES
PHOTO 5 - WATER TABLE AND BALUSTRADE
SCALE: NOT TO SCALE
PHOTO 6 - SOUTHWEST BUILDING CORNER
PHOTO 7 - CHIMNEY FROM ABOVE PHOTO 8 - LOW SLOPE ROOF TRANSITION PHOTO 9 - LOW SLOPE ROOF TRANSITION PHOTO 10 - PERIMETER WALL PHOTO 11 - SOUTH EAST BUILDING CORNER PHOTO 12 - MASONRY CHIMNEY AND UPPER ROOF
PHOTO 13 - WEST ELEVATION BALUSTRADE PHOTO 14 - WEST ELEVATION GUTTER TRANSITION PHOTO 15 - WEST ELEVATION EAVE LINE PHOTO 16 - TYPICAL CONDUCTOR BOX
PHOTO 17 - DOWNSPOUTS AT GRADE LEVEL
EXISTING BALUSTRADE TO REMAIN; APPLY LEAD T'S, TYPICAL.
TYPICAL ELECTRICAL CONDUIT PENETRATION; FIELD WRAP.
EXISTING WATER DIVERTER TO BE REMOVED AND DISPOSED OF.
EXISTING GUTTER COVERED WITH ASPHALT SHINGLES; REPLACE GUTTER AND
DOWNSPOUTS.
EXISTING ALUMINUM GUTTER; REMOVE AND DISPOSE OF.
PROVIDE NEW STEP FLASHINGS TO CONCEAL THE LIMITS OF EXISTING FLASHINGS;
TYPICAL.
REPLACE EXISTING CONDUCTOR BOX AND DOWNSPOUTS TO MATCH EXISTING;
TYPICAL.
PROVIDE CLEANOUTS AT GRADE LEVEL AT DESIGNATED LOCATION ONLY.
TIE DOWNSPOUT INTO SUB-GRADE DRAINAGE SYSTEM. COORDINATE WITH
OWNER FOR REPLACEMENT OF SUB-GRADE SYSTEM BY OTHERS.
1. THE INFORMATION SHOWN ON THIS DRAWING HAS BEEN COMPILED FROM VARIOUS SOURCES, AND MAY NOT REFLECT THE ACTUAL
CONDITIONS AT THE TIME OF CONSTRUCTION.
2. PHOTOGRAPHIC INDICATORS ARE IN APPROXIMATE LOCATIONS. THEY ARE NOT INTENDED TO DEFINE THE LIMITS OF WORK.
3. THE PHOTOGRAPHS SHOWN ON THIS SHEET ARE BOTH UNIQUE AND TYPICAL CONDITIONS. THEY ARE NOT MEANT TO BE ALL
ENCOMPASSING.
4. REFER TO G101 FOR ADDITIONAL INFORMATION.
5. THE PHOTOGRAPH INDICATORS SHOWN ON THIS SHEET DO NOT DEFINE TRADE WORK. THEY ARE INTENDED TO SHOW THE EXISTING CONDITIONS. REFER TO THE OTHER SHEETS IN THIS PACKAGE FOR ADDITIONAL INFORMATION.
PHOTO 18 - TYPICAL INTERIOR BOOK STACKS PHOTO 19 - ACCESS DOOR TO ATTIC SPACE
12 2 1 3 4 5 5 8 1 6 7 11 711 14 61
11 1 28 11 210 9 11102 12 13 1 14 3 1 8 21 8
1 11 714 15 16 14 15 15 141 17 1714
1417 19
ROOF AREA NOT IN CONTRACT (N.I.C.)
PHOTO INDICATOR (EXTERIOR)
PHOTO INDICATOR (INTERIOR)
LEGEND:
ROOF
AREA A
ROOF AREA B
PLAN
NORTH
C
1 2
A
B
3 4 5 6
D
E
This drawing and the design and construction features disclosed are proprietary to Gale Associates, Inc. and shall not be altered or reused in whole or part without the express written permission of Gale Associates, Inc.
Copyright©2024
PR
OJ
EC
T
OW
NE
R
DATENO. DESCRIPTION BY
SHEET TITLE
DRAWING SCALE
GRAPHIC SCALE
CHECKED BY
PROJECT NO.
DESIGNED BY
DRAWN BY
CADD FILE
DRAWING NO.
DATE
Gale Associates, Inc.
Engineers and Planners
300 LEDGEWOOD PL | ROCKLAND, MA 02073
P 781.335.6465 F 781.335.6467 www.gainc.com
Boston Baltimore Orlando Hartford Manchester Portland
RO
OF
R
EP
LA
CE
ME
NT
A
ND
A
SS
OC
IA
TE
D
W
OR
K W
HE
EL
ER
M
EM
OR
IA
L L
IB
RA
RY
E M
AI
N
ST
RE
ET
OR
AN
GE
, M A
TO
W
N
OF
O
RA
NG
E
6 P
RO
SP
EC
T
ST
RE
ET
, S
UI
TE
OR
AN
GE
, M
A
842830
AJM/JMM
CM/BHN
1/31/2025
100% SUBMISSION
842830 G100's
CM
AJM
AS NTOED
PHOTOGRAPHIC
DOCUMENTATION
G102
EXISTING MASONRY
PEDIMENT
CANOPY ROOF; NOT
IN CONTRACT. DO
NOT STORE MATERIAL
OR EQUIPMENT ON
ROOF.
