This addendum document, issued by the Florida Fish and Wildlife Conservation Commission (FWC) on October 7, 2026, provides clarification regarding questions submitted for Solicitation No. FWC 26/27-15 for Telogia Creek Sand Pine Removal services. The solicitation seeks competitive bids for sand pine regeneration removal across approximately 797 acres at multiple locations throughout Telogia Creek Wildlife Management Area in Liberty County, Florida. All bid responses must be received no later than 1:00 PM ET on Friday, October 16, 2026. A mandatory pre-bid conference and site visit were conducted on September 28, 2026, at 10:00 AM ET, and attendance is required for bid responsiveness. The contract term is one year with optional renewal for up to two additional years under the same terms and conditions. Award is anticipated for October 20, 2026, and work must be completed and invoiced by June 15, 2027.
The addendum addresses a question regarding the prevalence and location of sand pines less than one-half inch in stem diameter, which require hand pulling as the primary removal method per page 15 of the solicitation documents. The FWC responded that while a direct stem count of pines less than one-half inch diameter is not available, these trees should be expected to have a smaller population than those greater than one-half inch in diameter. Sand pines greater than one-half inch in diameter will require cutting with a brush cutter or chainsaw. The FWC noted that representative sites were shown at the mandatory pre-bid conference. Bidders are required to submit cost-per-acre pricing for three distinct sand pine encroachment levels designated as Light, Moderate, and Heavy, with award going to the responsive and responsible bidder with the lowest total summed cost across all three categories.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FWC 26.27-15 ITB Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
Commissioners Rodney Barreto Chairman Coral Gables
Steven Hudson Vice Chairman Fort Lauderdale
Preston Farrior Tampa
Joshua Kellam Palm Beach Gardens
Gary Lester Oxford
Albert Maury Coral Gables
Sonya Rood St. Augustine
Office of the Executive Director Roger A. Young Executive Director
Charles “Rett” Boyd Assistant Executive Director
George Warthen Chief Conservation Officer
Jessica Crawford Chief of Staff
850-487-3796
850-921-5786 FAX
Managing fish and wildlife resources for their long-term well-being and the benefit of people.
620 South Meridian Street Tallahassee, Florida 32399-1600 Voice: 850-488-4676
Hearing/speech-impaired:
800-955-8771 (T) 800-955-8770 (V)
MyFWC.com
DATE: OCTOBER 7, 2026
ADDENDUM NO.: 1
BID NO.: FWC 26/27-15
BID TITLE: TELOGIA CREEK SAND PINE REMOVAL
UPDATE: QUESTIONS
The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s (FWC) Solicitation No. FWC 26/27-15, “TELOGIA CREEK SAND PINE REMOVAL”.
All responses to the subject solicitation must be received no later than 1:00 PM (ET) on Friday, October 16, 2026.
A response received after the exact time specified will not be considered. Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.
Written notices, formal requests and proceedings must conform with the requirements set forth in Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875 Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.
Sincerely, Elbert Orellana FWC Procurement Manager
FWC SOLICITATION ADDENDUM 2
BEGIN ADDENDUM
QUESTION #1
On page 15 of the Solicitation, it states:
5.6. Hand pulling should be the primary method of removal and sand pines less than ½-inch in stem diameter must be pulled by hand. However, brush saws and chainsaws will be acceptable for removing sand pines with greater than ½-inch stem diameter.
This was not addressed at the Pre-Bid Conference and sand pines less than ½-inch in stem diameter were not evident in the units that were shown. How prevalent are these "less than ½-inch in stem diameter" sand pines and in which units are they located? Is there an average stem per acre count of sand pines "less than ½-inch in stem diameter" that require hand pulling?
ANSWER #1
While a direct stem count on pines less than a 1 /2” Diameter is not available they should be expected to have a population smaller than those greater than 1 /2” Diameter. Sand Pines greater than a 1 /2” diameter will require cutting with a brush cutter or chainsaw. Representative sites were shown at the mandatory pre-bid conference.