FWC 26.27.02 Fabric Awning Replacement.pdf

PDF 897 KB Posted

Attached to
St. Pete Campus Awning Replacements
Solicitation number
ITB-16609
Issued by
Leon County, Florida

About this file

This is a project specification document for the Florida Fish and Wildlife Conservation Commission, Facilities Services division, for fabric awning replacement work at the Fish and Wildlife Research Institute's St. Petersburg campus. The project involves the removal of damaged fabric covers from existing awning frames and the fabrication and installation of new all-weather exterior woven acrylic or polyester fiber-reinforced vinyl fabric covers at three locations: the RMI Entrance (Base Bid), JU West Terrace and JU East Terrace (Alternate Bid #1), and RMI Rooftop (Alternate Bid #2). The new fabric covers must include a minimum 10-year warranty, with all seams and edges heat-welded and double-stitched using UV sunlight and marine environment-resistant thread with a lifetime warranty. Attachment methods vary by location: the RMI Entrance and RMI Rooftop installations require industry-standard "rope and grommet" (laced) methods, while the JU terraces require "staple stitch" methods. The contractor is responsible for obtaining all field dimensions onsite, as dimensions shown in client drawings are approximate.

The contractor shall provide a one-year warranty covering labor, materials, and equipment from final completion, including all necessary adjustments and replacement of defective items at no expense to the owner. The project spans multiple buildings at the St. Petersburg campus location at 100 Eighth Avenue SE, St. Petersburg, Florida 33701-5000. Detailed architectural drawings and plans are provided specifying dimensions, elevations, section details, and framework specifications for each bid component. The work requires coordination with the existing awning frame structures, which are illustrated in the specifications as aluminum and galvanized steel tubing assemblies with continuous perimeter rods for securing lacing lines.

View the file

Other files

File Type Posted
COE Addendum 2.pdf PDF
FWC.26.27.02 ITB Final.pdf PDF
Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

A

JB

B

E

I G

H T

H

V

E N

U E

S

T.

P

T E

R S

B U

R G

F

L O

R I

D A

FA

C

IL

IT

IE

S

SE

R

VI

C

ES

FI

SH

A

N D

W

IL

D

LI

FE

R

ES

EA

R C

H

IN

ST

IT

U

TE

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

F A

B R

I C

W N

I

G

R

P L

A C

E M

E N

T S

T

E R

S B

E

M

P

J.

R

. M . I a n d

F.

B U

I L

D I

N G

S

COVER

SHEET

JB

B

1 0 0 E I G H T H A V E N U E S E S T. P E T E R S B U R G , F L O R I D A

3 3 7 0 1 - 5 0 0 0

F A B R I C A W N I N G RE P L A C E M E N T

S T. P E T E R S B U R G C A M P U S - J. U. A N D R. M. I. B U I L D I N G S

FISH AND WILDLIFE RESEARCH INSTITUTE

Florida Fish and Wildlife Conservation Commission

KEY PLAN

SHEET LIST TABLE

SHEET TITLESHEET #

COVER

ALT

BID

#1

BASE

BID

ALT

BID

#2BASE BID - 'RMI' ENTRANCE

ALT. BID #1 - 'JU' E. TERRACE

ALT. BID #2 - 'RMI' ROOF TOP

ALT. BID #1 - 'JU' W. TERRACE

SECTION DETAILS

New covers to be constructed using all weather exterior woven acrylic or polyester fiber reinforced vinyl fabric. Fabric is to be covered by a minimum 10 Year Warranty.

All fabric seams and edges shall be heat welded and double stitched.

Sewing thread shall be U.V. Sunlight and Marine Environment resistant with a lifetime warranty.

New covers at 'RMI' Entrance (Base Bid), and 'RMI' Rooftop (Alt. Bid #2) to be attached to frame using industry standard "rope & grommet" (laced) method.

New covers at 'JU' West Terrace and 'JU' East Terrace (Alt. Bid #1) to be attached to frame using industry standard "staple stitch" method.

All dimensions shown in Client submitted drawings are approximate.

Contractor shall be responsible for obtaining all field dimensions onsite.

The Contractor shall warranty labor, materials, and equipment for a period of one (1) year from Final Completion. Contractor shall make good any defects,and shall include all necessary adjustments to and replacement of defective items without expense to the Owner.

Remove all remaining damaged fabric covers from existing awning frames.

Fabricate new awning covers and attach to existing frames, as specified.

SCOPE OF WORK

N O

R

3/

JB

B

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

FA

C

IL

IT

IE

S

SE

R

VI

C

ES

FI

SH

A

N D

W

IL

D

LI

FE

R

ES

EA

R C

H

IN

ST

IT

U

TE

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

F A

B R

N

I

P L

A C

E M

E N

T S

T

E R

S B

E

M

P

R

. M . I a

U

I L

D I

N G

S

'RMI'

ENTRANCE

BASE BID

JB

B

31' - 1"+/-

7' - 10"+/-

2' - 2"+/-

5' - 2"+/-

7' - 10"+/-

FABRIC

FABRIC

ELEVATION - 'RMI' ENTRANCE

PLAN VIEW - 'RMI' ENTRANCE

ELEVATION - 'RMI' ENTRANCE ELEVATION - 'RMI' ENTRANCE

1' - 2"+/-NOTE: AWNING FRAMEWORK

SHOWN WITHOUT FABRIC

FOR CLARITY

8"