EXISTING
CHIMNEY
ELEV. = 44'-0"±
48'-0"±
24'-6"±11'-9"± 11'-9"±
61'-3"±
11'-0"±
35'-6"±
14'-9"±
29'-3"±14'-3"± 14'-3"±
57'-9"±
ROOF AREA A
ELEV. = 36'-0"±
ROOF AREA B
LP ELEV. = 25'-0"±
HP ELEV. = 36'-0"±
SCALE:
A101
ROOF AREA PLAN
1/4"=1'-0"
PLAN
NORTH
LEGEND
ROOF EDGE
RIDGE/HIP LINE
VALLEY
GUTTER WITH DOWNSPOUT; REMOVE AND REPLACE
WATER DIVERTER TO BE REMOVED AND DISPOSED OF
STEEP-SLOPED ROOF SYSTEM WITH EXISTING WOOD ROOF DECK
STONE MASONRY
LIMESTONE WATERTABLE
LOW-SLOPE ROOF SYSTEM; ARROW INDICATES SLOPE
PRIMARY BUILDING ENTRANCE
SECONDARY BUILDING ENTRANCE
STRUCTURAL SLOPE;
# INDICATES SLOPE IN INCHES:INCHES
ALUMINUM ROOF LINE LOUVER
ROOF ELEVATION RELATIVE TO GRADE AT THE MAIN ENTRANCE WHICH IS
ASSUMED TO BE ZERO FEET; LP = LOW POINT; HP = HIGH POINT
DETAIL INDICATOR
WALKING PAD
ROOF DRAIN; # INDICATES DIAMETER
ROOF PENETRATION; # INDICATES DIAMETER
HEAT TRACE CABLE; REPLACE
VENT PIPE; # INDICATES DIAMETER
ROOF HATCH WITH ACRYLIC DOME
ALL ITEMS ARE EXISTING UNLESS OTHERWISE NOTED
10:12
ELEV.=_'-_"±
A50_
EXISTING BALUSTRADE
CORNER WALL; TYPICAL
EXISTING BALUSTRADE;
TYPICAL
EXISTING
CHIMNEY
ELEV. = 44'-0"±
4" 4"
VP
0 2' 4' 8'
10:12
10:12
10:12
10:12
10:12
10:12
10:12
10:12
10:12
V
VV
1. THE INFORMATION SHOWN ON THIS DRAWING HAS BEEN COMPILED FROM VARIOUS SOURCES
AND MAY NOT REFLECT THE ACTUAL CONDITIONS AT THE TIME OF CONSTRUCTION.
2. FOR THE SAKE OF CLARITY, EACH INDIVIDUAL DETAIL HAS NOT BEEN INDICATED ON THE
PLANS AND/OR ELEVATIONS. INSTALLATION DETAILS HAVE BEEN INDICATED FOR TYPICAL
COMPONENTS AT RANDOM LOCATIONS.
3. HATCH PATTERNS ARE FOR REPRESENTATION ONLY AND SHOULD NOT BE USED AS A MEANS
FOR QUANTIFYING.
4. JOB SITE SAFETY IS THE CONTRACTOR'S RESPONSIBILITY. GALE REPRESENTATIVES,
INCLUDING SUBCONSULTANTS RETAINED BY GALE, MAY VISIT THE JOB SITE FROM TIME TO
TIME. THESE VISITS ARE FOR CLARIFICATIONS OF SPECIFIC DESIGN RELATED ISSUES ONLY
AND ARE NOT FOR THE PURPOSES OF JOB SITE SAFETY. IT IS THE CONTRACTOR'S SOLE
RESPONSIBILITY TO COMPLY WITH ALL SITE SAFETY APPLICABLE REQUIREMENTS.
5. ALL ITEMS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL
REGULATIONS APPLICABLE TO THE PROJECT.
6. THE CONTRACTOR SHALL REPORT DETERIORATED OR UNSUITABLE STRUCTURAL
COMPONENTS OR SUBSTRATES TO THE OWNER PRIOR TO PERFORMING ANY INSTALLATION
WORK.
7. THE CONTRACTOR IS CAUTIONED THAT DUE TO BUILDING OCCUPANCY, THE OWNER
REQUIRES COMPLIANCE ON WORK HOURS, SCHEDULING, SET-UP, CLEANUP, PARKING,
SECURITY, ETC. REFER TO SPECIFICATIONS FOR OWNER REQUIREMENTS.
8. DETAILS NOT DEPICTED SHALL BE CONSTRUCTED IN A MANNER CONSISTENT WITH THE
DETAIL DRAWINGS.
9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND LEGALLY DISPOSING OF ALL
MATERIALS LISTED AND/OR INDICATED ON THE DRAWINGS OR NOTED IN THE WRITTEN
SPECIFICATIONS ; TYPICAL.
10. THE BUILDING SHALL BE MAINTAINED IN A DUST FREE CONDITION. THE CONTRACTOR SHALL
PROVIDE ALL NECESSARY TEMPORARY PROTECTION TO ENSURE THE INTERIOR OF THE
BUILDING REMAINS DUST FREE. NO DEMOLITION CAN PROCEED UNTIL AN APPROVED
TEMPORARY PROTECTION SYSTEM IS IN PLACE.
11. DUE TO THE CONGESTION AROUND THE PROJECT SITE THE CONTRACTOR MUST PROVIDE
DETAILED TRAFFIC AND SCAFFOLDING PLANS TO THE OWNER FOR REVIEW. THE
CONTRACTOR WILL ONLY BE ALLOWED THE AREAS SHOWN FOR SETUP AND STORAGE OF
MATERIALS.
