FY21 Water Softeners.pdf

PDF 179 KB Posted

Attached to
FY21 Water Softener Replacement
Solicitation number
21-444DHS-DEVDI-B-18160
Issued by
Lake County, Illinois

About this file

This document is a procurement specification listing from the Illinois Department of Human Services (IDHS) for the replacement of nine water softeners and brine tanks at the Jack Mabley Developmental Center in Dixon, Illinois. The project requires the removal and disposal of the existing water softeners and brine tanks, and the installation of equivalent capacity replacements. Vendors must attend a mandatory pre-bid onsite meeting, comply with social distancing and face covering requirements, and schedule all work during the Center's hours of operation. The project has a 12-month warranty on work performed and 24-month warranty on installed units. Bids are considered "not to exceed" the stated dollar amount, and the winning bidder must provide a performance bond if the project exceeds $50,000.

The procurement specifications also include additional onsite guidance, such as temperature checks and health screenings for vendors, as well as requirements for the Prevailing Wage Act and compliance with the Center's policies. The winning bidder must coordinate with the Center's engineer to ensure all work is approved upon completion.

View the file

Other files

File Type Posted
Mandatory Onsite Visit Guidance for Vendors-2020~21.docx DOCX document
RMU50~31.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Illinois Department of Human Services

PROCUREMENT SPECIFICATIONS LISTING

FY21

PROCURING ENTITY

Site Location: Site Contact:

Jack Mabley Developmental Center Matt Comerford, Business Administrator

1120 Washington Avenue P: 815-288-8335

Dixon, IL 61021 F: 815-288-8398

E: matt.comerford@illinois.gov

PROCUREMENT/PROJECT

PROCUREMENT/PROJECT SPECIFICATIONS

4. Removal and disposable of existing water softeners and brine tanks.

PERFORMANCE SPECIFICATIONS

2. All bids submitted for this opportunity are considered "not to exceed", and shall not exceed the dollar amount stated on the winning bid.

3. The selected vendor shall comply with all policies of the Jack Mabley Developmental Center while onsite performing work.

C. Each such bond is deemed to contain the following provisions whether such provisions are inserted in such bond or not:

2. All vendors must follow social distancing guidelines-- Stay at least 6 feet (about 2 arms’ length) from other people and do not gather in groups.

MMC 10/20/2020

1. Attendance at pre-bid onsite meeting as stated on BidBuy bid notification is MANDATORY. Failure to participate and achieve documented attendance will result in bid invalidation.

5. All vendors must wear a face mask (KN95) and a face shield, which will be furnished to them upon arrival. Vendors may choose to wear their own mask or face shield. If vendors opt to bring their own, the mask must cover their nose and mouth and fit under their chin; the shield must cover the nose down to the chin. Vendor must wear the face mask and shield while on Center's grounds. Face shields provided by the Center are required to be returned to the checkpoint upon leaving the Center.

6. In the event vendor is denied access due to any of the above reasons, IDHS will allow vendor one opportunity to reschedule the mandatory conference in the next 2 business days with a different representative. This alternate date will only be made available to vendors who were present at the first vendor conference but not permitted to participate by IDHS.

7. Please continue to monitor BidBuy as the Bid Due date and time may be adjusted.

Replacement of nine (9), total, water softeners and brine tanks in residential units and administration building.

ADDITIONAL SPECIFICATIONS: ONSITE GUIDANCE

1. Vendors must allow adequate time prior to the conference to allow for proper screening of all people coming onto the property.

3. All vendors will be required to get their temperature taken at the check point located at the main entrance of the Mabley Center.

1. Replace nine (9) existing water softeners and brine tanks with equivalent capacity.

2. Re-work piping to create headers for installation of two new pumps.

"The principal and sureties on this bond agree that all the undertakings, covenants, terms, conditions and agreements of the contract or contracts entered into between the principal and the State or any political subdivision thereof will be performed and fulfilled and to pay all persons, firms and corporations having contracts with the principal or with subcontractors, all just claims due them under the provisions of such contracts for labor performed or materials furnished in the performance of the contract on account of which this bond is given, when such claims are not satisfied out of the contract price of the contract on account of which this bond is given, after final settlement between the officer, board, commission or agent of the State or of any political subdivision thereof and the principal has been made."

4. All work should be scheduled in advance, occur during Mabley hours of operation, and approved upon completion by the Center's Engineer.

6. The winning bidder must comply with the Prevailing Wage Act.

B. The amount of the bond shall be fixed by the IDHS for the completion of the contract, for the payment of material, apparatus, fixtures, and machinery used in the work and for all labor performed in the work, whether by subcontractor or otherwise.

3. All replacement water softeners to use existing piping.

7. If a performance bond is required (project greater than $50,000), Bidder must submit the performance bond to the soliticaiton contact within ten (10) after award.

4. All Vendors will be asked a series of questions about their health. If the vendor displays any symptoms on the checklist, the vendor will not be allowed entry to the Center.

5. Winnng bidder must provide warranty guarantee of 12 months for work performed and 24 months on installed units.

A. Vendor on this project must furnish, supply and deliver a bond to the State, with good and sufficient sureties. The surety on the bond shall be a company that is licensed by the Department of Insurance authorizing it to execute surety bonds and the company shall have a financial strength rating of at least A- as rated by A.M. Best Company, Inc., Moody's Investors Service, Standard & Poor's Corporation, or a similar rating agency.