3'-5"+/-

31' - 1"+/- 7' - 10"+/-

8"

3'-5"+/-

10' - 0"+/- 1' - 2"+/-

8"

3'-5"+/-

11'-2"+/-

JB

B

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

F A

B R

N

I

P L

A C

E M

E N

T S

T

E R

S B

E

M

P

R

. M . I a

U

I L

D I

N G

S

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

FA

C

IL

IT

IE

S

SE

R

VI

C

ES

FI

SH

A

N D

W

IL

D

LI

FE

R

ES

EA

R C

H

IN

ST

IT

U

TE

'JU' WEST

TERRACE

ALTERNATE

BID #1

3/

JB

B

SECTION - 'JU-1' AWNING FRAMEWORK

ELEVATION - 'JU-1' AWNING FRAMEWORK

41' - 2"+/-

7"

4' - 1"+/-

25' - 3"+/-

25' - 3"+/-

41' - 2"+/-

9' - 8"+/-

18' - 0"+/-

3' - 4"+/-

PLAN VIEW - 'JU-1' AWNING FRAMEWORK

3' - 4"+/-

26' - 3"+/-

18' - 5'+/-

NOTE: AWNING FRAMEWORK

SHOWN WITHOUT

FABRIC FOR CLARITY

EXISTING

STRUCTURE

18' - 5"+/-

4' - 1"+/-

2' - 2"+/-

FABRIC

FABRIC

FABRIC

2' - 2"+/-

7"

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

FA

C

IL

IT

IE

S

SE

R

VI

C

ES

FI

SH

A

N D

W

IL

D

LI

FE

R

ES

EA

R C

H

IN

ST

IT

U

TE

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

F A

B R

N

I

P L

A C

E M

E N

T S

T

E R

S B

E

M

P

R

. M . I a

U

I L

D I

N G

S

JB

B

'JU' EAST

TERRACE

ALTERNATE

BID #1

3/

JB

B

SECTION - 'JU-2' AWNING FRAMEWORK

ELEVATION - 'JU-2' AWNING FRAMEWORK

2' - 6"+/-2' - 5"+/-

27' - 7"+/- 3' - 9"+/-

EXISTING

STRUCTURE

31' - 11"+/-

3' - 11"+/- 7"

18' - 5"+/- 17' - 2"+/-

30' - 2"+/-

7"

31' - 11"+/-

27' - 7"+/-

3' - 9"+/-

PLAN VIEW - 'JU-2' AWNING FRAMEWORK

FABRIC

NOTE: AWNING FRAMEWORK

SHOWN WITHOUT

FABRIC FOR CLARITY

FABRIC

FABRIC

3'-113 4"

20'-101 4"

JB

B

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

FA

C

IL

IT

IE

S

SE

R

VI

C

ES

FI

SH

A

N D

W

IL

D

LI

FE

R

ES

EA

R C

H

IN

ST

IT

U

TE

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

F A

B R

N

I

P L

A C

E M

E N

T S

T

E R

S B

E

M

P

R

. M . I a

U

I L

D I

N G

S

'RMI'

ROOFTOP

ALTERNATE

BID #2

3/

JB

B

28' - 4"+/-

18' - 4"+/-

18' - 4"+/-

SECTION - 'RMI' ROOFTOP - ALT. BID #2

ELEVATION - 'RMI' ROOFTOP - ALT. BID #2PLAN VIEW - 'RMI' ROOFTOP - ALT. BID #2

8"

28' - 4"+/-

NOTE: AWNING FRAMEWORK

SHOWN WITHOUT

FABRIC FOR CLARITY

EXISTING

STRUCTURE

8"

FABRIC

FABRIC

FABRIC

EXISTING

STRUCTURE

6"

JB

B

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

FA

C

IL

IT

IE

S

SE

R

VI

C

ES

FI

SH

A

N D

W

IL

D

LI

FE

R

ES

EA

R C

H

IN

ST

IT

U

TE

E

I G

H

E N

T E

R S

B U

R G

F

L O

R I

D A

F A

B R

N

I

P L

A C

E M

E N

T S

T

E R

S B

E

M

P

R

. M . I a

U

I L

D I

N G

S

'RMI'

DETAILS

JB

B

7"

2"

1/2" Ø CONTINUOUS ALUM. ROD

WELDED AT INSIDE PERIMETER

OF FRAMEWORK ASSEMBLY USED

TO SECURE AWNING LACING LINES

4"

1" x 1" ALUMINUM

TUBING (TYP.)

1" x 2" ALUM.

TUBING

SECTION - 'RMI' ENTRANCE

1" x 1" GALVANIZED

STEEL TUBING (TYP.)

3/4" Ø CONTINUOUS GALVANIZED

STEEL TUBING WELDED AT INSIDE

PERIMETER OF FRAMEWORK ASSEMBLY

USED TO SECURE AWNING LACING LINES

1" x 1" GALVANIZED

STEEL TUBING (TYP.)

1" x 1" GALVANIZED

STEEL TUBING (TYP.)

1" x 2" GALVANIZED

STEEL TUBING (TYP.)

8"

4"

3"

SECTION - 'RMI' ROOFTOP

File details come from the government source that posted it. Updated .