12. NOTIFY THE OWNER OF WORK LOCATIONS A MINIMUM OF 72 HOURS IN ADVANCE IN ORDER
THAT OCCUPANCY BELOW THE WORK AREAS MAY BE CONTROLLED.
GENERAL NOTES
4"
VP
EXISTING COPPER ICE DAM TO BE
REMOVED AND DISPOSED OF.
ROOF AREA D
ELEV. = 25'-0"±
ROOF AREA C
ELEV. = 25'-0"±
ALL DIMENSIONS
SHOWN ON THIS
SHEET ARE PLAN
DIMENSIONS
20'-0"±
PROVIDE CLEAN OUT
WHERE DOWNSPOUT
ENTERS SUB-GRADE
DRAINAGE SYSTEM.
EXISTING WATER DIVERTED
TO BE REMOVED AND
DISPOSED OF.
EXISTING SUB-GRADE
DRAINAGE SYSTEM
TO BE REMOVED AND
REPLACED BY
OTHERS;
COORDINATE WITH
OWNER.
PROVIDE AND INSTALL
SNOW TABS ABOVE
ENTRANCE WAY.
EXISTING SUB-GRADE
DRAINAGE SYSTEM TO BE
REMOVED AND REPLACED BY
OTHERS; COORDINATE WITH
OWNER.
PROVIDE GUTTER
EXPANSION JOINT.
A502
A502
A501
A504
A501
A501
A504
A501
A501
A501
SIM.
A502
A502
A502
A504
A501
A501
A503
A502 6 7
A502 A502 6 7
A502
A504
A504
A502
A501
A501
A501
A502
A502
A501
A501
A502
A502
A501
A502
SIM.
A504
A504
A502
SIM.
A502
SIM.
A502
SIM.
A501
A501
A503 3
A501
A501
A503
A501
EXISTING SUB-GRADE
DRAINAGE SYSTEM TO BE
REMOVED AND REPLACED BY
OTHERS; COORDINATE WITH
OWNER.
842830 A100s
CM
AJM
1/4"=1'-0"
ROOF AREA PLAN
A101
C
1 2
A
B
3 4 5 6
D
E
This drawing and the design and construction features disclosed are proprietary to Gale Associates, Inc. and shall not be altered or reused in whole or part without the express written permission of Gale Associates, Inc.
Copyright©2024
PR
OJ
EC
T
OW
NE
R
DATENO. DESCRIPTION BY
SHEET TITLE
DRAWING SCALE
GRAPHIC SCALE
CHECKED BY
PROJECT NO.
DESIGNED BY
DRAWN BY
CADD FILE
DRAWING NO.
DATE
Gale Associates, Inc.
Engineers and Planners
300 LEDGEWOOD PL | ROCKLAND, MA 02073
P 781.335.6465 F 781.335.6467 www.gainc.com
Boston Baltimore Orlando Hartford Manchester Portland
RO
OF
R
EP
LA
CE
ME
NT
A
ND
A
SS
OC
IA
TE
D
W
OR
K W
HE
EL
ER
M
EM
OR
IA
L L
IB
RA
RY
E M
AI
N
ST
RE
ET
OR
AN
GE
, M A
TO
W
N
OF
O
RA
NG
E
6 P
RO
SP
EC
T
ST
RE
ET
, S
UI
TE
OR
AN
GE
, M
A
842830
AJM/JMM
CM/BHN
1/31/2025
100% SUBMISSION
0 2' 4' 8'
8"
FLASHING MEMBRANE
SHEET METAL FLASHING
EXISTING WOOD BLOCKING
ROOF MEMBRANE
TAPERED INSULATION
LAP SEALANT; TYPICAL
EXISTING WOOD PLANK
ROOF DECK
ASPHALT SHINGLES
UNDERLAYMENT
HIGH TEMPERATURE BUTYL
BASED UNDERLAYMENT
CONTINUOUS CLEAT
ALL WORK ASSOCIATED WITH THIS
DETAIL TO BE PERFORMED BY THE
ROOFING CONTRACTOR UNLESS
DESIGNATED OTHERWISE.
6" MIN
ASPHALT SHINGLES
EXISTING WOOD PLANK
ROOF DECK
UNDERLAYMENT
HIGH TEMPERATURE BUTYL
BASED UNDERLAYMENT
CONTINUOUS CLEAT
FLASHING MEMBRANE
TERMINATION BAR
LAP SEALANT, TYPICAL
ROOF MEMBRANE
TAPERED INSULATION
EXISTING WOOD PLANK
ROOF DECK
18" MIN
4" MIN
6" MIN
ALL WORK ASSOCIATED WITH
THIS DETAIL TO BE PERFORMED
BY THE ROOFING CONTRACTOR
UNLESS DESIGNATED OTHERWISE
SET SHEET METAL TRANSITION IN
WATER CUT OFF MASTIC.
6" MIN
RIDGE CAP SHINGLE
ASPHALT SHINGLES
EXISTING WOOD PLANK
ROOF DECK
UNDERLAYMENT
HIGH TEMPERATURE BUTYL
BASED UNDERLAYMENT
CONTINUOUS CLEAT
FLASHING MEMBRANE
TERMINATION BAR
LAP SEALANT, TYPICAL
ROOF MEMBRANE
TAPERED INSULATION
EXISTING WOOD PLANK
ROOF DECK
ALL WORK ASSOCIATED WITH
THIS DETAIL TO BE PERFORMED
BY THE ROOFING CONTRACTOR
UNLESS DESIGNATED OTHERWISE
SET SHEET METAL TRANSITION IN
WATER CUT OFF MASTIC.
18" MINIMUM
17" MINIMUM
ASPHALT SHINGLES
HIGH TEMPERATURE BUTYL BASED
UNDERLAYMENT
HIGH TEMPERATURE BUTYL BASED
FLASHING SHEET
VALLEY FLASHING
EXPOSED SHEET METAL FLASHING SHALL
BE 6" MINIMUM WIDE AT THE HIGH
ELEVATIONS OF THE VALLEY ROOF AND
BECOME GRADUALLY WIDER (1" PER 10
FOOT SECTION) AS IT APPROACHES THE
ROOF EDGE.
PROVIDE 12" MINIMUM LAPS BETWEEN
VALLEY SHEET METAL SECTIONS.
SLIP SHEET
EXISTING WOOD PLANK ROOF DECK
COPPER VALLEY FLASHING
6" MINIMUM
PROVIDE SIMILAR CONFIGURATION ON
ADJACENT SURFACE
4" MIN.
2"
ALL WORK ASSOCIATED WITH
THIS DETAIL TO BE PERFORMED
BY THE ROOFING CONTRACTOR
UNLESS DESIGNATED OTHERWISE
0 3" 6" 9" 0 3" 6" 9"
0 3" 6" 9"0 3" 6" 9"
SCALE:
A501
STEEP SLOPE TO LOW SLOPE ROOF TRANSITION
3"=1'-0" SCALE:
A501
STEEP SLOPE TO LOW SLOPE ROOF TRANSITION
3"=1'-0" SCALE:
A501
TYPICAL ROOF HIP
NOT TO SCALE
SCALE:
A501
TYPICAL ROOF VALLEY
3"=1'-0"SCALE:
A501
ROOF RIDGE TO LOW SLOPE ROOF TRANSITION
3"=1'-0"
ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTINGALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTINGALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING
ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING
6" MIN
4" MIN
6" MIN
HIGH TEMPERATURE
BUTYL BASED
UNDERLAYMENT
WRAPPED OVER HIP;
EXTEND MINIMUM
36" ON EACH SIDE
OF HIP
MANUFACTURER'S
SEALING STRIP
BELOW
FASTENERS
BELOW
CUT COVERINGS FOR HIPS USING A SELF-SEALING
THREE-TAB SHINGLE OR MANUFACTURER'S
SUPPLIED CAP.
1. PROVIDE MANUFACTURER'S HIP SHINGLES AS
REQUIRED.
2. UNDERLAYMENTS SHALL BE SHINGLE LAPPED TO
SHED WATER. REVERSE LAPS ARE NOT ALLOWED.
ALL WORK ASSOCIATED WITH THIS
DETAIL TO BE PERFORMED BY THE
ROOFING CONTRACTOR UNLESS
DESIGNATED OTHERWISE.
CUT LINES
MANUFACTURER'S
SEALING STRIPS
C
1 2
A
B
3 4 5 6
D
E
This drawing and the design and construction features disclosed are proprietary to Gale Associates, Inc. and shall not be altered or reused in whole or part without the express written permission of Gale Associates, Inc.
Copyright©2024
PR
OJ
EC
T
OW
NE
R
DATENO. DESCRIPTION BY
SHEET TITLE
DRAWING SCALE
GRAPHIC SCALE
CHECKED BY
PROJECT NO.
DESIGNED BY
DRAWN BY
CADD FILE
DRAWING NO.
DATE
Gale Associates, Inc.
Engineers and Planners
300 LEDGEWOOD PL | ROCKLAND, MA 02073
P 781.335.6465 F 781.335.6467 www.gainc.com
Boston Baltimore Orlando Hartford Manchester Portland
RO
OF
R
EP
LA
CE
ME
NT
A
ND
A
SS
OC
IA
TE
D
W
OR
K W
HE
EL
ER
M
EM
OR
IA
L L
IB
RA
RY
E M
AI
N
ST
RE
ET
OR
AN
GE
, M A
TO
W
N
OF
O
RA
NG
E
6 P
RO
SP
EC
T
ST
RE
ET
, S
UI
TE
OR
AN
GE
, M
A
842830
AJM/JMM
CM/BHN
1/31/2025
100% SUBMISSION
842830 A500s
AS NOTED
A501
2" WIDE CLIPS SECURED
THROUGH TERMINATION
BARS
TERMINATION BAR
TAPERED EDGE STRIP
FLASHING MEMBRANE
ROOF MEMBRANE
TAPERED INSULATION
(THICKNESS VARIES)
REPOINT VERTICAL
SURFACE
EXISTING WATER
TABLE
EXISTING DENTIL
EXISTING BRICK
MASONRY WALL
EXISTING
WOOD PLANK
ROOF DECK
REMOVE EXISTING ASPHALTIC
COATING TO PERFORM THE WORK
EXISTING WATER TABLE JOINTS
ARE SPACED APPROXIMATELY
3'-0" ON CENTER
1 1/2" MIN
EXISTING BALUSTRADE BEYOND
BLIND NAILER; NOTCH AROUND
BALUSTRADE POSTS AND SEAL
TO SUBSTRATES
SHEET METAL COUNTER
FLASHING
LEAD T ON HORIZONTAL
SURFACE
REPOINT VERTICAL SURFACE
LEAD T ON HORIZONTAL
SURFACE
WIDTH VARIES
18"±
LEAD T ON HORIZONTAL SURFACE
2" WIDE CLIPS SECURED
THROUGH TERMINATION
BARS
TERMINATION BAR
TAPERED EDGE STRIP
FLASHING MEMBRANE
ROOF MEMBRANE
TAPERED INSULATION
(THICKNESS VARIES)
EXISTING WOOD PLANK
ROOF DECK1 1/2" MIN
EXISTING BALUSTRADE
BEYOND
BLIND NAILER; NOTCH
AROUND BALUSTRADE
POSTS AND SEAL TO
SUBSTRATES
SHEET METAL
COUNTER FLASHING
LEAD T ON HORIZONTAL
SURFACE
REPOINT VERTICAL
SURFACE
LEAD T ON HORIZONTAL
SURFACE
WIDTH VARIES
18"±
EXISTING ASPHALTIC COATING ON
BALLASTRADE AND WATERTABLE
CONTAINS ASBESTOS AND IS TO BE
REMOVED AND DISPOSED OF
APPROPRIATELY TO PERFORM THE
WORK
ALL WORK ASSOCIATED WITH
THIS DETAIL TO BE PERFORMED
BY THE ROOFING CONTRACTOR
UNLESS DESIGNATED OTHERWISE
MASONRY
CONTRACTOR
WORK DESIGNATION
SYMBOLS
ALL WORK ASSOCIATED WITH
THIS DETAIL TO BE PERFORMED
BY THE ROOFING CONTRACTOR
UNLESS DESIGNATED OTHERWISE
MASONRY
CONTRACTOR
WORK DESIGNATION
SYMBOLS
8" MIN.
6"MIN.
EXISTING MASONRY WALL
SAW CUT NEW REGLET
OPENING; FILL OPENING
WITH SEALANT
SEALANT; TOOL TO SHED
WATER
SHEET METAL REGLET
FLASHING; SET WITH LEAD
WEDGES AT 8" ON CENTER
AND SECURE WITH CLIPS
TERMINATION BAR
PLYWOOD SHEATHING
TERMINATION BAR
FLASHING MEMBRANE
LAP SEALANT, TYPICAL
EXISTING WOOD PLANK
ROOF DECK
ALL WORK ASSOCIATED WITH
THIS DETAIL TO BE PERFORMED
BY THE ROOFING CONTRACTOR
UNLESS DESIGNATED OTHERWISE
APPLICATION OF STEP FLASHING
3" TOP LAP
5"
8-1/2"
ASPHALT SHINGLES
NAIL FLASHING TO ROOF
DECK ONLY
SHEET METAL FLASHING
NOT TO SCALE
6"
HEIGHT VARIES
8" MIN TO
12" MAX AT EAVES
EXISTING LIMESTONE SURROUND
SAW CUT NEW REGLET OPENING; FILL
OPENING WITH SEALANT
SEALANT; TOOL TO SHED WATER
REGLET FLASHING
2" WIDE CLIPS SECURED THROUGH
TERMINATION BARS
ASPHALT SHINGLES
STEP FLASHING
UNDERLAYMENT
MODIFIED BITUMEN UNDERLAYMENT
EXISTING WOOD PLANK ROOF DECK
2" MIN
ALL WORK ASSOCIATED WITH
THIS DETAIL TO BE PERFORMED
BY THE ROOFING CONTRACTOR
UNLESS DESIGNATED OTHERWISE
MASONRY
CONTRACTOR
WORK DESIGNATION
SYMBOLS
MASONRY
CONTRACTOR SHALL
REPOINT LIMESTONE
JOINTS AS INDICATED
ON OTHER DETAILS
WITHIN THIS PACKAGE
EXISTING COPING STONE
REPOINT VERTICAL SURFACE
SEALANT; TOOL TO SHED
WATER
REGLET FLASHING
2" WIDE CLIPS SECURED
THROUGH TERMINATION BARS
1/2" PLYWOOD SHEATHING
TERMINATION BAR
LEAD T ON HORIZONTAL
SURFACE
REPOINT VERTICAL
SURFACE
REPOINT HORIZONTAL
JOINT
REPOINT VERTICAL
SURFACE
EXISTING LIMESTONE
SURROUND
APPROXIMATE LIMITS OF
EXISTING MORTAR JOINTS
TO BE POINTED
EXISTING WATER TABLE
EXISTING WATER TABLE
JOINTS AND SURROUND ARE
SPACED APPROXIMATELY 3'-0"
ON CENTER
6" MIN
ALL WORK ASSOCIATED WITH
THIS DETAIL TO BE PERFORMED
BY THE ROOFING CONTRACTOR
UNLESS DESIGNATED OTHERWISE
MASONRY
CONTRACTOR
WORK DESIGNATION
SYMBOLS
SPACE
INTENTIONALLY
LEFT BLANK
0 3" 6" 9"
0 3" 6" 9" 0 3" 6" 9"
0 3" 6" 9" 0 3" 6" 9"
SCALE:
A502
BALCONY ROOF BALUSTRADE
3"=1'-0"
SCALE:
A502
HIDDEN VIEW OF BALCONY ROOF BALUSTRADE
3"=1'-0" SCALE:
A502
PARAPET DETAIL
3"=1'-0"
SCALE:
A502
LOW SLOPE ROOF TO WALL TRANSITION
3"=1'-0" SCALE:
A502
ASPHALT SHINGLE ROOF TO WALL TRANSITION
3"=1'-0" ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING
ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTINGALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING
ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING
REFER TO DETAILS 20/A505
AND 21/A505 FOR ADDITIONAL
INFORMATION
REFER TO DETAILS
20/A505 AND 21/A505
FOR ADDITIONAL
INFORMATION
REFER TO DETAILS 20/A505
AND 21/A505 FOR ADDITIONAL
INFORMATION
9"±
EXISTING ASPHALTIC COATING ON
BALLASTRADE AND WATERTABLE
CONTAINS ASBESTOS AND IS TO BE
REMOVED AND DISPOSED OF
APPROPRIATELY TO PERFORM THE
WORK
EXISTING ASPHALTIC COATING ON
BALLASTRADE AND WATERTABLE
CONTAINS ASBESTOS AND IS TO BE
REMOVED AND DISPOSED OF
APPROPRIATELY TO PERFORM THE
WORK
C
1 2
A
B
3 4 5 6
D
E
This drawing and the design and construction features disclosed are proprietary to Gale Associates, Inc. and shall not be altered or reused in whole or part without the express written permission of Gale Associates, Inc.
Copyright©2024
PR
OJ
EC
T
OW
NE
R
DATENO. DESCRIPTION BY
SHEET TITLE
DRAWING SCALE
GRAPHIC SCALE
CHECKED BY
PROJECT NO.
DESIGNED BY
DRAWN BY
CADD FILE
DRAWING NO.
DATE
Gale Associates, Inc.
Engineers and Planners
300 LEDGEWOOD PL | ROCKLAND, MA 02073
P 781.335.6465 F 781.335.6467 www.gainc.com
Boston Baltimore Orlando Hartford Manchester Portland
RO
OF
R
EP
LA
CE
ME
NT
A
ND
A
SS
OC
IA
TE
D
W
OR
K W
HE
EL
ER
M
EM
OR
IA
L L
IB
RA
RY
E M
AI
N
ST
RE
ET
OR
AN
GE
, M A
TO
W
N
OF
O
RA
NG
E
6 P
RO
SP
EC
T
ST
RE
ET
, S
UI
TE
OR
AN
GE
, M
A
842830
AJM/JMM
CM/BHN
1/31/2025
100% SUBMISSION
842830 A500s
3"=1'-0"
DETAILS
A502
0 3" 6" 9"
1 1/2"
GUTTER DOG SPACED
24" ON CENTER; MAXIMUM
GUTTER BOX
HIGH TEMPERATURE BUTYL
BASED UNDERLAYMENT
WOOD CANT
STIFFENING BAR
AND BRASS
HARDWARE
GUTTER BOX
FLASHING
HOOK STRIP
EXISTING MASONRY
WALL
EXISTING WOOD RAFTER
AND SILL PLATE
HIGH TEMPERATURE BUTYL BASE
UNDERLAYMENT
UNDERLAYMENT
ASPHALT SHINGLES
ASPHALT SHINGLE STARTER
COURSE
SLIP SHEET
EXISTING WOOD PLANK
ROOF DECK
IT IS THE INTENT OF THIS PROJECT TO REMOVE AND REPLACE THE GUTTERS TO
MATCH THE ORIGINAL PROFILE.
THE CONTRACTOR WILL BE REQUIRED TO EXPOSE THE GUTTER DURING
MOBILIZATION TO FIELD MEASURE/CONFIRM THE CONFIGURATION. THE
CONFIGURATION SHOWN IS BASED ON THE CONDITIONS THAT COULD BE OBSERVED
WITHOUT REMOVAL OF THE EXISTING ICE DAM PROTECTION.
ALL WORK ASSOCIATED WITH
THIS DETAIL TO BE PERFORMED
BY THE ROOFING CONTRACTOR
UNLESS DESIGNATED OTHERWISE
SECTION A-A
LINE OF GUTTER BEYOND
GUTTER
1"
1"
GUTTER HANGERS, DOGS, DOWNSPOUTS,
STIFFENING BARS, AND OTHER COMPONENTS
NOT SHOWN FOR CLARITY.
WATER DIVERTER
GUTTER END CAP
SOLDER1 1/2"
ALL WORK ASSOCIATED WITH THIS
DETAIL TO BE PERFORMED BY THE
ROOFING CONTRACTOR UNLESS
DESIGNATED OTHERWISE.
DECORATIVE CONDUCTOR BOX
(6 TOTAL)
SCALE: NOT TO SCALE
1'-2"±
8"±
4 1/2"±
8"±
3 1/2"±
4"±
ALL DIMENSIONS ARE APPROXIMATE.
CONTRACTOR TO VERIFY IN FIELD.
REMOVE, STORE, AND PROTECT ONE
EXISTING CONDUCTOR BOX FOR
COMPARISON WITH THE REPLACEMENT
UNIT PRIOR TO INSTALLATION.
IT IS THE INTENT OF THIS PROJECT TO
MATCH THE EXISTING CONFIGURATION
AND PROFILE.
PROVIDE SCREEN OVER
OPENING TO PREVENT
DEBRIS ACCUMULATION
BUT ALLOW OVERFLOW
SPACE
INTENTIONALLY
LEFT BLANK
SPACE
INTENTIONALLY
LEFT BLANK
0 3" 6" 9"
SCALE:
A503
GUTTER EDGE
3"=1'-0"
ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING
SCALE:
A503
ISOMETRIC DECORATIVE
CONDUCTOR BOX
NOT TO SCALE
ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING
SCALE:
A503
GUTTER EXPANSION JOINT ISOMETRIC
NOT TO SCALE
ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING
ALL WORK ASSOCIATED WITH THIS
DETAIL TO BE PERFORMED BY THE
ROOFING CONTRACTOR UNLESS
DESIGNATED OTHERWISE
A
PROVIDE AND INSTALL WIRE BALL
STRAINER AT ALL DOWNSPOUT
LOCATIONS
TIE THE NEW DOWNSPOUT INTO THE
SUB-GRADE DRAINAGE SYSTEM.
COORDINATE WITH THE OWNER FOR
THE REMOVAL AND REPLACEMENT OF
THE SUB-GRADE SYSTEM BY OTHERS
AT THE DESIGNATED LOCATIONS.
C
1 2
A
B
3 4 5 6
D
E
This drawing and the design and construction features disclosed are proprietary to Gale Associates, Inc. and shall not be altered or reused in whole or part without the express written permission of Gale Associates, Inc.
Copyright©2024
PR
OJ
EC
T
OW
NE
R
DATENO. DESCRIPTION BY
SHEET TITLE
DRAWING SCALE
GRAPHIC SCALE
CHECKED BY
PROJECT NO.
DESIGNED BY
DRAWN BY
CADD FILE
DRAWING NO.
DATE
Gale Associates, Inc.
Engineers and Planners
300 LEDGEWOOD PL | ROCKLAND, MA 02073
P 781.335.6465 F 781.335.6467 www.gainc.com
Boston Baltimore Orlando Hartford Manchester Portland
RO
OF
R
EP
LA
CE
ME
NT
A
ND
A
SS
OC
IA
TE
D
W
OR
K W
HE
EL
ER
M
EM
OR
IA
L L
IB
RA
RY
E M
AI
N
ST
RE
ET
OR
AN
GE
, M A
TO
W
N
OF
O
RA
NG
E
6 P
RO
SP
EC
T
ST
RE
ET
, S
UI
TE
OR
AN
GE
, M
A
842830
AJM/JMM
CM/BHN
1/31/2025
100% SUBMISSION
842830 A500s
AS NOTED
A503
SHEET METAL FLASHING FLANGE;
EXTEND MINIMUM 10" UP SLOPE;
STRIP-IN FLANGE WITH MODIFIED
BITUMEN STRIPPING
ASPHALT SHINGLES
UNDERLAYMENT
HIGH-TEMPERATURE RESISTANT
MODIFIED BITUMEN MEMBRANE -
EXTEND 36" ONTO ROOF DECK ABOVE,
BELOW, AND ON BOTH SIDES OF VENT
REPLACE ROOF LINE LOUVER
TO MATCH EXISTING
CLIPS
6" MIN. EXISTING WOOD PLANK
ROOF DECK
EXISTING WOOD
RAFTERS
MODIFIED BITUMEN UNDERLAYMENT
ASPHALT SHINGLE
HIGH TEMPERATURE BUTYL BASED UNDERLAYMENT
UNDERLAYMENT
MODIFIED BITUMEN UNDERLAYMENT
SNOW GUARD TAB
EXISTING WOOD PLANK ROOF DECK
EXISTING WOOD RAFTERS
SNOW GUARD TABS SHALL BE PLACED EVERY OTHER
JOINT (18"-24" DEPENDING ON WIDTH OF SLATES), AND
STAGGERED BETWEEN EVERY COURSE OF SHINGLES
UNLESS RECOMMENDED OTHERWISE BY THE
MANUFACTURER.
ALL WORK ASSOCIATED WITH
THIS DETAIL TO BE PERFORMED
BY THE ROOFING CONTRACTOR
UNLESS DESIGNATED OTHERWISE
RIDGE LINE
SNOW GUARD TAB
GUTTER
24"
MULTIPLE
TIERS
LAYOUT PLAN OF SNOW TABS
SNOW GUARDS TO START
AT SECOND COURSE OF
SHINGLES AT EAVE.
11"
FIGURE A
FIGURE B
SHEET METAL
APRON
FLASHING
SHEET METAL CRICKET TO SHED
WATER
EXISTING BRICK MASONRY
CHIMNEY
SHEET METAL STEP FLASHING
SHEET METAL REGLET COUNTER
FLASHING
ASPHALT ROOFING
EXISTING BRICK MASONRY
CHIMNEY
SHEET METAL REGLET FLASHING
SHEET METAL CRICKET; PROVIDE
1/2"/FOOT MINIMUM SLOPE TO
SHED WATER
ASPHALT ROOFING
SHEET METAL REGLET COUNTER
FLASHING
SHEET METAL STEP FLASHING
SHEET METAL REGLET APRON
FLASHING
SOLDER ALL SEAMS
12" 18"
4"
6"
4"
FIGURE C
SHEET METAL CRICKET PAN
REFER TO THE ROOF TO
CHIMNEY/WALL AND TYPICAL
STEP FLASHING DETAILS FOR
ADDITIONAL INFORMATION.
ALL WORK ASSOCIATED WITH
THIS DETAIL TO BE PERFORMED
BY THE ROOFING CONTRACTOR
UNLESS DESIGNATED
OTHERWISE.
MASONRY
CONTRACTOR
WORK DESIGNATION
SYMBOLS
COORDINATE FULL CHIMNEY
REPOINTING WITH THE
ROOFING OPERATIONS FOR
ORDERLY PROGRESS.
THE MASONRY CONTRACTOR
WILL BE RESPONSIBLE FOR
ERECTING AND MAINTAINING
THE SCAFFOLDING
REQUIRED TO ACCESS AND
REPOINT THE CHIMNEYS
ROOF HATCH
COMPRESSION ROD; ADHERE IN
PLACE
INSULATED ROOF HATCH CURB
FLASHING MEMBRANE
ROOF MEMBRANE
LAP SEALANT
COVERBOARD
TAPERED EDGE STRIP TO PROVIDE A
SMOOTH TRANSITION
TAPERED INSULATION
EXISTING WOOD PLANK ROOF DECK
6" NOMINAL WIDE WOOD BLOCKING TO
PROVIDE 8" MINIMUM FLASHING
HEIGHT ABOVE FINISHED ROOF
SURFACE
PROVIDE MANUFACTURER'S
WALKWAY PAD AROUND
HATCHES
8"
MIN.
FALL ARREST RAIL AROUND THE
HATCH IS NOT SHOWN FOR
CLARITY.
CLOSURE METAL
6" MIN.
PROVIDE TAPERED EDGE STRIP
OR TAPERED INSULATION
CRICKETS BEHIND HATCH TO
SHED WATER.
ALL WORK ASSOCIATED
WITH THIS DETAIL TO
BE PERFORMED BY THE
ROOFING CONTRACTOR
UNLESS DESIGNATED
OTHERWISE
EXISTING PENETRATION; DIAMETER
VARIES
SHEET METAL HOSE CLAMP OVER
MEMBRANE BUFFER STRIP; PROVIDE A
CONTINUOUS BEAD OF MASTIC BEHIND
MEMBRANE
SEPARATION LAYER AS REQUIRED BY
MEMBRANE MANUFACTURER
FLASHING MEMBRANE
ROOF MEMBRANE
COVERBOARD
LAP SEALANT
TAPERED INSULATION; HEIGHT VARIES
VAPOR RETARDER
EXISTING WOOD PLANK ROOF DECK
8"
MIN.
VARIES
ALL WORK ASSOCIATED WITH THIS DETAIL TO BE
PERFORMED BY THE ROOFING CONTRACTOR UNLESS
DESIGNATED OTHERWISE.
6" MIN.
0 3" 6" 9" 0 3" 6" 9"
0 3" 6" 9"0 3" 6" 9"
SCALE:
A504
CHIMNEY FLASHING
NOT TO SCALE
ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING
SCALE:
A504
SNOW TABS
3"=1'-0"
ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING
SCALE:
A504
ASPHALT SHINGLES ROOF LINE LOUVER
3"=1'-0"
ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING
SCALE:
A504
ROOF HATCH
3"=1'-0"
ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING
SCALE:
A504
PIPE WRAP
3"=1'-0"
ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING
ALL WORK ASSOCIATED WITH
THIS DETAIL TO BE PERFORMED
BY THE ROOFING CONTRACTOR
UNLESS DESIGNATED OTHERWISE
0 3" 6" 9"
SCALE:
A504
ROOF DRAIN - LEAD AND OAKUM
3"=1'-0"
ALL ITEMS ARE NEW UNLESS SPECIFIED AS EXISTING
PLUMBING
SUBCONTRACTOR
WORK DESIGNATION
SYMBOLS
1/2"/FT
REFER TO
TAPER
PLAN
TERMINATE AND CLAMP
ROOF
MEMBRANE/FLASHING
UNDER CLAMPING
RING; PROVIDE A
CONTINUOUS BEAD OF
WATER CUT-OFF
MASTIC UNDER
MEMBRANE ON
CLAMPING RING SEAT
UNDER DECK CLAMP
BOLTED SUPPORT RING AND GASKET
REMOVE AND REPLACE EXISTING DRAIN
BOWL; NEW ASSEMBLY IS TO HAVE
INTEGRAL EXTENDABLE COLLAR TO
ACCOMMODATE INSULATION AS SHOWN
LEAD AND OAKUM JOINT; REMOVE AND
REPLACE
PIPE INSULATION
EXISTING LEADER PIPE; PROVIDE LEADER
EXTENSION AS NECESSARY; CLEAR TO
ACHIEVE FREE FLOWING SYSTEM
TAPERED INSULATION; TAPER DRAIN
SUMP AT SLOPE AND DIMENSIONS AS
INDICATED
ROOF MEMBRANE
COVERBOARD
TAPERED INSULATION
SUMP INSULATION TO BE INSTALLED AS REQUIRED BY THE
MANUFACTURER.
DRAIN PIPE INSULATION SHALL EXTEND 24" MINIMUM
VERTICALLY, OR 12" BEYOND THE FIRST ELBOW
DIRECTION, WHICH EVER IS LESS.
COORDINATE INTERIOR
ACCESS WITH THE OWNER.
CLEAN DRAINS PRIOR TO AND AFTER COMPLETION OF
THE ROOFING OPERATION.
DRAIN SUMP
2'-0"
ALL WORK ASSOCIATED WITH THIS DETAIL TO BE
PERFORMED BY THE ROOFING CONTRACTOR UNLESS
DESIGNATED OTHERWISE.
VAPOR RETARDER
EXISTING WOOD PLANK ROOF DECK
PROVIDE NEW METAL SUMP
THE CONTRACTOR MUST PROVIDE
TEMPORARY PROTECTION ON THE
INTERIOR OF THE DRAIN LEADER LINE TO
PREVENT DUST MIGRATION INTO THE
BUILDING.
INTERLOCKING CAST IRON
STRAINER
PROVIDE ADJUSTABLE
EXTENSION SLEEVE AS
REQUIRED TO
ACCOMMODATE INSULATION
THICKNESS
EXISTING
OPENING
C
1 2
A
B
3 4 5 6
D
E
This…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .